Pages that link to "PNO-I-87-072, on 870730,reactor Scrammed Due to Low Reactor Vessel Water Level After Power Lost to Reactor Feedwater Control Circuit.Caused by Failed Transfer Circuit to Instrumentation Inverter.Investigation Continuing"
Jump to navigation
Jump to search
The following pages link to PNO-I-87-072, on 870730,reactor Scrammed Due to Low Reactor Vessel Water Level After Power Lost to Reactor Feedwater Control Circuit.Caused by Failed Transfer Circuit to Instrumentation Inverter.Investigation Continuing:
Displayed 19 items.
- ML20136E919 (← links)
- PNO-I-85-039, on 850522,several Fires Identified & Extinguished Outside Facility Structure & Inside Industrial Security Area.Caused by Apparent Arson.Investigation Initiated & Security Measures Increased (← links)
- PNO-I-88-115, on 881101,reactor Scrammed from Full Power Due to Main Turbine Trip.Caused by Loss of Electrical Field on Main Generator.Reactor Stabilized in Shutdown Condition & Entered Into 5-day Outage,Including Deinerting of Drywell (← links)
- PNO-I-98-053, on 981115,plant Experienced Turbine Trip While Operating at 95% Power Due to High Level Condition on One of Two Moisture Separators.Reactor Automatically Shut Down.Util Evaluating Incorrect Sys Drawing.States of Nj & DE Notifie (← links)
- PNO-I-86-047, on 860706,alert Declared When Sabotage Suspected as Possible Cause for Initiation of Diesel Generator Bldg Fire Suppression Sys When Water Deluge Valve Opened.Caused by Failed Heat Sensor.Alert Terminated (← links)
- ML20198R616 (← links)
- PNO-I-86-036, on 860502,facility Lost Offsite Power to Vital Buses While Two of Four Emergency Diesel Generators Out of Svc.Caused by Technician Error.Offsite Power Restored & Alert Terminated (← links)
- PNO-I-86-027, on 860411,NRC Issued License NPF-50,authorizing Operation of Reactor at Max 3,293 Mwt.Fuel Loading Planned for 860412 Delayed Due to Problems W/Two of Four Source Range Monitors.Loading Planned for 860414 (← links)
- ML20207G536 (← links)
- ML20213G734 (← links)
- PNO-I-86-063, on 860808,licensee Identified Deficiency That Would Prevent Torus Reactor Bldg Vacuum Relief Valves from Fulfilling Safety Function.Control Logic Reversed for Valves Causing Valves to Isolate on Negative Pressure Condition (← links)
- PNO-I-99-043, on 990916,Hurricane Floyd Was Approaching Ccnpp,Sgs,Hcgs & Ocnpp.Hurricane Was Centered at Latitude 36.0 North & Longitude 76.6 West & Moving north-northeast at Approx 25 Mph.Plants Remain at Power (← links)
- ML20236F702 (redirect page) (← links)
- PNO-I-87-072 (redirect page) (← links)
- PNO-I-87-094, on 871013,explosion & Fire Occurred in Main Transformer Phase a Causing Turbine Generator Trip.Cause of Fire Unknown.Licensee Fire Dept Responded & Automatic Water Deluge Sys initiated.One-wk Outage Anticipated (← links)
- PNO-I-86-078, on 860911 & 19,during Loss of Offsite Power (LOP) Testing,Numerous Equipment Failures Identified.Cause Unknown.Licensee to Seek NRC Concurrence Prior to Initiating LOP Testing & Reactor Restart (← links)
- PNO-I-86-045, on 860628,reactor Achieved Criticality.Initial Criticality Followed by Full Core Shutdown Margin Demonstration & source-range Detector Nonsaturation demonstration.Twenty-fourth Criticality Coverage Provided (← links)
- PNO-I-85-064A, on 850904,gas Discharged Into Diesel Generator Through Fire Suppression Sys Nozzles & Drifted to Access Bay for Four Fuel Tank Rooms & Adjacent Areas.Cause Unknown. Investigation Underway (← links)
- PNO-I-85-064, on 850904,carbon Dioxide Fire Protection Sys Initiation Occurred,Causing Discharge of 17 Tons of Liquid Cardox Into Fuel Storage Area.Plant Evacuated & Search & Rescue Stations Established (← links)