1 STEAM GENERATOR TUBE INSERVICE INSPECTION REPORT SEQUOYAH NUCLEAR PLANT UNIT 2 CYCLE 1 REFUELING OUTAGE July 1983
~;
Y 8404270219 840424
PDR ADOCK 05000328.
PDR.,
_ G; 1
i L
CONTENTS Inspection Summary Steam Generators Nos. 2 and 3-Table I Table II - Dent Analysis Summary Steam Generator No. 2 Table III - Dent Analysis Summary Steam Generator No. 3.
Identification of Tubes Plugged Table IV
+, -
D i ki' e
T B
s%
- k
^"
E-'-
m.
m
- ___.______g
,g,,
r-T' r
TABLE I n7 INSPECTION
SUMMARY
SEOUOYAll ~ UNIT.#2 Steam Genera tors # 2 a - # 3 -
S/G #2
- S/G #3 ilOT
' COLD-HOT COLD
'1983 TOTALS LEG LEG LEG LEG a
Tubes 4In-Steam. Generator
- (Straight' Lengths) 13,552 3,388 3,388 3,388' 3,388 TubessInspected 1,289 397 33 462 397
' ' Tubes-Recording.. Severe ~ Damage.
- (Approximate
- Wa11 Loss '4 0%. & Greater) 1 0'
0 0
1 (R2-C94)
Tubes. Recording Moderate Damage-(Approximate Wall Loss 20% to 39%)
0 0~
0 0
0 l Tubes Recording ' Minor.' Damage-(Approximate' Wall' Loss Less Than120%)
0 0
0 0
0
~
1 P
L c.2;
.),
. ge+
r m
C"
+
[
4
b TABLE II
?-
DENT ANALYSIS
SUMMARY
~
Sequoyah Unit #2 Steam Generator #2 1983 Hot Cold Total Leo Le6
~ Tubes In Steam Generator (Straight Lengths) 6776 3388 3388 Total Tubes Analyzed
'(Straight Lengths) 383 241 142
~
Total Intersections Analyzed 2034 1686 348 Dents 20+ Mils No. of Intersections 0
0 0
Dents 16-20 Mils No. of Intersections 0
0 0
Dents 11-15 Mils No.lof Intersections 0
0 0
Intersections Recording. Initiation of Dents or Magnetite Buildup No. of Intersections-
.126 124.
2 6.2%
'7.4%
0.6%
~~
' Intersections Recording' No Dents Nor
. MOgnetite Buildup
.No. of Intersections' 1908
'1562 346 93.8%.
92.,6%
9,9 ~4 %
O e'
u e.a
TABLE III DENT ANALYSIS
SUMMARY
~
Sequoyah Unit #2 Steam Generator #3 1983 Hot Cold Total Leo Leo Tubes In Steam Generator (Straight Lengths) 6776 3388 3388 Total Tubes Analyzed (Straight Lengths) 601 472 129 Total Intersections Analyzed 2766 2383 383
- Dents 20+ Mils No. of Intersections 0
0 O
Dents 16-20 Mils No. of Intersections 0
0 0
Dents'11-15 Mils No. of Intersections 0-0-
0 Intersections Recording Initiation of ' Dents or Magnetite uildup.
No..of Intersections 131 111 20 4.7%
4.7%
5.2%.
Intersections Recording No Dents Nor-Magnetite Buildup No.'of Intersections 2635
'2272 363 95.3%
-95.3%
94.8%,
i
't
.4 su
((
Y
?'
4 L.
I
+
TABLE IV SEQUOYAH UNIT 2 IDENTIFICATION OF TUBES PLUGGED S/G No.
Tube Plug Location Reason 3
R2-C94 Loose part damage re-sulting in primary-to-secondary leak
- e b
n 9
1 2
l
^ " '
'