MONTHYEARGO2-22-075, Response to Request for Additional Information Related to Revised Pressure-Temperature Limit Curves2022-07-11011 July 2022 Response to Request for Additional Information Related to Revised Pressure-Temperature Limit Curves GO2-20-146, Erratum to Fourth Ten-Year Inservice Inspection (ISI) Program Relief Request 4ISI-092020-11-17017 November 2020 Erratum to Fourth Ten-Year Inservice Inspection (ISI) Program Relief Request 4ISI-09 GO2-20-127, Response to Request for Additional Information Related to Fourth Interval Inservice Inspection (ISI) Program Request 4ISI-092020-10-22022 October 2020 Response to Request for Additional Information Related to Fourth Interval Inservice Inspection (ISI) Program Request 4ISI-09 ML20114E2352020-04-22022 April 2020 Columbia,Fourth Ten-Year Interval Inservice Inspection Program Relief Request 4ISI-09 ML17047A7492017-02-16016 February 2017 Response to Request for Additional Information, Columbia Mur LAR Evib Rais ML15238A7422015-08-13013 August 2015 Resubmittal of Deviation from BWRVIP Flaw Evaluation Requirements for Jet Pump Riser Indication GO2-15-035, Global Nuclear Fuel - Americas Affidavit for Withholding Information2014-10-21021 October 2014 Global Nuclear Fuel - Americas Affidavit for Withholding Information GO2-14-110, Response to Request for Additional Information on License Amendment Request to Change Emergency Core Cooling System Surveillance Requirements2014-09-0909 September 2014 Response to Request for Additional Information on License Amendment Request to Change Emergency Core Cooling System Surveillance Requirements ML14204A7092014-07-23023 July 2014 Enclosure 3, Affidavit of Peter M. Yandow ML11308A0232011-10-27027 October 2011 License Renewal Reactor Pressure Vessel (RPV) Nozzle Upper Shelf Energy (Use) NRC Request for Additional Information RAI 4.2-7 Support: Data Cover Letter 0000-0138-8826-R2, Data and Affidavit ML1127000682011-09-26026 September 2011 Enclosure 3, Mfn 10-245 R4, Affidavit ML11234A5292011-08-17017 August 2011 Declaration of Standing of Tom Bailie ML11234A5262011-08-15015 August 2011 Declaration of Standing from Bruce Smartlowit ML11234A5272011-08-0909 August 2011 Declaration of Standing of Scott Madison ML11234A5312011-08-0808 August 2011 Declaration of Dr. Arjun Makhijani Regarding Safety and Environmental Significance of NRC Task Force Report Regarding Lessons Learned from Fukushima Daiichi Nuclear Power Station Accident ML0520003282005-07-14014 July 2005 Surveillance Program for Channel-Control Blade Interference ML0510302832005-04-0101 April 2005 Response to Request for Additional Information Regarding Permanent Relief from Inservice Inspection Requirements of 10 CFR 50.55a(g) and Request to Revise Pressure/Temperature Curves of Technical Specification 3.4.11 ML18191A1891978-09-18018 September 1978 Forwarding Proprietary Information Consisting of Addenda No. 1 to Air Products Post LOCA Recombiner Test Summary Report No. APCI-78-6P. in Accordance with Sec. 2.790, Request Withholding Pursuant from Public, Pending Review ML18191A1981978-07-10010 July 1978 Letter Submitting 4 Copies of Air Products and Chemicals, Inc., Report APCI-78-6 and APCI-78-6P ML18191A4751978-05-17017 May 1978 Wppss Nuclear Project No. 2 Environmental Report - Operating License Stage Amendment No. 1 ML18191A2381977-12-16016 December 1977 Advising of Intention to Complete Evaluation Regarding BWR Relief Valve Control System & Associated Containment Loads for Wppss Nuclear Project No. 2 Is Scheduled During 2nd Quarter of 1978 ML18191A4831977-03-21021 March 1977 Wpps Nuclear Project No. 2 Environmental Report - Operating License Stage Submittal for Docketing