ML18227D412

From kanterella
Jump to navigation Jump to search
Transmitting 1977 Turkey Point Annual Operating Report
ML18227D412
Person / Time
Site: Turkey Point  NextEra Energy icon.png
Issue date: 03/03/1978
From: Pearson J, Robert E. Uhrig
Florida Power & Light Co
To: O'Leary J
NRC/RGN-II
References
L-78-86
Download: ML18227D412 (12)


Text

REGULATORY NFO RTION DISTRIBUTION SY- TE RIDS)

DISTRIBUTION FOR INCOh'i~NG MATERIAL 50-2 3/2. 1 REC: OREILLY l-P ORG: UHPIG R E DOCDATE: 0:=/0::-/78 NRC FL PWR ~~'. LiGHT DATE Rl AID: 03,/ 1 4/

DOCTYPE: LETTEP. NOTARIZED: NO COPIES RECEIi)ED

SUBJECT:

LTR 1 ENC! 1 ANNUAL OPERATING REPT FOP UNITS 3 Z. 4.

PLAh/T NAME: TURKFY PT 53 REVIEWER IhlIT IAL: X ~

TURKEY PT 83 DISTR I BUTER INITIAL:

DISTRIBUTION OF THIS MATERIAL IS AS FOLLOWS ANNUAL ~~. SEMI-ANNUAL OPERATING REPORTS (OL STAGE>.

(DISTRIBUTION CODE A008)

FOR ACTION: 'ROJ . UIS~~W/ENCL LIC AS T PARR I SH+yW/5 ENCL I hlTERNAL: REG FILE~~W/E5lP. NRC PDR++W/ENCL

~WM'NCL MIPC++W/2 ENCL HANAUER~~W/ENCL STELLO+4W/ENCL E I SENHUT++W/ENCL SHAO++W/ENCL BAER~~W/ENCL BUTLER++W/ENCL GRIMES~~W/ENCL P. CHECK~+W/ENCL J. COLLINS++W/ENCL EXTERNAL: LPDR'S MIAMIi FL++W/ENCL NATL LAB ORNL++W/Eh(CL T I C++W/ENCL NS I C+4 W/ENCL ACRS CAT B~+W/15 ENCL DISTRIBUTION: LTR 41 ENCL 41 CONTROL NBR 78075004n S I ZE: 1 P+1P THE END

. O. BOX 013100, MIAMI, FL 33101 FLORIDA POWER 5 LIGHT COMPANY March 3, 1978 L-78-86 Mr. James P. O'Reilly, Directox, Region g Wp Office of Inspection and Enfoxcement U. S. Hucleax Regulatory Commission 230 Peachtree Street, H. H., Suite 1217 Atlanta, Georgia 30303 '

Dear Mr. O'Reilly:

ih

'Re: Turkey Poirt Units 3 and 4 Docket Nos. 50-250 and 50-251 /

1977 Annual Oaeratin RexIort Two copies of the 1977 Turkey Point Annual Operating Report are attached. This report is submitted in compliance with Technical Specification 6.9.l.b.

Very truly yours, rf Robert E. Uhrig Vice President REU/HAS/ms Attachment CC Director, Office of Inspection and Enforcement (40)

Director, Office of Management Information and Pxogram Control (2)

Robert Lowenstein, Esctuire

FLORIDA POWER 6 LIGHT COMPANY PLANT LOCATION: TURKEY POINT PLANT STANDARD FORMAT FOR REPORTIHG NUMBER OF PERSONNEL AND MAN-RKM FOR WORK AND JOB FUHCTION NUMBER OF PERSONNEL (> 100 MREM) TOTAL MAH-RKM CONTRACT WORKERS CONTRACT WORKERS WORK 6 JOB FUNCTION STATION UTILITY AND OTHERS STATION UTILITY AND OTHERS REACTOR OPERATIONS 6 SURVEILLANCE MAIHTEHANCE PERSONNEL 9 28 3 3.58 22. 44 4.26 OPERATltlC PERSONNEL 54 0 0 55.96 0.00 0.00 HEALTH PHYSICS PERSONNEL 9 0 26 2.73 0. 00 25.48 SUPERVISORY PERSONNEL 0 0 4 0.00 0.00 4.78 KHGIHEERING PERSONNEL 4 0 0 12.38 0.00 0.00 ROUTINE MAINTENANCE MAIHTEtlANCE PERSONtlEL 175 86 72 398.14 156.64 55.30 OPERATIHC PKRSOt)NEL 7 0 0 8.56 0.00 0.00 HEALTH PHYSICS PERSONNEL 5 0 0 2.44 0.00 0.00 SUPERVISORY PERSONNEL 3 0 4 5.42 0.00 4;86 Et)CIttEERINC PERSONNEL 4 0 0 3.32 0.00 0.00 IHSERVICE INSPECTION MAINTENANCE PERSONNEL 0 254 0.00 0.00 601.78 OPERATING PERSONNEL 0 0 0.00 0.00 0.00 HEA).TH PHYSICS PERSONNEL 0 0 0.00 0.00 0.00 SUPERVISORY PERSONNEL . 0 ~ 3 0.00 0.00 8. 32 Kti'GIHEERIHC PERSONHEL 13 0 24.48 0.00 0.00 SPECIAL MAINTENANCE MAINTENANCE PERSONNEL 2 48 0. 24 0.00 29.02 OPERATINC PERSONNEL 0 0 0.00 0.00 0.00 HEALTH PHYSICS PERSONNEL 0 0 0.00 0.00 0.00 SUPERVISORY PERSONNEL 0 0 0.00 0.00 0.00 EHGIHEERIHC PERSONNEL 6 0 3.12 0.00 0.00 WASTE PROCESSING tlAIHTEHAHCE PERSOHtlEL 0 0. 00 0.00 0.00 OPERATING PERSONNEL 0 0. 42 0.00 0.00 HEALTH PHYSICS PERSONNEL ~

