NRC FOPM',)95 U.S. NUCLEAR REGULATORY iIISSI

\\z'TBIi NRC DISTRIBUTION FoR PART 50 DOCKET MATERIAL DOCKET NUMBER FILE NUMBER R. H. Engelken F ROM:

WPP SS Richland, Uashington 99352 D. L. Renberger DATE OF DOCUMENT 09 29 77 DATE RECEIVED 12 08 77 ETTER QORIGINAL J2fCOPY 0 NOTOR IZED gkf$ICLASSIFI ED PROP INPUT FORM NUMBER OF COPIES RECEIVED Furnishing information copcernin DES C 8 IP TI0 N assessment of the impact of suppression po dynamic loading pheomena on the WPPSS Nucl Project No.

2 struc'tures and equipment...

ENCLOSURE 1

ar 2p'LANT NAiIE.

GPSS 2

jcm 12/09/77 VCH CHIEF:

PROJECT MANAGER:

LIC. ASST:

WC/i FOR ACTION/IN FORMATION ENVIRONiiIENTAL ASSIGNED AD:

BRANCH CHIEF:

B.

HARLESS INTERNALDISTRIBUTION SYSTEMS SITE SAFETY G

ENVIRON ANALYSIS DENTON't:: MULLER GOSSICK C STAFF AG ~IEViT 1VS LPDR:

TIC V

C REG V (J.

HAVICHETT) 16 CYS SENT CATEGORYI EViGINEERIViG ACTOR SAFETY ROSS ViOVAK ROSZTOCZY CHECK LTZMAN n'R EXTERNALOISTR IBUTION Ta ACRS L TO CTORS VIRON TECH ERNST BALLARD L OD TECH I AilMILL (Z)

VOL'L'iVEER VC LYSIS IVS 773p30104 CONTROL iVUMBE R NRC FORM ISB IZ TBI

4

A JOINT OPERATING AGENCY Rf~l6%'f MCB HKIP'i Washington Public Power Supply System P. O. BOX 968 3000 GKO. WASHINGTON WAY RICHLAND. WASHINGTON 99352 PHONE(509) 946.1611 September 29, 1977 G02-77-363 Docket No. 50-397 gjjP,, 9 R.

H. Engelken, Director Nuclear Regulatory Commission, Region V

Suite 202, Walnut Creek Plaza 1990 N. Cali'fornia Boulevard IIalnut Creek, California 94596

Subject:

WPPSS NUCLEAR PROJECT NO.

2 SUPPRESSION POOL HYDRODYNAMIC LOADING INDUCED REACTOR BUILDING ACCELERATIONS

Reference:

Gentlemen:

Letter, D. L. Renberger to R.

H. Engelken,

entitled, "Mark II Containment-Design Deficiency,"

dated February 24, 1976.

(G02-76-65)

As you are aware, we have an ongoing assessment of the impact of suppression pool dynamic loading phenomena on the WPPSS Nuclear Project No.

2 structures and equipment.

From some of the prelim-inary results of this assessment, we have determined that suffici-ent loading is transmitted to equipment outside the suppression pool to require further evaluation and design change.

The reactor building accelerations are calculated to occur as a result of hydro-dynamic loading on the suppression pool floor/basemat.

Because of schedule considerations, we are implementing as a precautionary mea-sure at this time, revisions to drywell snubber requirements to ac-commodate the currently available loadings.

These calculated build-ing accelerations are based on preliminary conservative load defini-tions which are expected to be refined during the next several months as a part of the Hark II Owner's Program.

77343010+

0 (Fv

~

pe Nuclear Regulatory Commission, Region V

Page 2

As discussed in the referenced previous correspondence related to the suppression pool dynamic problem, it is our intention to handle resolu-tion of this problem as a NRC-Division of Reactor Licensing issue.

A revision to the WPPSS Nuclear Project No.

2 Design Assessment Report describing our approach in the resolution of this matter is scheduled for completion the first quarter of 1978.

We trust this manner of resolu-tion will be. acceptable to you.

If you have any questions with regard to this matter please contact us.

DLR GLG:vh Very truly yours, 6 Q /0'.uL<<p&r D. L.

RENBERGER Assistant Director Generation 8 Technology cc:

Director of Nuclear Reactor Regulations

~ Attention:

Hr. Steven A. Varga Light Water Reactor Projects Branch 4

U. S. Nuclear Regulatory Commission Washington, D. C.

70555 D.

Roe - BPA JJ Byrnes -