Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20325A192 + (Update to the Provisional Recognition of the International Standard Organization/International Electrotechnical Commission Standard No 17025, General Requirements for the Competence of Testing and Calibration Laboratories, 2017 Edition)
- ML11297A118 + (Update to the Reactor Vessel Internals Inspection Program Commitments)
- CNL-17-122, Update to the Request for Enforcement Discretion for Technical Specification 3.0.3, Limiting Condition for Operation Applicability + (Update to the Request for Enforcement Discretion for Technical Specification 3.0.3, Limiting Condition for Operation Applicability)
- RA-23-0234, Update to the Response to NRC Regulatory Issue Summary 2023-01 Preparation and Scheduling of Operator Licensing Examinations for Oconee Nuclear Station (ONS) + (Update to the Response to NRC Regulatory Issue Summary 2023-01 Preparation and Scheduling of Operator Licensing Examinations for Oconee Nuclear Station (ONS))
- ML19093A982 + (Update to the Schedule in Response to a Request of 05/18/1977 for Additional Information on the Reactor Vessel Material Surveillance Program)
- DCL-04-071, Update to the Seismicity Evaluation of the December 22, 2003 San Simeon Earthquake + (Update to the Seismicity Evaluation of the December 22, 2003 San Simeon Earthquake)
- ZS-2012-0423, Update to the Service List and Correspondence Addressee for Zionsolutions + (Update to the Service List and Correspondence Addressee for Zionsolutions)
- ZS-2017-0147, Update to the Service List and Correspondence Addressees for Zionsolutions, LLC + (Update to the Service List and Correspondence Addressees for Zionsolutions, LLC)
- ZS-2015-0052, Update to the Service List and Correspondence Addressees for Zionsolutions, LLC + (Update to the Service List and Correspondence Addressees for Zionsolutions, LLC)
- NL-19-1491, Update to the Snubber Program Plan for the Fifth Ten-Year Inservice Testing Interval + (Update to the Snubber Program Plan for the Fifth Ten-Year Inservice Testing Interval)
- ZS-2013-0023, Update to the Supplement for the Request for Amendment to Approve Methods of Analysis, Use of the Upgraded Fuel Handling Building Crane System as a Single-Failure Proof Crane and Approval of a NUREG 0612 Compliant Heavy Loads. + (Update to the Supplement for the Request for Amendment to Approve Methods of Analysis, Use of the Upgraded Fuel Handling Building Crane System as a Single-Failure Proof Crane and Approval of a NUREG 0612 Compliant Heavy Loads.)
- CNL-17-003, Update to the TVA Response to NRC Letter Re Chilled Work Environment for Raising and Addressing Safety Concerns at the Plant + (Update to the TVA Response to NRC Letter Re Chilled Work Environment for Raising and Addressing Safety Concerns at the Plant)
- ML19329C854 + (Update to the Targeted ITAAC for Vogtle Electric Generating Plant Units 3 and 4)
- ML19329C875 + (Update to the Targeted ITAAC for Vogtle Electric Generating Plant Units 3 and 4)
- L-MT-23-051, Update to the Technical Specification Bases + (Update to the Technical Specification Bases)
- L-MT-24-042, Update to the Technical Specifications Bases + (Update to the Technical Specifications Bases)
- ML11214A191 + (Update: Laboratory Testing of Zeolitic Materials)
- ML12208A090 + (Update: PNO-I-12-004A - Limerick, Unit 1, Notification of Unusual Event Declared Due to Electrical Fault in Non-Safety Related Transformer)
- ML12320A020 + (Update: PNO-I-12-007A Hurricane Sandy Update Causes Oyster Creek Alert and Shutdowns of Reactors at Nine Mile Point Unit 1, Indian Point Unit 3 and Salem Unit 1)
- ML12333A307 + (Update: PNO-I-12-008A-Update Fitzpatrick NOEU for Fire in Main Transformer)
- ML13129A156 + (Update: Receipt of New Mexico Final Regulations to Incorporate Rats Id: 1993-2)
- ML113260312 + (Update: Senior Reactor and Reactor Operator Initial License Examinations - Nine Mile Point Unit 2)
- ML16271A112 + (Update: U.S. Nuclear Regulatory Commissions Completed Comprehensive Technical Review of NEI 05-05, Controller Guideline for Force-On-Force Exercise Simulations, Revision 5, Dated December 2015)
- ML15275A283 + (Update: Unplanned Shutdown Greater than 72 Hours Following the Loss of Cooling Water in the Turbine Building)
- ML16224B063 + (Update:Receipt of New Mexico Proposed License Condition to Rats Id 1993-2)
- ML14197A073 + (Updated (July 14, 2014) Talking Points for Public Teleconference)
- ML21174A239 + (Updated - Certificate of Compliance No. 9320, Revision 5, Model No. Midus (Renewal and Changes))
- PMNS20241511, Updated - Virtual Only - Public Meeting to Discuss the Part 53 RISK-INFORMED, TECHNOLOGY-INCLUSIVE Regulatory Framework for Advanced Reactors Rulemaking Proposed Rule + (Updated - Virtual Only - Public Meeting to Discuss the Part 53 RISK-INFORMED, TECHNOLOGY-INCLUSIVE Regulatory Framework for Advanced Reactors Rulemaking Proposed Rule)