ML18191A8081976-11-28028 November 1976 Request for Extension of Construction Permit No. CPPR-93 Wppss Nuclear Project No. 2 ML18191A2691976-08-17017 August 1976 Wppss Nuclear Project No. 2 Annual Financial Data ML18191A2711976-06-16016 June 1976 Wppss Nuclear Project No. 2. Compliance to 10 CFR Part 50, Appendix I ML18191A8101976-04-28028 April 1976 Wppss Nuclear Project No. 2 Post-Construction Permit Item Drywell/Wetwell Leakage Study ML18191A2321976-03-18018 March 1976 Attached Wppss Nuclear Project No. 2 Mark II Containment Design Evaluation. Will Continue to Provide Updated Information on Status of Generic Mark II Owners Range Program in Support of Dffr Design Basis Information ML18191A2741976-01-12012 January 1976 Wppss Nuclear Project No. 2. Clarification of Criteria, Pipe Rupture Protection Inside Containment ML18191A2331975-08-19019 August 1975 Response to Request for Additional Information, Dated 7/8/1974, to Resolve Remaining NRC Concerns on Sacrificial Shield Wall Design ML18191A8131975-08-18018 August 1975 Wppss Nuclear Project No. 2 Response to Request for Information Main Steam Isolation Valve Leakage Control System ML18191A2341975-07-25025 July 1975 Attached Wppss Nuclear Project No. 2 Suppression Pool Current Design Drawings, Which Do Not Reflect Any Design Changes That May Be Needed to Accommodate Loads Resulting from Pool Dynamic Forces During SRV Actuation or LOCA ML18191A2861975-06-26026 June 1975 Wppss Nuclear Project No. 2. Response to Questions Sacrificial Shield Wall Design ML18191A2351975-03-26026 March 1975 Response to Request for Additional Information Protection Against Pipe Breaks Outside Containment ML18191A2971975-02-21021 February 1975 Wppss Nuclear Project No. 2, Post Construction Permit Item, Piping and Instrumentation Diagrams ML18191A3641975-02-11011 February 1975 Response to Questions Regarding Sacrificial Shield Wall Design 2022-07-11
[Table view] Category:Letter
MONTHYEARGO2-24-004, License Amendment Request to Revise Emergency Plan2024-01-30030 January 2024 License Amendment Request to Revise Emergency Plan IR 05000397/20230042024-01-29029 January 2024 Integrated Inspection and Independent Spent Fuel Storage Installation Report 05000397/2023004 and 07200035/2023001 GO2-24-003, Relief Requests for the Columbia Generating Station Fifth Ten-Year Interval Inservice Testing2024-01-29029 January 2024 Relief Requests for the Columbia Generating Station Fifth Ten-Year Interval Inservice Testing ML24011A1522024-01-10010 January 2024 March 2024 Emergency Preparedness Exercise Inspection-Request for Information GO2-24-005, Docket No. 50-397 Supplement to Reply to a Notice of Violation; EA-21-1702024-01-0808 January 2024 Docket No. 50-397 Supplement to Reply to a Notice of Violation; EA-21-170 GO2-23-136, Guarantee of Payment of Deferred Premium2023-12-20020 December 2023 Guarantee of Payment of Deferred Premium GO2-23-135, Notice of Readiness for Supplemental Inspection2023-12-14014 December 2023 Notice of Readiness for Supplemental Inspection GO2-23-130, Reply to a Notice of Violation; EA-23-0542023-12-14014 December 2023 Reply to a Notice of Violation; EA-23-054 GO2-23-105, Licensing Basis Document Update and Biennial Commitment Change Report2023-12-12012 December 2023 Licensing Basis Document Update and Biennial Commitment Change Report ML23288A0002023-12-0707 December 2023 Issuance of Amendment No. 272 to Adopt TSTF-541, Revision 2, Add Exceptions to Surveillance Requirements for Valves and Dampers Locked in the Actuated Position GO2-23-107, Application to Revise Technical Specifications to Adopt TSTS-584, Eliminate Automatic RWCU System Isolation on SLC Initiation2023-12-0505 