Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ENS 47473 + (Temporary Loss of Shutdown Cooling)
- ENS 43670 + (Temporary Loss of Smoke Detector Function)
- ENS 42120 + (Temporary Loss of the Running Rhr Pump During a Bus Transfer)
- ML20198D330 + (Temporary Mod Request T-10038 to Rev 0 to Maint Procedure MP 1411.08, Velan Bolt Bonnet Swing Check Valve Maint, Providing Instruction for Reassembly of FW-1009)
- ML20126K563 + (Temporary Mod Request T-8262 to Rev 10 to Sys Procedure Sp 1106.16, Condensate Sys)
- ML20126K544 + (Temporary Mod Request T-9000 to Rev 17 to Sys Procedure Sp 1103.05, Pressurizer Operation)
- ML20129E188 + (Temporary Mod Request T-9072 to Rev 11 to Sys Procedure Sp 1105.16, Steam & Feedwater Rupture Control Sys Operating Procedure)
- ML20129D401 + (Temporary Mod Request T-9098 to Rev 5 to Sys Procedure Sp 1106.27, Startup Feed Pump Operating Procedure)
- ML20129E133 + (Temporary Mod Request T-9216 to Rev 14 to Plant Procedure Pp 1102.03, Trip Recovery)
- ML20129B141 + (Temporary Mod Request T-9216 to Rev 14 to Plant Procedure Pp 1102.03, Trip Recovery)
- ML20198D318 + (Temporary Mod Requests T-10161 & T-10144 to Maint Procedure MP 1411.07, Maint & Repair of Limitorque Valve Operators Type SMC-04, Adding Steps to Grease 6.13.9 Not Gear Box & for Dissassembly/Reassembly of Gear Box Respectively)
- ML20198D284 + (Temporary Mod Requests T-10172,T-9693,T-9549,T-9542,T-9488 & T-9478 to Rev 0 to Maint Procedure MP 1411.05, Maint & Repair of Limitorque Valve Operators Types SMB-0 Through SMB-4. T-101.72 Adds Steps for Sizing Housing Cover Gasket)
- ML20129E114 + (Temporary Mod Requests T-8738,T-8703,T-8629,T-8559,T-8012 & T-7781 to Rev 18 to Sys Procedure Sp 1104.07, Hpis Procedure)
- ML20129E022 + (Temporary Mod Requests T-8750,T-8749 & T-8748 to Rev 5 to Sys Procedure Sp 1106.24, Main Steam Sys Operating Procedure)
- ML20129D657 + (Temporary Mod Requests T-8955,T-8942 & T-8077 to Sys Procedure Sp 1105.03, Safety Features Actuations Sys)
- ML20126K591 + (Temporary Mod Requests T-9023,T-8524 & T-8351 to Sys Procedure Sp 1104.04, Decay Heat & Low Pressure Injection Operating Procedure)
- ML20126K579 + (Temporary Mod Requests T-9026 & T-8913 to Rev 8 to Sys Procedure Sp 1106.07, Main Feedwater Sys)
- ML20126K559 + (Temporary Mod Requests T-9096,T-9042,T-9045,T-9064,T-8983, T-8945,T-8591,T-8592,T-8594,T-8593 & T-7110 to Rev 20 to Sys Procedure Sp 1104.02, Makeup & Purification Sys)
- ML20126K630 + (Temporary Mod Requests T-9187,T-9105,T-9073 & T-8783 to Rev 22 to Sys Procedure Sp 1106.06, Auxiliary Feedwater Sys)
- ML20235U409 + (Temporary Mod Sheet to Rev 2 to Conduct of Operations Procedure 2.0.7, Plant Temporary Mod Control)
- ML032731438 + (Temporary Modification of Implementation of Orders Dated February 25, 2002 and October 16, 2002)
- ML070530467 + (Temporary NMC Management Changes)
- ML18058B898 + (Temporary Non-Code Repair for Pipe Leak/Wall Thinning Downstream of Cv 0826,SWS,Line HB-23-16)
- ML20008F618 + (Temporary Operating Procedure SD-OP-004, for Chem-Nuclear Sys,Inc Mobile Cement Solidification Unit 1)
- ENS 46123 + (Temporary Outage of Public Prompt Notification System Due to a Bomb Threat Offsite)
- ML053130310 + (Temporary PM Assignment)
- ML050190287 + (Temporary Permit to Operate a Temporary Filter Truck Peach Bottom Atomic Power Station, PWS 7670905)
- ML020360110 + (Temporary Personnel Assignment)
- ML030520281 + (Temporary Personnel Assignment - Beaver Valley Power Station, Units 1 & 2)
- ML030290209 + (Temporary Personnel Assignment. Informs That Effective 01/27/2003, Until Further Notice, Guy S. Vissing Will Replace Donna Skay as Project Manager for Calvert Cliffs Nuclear Power, Unit Nos. 1 & 2)
- ML20127G571 + (Temporary Procedure Change 84-371 to Rev 2 to Procedure 27.304.01, NSST & Reserve Station Svc Transformer Transfer Checks)
- ML20204J139 + (Temporary Procedure Change 88-504 to Rev 4 to Procedure E-0, Reactor Trip or Safety Injection)
- ML20072K024 + (Temporary Procedure Change,Conduct of Operations - Operations Group)
- ML20099B974 + (Temporary Procedure Secondary Containment Preventative Maint Program)
- ML20096E415 + (Temporary Procedure Tp 21.001.02, On-Shift Advisor Training,Duties & Responsibilities)
- ML20092G747 + (Temporary Procedure to Rev 0 to Temporary Procedure T-ENG-90-14, Unit One Train B DCP 88-VIN0070 Sequencer Functional)
- ML18122A318 + (Temporary Project Manager Assignment)
- ML053180249 + (Temporary Project Manager Assignment)
- ML053140323 + (Temporary Project Manager Assignment)
- ML18123A337 + (Temporary Project Manager Assignment to Lisa Regner, Effective May 13, 2018)
- ML19205A126 + (Temporary Project Manager Change Letter)
- ML16298A153 + (Temporary Project Manager Reassignment)
- ML18054A651 + (Temporary Project Manager Reassignment)
- ML18054A613 + (Temporary Project Manager Reassignment)
- ML18058B637 + (Temporary Project Manager Reassignment)
- ML18058B631 + (Temporary Project Manager Reassignment)
- ML19017A158 + (Temporary Project Manager Reassignment)
- ML17110A069 + (Temporary Project Manager Reassignment from April 24, 2017, Through Approximately September 29, 2017)
- ML17110A062 + (Temporary Project Manager Reassignment from April 24, 2017, Through Approximately September 29, 2017)
- ML17128A097 + (Temporary Project Manager Reassignment from May 8, 2017, Through Approximately September 29, 2017)
- ML062410189 + (Temporary Reassignment Letter for M. Murphy)