Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20085G215 + (Transmittal, Approval of NIST 2019 Triennial Update to Decommissioning Funding Plan)
- ML081050616 + (Transmittal, Response of Entergy Nuclear Operations, Inc. to the Boards April 1, 2008 Order Relating to the Service and Content of Westcans Reply Dated February 15, 2008)
- ML21126A114 + (Transmittal, Response to License Amendment Request)
- ML24282A947 + (Transmittal-Topical Report Withholding Determination - Terrapower, LLC NAT-9391, Rev. 0, Radiological Release Consequences Methodology)
- ML20073G324 + (Transmittal/Receipt Ack 94-05,informing That Transmittal 94-04 Sent Out Indicating UFSAR Updates.Updates Not UFSAR Updates & Should Be Discarded)
- ML22118B144 + (Transmittal: Letter Certificate of Compliance No. 9218, Rev. 26, Model No. TRUPACT-II and Certificate of Compliance No. 9279, Rev. 10, Model No. Halfpact Transport Packages)
- ML25317A014 + (Transmittal: U.S. Nuclear Regulatory Commission Form 896, -A Topical Report Verification, for EPRI Report 3002033918, Risk-informed High Energy Line Break Evaluation Requirements)
- ML070260547 + (Transmitted of Final Safety Evaluation Report and Certificate of Compliance for Holtec International HI-Star 100 Storage Cask)
- SBK-L-09168, Transmitted of Response to Request for Additional Information Regarding Permanent H Alternate Repair Criteria for Steam Generator Inspections + (Transmitted of Response to Request for Additional Information Regarding Permanent H Alternate Repair Criteria for Steam Generator Inspections)
- ML082270296 + (Transmitted of Resubmittal of Information Regarding Main Steam and Feedwater Isolation System (Msfis) Controls Modification)
- 05000315/LER-1979-064-03, Transmitter Blp 141 Found to Be 13% Out of Spec High.Caused by Bellows Fill Fluid Leaking Out Due to Burr on Mounting Beam Surface.Steps Taken by Manufacturer to Modify Assembly Procedures + (Transmitter Blp 141 Found to Be 13% Out of Spec High.Caused by Bellows Fill Fluid Leaking Out Due to Burr on Mounting Beam Surface.Steps Taken by Manufacturer to Modify Assembly Procedures)
- 05000315/LER-1979-052-03, Transmitter Blp 142 Found to Have Drifted 7% High During Investigation of High Level Indication for Steam Generator 4.Caused by Bellows Fill Fluid Leaking Out Due to Burr on Mounting Beam + (Transmitter Blp 142 Found to Have Drifted 7% High During Investigation of High Level Indication for Steam Generator 4.Caused by Bellows Fill Fluid Leaking Out Due to Burr on Mounting Beam)
- ML20266J588 + (Transmitter Subassembly.Sheet 1 of 6)
- ML20266J610 + (Transmitter Subassembly.Sheet 1 of 6)
- ML20266J592 + (Transmitter Subassembly.Sheet 2)
- ML20266J614 + (Transmitter Subassembly.Sheet 2)
- ML20266J617 + (Transmitter Subassembly.Sheet 3)
- ML20266J595 + (Transmitter Subassembly.Sheet 3)
- ML20266J598 + (Transmitter Subassembly.Sheet 4)
- ML20266J621 + (Transmitter Subassembly.Sheet 4)
- ML20266J602 + (Transmitter Subassembly.Sheet 5)
- ML20266J623 + (Transmitter Subassembly.Sheet 5)
- ML20266J627 + (Transmitter Subassembly.Sheet 6)
- ML20266J606 + (Transmitter Subassembly.Sheet 6)
- ML18347A692 + (Transmitting 1975 Annual Financial Report)
- ML18227D412 + (Transmitting 1977 Turkey Point Annual Operating Report)
- ML091970002 + (Transmitting Additional Draft RAI on Containment Overpressure Issue for the Proposed EPU Amendment)
- ML18230A484 + (Transmitting Affidavit of J. A. Jones, Marked for Identification as Applicant Exhibit Pp, & Revisions to Applicants Proposed Findings of Fact & Conclusion of Law in Form of Supplemental Initial Decision (Construction Permits))