- RS-21-112, Updated 10 CFR 50.46 Report of Emergency Core Cooling System Evaluation Model Changes and Errors + (Updated 10 CFR 50.46 Report of Emergency Core Cooling System Evaluation Model Changes and Errors)
- ULNRC-06911, Updated 10 CFR 72.30 to Status of ISFSI Decommissioning Funding Plan + (Updated 10 CFR 72.30 to Status of ISFSI Decommissioning Funding Plan)
- ML21146A183 + (Updated 2 Nextera - Duane Arnold Energy Center Loss of Offsite Power Due to Derecho Event Aug 2020)
- ML043270458 + (Updated 2004 Survey of Toxic Chemicals and Pipelines in the Vicinity of the Plant)
- ML15181A250 + (Updated 2015 Nuclear Liability Certificate of Insurance)
- ML19077A310 + (Updated 2019.2.21 Chinas Regulatory Practice on New Reactors Transition to Operation)
- ML25084A281 + (Updated 2025 Decommissioning Costs and Funds, March 21, 2025, Redacted)
- ML18191A013 + (Updated 5/17/1978 Amend 1 to Environmental Report - Op. Lic. Stage)
- MN 16-015, Updated 6/8/2016 - Notice of Category 3 Public Meeting - Annual Assessment of Safety Performance for Indian Point Units 2 and 3 for 2015 + (Updated 6/8/2016 - Notice of Category 3 Public Meeting - Annual Assessment of Safety Performance for Indian Point Units 2 and 3 for 2015)
- 05000251/LER-1980-013-03, Updated 80-013/03X-1:on 801111,six Ionization Type Detectors Found Inoperable During Final Acceptance Testing on Modified Fire Detection Sys.Caused by Improper Electrical Contact Due to Moisture Induced Corrosion of Terminal + (Updated 80-013/03X-1:on 801111,six Ionization Type Detectors Found Inoperable During Final Acceptance Testing on Modified Fire Detection Sys.Caused by Improper Electrical Contact Due to Moisture Induced Corrosion of Terminals)
- 05000271/LER-1981-028-03, Updated 81-028/03X-1:on 811017,field Breaker Failed to Open, Effectively Disabling Rrmg Set Recirculation Pump Trip Instrumentation.Caused by Binding of Operating Mechanism.New Breaker Installed + (Updated 81-028/03X-1:on 811017,field Breaker Failed to Open, Effectively Disabling Rrmg Set Recirculation Pump Trip Instrumentation.Caused by Binding of Operating Mechanism.New Breaker Installed)
- ML22074A168 + (Updated ACRS Subcommittee Presentation Slides for NEDO-33914, BWRX-300 Advanced Civil Construction and Design Approach Licensing Topical Report)
- ML20084L238 + (Updated AO 50-265/74-7:on 750115,RHR Svc Water Line Taken Out of Svc for Repair.Defective Temporary Pipe Support Also Remved & Hydrostatic & Flow Rate Tests Performed)
- ML20086D886 + (Updated AO 73-02:on 730115,fan 1 on West Cooling Tower Failed in Forward Direction After Completion of Deicing Cycle.Caused by Bearing Failure in Reduction Gear Unit.Fan Disassembled & Angle Speed Reducer Drive Replaced)
- ML20086D806 + (Updated AO 73-06:on 730302,chemist,while Attempting to Draw Offgas Sample,Discovered Improper Flow Through Offgas Sample/Monitoring Sys.Caused by Two Lines to Offgas Monitoring Sys Rolled During Mods)
- ML20086D795 + (Updated AO 73-07:on 730302,steam Leak Noted Around Bonnet of Steam Exhaust Line Check Valve.Hpci Exhaust Stop Check Valve Gagged Shut,Check Valve Bonnet Gasket Replaced & Bonnet Retightened)
- ML20086D784 + (Updated AO 73-08:on 730307,time Delay Relay Failed to Actuate Isolation of Sys within Specified Time.Check of Timer Will Be Conducted After 3 Months to Confirm Reliability of Timer.Relay Replaced & Bench Tested)
- ML20086D769 + (Updated AO 73-09:on 730410,microswitch Installed in DPIS-129B Failed to Actuate at Required Setpoint.Defective Switch Replaced,Actuating Arm Realigned & Trip Point Actuation Rechecked Repeatedly)
- ML20086D755 + (Updated AO 73-10:on 730417,relief Valve Initiation Time Delay Relay Failed to Actuate.Similar Event Occurred on 721020.Relay Replaced & Replacement Verified.No Further Action Necessary)
- ML20086D734 + (Updated AO 73-14:on 730530,fuse Which Supplies Ac to Main Steam Line Radiation Monitor Drawer 17-251D & High Voltage Power Supply for Reactor Bldg Ventilation Area Monitors Blew.Blown Fuse Replaced & Isolation Cleared)
- ML20086D708 + (Updated AO 73-15:on 730612,first-stage Turbine Pressure Permissive Pressure Switch 5-14A Failed to Actuate at Proper Setpoint.Switch Reset.Surveillance Test Will Be Conducted Again in 3 Months Rather than 6 Months)
- ML20086D656 + (Updated AO 73-17:on 730614,drywell Purge & Vent Exhaust Valve V-16-19-7A Failed to Shut.Valves V-16-19-4 & V-16-19-16 Closed,Insuring Containment Integrity.Valve Will Remain Shut Until Primary Integrity Not Required)
- ML20086D611 + (Updated AO 73-19:on 730625,during RCIC Surveillance Testing to Check Auto Closure of RCIC Steam Isolation Valves 15 & 16,valve 15 Failed to Close as Required.Caused by Misalignment or Binding in Declutch Mechanism)