0 1.64 0.00 0.00 SUPERVISORY PERSONNEL 0 0.00 0.00 0.00 ENGINEERING PERSONNEL 0 0.00 0.00 0.00 REFUELING MAINTEIIANCE PERSONNEL 12 Q 11.76 0.00 O.oh OPERATING PERSONNEL 0 0 0.00 0.00 0.00 HEALTH PHYSICS PERSONNEL 0 0 0.00 0 00 0.00 SUPERVISORY PERSONNEL 0 0 0.00 0.00 0.00 ENCIttEERINC PERSONNEL 9 0 8.72 0.00 0.00 TOTAL MAIHTEHAHCE PERSONNEL 198 114 377 413.72 179.08 690.36 OPERATING PERSONNEL 63 0 64.94 0.00 0.00 HEALTH PHYSICS PERSONNEL 17 ~

0 26 9.54 0.00 25.48 SUPERVISORY PERSONHKL 3 0 11 5.42 0.00 17,96 ENGIHEERIHC PERSONNEL 36 0 0 52,02 '0.00 0.00 GRAND TOTAL 317 114 414 545.64 179.08 733.80

~'J/Ot/ Pg REGULATORY INFORMATION 'DISTRIBUTION SYSTEM RIDS >

DISTRIBUTION FOR INCOMING MATERIAL 50-251 REC: STELLO V ORG: UHRIG R E DOCDATE: 03/03/78 NRC FL PWR 5 LIGHT DATE,RCVD: 03/07/78 DOCTYPE: LETTER NOTARIZED: NO COPIES RECEIVED

SUBJECT:

LTR 1 ENCL 0 REQUEST FOR NRC"S APPROVAL TO RETURN UNIT 4 TO OPERATION AND CONCLUDING THAT THE OPERATION OF THIS UNIT FOR IN EXCESS OF AN ADDL SIX EFFECTIVE MONTHS WILL NOT ENDANGER THE HELATH AND SAFETY OF THE PUBLIC.

PLANT NAME: TURKEY PT 03 REVIEWER INITIAL: X JM DISTRIBUTOR INITIAL:

+++++<+++++++444+ DISTRIBUTION OF THIS MATERIAL IS AS FOLLOWS 4444++44o+o++++wo+

GENERAL DISTRIBUTION FOR AFTER ISSUANCE OF OPERATING LICENSE..

(DISTRIBUTION CODE A001>

FOR ACTION: 8 +LTR ONLY(7)

INTERNAL: REG

~'p FILE4+LTR ONLY 2)

NRC PDR%+LTR ONLY(1)

OELD4.+LTR ONLY< 1)

CHECK++LTR ONLY(i>

HANAUER4+LTR ONLY(1)

EISENHUT4<LTR ONLY < 1 ) SHAO+4LTR ONLY<1)

BAER++LTR ONLY(i) BUTLER++LTR ONLY(1)

GRIMES44LTR ONLY< 1) J COLLINS++LTR ONLY(i)

J. MCGOUGH++LTR ONLY(i>

EXTERNAL: LPDR S MIAMI'L++LTRONLY < 1 )

TIC++LTR ONLY(i >

NSIC4+LTR ONLY< 1)

ACRS CAT 8++LTR ONLY(16)

DISTRIBUTION: LTR 40 ENCL 0 CONTROL NBR: 780660033 SIZE: 1P THE END

I 0,

I

~

~

'I I p N II h

l P I N

'4

0 yXVlll J~P&l i FLORIDA POWER & LIGHT COMPANY March '3i 1 L-78-83 Office of Nuclear Reactor Regulation kCEIYQ Attention: Mr. Victor Stello, Director ~4R Division of Operating Reactors .v g yj ~978 U. S. Nuclear Regulatory Commission Washington, D. C. 20555 /

Dear Mr. Stello:

Oj~

Re: Turkey Point Unit 4 Docket Number 50-251 On March 1, 1978, Florida Power 6 Light Company forwarded to you a report of the current steam generator inspection and the preventative plugging program for Turkey Point Unit, 4. This report supports the'operation of Turkey Point Unit 4 for in ex-cess of'ix effective months following the inspection. The steam generators will be r'einspected'uring the next refueling outage.

