At 0012 CDST, on 9-27-07 the Plant Shift SAt 0012 CDST, on 9-27-07 the Plant Shift Superintendent (PSS) was notified that an alarm was received for the C-333 Unit 6 Cell 4 UF6 Release Detection (PGLD) System. Operators responded and found that the READY and MANUAL lights for this system were not illuminated. This PGLD System contains detectors that cover C-333 Unit 6 Cell 4 and Section 2 of the cell bypass piping. At the time of this alarm, some areas of Section 2 of the cell bypass were operating above atmospheric pressure. TSR 2.4.4.1 requires that at least the minimum number of detector heads in each defined section of the cell bypass are operable during steady state operations above atmospheric pressure. With the Unit 6 Cell 4 PGLD system inoperable, only 2 of the required 3 heads in Section 2 of the cell bypass were operable. This PGLD System was declared inoperable, TSR LCO 2.4.4.1.C.1 was entered and a continuous smoke watch was put in place within one hour. Maintenance investigated and determined that two detector heads had shorted to ground which caused this alarm. Engineering has determined that the system would not have been able to perform its intended safety function when this alarm came in. The shorted heads were replaced and the GLD System was declared operable at 0350 hours on 9-27-07 following repairs and testing. This event is reportable as a 24 hour event in accordance with 10CFR 76.120(c)(2)(i). This is an event in which equipment is disabled or fails to function as designed when: a.) the equipment is required by a TSR to prevent releases, prevent exposures to radiation and radioactive materials exceeding specified limits, mitigate the consequences of an accident, or restore this facility to a pre-established safe condition after an accident; b.) the equipment is required by a TSR to be available and operable and either should have been operating or should have operated o demand, and c.) no redundant equipment is available and operable to perform the required safety function.</br>The licensee notified the NRC Resident Inspector.ensee notified the NRC Resident Inspector.  
05:12:00, 27 September 2007  +
43,670  +
16:02:00, 27 September 2007  +
05:12:00, 27 September 2007  +
At 0012 CDST, on 9-27-07 the Plant Shift SAt 0012 CDST, on 9-27-07 the Plant Shift Superintendent (PSS) was notified that an alarm was received for the C-333 Unit 6 Cell 4 UF6 Release Detection (PGLD) System. Operators responded and found that the READY and MANUAL lights for this system were not illuminated. This PGLD System contains detectors that cover C-333 Unit 6 Cell 4 and Section 2 of the cell bypass piping. At the time of this alarm, some areas of Section 2 of the cell bypass were operating above atmospheric pressure. TSR 2.4.4.1 requires that at least the minimum number of detector heads in each defined section of the cell bypass are operable during steady state operations above atmospheric pressure. With the Unit 6 Cell 4 PGLD system inoperable, only 2 of the required 3 heads in Section 2 of the cell bypass were operable. This PGLD System was declared inoperable, TSR LCO 2.4.4.1.C.1 was entered and a continuous smoke watch was put in place within one hour. Maintenance investigated and determined that two detector heads had shorted to ground which caused this alarm. Engineering has determined that the system would not have been able to perform its intended safety function when this alarm came in. The shorted heads were replaced and the GLD System was declared operable at 0350 hours on 9-27-07 following repairs and testing. This event is reportable as a 24 hour event in accordance with 10CFR 76.120(c)(2)(i). This is an event in which equipment is disabled or fails to function as designed when: a.) the equipment is required by a TSR to prevent releases, prevent exposures to radiation and radioactive materials exceeding specified limits, mitigate the consequences of an accident, or restore this facility to a pre-established safe condition after an accident; b.) the equipment is required by a TSR to be available and operable and either should have been operating or should have operated o demand, and c.) no redundant equipment is available and operable to perform the required safety function.</br>The licensee notified the NRC Resident Inspector.ensee notified the NRC Resident Inspector.  
Has query"Has query" is a predefined property that represents meta information (in form of a <a rel="nofollow" class="external text" href="https://www.semantic-mediawiki.org/wiki/Subobject">subobject</a>) about individual queries and is provided by <a rel="nofollow" class="external text" href="https://www.semantic-mediawiki.org/wiki/Help:Special_properties">Semantic MediaWiki</a>.
0.00405 d (0.0972 hours, 5.787037e-4 weeks, 1.33175e-4 months)  +  and 2.777778e-4 d (0.00667 hours, 3.968254e-5 weeks, 9.132e-6 months)  +
00:00:00, 27 September 2007  +
GDP-1  +
Modification date"Modification date" is a predefined property that corresponds to the date of the last modification of a subject and is provided by <a rel="nofollow" class="external text" href="https://www.semantic-mediawiki.org/wiki/Help:Special_properties">Semantic MediaWiki</a>.
23:31:30, 24 November 2018  +
16:02:00, 27 September 2007  +
0.451 d (10.83 hours, 0.0645 weeks, 0.0148 months)  +
05:12:00, 27 September 2007  +
Temporary Loss of Smoke Detector Function  +