Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML12297A237 + (Submittal of Revised Pages for Bmrc Technical Specifications Amendment 27)
- ML12187A097 + (Submittal of Revised Pages for the Bmrc Decommissioning Plan and Submittal of the Bmrc Final Status Survey Plan)
- ML021480507 + (Submittal of Revised Palisades Nuclear Plant Emergency Implementing Procedure EI-7.0 (Revision 7))
- DCL-12-121, Submittal of Revised Phase 1 and 2 Documents for the License Amendment Request for Digital Process Protection System Replacement + (Submittal of Revised Phase 1 and 2 Documents for the License Amendment Request for Digital Process Protection System Replacement)
- DCL-12-120, Submittal of Revised Phases 1 & 2 Documents for License Amendment Request for Digital Process Protection System Replacement + (Submittal of Revised Phases 1 & 2 Documents for License Amendment Request for Digital Process Protection System Replacement)
- RS-04-161, Submittal of Revised Physical Security Plans + (Submittal of Revised Physical Security Plans)
- RS-04-138, Submittal of Revised Physical Security Plans + (Submittal of Revised Physical Security Plans)
- RS-04-156, Submittal of Revised Physical Security Plans + (Submittal of Revised Physical Security Plans)
- RS-11-181, Submittal of Revised Post-Transaction Organization Related to Application for Approval of Indirect Transfer of Control of Licenses + (Submittal of Revised Post-Transaction Organization Related to Application for Approval of Indirect Transfer of Control of Licenses)
- L-PI-19-038, Submittal of Revised Pressure and Temperature Limits Report + (Submittal of Revised Pressure and Temperature Limits Report)
- ML24100A121 + (Submittal of Revised Pressure and Temperature Limits Report)
- NRC-12-0015, Submittal of Revised Relief Request No. PRR-002 for the Inservice Testing Program Third 10-Year Interval + (Submittal of Revised Relief Request No. PRR-002 for the Inservice Testing Program Third 10-Year Interval)
- NRC-16-0028, Submittal of Revised Relief Request No. PRR-007 for the Inservice Testing Program Third 10-Year Interval + (Submittal of Revised Relief Request No. PRR-007 for the Inservice Testing Program Third 10-Year Interval)
- NRC-17-0062, Submittal of Revised Relief Request No. RR-A37, Revision 1, for the Inservice Inspection Program Third 10-Year Interval + (Submittal of Revised Relief Request No. RR-A37, Revision 1, for the Inservice Inspection Program Third 10-Year Interval)
- NRC-20-0054, Submittal of Revised Relief Request RR-A39 for the Fourth Ten-Year Inservice Inspection Interval + (Submittal of Revised Relief Request RR-A39 for the Fourth Ten-Year Inservice Inspection Interval)
- EPID:L-2020-LLR-0161 + (Submittal of Revised Relief Request RR-A39 for the Fourth Ten-Year Inservice Inspection Interval)
- NRC-17-0051, Submittal of Revised Relief Requests Nos. VRR-012 and VRR-013 for the Inservice Testing Program Third 10-Year Interval + (Submittal of Revised Relief Requests Nos. VRR-012 and VRR-013 for the Inservice Testing Program Third 10-Year Interval)
- ML11189A036 + (Submittal of Revised Request for Approval of the PVNGS Cyber Security Plan)
- ML040780250 + (Submittal of Revised Request for Relief to Requirements of 10CFR50.55a Concerning Third Ten-Year Interval Inservice Testing Program)
- CNL-18-104, Submittal of Revised Response to Request for Additional Information Regarding Application to Modify Plant Technical Specifications to Extend Surveillance Requirements 3.3.1.5, 3.3.2.2 and 3.3.6.2 Specified Intervals + (Submittal of Revised Response to Request for Additional Information Regarding Application to Modify Plant Technical Specifications to Extend Surveillance Requirements 3.3.1.5, 3.3.2.2 and 3.3.6.2 Specified Intervals)
- NLS2008059, Submittal of Revised Root Cause Investigation - Diesel Generator Amphenol Connector + (Submittal of Revised Root Cause Investigation - Diesel Generator Amphenol Connector)
- ML12160A063 + (Submittal of Revised Section 4.3, Fuel Storage, Developmental Revision G of Technical Specification (TS))
- ML13274A349 + (Submittal of Revised Section 4.3.1, Criticality Developmental Revision G of the Unit 2 Technical Specification)
- CNL-18-059, Submittal of Revised Site Safety Analysis Report Subsection 2.4.2.2, Flood Design Considerations, and Subsection 2.4.3.5, Probable Maximum Flood Flow, and Figure 2.4.3-3 in Support of Early Site Permit Application for Clinch River Nuclear + (Submittal of Revised Site Safety Analysis Report Subsection 2.4.2.2, Flood Design Considerations, and Subsection 2.4.3.5, Probable Maximum Flood Flow, and Figure 2.4.3-3 in Support of Early Site Permit Application for Clinch River Nuclear s)
