ENCLOSURE 1 c Beaver Valley Power Station Unit No.1 10th Refueling Outage (Attachments I through 3A)

Examinations and analysis were performed in compliance with the Beaver Valley Power Station Unit No.1 ,

Technical Specifications, NRC Regulatory Guide 1.83, the EPRI Steam Generator Examination Guidelines (Rev. 3) and NED/ISI Procedure ISIEl-7 (Rev. 2), " Steam Generator. Analysis Guidelines." Each analyst was required to pass a site specific performance demonstration prior to analyzing the eddy current data from the current outage.

1 One hundred percent (100%) ofinservice tubes in Steam Generators RC-E-1 A,-1B and -lC were examined full length (tube end to tube end) with bobbin coil probes. In accordance with the Interim Plugging Criteria (IPC) for BVPS Unit No.1, distorted signals greater than 1.00 volt resulting from the bobbin coil examination were further interrogated I with the Zetec 3-Coil Rotating Pancake Coil (RPC) probe. Those signals (> 1.00 volt) that confirmed with RPC were l removed from service. Distorted signals 51.00 volt were not examined with RPC unless they were selected as part of the 1 I

100 tube random sample which is required for IPC implementation. A total of one hundred sixty-six (166) tubes were unplugged, examined and returned to service under IPC,80 tubes in RC-E-1 A and 86 tubes in RC-E-1B.

One hundred percent (100%) of inservice tubes in the WEXTEX Region Zone 4 were examined with RPC in each steam generator. This examination was perfonned in accordance with the Westinghouse Owner's Group (WOG) recommended inspection plan for WEXTEX sampling. The increased sample size from the normal 50% of Zone 4 was based on the discovery of a single circumferential indication in RC-E-1B. No other circumferential indications were observed during this examination; however,2 axial indications were found, one in RC-E-1 A and one in RC-E-18. The bobbin coil distorted signals observed in this area were administratively removed from service.

In support ofIPC, eight (8) tube support plate intersections plus three (3) top-of-tubesheet intersections were removed

' from RC-E-l A for metallurgical analysis.

During the RPC examination of BWNT plugs, several plugs of heat no. W592 exhibited circumferential indications.

Fifty-nine (59) plugs of heat no. W592 were removed. These tubes were then re-plugged. l l

The following table summarizes the results of the examinations: l RC-E-1 A RC-E-1 B RC-E-lC ,

1 i

TUBES EXAMINED (BOBBIN) 2661 2889 2994 356 281 55 l SUPPORT PLATES EXAMINED (RPC)

TUBES REMOVED FROM SERVICE 88 70 28 TUBES RETLRNED TO SERVICE 80 86 0 NET CHANGE IN TUBE STATUS -8 +16 -28 Additional Examinations:

Sixty-two (62) Westinghouse Plug-in-Plug (PIP) retainers were visually examined. No indications were observed.

A remote visual examination of the inlet and outlet nozzle inner radius areas in RC-E-1 A was performed. This exam met the requirements of ASME Section XI (IWA-2211c) and satisfies DLC relief request no. BVl-B3.140-1 Rev.1. There were no indications observed.

9601230256 960112 PDR ADOCK 05000334 G PDR

ENCLOSURE 1(cono Beaver Valley Power Station Unit No. I hm 10th Refueling Outage (Attachments 1 through 3A)

The results of the Beaver Valley Power Station Unit No. I inspections are provided in the following Attachments:

Attachment 1 - Examination Results from the Unit #1 10th Refueling Outage (10R) for Steam Generator RC-E-l A Attachment I A - Tube Plugging Results from the Unit #1 10th Refueling Outage (10R) for Steam Generator RC-E-1 A Attachment 2 - Examination Results from the Unit #1 10th Refueling Outage (10R) for Steam Generator RC-E-1B Attachment 2A - Tube Plugging Results from the Unit #1 10th Refueling Outage (10R) for Steam Generator RC-E-1B Attachment 3 - Examination Results from the Unit #1 10th Refueling Outage (10R) for Steam  ;

Generator RC-E-IC l l

Attachment 3A - Tube Plugging Results from the Unit #1 10th Refueling Outage (10R) for Steam l Generator RC-E-lC O

ENCLOSURE 2 m Beaver Valley Power Station Unit No. 2 b Fifth Refueling Outage (Attachments 4 through 6A)

Examinations and analysis were performed in compliance with the Beaver Valley Power Station Unit No. 2 Technical Specifications, NRC Regulatory Guide 1.83, the EPRI Steam Generator Examination Guidelines (Rev. 3) and NED/ISI Procedure ISIC.1-8 (Rev. 3), " Steam Generator Analysis Guidelines " Each analyst was required to pass a site  ;

specific performance demonstration prior to analyzing the eddy current data from the current outage. '

One hundred percent (100%) of inservice tubes in Steam Generators 2RCS-SG21 A,-SG21B and -SG21C were examined full length (tube end to tube end) with bobbin coil probes. In addition, the Zetec 3-Coil Rotating Pancake Coil (RPC) probe was used on indications that could not be resolved through standard bobbin coil testing. This probe was also used to examine a 20% random sample of the shot peened roll transition area at the top of the tubesheet in each steam generator. No indications associated with the roll transition were identified.