- ML18347A681 + (Transmitting Analysis to Determine Allowable Tube Wall Degradation for Palisades Steam Generators, with Corrections for Additional Error)
- ML18227D279 + (Transmitting Annual Operating Report for Period 1/1/1976 to 12/31/1976)
- ML18347B263 + (Transmitting Answer of Consumers Power Company to Great Lakes Energy Alliances Petition for Leave to Intervene Which Was Filed March 14, 1979)
- ML18230A489 + (Transmitting Applicants Proposed Findings of Fact & Conclusions of Law in Form of Supplemental Initial Decision (Construction Permits), Which Are Being Distributed This Date in Accordance with Schedule for Findings Ordered by Board)
- ML19029A590 + (Transmitting Application to Increase Spent Fuel Storage Capacity from 264 to 1170 Fuel Assemblies)
- ML18230B040 + (Transmitting Aquatic & Fisheries Studies, Baseline Preoperational Biological Survey Conducted to Determine Existing Aquatic Terrestrial Populations with Figures of Sampling Points & Areas)
- ML12086A203 + (Transmitting Audit Plan Re Thermal Conductivity Degradation)
- ML18227D483 + (Transmitting Corrected Legal Motion to Lodge Documents & Request It Be Substituted to Motion Filed on 10/25/1977 on Behalf of Florida Cities)
- ML18230A214 + (Transmitting Cost Estimates for Revised Cooling Tower Blowdown System, Letter Advising Cost Will Be Increased by Approximately $6.500,000 as a Result of Modifications to System)
- ML101730201 + (Transmitting Draft RAI the Proposed Amendment Concerning Large-Break LOCA)
- ML090770843 + (Transmitting Draft RAIs Supplemental Responses to GL 2004-02)
- ML110200692 + (Transmitting Draft Requests for Additional Information (Snpb) EPU Review)
- ML25108A110 + (Transmitting Draft Site Info - Date of Structures)
- ML22318A002 + (Transmitting Email - NRC 896 -A Version Verification for NuScale Topical Report TR-108553-P-A, Revision 0)
- ML22349A025 + (Transmitting Email for Completeness Determination for NuScale Topical Report NuScale Power, LLC Quality Assurance Program Description, MN-1226, Rev 0)
- ML25106A198 + (Transmitting Email from C. Grossman, NRC, to B. Jordan, Dod, Transmitting Notice of NRC Involvement at Dod Sites with Confirmed Radioactive Contamination Per the MOU for Fy 2024)
- L-78-104, Transmitting Evaluation Report of Abnormal Indications from Metal Impact Monitoring System, Turkey Point Unit No. 4 + (Transmitting Evaluation Report of Abnormal Indications from Metal Impact Monitoring System, Turkey Point Unit No. 4)
- ML18283B390 + (Transmitting Final Report of Reportable Deficiency, Possibility of Marginally Adequate Support Structure on Main Steam & Relief Valve Discharge Piping - in Control No. HO-1127F2)
- ML18227D404 + (Transmitting Groundwater Monitoring Data for February 1978)
- ML18230A486 + (Transmitting Info-brief of Carolina Power & Light Co., Corporate Communications, Letter Advising CP&L Announced Organizational Changes Effective 6/1/1979, Which Relate to Personnel & Positions Discussed in Testimony)
- ML18283B387 + (Transmitting Interim Report of Reportable Deficiency Clogged Cooling Water Lines to RHR & Core Spray Pump Motor Bearing Coolers. Final Report Will Be Submitted When Plans to Correct Deficiency Are Completed & Approved)
- ML18283B383 + (Transmitting Interim Report of Reportable Deficiency Clogged Cooling Water Lines to RHR & Core Spray Pump Motor Bearing Coolers. Final Report Will Be Submitted When Plans to Correct Deficiency Are Completed & Approved)
- ML18283B389 + (Transmitting Interim Report of Reportable Deficiency, Defective CAM Followers in General Electric Type SBM Switches, Letter Advising Final Report Will Be Prepared Once Investigations & Replacements Are Completed)