PN-77-183:during Routine Insp in Aug 1977,licensee Discovered Cracks in Reinforced Concrete Svc Water Intake Tunnel.Licensee Does Not Believe That Extensive Repairs Will Be Required
ML20151X452
Person / Time
Site: Summer South Carolina Electric & Gas Company icon.png
Issue date: 10/14/1977
From: Dreher F, Moseley N, Reinmuth W
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE)
To:
References
PN-77-183, NUDOCS 9809170097
Download: ML20151X452 (1)


Text

.

PRELIMINARY NOTIFICATION October 14, 1977 PRELIMINARYNOTIFICATIONOFEVENTORUNUSbALOCCURRENCE--PN-77-18 This preliminary notification constitutes EARLY notice of an event of POSSIBLE safety or public interest sicnificance.

The information

}

presented is as initially received without verification or evaluation

)

L and is basically all that is known by IE staff as of this date.

FACILITY: South Carolina Electric and Gas. Company Virgil C. Summer Nuclear Station Docket ho. 50-395 Fairfield County, South Carolina

SUBJECT:

INTAKE STRUCTURE SETTLEMENT During routine inspection in August 1977, the licensee discovered cracks in the reinforced concrete service water intake tunnel. Followup examination of the pump house structure and the intake tunnel showed h

settlement of 8-1/2 inches.

The net settlement predicted by the designer was 6-7 inches.after credit for 2 inches of rebound when the reservoir is filled. Current indications are that final settlement could be on the order of 18 inches.

The licensee reports that this value would not cause unacceptable structural damage or operational problems. The 36 inch dis-j charge pipe from the pump house to the reactor building, and the 36 inch 4

make up supply pipe from the main cooling water pump house to the service 3

water reservoir pump house have not been installed.

Installation will be j'

deferred.

M The licensee's evaluation is in progress. At present, the licensee does not believe that extensive repairs will be required mn that the core -- -

-e h

loading date will be affected.

Construction of the plant is approxi-mately 50 percent completed.

?

Media interest in not expected. The State of South Carolina has been notified.

A news release is not planned by the licensee or NRC.

IE inspectors are at the site.

Region II (Atlanta) received original notification of this occurrence by telephone from the licensee quality assurance manager on August 30, 1977 and has been periodically advised of further settlements. This information..__

is current as of 2:00 p.m. on October 13, 1977.

Contact:

FADreher, IE x27551 WReinmuth, IE x27551 NCMoseley, IE x28484 f

,3 Distribution:

Transmitted H St fl M ;

I w a-Chairman Hendrie Commissioner Bradford 3

Commissioner Kennedy S. J. Chilk, SECY C. C. Kamerer, CA l

i R

Commissioner Gilinsky (For Distribution) 4-Transmitted: MNBB 3: o u P Bldg T o,g E. Volgenau, IE r

i' $$

L. V. Gossick,.ED0 E. G. Case, NRR Region.2T 3/d[ O

'j 8tf S. H. Hanauer, ED0 l

i 7R.

J. J. Fouchard, PA SS Bldg Jf o 6 (MAIL) d/

I W. G. Mcdonald, MIPC C. V. Smith, NMSS P,. J. McTiernan, 01A EE-R. G. Ryan, OSP 4 g ' @

R. Minogue, SD T; i 7 H. K. Shapar, ELD PRELIMINARY NOTIFICATION l

,