n rOq (id'ld V ERMONT YANKMn NUcr#AR POWER CORPORATION L~VJ3 b
3EVcNTY GEVc4 OHOVc LTHCcT RUTI. AND, VI'.1&IO NT OG701 R I F* L Y T O:
VYV-7504 p,
- o. nox 357 VcRNON, VERMONI 05354 liarch 9, 1973 cv%
r
/
N
@V s
Director (o
i' 4
Directorate of Licensing LLJ L
U.S. Atomic i:ncrgy Conni: sion E
Uashington, D.C.
20545 Idb 4 $735-
-11 O grKiG C4luy y,9 E@
y W1 ItEFl:REHCC: Operating Licence DPR-28 tep#
f Docket No. 50-271 M
f g
Abnormal Occurience No. An-73-07
?
Dear Sir:
(;-
f>
An defined by Technical Specifications for the Verrnont Yankee Nuclear
~
Pou,r nrar tem prtinn f,. 7. n,1 un nrn vnnnreina enn (n11n..<no Aher,v.
,1
\\.;'
Au-7 ',-0 7.
G.. < u i r u i. e un
)I At approxinately 2300 on March 2, 1973 during conduct of an
\\.
operability check of the High Pressure Coolant Injection (HPCI) Systen, a stean Icak was noted around the bonnet of the steam exhaust line j
check valve (llPCI-65). Although the HPCI systen was observed to be
' g, /,,
operable, repair of the check valve was elected as an innediate course of actlon.
Replacenent of the gasket precluded HPCI operability as
- /
required by Section 3.5.1:.1.a of Technical Specifications.
The react.or U
was operating at approxinately 60Z power at the time of this incident.
The :lPCI exhaust line stop check valve uns ganged shut and the check valve bonnet ganket pas replaced and the bonnet retightened.
Con c u r re n t. l y, the operability verification required by Section 4.5.E.2 l
of Technical Specifications was initiated.
At 0230 on March 3, 1973 the llPCI operability tnst van repeated satisfactorily, and no leakage was detected fron the bonnet of !!PCI-65.
The Plant Operations Review Committen concluded that although the valve bonnet leaked, the UFCI systen was still operable and would have perf orned i t:. designed function prior to gan);ing shut the exhaust line utop check valve.
Additionally, to determine whether or not this failure was a ttributable to conditiens during system operation, the valve bonnet 8312050123 730309 fd f
o 1
PDR ADOCK 05000271 S
PDR fg 1714 a
G GNKCC NUCLEAR T'OWCR Cor I'
VCnMoNT l
l Directorate of I.icennini; l
!!:irch 9, 1973 Page 2 l
stu<l tightneun will be checked follouing each IIPCI Tamp operability tent f
during the next three months.
Very truly yours, i
l VI:1:MONT YANKEE NUCLEAR POWER CORPORATION f
O-
[
B.U. Riley 1
i Plant Superintendent l
If.lE / rph I