December 2023 Application to Revise Technical Specifications to Adopt TSTS-584, Eliminate Automatic RWCU System Isolation on SLC Initiation GO2-23-126, Docket No. 50-397 Voluntary Response to Regulatory Issue Summary 2023-012023-11-28028 November 2023 Docket No. 50-397 Voluntary Response to Regulatory Issue Summary 2023-01 GO2-23-121, Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation2023-11-27027 November 2023 Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation IR 05000397/20230122023-11-20020 November 2023 Commercial Grade Dedication Inspection Report 05000397/2023012 ML23311A2082023-11-0909 November 2023 Reassignment of U.S. Nuclear Regulatory Commission Branch Chief in the Division of Operating Reactor Licensing for Plant Licensing Branch IV IR 05000397/20230102023-11-0909 November 2023 Biennial Problem Identification and Resolution Inspection Report 05000397/2023010 IR 05000397/20230932023-11-0101 November 2023 Final Significance Determination of a White Finding, Notice of Violation and Follow-Up Assessment Letter; NRC Inspection Report 05000397/2023093 ML23299A2072023-10-26026 October 2023 Biennial Requalification Inspection Request for Information IR 05000397/20230032023-10-25025 October 2023 Integrated Inspection Report 05000397/2023003 IR 05000397/20230112023-10-0404 October 2023 License Renewal Phase 2 Report 05000397/2023011 IR 05000397/20234012023-09-11011 September 2023 Security Baseline Inspection Report 05000397/2023401 GO2-23-097, In-Service Inspection Summary Report for the Twenty-Sixth Refueling Outage (R26)2023-09-0606 September 2023 In-Service Inspection Summary Report for the Twenty-Sixth Refueling Outage (R26) ML24032A2182023-09-0101 September 2023 Information Request, Security IR 2024401 GO2-23-100, Technical Specification Section 5.6.4 Post Accident Monitoring Instrumentation 14-Day Report for Inoperable Suppression Pool Level Indication2023-08-31031 August 2023 Technical Specification Section 5.6.4 Post Accident Monitoring Instrumentation 14-Day Report for Inoperable Suppression Pool Level Indication GO2-23-056, Application to Revise Technical Specifications to Adopt TSTF-230, Add New Condition B to LCO 3.6.2.3, RHR Suppression Pool Cooling2023-08-29029 August 2023 Application to Revise Technical Specifications to Adopt TSTF-230, Add New Condition B to LCO 3.6.2.3, RHR Suppression Pool Cooling IR 05000397/20230052023-08-22022 August 2023 Updated Inspection Plan for Columbia Generating Station (Report 05000397/2023005) - Mid Year Letter IR 05000397/20230022023-08-0101 August 2023 Integrated Inspection Report 05000397/2023002 GO2-23-093, Supplement to Reply to a Notice of Violation: EA-21-1702023-07-27027 July 2023 Supplement to Reply to a Notice of Violation: EA-21-170 ML23206A2442023-07-25025 July 2023 Energy Northwest Columbia Generating Station, Response to Apparent Violation in NRC Inspection Report 05000397/2023092; EA-23-054 GO2-23-068, Notification of Completion of Commitments Required Prior to Entry Into the Period of Extended Operation2023-07-19019 July 2023 Notification of Completion of Commitments Required Prior to Entry Into the Period of Extended Operation GO2-23-090, Reply to a Notice of Violation2023-07-12012 July 2023 Reply to a Notice of Violation ML23143A1202023-06-27027 June 2023 Request Number 4ISI-11 to the American Society of Mechanical Engineers Boiler and Pressure Vessel Code Regarding Alternate Examination of Reactor Vessel Welds GO2-23-073, Notification of NPDES Permit Issuance2023-06-26026 June 2023 Notification of NPDES Permit Issuance ML23163A2502023-06-12012 June 2023 Summary of Changes and Analysis for Revision 41 of Plant Procedures Manual 13.8.1 