Search by property

Jump to navigation Jump to search

This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.

Search by property

A list of all pages that have property "Title" with value "WPPSS-2 Semiannual Effluent Rept for Period Jan-June 1989". Since there have been only a few results, also nearby values are displayed.

Showing below up to 26 results starting with #1.

View (previous 50 | next 50) (20 | 50 | 100 | 250 | 500)


    

List of results

  • ML18191A297  + (WPPSS Nuclear Project No. 2, Post Construction Permit Item, Piping and Instrumentation Diagrams)
  • ML18191A236  + (WPPSS Nuclear Project No. 2, Response to Request for Additional Information, Pipe Rupture Protection Inside Containment)
  • ML18191A301  + (WPPSS Nuclear Project No. 2, Schedule for Submission of Requested Additional Information)
  • ML18191A239  + (WPPSS Nuclear Project No. 2, Suppression Pool Hydrodynamic Loading Induced Reactor Building Accelerations)
  • ML18191A289  + (WPPSS Nuclear Project No. 2. BWR Mark II Containment Additional Design Information)
  • ML18191A287  + (WPPSS Nuclear Project No. 2. BWR Mark II Containment Additional Design Information)
  • ML18191A274  + (WPPSS Nuclear Project No. 2. Clarification of Criteria, Pipe Rupture Protection Inside Containment)
  • ML18191A271  + (WPPSS Nuclear Project No. 2. Compliance to 10 CFR Part 50, Appendix I)
  • ML18191A270  + (WPPSS Nuclear Project No. 2. Main Steam Isolation Valve Leakage Control System)
  • ML18191A278  + (WPPSS Nuclear Project No. 2. Mark II Containment Program. Load Combination for Mark II Containments Concrete Structures Hydrodynamic Loads)
  • ML18191A273  + (WPPSS Nuclear Project No. 2. Mark II Containment - Design Deficiency)
  • ML18191A272  + (WPPSS Nuclear Project No. 2. Mark II Containment - Design Deficiency)
  • ML18191A284  + (WPPSS Nuclear Project No. 2. Mark II Containment - Supporting Program)
  • ML18191A286  + (WPPSS Nuclear Project No. 2. Response to Questions Sacrificial Shield Wall Design)
  • ML18191A263  + (WPPSS Nuclear Project No. 2. Schedule for Annulus Pressurization and Reactor Feedwater Nozzle Crack Information)
  • ML20138J833  + (WPPSS Nuclear Project Unit 2 TER on IPE Back End Analysis)
  • ML20138J839  + (WPPSS Nuclear Project,Unit 2 TER on IPE Submittal Human Realiability Analysis, Final Rept)
  • ML20082A808  + (WPPSS Nuclear Projects 1,3,4 & 5 Restoration Plan)
  • ML19224A922  + (WPPSS Presentation Package,Tmi Incident & Its Impact on WPPSS Projects)
  • ML022120154  + (WPPSS Project No. 2, License Amendment 137, Increasing Authorized Maximum Power Level of Reactor from Current Limit of 3323 Megawatts Thermal (Mwt) to 3486 Mwt & Modifies TSs to Incorporate Increased Power Limit in Plant Operating Limits)
  • ML17277A822  + (WPPSS Unit 2 Single-Loop Operation Analysis)
  • ML17279A764  + (WPPSS,1987 Annual Rept)
  • ML17285A989  + (WPPSS,1989 Annual Rept)
  • GO2-91-007, WPPSS,1990 Annual Financial Rept  + (WPPSS,1990 Annual Financial Rept)
  • ML20133N361  + (WPPSS-2 Emergency Preparedness Exercise Manual for 850909-13)
  • ML102730076  + (WR 341602 6th-Surv.pdf)
  • ML22088A145  + (WR Non Destructive Testing Letter Submittal of Material Status Reports to the U.S International Atomic Energy Agency Caribbean Territories Safeguards Agreement)
  • ML19324A050  + (WR Waugh Basemat Concrete Testing Program)
  • ML13289A158  + (WR2003-1-45-149, Study to Confirm the Calibration of the Numerical Model for the Thermal Discharge from SQN as Required by NPDES Permit No. TN0026450 of August 2001 (Draft), June 2003)
  • ML13289A153  + (WR2009-1-45-150, Study to Confirm the Calibration of the Numerical Model for the Thermal Discharge from SQN as Required by NPDES Permit No. TN0026450 of September 2005, January 2009)
  • ML13289A168  + (WR2009-1-45-150, Study to Confirm the Calibration of the Numerical Model for the Thermal Discharge from Sequoyah Nuclear Plant as Required by NPDES Permit No. TN0026450 of September 2005, January 2009)
  • ML13289A164  + (WR2009-1-45-151, Ambient Temperature and Mixing Zone Studies for SQN as Required by NPDES Permit No. TN0026450 of September 2005, January 2009)
  • ML13289A134  + (WR2009-1-45-151, Ambient Temperature and Mixing Zone Studies for Sequoyah Nuclear Plant as Required by NPDES Permit No. TN0026450 of September 2005)
  • ML13289A137  + (WR2009-1-45-151, Ambient Temperature and Mixing Zone Studies for SQN as Required by NPDES Permit No. TN0026450 of September 2005)
  • ML13289A165  + (WR2013-1-45-152, Study to Confirm the Calibration of the Numerical Model for the Thermal Discharge from Sequoyah Nuclear Plant as Required by NPDES Permit No. TN0026450 of March 2011, April 2013)
  • ML13289A095  + (WR2013-1-45-152, Study to Confirm the Calibration of the Numerical Model for the Thermal Discharge from Sequoyah Nuclear Plant as Required by NPDES Permit No. TN0026450 of March 2011)
  • ML13289A100  + (WR2013-1-45-152, Study to Confirm the Calibration of the Numerical Model for the Thermal Discharge from Sequoyah Nuclear Plant as Required by NPDES Permit No. TN0026450 of March 2011)
  • ML19341C323  + (WRAITH-A Computer Code for Calculating Internal & External Doses Resulting from an Atmospheric Release of Radioactive Material)
  • ML20005A941  + (WRAP-BWR Verification Studies)
  • ML19211D470  + (WRAP-BWR-EM Sys Development & Applications)
  • ML20053E669  + (WRAP-PWR Verification Studies)
  • ML19211D450  + (WRAP-PWR-EM Sys Development & Applications)
  • ML18297A119  + (WRSC-TR-2005-00257 Rev.5 Groundwater Monitoring Plan for the Z-Area Saltstone Disposal Facility 2010)
  • ML18082A028  + (WSRC-MS-2004-00004, Rev. 0, Z-Area Groundwater Monitoring Report for 2003)
  • ML25252A416  + (WSRC-RP-2000-4134, Rev. 0, Scoping Summary for the General Separations Area Eastern Groundwater Operable Unit)
  • ML22026A434  + (WSRC-RP-2000-4134, Scoping Summary for the General Separations Area Eastern Groundwater Operable Unit)
  • ML19346D756  + (WSRC-RP-2000-4134, Scoping Summary for the General Separations Area Eastern Groundwater Operable Unit (U) October 2019)
  • ML24344A296  + (WSRC-RP-2000-4134, Scoping Summary for the General Separations Area Eastern Groundwater Operable Unit (U) - 2023)
  • ML24344A297  + (WSRC-RP-2000-4134, Scoping Summary for the General Separations Area Eastern Groundwater Operable Unit (U) - 2024)
  • ML24344A295  + (WSRC-RP-2000-4134, Scoping Summary for the General Separations Area Eastern Groundwater Operable Unit (U) - 2021)