- ML100540345 + (Submittal of Revised Site Security Plan)
- L-78-262, Submittal of Revised Specification 3.41.b.7 + (Submittal of Revised Specification 3.41.b.7)
- ML13093A311 + (Submittal of Revised System Verification and Validation Plan and Tricon Documents for the License Amendment Request for Digital Process Protection System Replacement)
- ML12054A116 + (Submittal of Revised Technical Specifications for Possession-Only License R-77 to Commence Decommissioning Activities at the Buffalo Materials Research Center)
- BVY 09-014, Submittal of Revised Technical Specification Bases Pages + (Submittal of Revised Technical Specification Bases Pages)
- ML22266A286 + (Submittal of Revised Terrapower, LLC Quality Assurance Topical Report, Revision 14)
- PLA-7847, Submittal of Revised Topical Report to Support License Amendment Requesting Application of Advanced Framatome Methodologies + (Submittal of Revised Topical Report to Support License Amendment Requesting Application of Advanced Framatome Methodologies)
- ML15308A500 + (Submittal of Revised Unit 1 Cycle 19 and Unit 2 Cycle 18 Core Operating Limits Reports PLA-7396. Part 2 of 2)
- PLA-7396, Submittal of Revised Unit 1 Cycle 19 and Unit 2 Cycle 18 Core Operating Limits Reports PLA-7396. Part 1 of 2 + (Submittal of Revised Unit 1 Cycle 19 and Unit 2 Cycle 18 Core Operating Limits Reports PLA-7396. Part 1 of 2)
- CPSES-200501960, Submittal of Revised Unit 2 Eighth Refueling Outage Inservice Inspection Summary Report + (Submittal of Revised Unit 2 Eighth Refueling Outage Inservice Inspection Summary Report)
- ML24094A299 + (Submittal of Revised University of Illinois Topical Report, University of Illinois Urbana-Champaign High Temperature Gas-cooled Research Reactor: Applicability of Nuclear Regulatory Commission Regulations, Release 04, Dated March 15, 2024)
- ML24064A012 + (Submittal of Revised University of Illinois Topical Report, University of Illinois Urbana-Champaign High Temperature Gas-cooled Research Reactor: Applicability of Nuclear Regulatory Commission Regulations, Release 03, Dated February 28, 202)
- NRC-19-0067, Submittal of Revised Valve Relief Request VRR-004 for the Inservice Testing Program Fourth 10-Year Interval + (Submittal of Revised Valve Relief Request VRR-004 for the Inservice Testing Program Fourth 10-Year Interval)
- EPID:L-2019-LLR-0098 + (Submittal of Revised Valve Relief Request VRR-004 for the Inservice Testing Program Fourth 10-Year Interval)
- ML032020441 + (Submittal of Revised/Complete Version of Gas Report Concrete Storage Bunker Located within Area 5 of the Sorrento Valley West Land Area, Dated June 2003)
- ML21351A266 + (Submittal of Revision 0 of LANCR02/PANAC11 and Revision 4 of LANCR02 Licensing Topical Reports)
- ML21270A055 + (Submittal of Revision 0 of the Defueled Safety Analysis Report)
- ML21270A059 + (Submittal of Revision 0 of the Defueled Safety Analysis Report)
- ML17251A161 + (Submittal of Revision 0 to Defueled Safety Analysis Report and Final Safety Analysis Report Rev. 41 Change of Summary Description)
- ML15083A264 + (Submittal of Revision 0 to FPL-072-PR-002, Flooding Hazards Reevaluation Report)
- L-MT-13-063, Submittal of Revision 0 to the Core Operating Limits Report for Cycle 27 and Revision 0 to Pressure Temperature Limits Report + (Submittal of Revision 0 to the Core Operating Limits Report for Cycle 27 and Revision 0 to Pressure Temperature Limits Report)
- ML16071A172 + (Submittal of Revision 001 to the Cyber Security Plan)
- ML15205A166 + (Submittal of Revision 021 to Emergency Plan Implementing Procedure EPIP-13, Initial Dose Assessment for Radiological Emergencies)
- ML16029A411 + (Submittal of Revision 025 to Emergency Plan Implementing Procedure, EP-002-052, Nuclear Management Manual)
- ML16078A137 + (Submittal of Revision 032 to EP-001-001, Recognition and Classification of Emergency Conditions and Supporting Documents)
- ML15205A163 + (Submittal of Revision 045 to Emergency Plan Implementing Procedure EPIP-6, Activation and Operation of the Technical Support Center (TSC))
- ML052490514 + (Submittal of Revision 1 - 2005 Independent Corrective Action Program Implementation Assessment Plan for the Davis-Besse Nuclear Power Station)