Emergency Dose Projection System Operations GO2-23-072, Cycle 27 Core Operating Limits Report2023-06-0505 June 2023 Cycle 27 Core Operating Limits Report ML23157A2702023-06-0101 June 2023 4-2022-011 -022 Letter - OI Closure to Licensee IR 05000397/20230922023-06-0101 June 2023 NRC Inspection Report 05000397/2023092 and Preliminary White Finding IR 05000397/20230902023-06-0101 June 2023 Final Significance Determination of a White Finding, Notice of Violation and Follow-Up Assessment Letter; NRC Inspection Report 05000397/2023090 GO2-23-055, Independent Spent Fuel Storage Installation, 2022 Annual Radiological Environmental Operating Report2023-05-15015 May 2023 Independent Spent Fuel Storage Installation, 2022 Annual Radiological Environmental Operating Report IR 05000397/20230012023-05-0505 May 2023 Integrated Inspection Report 05000397/2023001 - April 26, 2023 GO2-23-006, License Amendment Request to Clean-Up Operating License and Appendix a Technical Specifications2023-05-0101 May 2023 License Amendment Request to Clean-Up Operating License and Appendix a Technical Specifications IR 05000397/20233012023-05-0101 May 2023 NRC Examination Report 05000397/2023301 GO2-23-053, 2022 Annual Environmental Operating Report2023-04-26026 April 2023 2022 Annual Environmental Operating Report GO2-23-057, 2022 Annual Radioactive Effluent Release Report2023-04-25025 April 2023 2022 Annual Radioactive Effluent Release Report ML23110A2642023-04-20020 April 2023 Request for Information License Renewal Phase 2 Inspection GO2-23-012, Application to Revise Technical Specifications to Adopt Tstf-541, Add Exceptions to Surveillance Requirements for Valves and Dampers Locked in the Actuated Position2023-03-27027 March 2023 Application to Revise Technical Specifications to Adopt Tstf-541, Add Exceptions to Surveillance Requirements for Valves and Dampers Locked in the Actuated Position GO2-23-041, Generation Station - Level of Financial Protection - Annual Reporting Requirement2023-03-15015 March 2023 Generation Station - Level of Financial Protection - Annual Reporting Requirement GO2-23-038, Plant Decommissioning Fund Status Report2023-03-15015 March 2023 Plant Decommissioning Fund Status Report ML23013A0812023-03-15015 March 2023 Issuance of Amendment No. 270 Revision to Technical Specifications to Adopt TSTF 505, Revision 2, Provide Risk-Informed Extended Completion Times-RITSTF Initiative 4B GO2-23-034, Report of Changes or Errors in Emergency Core Cooling System Loss of Coolant Accident Analysis Models Pursuant to 10 CFR 50.462023-03-13013 March 2023 Report of Changes or Errors in Emergency Core Cooling System Loss of Coolant Accident Analysis Models Pursuant to 10 CFR 50.46 2024-01-08
[Table view] |
Text
NRC FonM 195 u.s. NUCLEAR nEGULATon Y coMMIssIoN DOCKET NUMBER'0-397 I2 76)
FILE NUMBER
.NhC DESTREBUTEON Fo ~ PAFIT 50 DOCKET MATERIAL W~z ntQ; DATE OF DOCUMENT W;H. Regan, JR. Washington Public Power Oist. 6-16-76 Richland, Washington DATE RECEIVED
~
, D.L. Rebberger 6-21-76 DNOTORIZED" " PROP INI UT Foim<E"- NUMBER QF coPIEqIRFcEIYED l9LETTE R E5OR IG INAL SUNG LASS IF IE D
-~-CICOP Y DESCRIPTIO/4 ENCLOSURE ILtr. notarized'6-14'-<76. r e their 10-14-75 ltr...
Ltr. concerning the eligibilty. of WPPSS Nuclear - ACKNOWLEDGED Project 0 2 to dispense with. the cost benefit analysis .....'..
(1 Signed Cy. Received)
DO NOT REMOVE (3 Pagesg Hanford, 8 2 FOR ACTION/INFORfvlATION AB 6-23-76 ASSTG"EED AD: ASSIGIHD AD; RANCH CHIEF; u er EcIANCH CHIEF:
0JMT I IANAGEH; PROJECT hMNAGER:
IC.---ASST.: u I 00 LIC. A'SST.:
INTERNAL D IST R<I BUTlON EG FXLF SYSTEhES SAFETY 'LAIG'YSTE ES EEVTHO <.F F RC- PDR HEXIEr~483 TEDESCO SCHROEDEH- BEIEAROYA .