I In accordance, with paragraph'.D of Facility Operating License DPR-41, Florida Power 6 Light Company requests NRC approval to return Turkey, Point Unit 4,to operation. This approval is re-quested by, March,7, 1978 'so as not, to delay the return to power of the Unit.

The Turkey Point Plant Nuclear Safety Committee and the Florida Power S Light Company Nuclear Review Board have reviewed this request. They have concluded that the operation of Unit 4 for in excess of an additional six effective months will not endanger the health and safety of the public.

Very truly yours, Robert E. Uhrig Vice President REU:cs cc: Mr. James P. O'Reilly, Region Mr. Robert Lowenstein, Esquire II 7806600M ALII S"'+

1y PEOPLE... SERVING PEOPLE

4 ~l I

\

REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS>

DISTRIBUTION FOR INCOMING MATERIAL 50-251 REC: STELLO V ORG: UHRIG R E DOCDATE: 03/03/78 NRC FL PWR 8c LIGHT DATE RCVD: 05/16/78 DOCTYPE: LETTER NOTARIZED: NO COPIES RECEIVED

SUBJECT:

LTR 1 ENCL 0 FURNISHING REQUEST TO RETURN UNIT 4 TO OPERATION BY 03/07/78... ADVISING SUBJECT FACILITY"S NUC SAFETY COMMITTEE 8( APPLICANT HAVE REVIEWED THIS REQUEST AND CONCLUDED OPERATION OF UNIT 4 IN EXCESS OF AN ADDL SIX EFFECTIVE MONTHS WILL NOT ENDANGER THE HEALTH ~ S,q~erv cr ~tv F'<e~W PLANT NAME: TURKEY PT 84 REVIEWER INITIAL: X JM DISTRIBUTOR INITIAL:

DISTRIBUTION OF THIS MATERIAL IS AS FOLLOWS GENERAL DISTRIBUTION FOR AFTER ISSUANCE OF OPERATING LICENSE.

(DISTRIBUTION CODE A001>

FOR ACTION: SCHWENCER++LTR ONLY(7>

INTERNAL: G FI LTR ONLY(1 > NRC PDR++LTR ONLY(i)

+4LTR ONLY<2) OELD+4LTR ONLY(i)

HANAUER++LTR ONLY(i) CHECK++LTR ONLY(i>

EISENHUT+4LTR ONLY< 1) SHAO++LTR ONLY<i)

BAER44LTR ONLY(1> BUTLER++LTR ONLY(1>

EEB<<LTR ONLY< 1) J COLLINS++LTR ONLY(1)

J. MCGOUGH++LTR ONLY(1)

EXTERNAL: LPDR S MIAMIr FL4'4'LTR ONLY( 1 )

TIC++LTR ONLY(i)

NSIC++LTR ONLY(1)

ACRS CAT B++LTR ONLY(16>

DISTRIBUTION: LTR 40 ENCL 0 CONTROL NBR: 781360117 SIZE: iP THE END  %%%%%%%%%4%%%%%%%%%%%%%%%%%%%%%%%4

H I

I n" '

t

P. O. BOX 013100, MIAMI, FL '33101 III'""t"'I~lt~tli III,I', @if 'III'.II"

'LORIDA POWER

~pBc LIGHT COMPAN Y MaPch L-78-83 3i+ 978

~~

Office of Nuclear Reactor'egulation rC/7 Attention: Mr. Victor Stella, Director D%~

CA~

Division of Operating Reactors C'9

~CA~

~i CI

+CfJ U. S. Nuclear Regulatory Commission washington, D. C. 20555 r

CD CO

Dear Mr. Stello:

Re: Turkey Point: Unit 4 Docket: Number 50-251 '

On March 1, 1978, Florida Power 6 Light Company forwarded to you a report of the current steam generator inspection and the preventative plugging program for Turkey Point Unit'4. This report supports the operation of Turkey Point Unit: 4 for in ex-cess of six effective months following t:he inspection. The steam generators will be reinspected during t: he next refueling outage.

Xn accordance with paragraph 3.D of Facility Operating License DPR-41, Florida Power 6 Light Company requests NRC approval to return, Turkey Point Unit 4 to operation. This approval is re-quested by March 7, 1978 so as not to delay the return to power of the Unit.

The Turkey Point Plant Nuclear Safety Committee aTIQ ther Florida

  • Power 6 Light Company Nuclear Reviei~ Board have reviewed t:his request. They have concluded that: the operation of Unit 4 for in excess of an additional six effective months will not. endanger the health and safety of the public.

Very truly yours, Robert E. Vhrig Vice President REU:cs cc: Mr. James P. O'Reilly, Region 1X Mr. Robert Lowenstein, Esquire 1