ML18191A289
| ML18191A289 | |
| Person / Time | |
|---|---|
| Site: | Columbia |
| Issue date: | 05/08/1975 |
| From: | Stein J Washington Public Power Supply System |
| To: | Butler W Office of Nuclear Reactor Regulation |
| References | |
| G02-75-132 | |
| Download: ML18191A289 (4) | |
Text
l NRC DI'STRIBUTION FOR PART 50 DOCKET MATERIAL (TEMPORARY FORM)
CONTROL NO:
5294 FILE'ROM:
- Richland, Wash.
99352 Sten TO:
Mr. W.R. Butler
'-8<<75 ORIG 1 signed 5-13-75 CC OTHER DATE OF DOC DATE REC'D LTR SENT AEC PDR SENT I.OCAL PDR TWX RPT OTHE R CLASS UNCLASS PROP INFO INPUT NO CYS REC'D 1
DOCKET NO:
50-397 DESCRIPTION:
Ltr re our 4-17-75 6 4-23-75 ltrs....adv. that info re containment des info will be submitted by the week of'u 2, 1975....
ENCLOSUR ES:
gn e
PLANT NAME:
WPPSS 2
FOR ACTION/liUFORI"IATION DHL 5-14-75
'5UT ER (L)
W opies CLA K(L)
W/ Copies PARR!i i vv/ Copies KNIEL (L)
W/ Copies SCHWENCER (L)
W/ Copies STOLZ (L)
W/ Copies VPSShi I O il i Yy/ t op(es PURPLE (L)
W/ Copies ZIEMANII(L)
W/ Copies DICKER (E)
W/ Copies vNiruTnni {ci WI Copies YOUNGBLOOD (E)
W/ Copies REGAN (E)
W/ Copies LEAR (L)
. W/ Cooies SPclS W/ Copies LICENSING PROJECT Wl Copies YdDAGER EG Fl OOGC, ROOM P-506A "irGOSSI CK/STAFF ASF.
IAMBUSSO
>BOYD OORE (L)
EYOUNG (L)
SKOVHOLT (L)
GOLLER {L) (Ltr)
P. COLLINS DENISE EG OPR ILE & REGION (?)
MPIC STEE LE TECH REVIEW SCHROEDER MACCARY KNIGHT
- oAWLICKI HAO TFLLO HOUSTON OVAlCg3)
OSS MMMM KEDESCO J.
COLLINS LAIN AS BENAROYA VOLLMER INTERNALDISTR I BUTIOiU DENTON G R li>IES GAMM ILL KASTNER BAI I ARD SPANGLER LIC ASST.
R. DIGGS (L)
H. GEARIN (L)
E. GOULBOURiUE (L)
P. KR E UTZE R (E)
J. LEE (L) 4'. MAIGBET (L)
S. REED(E)-
M. SERVICE (L)
S. SHEPPARD (L)
M. SLATER (E)
H. SivIITH (L)
S. TEETS (L)
G. Wl LLIAMS(E)
V. WILSON (L)
R. ~~GR~~ (L)
ENVIRO MULLER DICKER KNIGHTON YOUNGB LOOD BEGAN 0 ROJECT LDR L4psa HAR LESS EXTERNAL DISTR IBUTlON A/T liUD.
BRAITMAN SA LTZiblAN ME LTZ PLANS 4ACDONALD CHAPMAN
~< {Ltr)gFj4ygzg
- 44. COUPE PETE RSOiU HARTFIELD (2)
KLECKER EISENHUT WIGGINTON
.~yAWd-A LOCAL PDR
- Richland, Wash.
H CIC (ABERiUATHY)
(1)(277~10) NAT'IONALLABS 4-NSIC (BUCHANAN) p 1
W. PENNINGTON, Rrn E.201 GT 1 ASLB 1
CONSULTANTS
....P Newton Ar.derson
~
NEWi%1ARK/0LUME/AGBABIAN ACRS~~CC'/SENT 1 P D R-SAN/LA/NY 1 BROOKI-lAVEN~IAT LAB 1 G. ULRIKSON, ORNL 1 AGkfiED (RUTH GUSSi~)IAiU)
Rm B-127 GT 1 J. D. RUNKLES, Rm E.201
...,...GT
Q
~ ~
F Q ~ 1 F$
~
~
~
R
~
~
~
~
~
~
~
4 4
Washington Public Power Supply System A JOINT OPERATING AGENCY P. O. BOX 968 3000 GEO, WASHINGTON WAY RICHLAND, WASHINGTON 09352 PHONE (509) 946-9681 Docket No. 50-397 May 8, 1975 G02-75-132 0@(@
Dr.
W.
R. Butler, Chief BWR-Projects Branch No. 1-2 0~
pq<,
Jap Directorate of Licensing U. S. Nuclear Regulatory Commis ~
@4 Q
Washington, D.C.
20545
Subject:
WPPSS NUCLEAR PROJECT NO.
BWR MARK II CONTAINMENT ADDITIONAL DESIGN INFORMATION
Reference:
1)
- Letter, W.R. Butler to J.J.
- Stein, Suppression pool hydrodynamic loads during LOCA, dated April 17, 1975.
2)
- Letter, W.R. Butler to J.J.
- Stein, Pool dynamic loads due to relief valve operation, dated April 23, 1975.
Dear Dr. Butler:
You have recently transmitted two (2) letters to us requesting additional information relative to the design of Mark II containments to account for suppression pool hydrodynamic loads that occur during loss of coolant accidents (Reference
- 1) and safety/relief valve discharge events (Reference 2).
A schedule and program for resolution of these matters is being developed in conjunction with other utilities owning Mark II containments and the General Electric Company.
At this time, we are unable to determine whether the infor-mation requested by Reference 2 can be supplied within the specified 90 days.
We will provide you with our schedule for submitting the requested containment design information and evaluation by the week of June 2, 1975.
Very truly yours, JJS:GLG:ke J. J.
STEIN Managing Director
~a/
Q) 4'5c~y I
4 ~