EIiD SSICK & STMF ENGIIEEEHI NG XPPOLITO hiXPC ~A CASE KNIGHT OPERATING HECTO S GAI ""IXLL HANAUER STELIO STEPP PAIILICEV HUI 'M,N OPE'"RATING TECH MNAGEIKNT REACTOR SAFETY EI SEIGIUT SXT. AiIALYSIS ROSS -=.- SEIAO VOLLIZH P COLTiINS NOVAK 2AEH EJNCEI HOUSTON HOSZTOCZY SCHltENCEH J. COLLINS PL<<ERSON CHECK GRXhIES KHEG~R hil"LTZ
.EEE'"LTL". EES AT&X SXTi SAFETY &, ENVXRO SKOVEIOLT SALTZhEAN Al'EALYSIS HUTBEHG '1Qif lcMULLER EXTERNAL DISTRIBUTION CONTROL NUI<1BER D~R NA'l'L LLAE3 PHOO'sGfAVEN NATL LAE3 TP REGi. V-IE. ULHIKSON OHNL
,i C LA PDH CONSULTAlfZS 6269" ASID CHS i SEI'IT NRC FOAM 1BB I2.76)
1 ~
ll I
~ ~ r 1
It
t, DDCKEIID U
Washington Public Power Supply te 851878>
A JOINT OPERATING AGENCY
+c9 Seeks Doc4I Ccck P. O. BOX 968 3000 GEO. WASHINGTON WAY RICHLAND, WASHI o 8 09) 946-968l (Docket No. 50-397) June 16, 1976 G02-76-248 Director of Nuclear Reactor Regulation ~11 I !~
U. S. Nuclear Regulatory Commission Washington, D. C. 20555 Attention: Mr. W. H. Regan Jr., Manager Environmental Projects Branch Division of Reactor Licensing
Subject:
Reference:
WPPSS NUCLEAR PROJECT NO. 2 COMPLIANCE TO 10 CFR PART, 50, APPENDIX I Ltr. N. 0. Strand to W. H. Regan, dated October 14, 1975,
/+~
subject, HWNP-2 Appendix I Information". (GOl-75-223)
Dear Mr. Regan:
This letter concerns the eligibility of WPPSS Nuclear Project No. 2 (HWNP-28) to dispense with the cost-benefit analysis contemplated by Section II.D of Appendix I to 10 CFR 50, in accordance with the September 4, 1975 amendments thereto, including the Annex to Appendix I.
Since the application for WNP-2 (which was filed on August 19, 1971) and since the issuance of the construction permit (on March 19, 1973), the NRC has adopted (and subsequently amended) Appendix I to 10 CFR 50, applicable to applications filed after January 21, 1971; The provisions of Section II. D. of Appendix I, as amended, allow the option of dispensing with the cost-benefit analysis and with consideration of further augments to the radwaste system, so long as WNP-2 (and all reactors at the site together in the case of Hper site" design objectives) satisfies the February, 1974 concluding statement of the Regulatory Staff which is incorporated as an Annex to Appendix I.
The question of eligibility of WNP-2 to dispense with this Appendix I cost-benefit analysis as to Hper site" limitations has been reviewed by the Regulatory Staff in connection with their review of WPPSS Nuclear Project No. 1 (",WNP-1H) and WPPSS Nuclear Project No. 4 (HWNP-48),
Docket Nos. 50-460 and 50-513. (See re'ference letter). The Staff con-cluded in its testimony at the ASLB hearing for WNP-1 and WNP-4 held
ter. W. H. Regan Jr.
Page 2 on November 11, 1975 that "the aggregate doses associated with WPPSS Nuclear Project No. 1, WPPSS Nuclear Project No. 2, and WPPSS Nuclear Project No. 4 operation meet.. the RM-50-2 (i.e., Annex) design objectives".
(Tr. 724-727). These conclusions were ratified by the Atomic Safety and Licensing Board in its decision pertaining to WNP-1 and WNP-4 of December 22, 1975. RAI-75/12 922, 934.
In view of the fact that the Staff has previously evaluated WNP-2 on a per site bas.is under the Annex to Appendix I in the context of the proceeding involving WNP-1 and WNP-4, we are proceeding on the assumption that no further showing is required to demonstrate that WNP-2 is eligible to dispense with the Section II.D. cost-benefit analysis.
A complete description of the WNP-2 radwaste systems and equipment, as well as the plans and technical specifications which are being developed to keep releases of radioactive material in effluents to unrestricted areas as low as reasonably achievable, will be submitted to the Staff with the filing of our Operating License Application which is anticipated to be filed by September 15, 1976.
Very truly yours, D. L. RENBERGER Assistant Director Generation 5 Technology DLR:RKW:vws
WPPSS NUCLEAR PROJECT NO. 2 Compliance to 10 CFR Part 50, Appendix I STATE OF WASHINGTON ss COUNTY OF BENTON D. L. RENBERGER, Being first duly sworn, deposes and says: That he is the Assistant Director, Generation and Technology, for the WASHINGTON PUBLIC POWER SUPPLY SYSTEM, the applicant herein; that he is authorized to submit the foregoing on behalf of said applicant; that he has read the foregoing and knows the contents thereof; and believes the same to be true to the best of his knowledge.
, 1976 D. L. RENBERGER On this day personally appeared before me D. L. RENBERGER to me known to be the individual who executed the foregoing instrument and acknowledged that he signed the same as his free act and deed for the uses and purposes therein mentioned.
GIVEN under my hand and seal this ~/day of , 1976.
tary Public in an for the State of Washington Residing at