Pages that link to "IR 05000341/1998016"
Jump to navigation
Jump to search
The following pages link to IR 05000341/1998016:
Displayed 50 items.
- IR 05000341/1985047 (← links)
- IR 05000341/1986002 (← links)
- ML20137C726 (← links)
- IR 05000701/2010015 (← links)
- IR 05000341/1985049 (← links)
- PNO-III-85-098, on 851117,between 17,000 & 35,000 Gallons of Radioactive Water Released from Ruptured Seam in Condensate Storage Tank.Water Radioactivity Less than 0.4% of Regulatory Limit for Offsite Release (← links)
- IR 05000320/2010031 (← links)
- ML20136F404 (← links)
- PNO-III-85-083, on 850917,leak Observed in East Steam Bypass Line.Transient Power Spike Observed While Attempting to Isolate Line & Open Valve.Cause of Transient Not Determined. Cracked Piping Around Valve Under Investigation (← links)
- IR 05000341/1985034 (← links)
- ML20135H696 (← links)
- ML20135E493 (← links)
- IR 05000341/1985006 (← links)
- ML20135C208 (← links)
- IR 05000341/1996015 (← links)
- ML20135B677 (← links)
- PNO-III-85-077, on 850904,leak Rate Test Connection Valve Installed on 850620 in Containment Sampling Sys Found Open & Attached Line Uncapped,Due to Unrevised Containment Valve Lineup Procedure.Valve Closed (← links)
- ML20134P507 (← links)
- ML20134P505 (← links)
- IR 05000341/1988009 (← links)
- ML20148N147 (← links)
- ML20148N139 (← links)
- IR 05000341/1997008 (← links)
- IR 05000341/1997004 (← links)
- PNO-III-88-022, on 880318,received Bomb Threat Possibly Originating on Site.Site Access Restricted to Essential Personnel & Search of Facility Begun.No Explosive Devices Found & No Explosions Occurred.Investigation Continuing (← links)
- ML20148B893 (← links)
- PNO-III-88-014, on 880226,portion of Automatic Start Circuitry for Plant Four Diesel Generators Not Fully Tested. Unusual Event Classification Terminated on 880227 Following Manual Reactor Scram.Maint & Testing Outage Begun (← links)
- IR 05000341/1996012 (← links)
- IR 05000341/1986003 (← links)
- ML20141N794 (← links)
- IR 05000341/1997006 (← links)
- PNO-III-86-037, on 860418,util Announced Extension of Outage to mid-Jul 1986.Licensee Review of Reevaluation of Design Work Performed on Concrete Embedments & Pipe Supports Will Be Completed by 860501 (← links)
- ML20141F187 (← links)
- IR 05000341/1997009 (← links)
- ML20140G103 (← links)
- IR 05000341/1985048 (← links)
- PNO-III-86-004, RHR Pump Motor Removed Offsite for Testing & Insp Following 851125 Failure Due to Mfg Defect.Pump Replaced.Generic Implications Under Investigation (← links)
- ML20140D352 (← links)
- ML20140D332 (← links)
- PNO-III-86-024, on 860317,backup Reactor Protection Sys Trip Breaker Failed to Trip During Bus a Transfer from Primary Electrical Supply.Caused by Repeated Testing.Manual Scram Inserted.Investigation Underway (← links)
- PNO-III-85-095, on 851113,unusual Noise & Vibration Observed in Emergency Diesel Generator.Operator Manually Tripped Diesel.Preliminary Evaluation Indicates Damage to Connecting Rod Bearing for Upper Crankshaft & Upper Piston Skirt (← links)
- IR 05000341/1985043 (← links)
- IR 05000341/1985051 (← links)
- IR 05000341/1985045 (← links)
- IR 05000341/1985037 (← links)
- ML20138J555 (← links)
- IR 05000701/2009030 (← links)
- IR 05000341/1985044 (← links)
- PNO-III-85-076, on 850825,recirculation Pump B Problem Resulted in Brief Power Increase from 2.9 to 8.8%.Reactor Operators Tripped Pump After Failing to Reduce Pump Speed. Testing Disclosed No Problems W/Speed Control Circuitry (← links)
- IR 05000341/1996201 (← links)