Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- PMNS20171519, Steam Generator Task Force Meeting + (Steam Generator Task Force Meeting)
- PMNS20200012, Steam Generator Task Force Meeting + (Steam Generator Task Force Meeting)
- ML18022B105 + (Steam Generator Task Force Meeting - Industry Slides - January 23, 2018)
- ML19247C145 + (Steam Generator Task Force Meeting - September 4, 2019 Industry Slides)
- ML18233A520 + (Steam Generator Task Force Meeting - Slide Presentation)
- ML20041E099 + (Steam Generator Task Force Meeting Summary - January 22 2020)
- ML19344A876 + (Steam Generator Task Force Meeting Summary November 14, 2019)
- ML17249A493 + (Steam Generator Technical Evaluation,Ginna Power Station)
- L-18-081, Steam Generator Technical Specification Amendment Request + (Steam Generator Technical Specification Amendment Request)
- ML042880026 + (Steam Generator Tub Inspection Summary Reports for Their 2002 and 2003 Outages)
- LR-N14-0232, Steam Generator Tube - Inspection Report - Twentieth Refueling Outage (2R20) + (Steam Generator Tube - Inspection Report - Twentieth Refueling Outage (2R20))
- ML041830118 + (Steam Generator Tube 90-Day Inspection Report Associated with the Spring 2003 Refueling Outage)
- ML20092M947 + (Steam Generator Tube Alternate Plugging Criteria Presentation Matls)
- L-20-112, Steam Generator Tube Circumferential Crack Report-Spring 2020 Refueling Outage + (Steam Generator Tube Circumferential Crack Report-Spring 2020 Refueling Outage)
- L-16-195, Steam Generator Tube Circumferential Crack Report - Spring 2016 Refueling Outage + (Steam Generator Tube Circumferential Crack Report - Spring 2016 Refueling Outage)
- L-12-274, Steam Generator Tube Circumferential Crack Report - Spring 2012 Refueling Outage + (Steam Generator Tube Circumferential Crack Report - Spring 2012 Refueling Outage)
- L-22-136, Steam Generator Tube Circumferential Crack Report - Spring 2022 Refueling Outage + (Steam Generator Tube Circumferential Crack Report - Spring 2022 Refueling Outage)
- L-18-123, Steam Generator Tube Circumferential Crack Report - Spring 2018 Refueling Outage + (Steam Generator Tube Circumferential Crack Report - Spring 2018 Refueling Outage)
- L-08-104, Steam Generator Tube Circumferential Cracking Report for the Fifteenth Refueling Outage + (Steam Generator Tube Circumferential Cracking Report for the Fifteenth Refueling Outage)
- 05000424/FIN-2008003-02 + (Steam Generator Tube Damage as a Result of Tube Pulling Activities)
- 05000382/LER-2023-003, Steam Generator Tube Degradation Indicated by Failed In-Situ Pressure Testing + (Steam Generator Tube Degradation Indicated by Failed In-Situ Pressure Testing)
- Information Notice 2003-13, Steam Generator Tube Degradation at Diablo Canyon + (Steam Generator Tube Degradation at Diablo Canyon)
- ML20024C293 + (Steam Generator Tube Eddy Current Insp Rept,Steam Generators a & B,1983 Refueling Outage)
- ML20050E191 + (Steam Generator Tube Eddy Current Insp Rept,Steam Generator B,1981 Refueling Outage)
- Information Notice 1998-27, Steam Generator Tube End Cracking + (Steam Generator Tube End Cracking)
- 05000368/LER-2009-003, Steam Generator Tube Exceeding Technical Specification Plugging Criteria Remained in Service During Previous Cycles as a Result of the Failure to Use Proper Independent Verification + (Steam Generator Tube Exceeding Technical Specification Plugging Criteria Remained in Service During Previous Cycles as a Result of the Failure to Use Proper Independent Verification)
- ML20049J649 + (Steam Generator Tube Experience)
- ML20041D057 + (Steam Generator Tube Experience)
- Information Notice 2000-09, Steam Generator Tube Failure at Indian Point Unit 2 + (Steam Generator Tube Failure at Indian Point Unit 2)
- ML20115B680 + (Steam Generator Tube Failures)
- LR-N07-0045, Steam Generator Tube ISI Summary Report + (Steam Generator Tube ISI Summary Report)
- L-2010-075, Steam Generator Tube Inpsection Report.Turkey Point Unit 4, Steam Generator Tube Inspection Report + (Steam Generator Tube Inpsection Report.Turkey Point Unit 4, Steam Generator Tube Inspection Report)
- NL-03-182, Steam Generator Tube Inservice Examination Results for 2003 Refueling Outage 12 (R12) + (Steam Generator Tube Inservice Examination Results for 2003 Refueling Outage 12 (R12))
- ML20096F181 + (Steam Generator Tube Inservice Insp Rept, for BVPS)
- ML20078B866 + (Steam Generator Tube Inservice Insp Rept,Core 1 Refueling Outage)
- ML20084C346 + (Steam Generator Tube Inservice Insp Rept,Sequoyah Unit 2 Cycle 1 Refueling Outage)
- ML19331D326 + (Steam Generator Tube Inservice Insp, for May 1980)
- ML12321A047 + (Steam Generator Tube Inservice Inspection Report for the Spring 2012 Refueling Outage)
- ML24303A358 + (Steam Generator Tube Inservice Inspection Discussion-Fall 2024 (Oct. 25, 2024))
- ML090060111 + (Steam Generator Tube Inservice Inspection Report for the 2008 Refueling Outage)
- ML081560216 + (Steam Generator Tube Inservice Inspection Report for the 2007 Refueling Outage)
- ML11291A058 + (Steam Generator Tube Inservice Inspection Report for the 2011 Refueling Outrage)
- 2CAN030601, Steam Generator Tube Inservice Inspection Report Arkansas Nuclear One - Unit 2 + (Steam Generator Tube Inservice Inspection Report Arkansas Nuclear One - Unit 2)
- ML041000562 + (Steam Generator Tube Inservice Inspection for 10th Refueling Outage (1RF10))
- ML042890259 + (Steam Generator Tube Inservice Inspection Reports for the End-of-Cycle 5 Refueling Outage in 2003)
- ML13149A229 + (Steam Generator Tube Inservice Inspection Report for the Fall 2012 Refueling Outage)
- ML041050823 + (Steam Generator Tube Inservice Inspection Summary Reports from the Fall 2001 Outage)
- ML101530533 + (Steam Generator Tube Inservice Inspection Report for 2009 Refueling Outage)
- ML093200207 + (Steam Generator Tube Inservice Inspection Report for 2009 Refueling Outage)
- ML14294A449 + (Steam Generator Tube Inservice Inspection Report for the Spring 2014 Refueling Outage)
- ML11154A101 + (Steam Generator Tube Inservice Inspection Report for the 2010 Refueling Outage)
- ML030930551 + (Steam Generator Tube Inservice Inspection)