The following table summarizes the results of the examinations:

2RCS-SG21 A 2RCS-SG21B 2RCS-SG21C TUBES EXAMINED (BOBBIN) 3331 3344 3332 l l

SUPPORT PLATES EXAMINED (RPC) 285 814 491 ,

l r3 TUBES REMOVED FROM SERVICE 19 24 20

)

Additional Examinations:

Eighteen (18) Westinghouse Plug-in-Plug (PIP) retainers were visually examined. No indications were observed. l Two (2) tubes required stabilization as a result of possible foreign object wear against the tubes. These tubes were also removed from service.

A visual examination of the inlet and outlet nozzle inner radius areas of 2RCS-SG21 B was performed. This exam met the requirements of ASME Section XI (IWA-221 Ic) and satisfies DLC relief request no. BV2-B3.140-1 Rev. O. There were no indications observed.

ENCLOSURE 2(cono

(

Beaver Valley Power Station Unit No. 2 ' I Fifth Refueling Outage (Attachments 4 through 6A)

The results of the Beaver Valley Power Station Unit No. 2 inspections are provided in the following Attachments:

Attachment 4 - Examination Results from the Unit #2 5th Refueling Outage (SR) for Steam  ;

Generator 2RCS-SG21 A '

i Attachment 4A - Tube Plugging Results from the Unit #2 5th Refueling Outage (5R) for Steam Generator 2RCS-SG21 A Attachment 5 - Examination Results from the Unit #2 5th Refueling Outage (SR) for Steam Generator 2RCS-SG21B Attachment 5A - Tube Plugging Results from the Unit #2 5th Refueling Outage (SR) for Steam Generator 2RCS-SG21B Attachment 6 - Examination Results from the Unit #2 5th Refueling Outage (5R) for Steam Generator 2RCS-SG21C Attachment 6A - Tube Plugging Results from the Unit #2 5th Refueling Outage (5R) for Steam Generator 2RCS-SG21C ,

l

/]

U I

O

G V ATTACHMENT 1 EXAMINATION RESULTS FROM THE UNIT #1 10TH REFUELING OUTAGE (10R)

FOR STEAM GENERATOR RC-E-1 A i l

O

~ ~ . . - , . ~ . ~ . . ..-. ~ . . . .. - . . . - .- . - . . - . . .- - . _-_ --. .

1 l

                                • BWNS TUBAN II (Version 2.0) 05/16/1995 13:16:12 ****************
                                • Bcavar Vallcy Unit 1 ****************
                                • SG A ****************
                                • 1/95 RFO (10R) ****************
                                • Bobbin,MRPC ****************

Page 1 of 16 Steam Generator RC-E-1A Location & Percent Through Wall Calls (%TW) For All Indications ,

ROW COL TEST TYPE %TW IND VOLTS LOCATION i 1 1 MRPC NDF TSH +17.78 Bobbin 21 ODI 0.23 TSH +17.71 l 1 4 MRPC VOL 2.24 TSH +17.84 '

Bobbin 35 ODI 2.64 TSH +17.91 1 5 MRPC. VOL 1.26 TSH +17.84 Bobbin '30 ODI 0.77 TSH +17.24 1 18 Bobbin DSI 0.65 02H -0.03 1 19 Bobbin DSI 0.57 O1H +0.00 1 22 Bobbin DSI 0.66 O1H -0.09 1 26 Bobbin DSI- 0.82 O1H -0.03 1 30 MRPC NDF O1H +0.00 Bobbin DSI 1.24 O1H -0.26 1 41 Bobbin DSI 0.29 O1H -0.11 1 45 Bobbin DSI 0.66 O1H -0.03 1 67 Bobbin DNG 7.74 07H -0.79 1 70 MRPC SAI 0.69 O1H +0.00 Bobbin DNG 10.77 01C +33.78 l Bobbin DNG 5.77 01C +33.17 I Bobbin DSI 0.50 O1H +0.00 1 71 Bobbin DSI 0.45 O1H -0.06 1 94 MRPC VOL 0.78 TSH +17.92 Bobbin FSD 2.52 TSC- +17.62 Bobbin 26' ODI 0.40 TSH +17.47 2 11 MRPC NDF 02H +0.00 ,

Bobbin DSI 1.42 02H -0.12 l 2 14 MRPC NDF 02H -0.11 0 2 2

16 Bobbin 24 MRPC Bobbin DSI NDF DSI 0.64 1.72 01H 01H 01H

+0.00

+0.00

-0.20 Bobbin DSI 0.40 02H -0.03

.2 27 Bobbin DSI 0.38 O1H -0.06 2 28 Bobbin DSI 0.56 O1H -0.06 2 30 Bobbin DSI 0.68 O1H -0.06 2 33 Bobbin DSI 0.35 03H +0.00 2 35 Bobbin DSI 0.89 01H -0.11 2 36 Bobbin DSI 0.52 O1H -0.03 2 37 MRPC. NDF O1H +0.00 Bobbin DSI 1.24 O1H -0.23 2 38 Bobbin DSI 0.77 O1H -0.11 )

2 40 MRPC NDF 01H +0.00 Bobbin DSI 1.15 01H -0.14 2 44 MRPC NDF O1H +0.21 .

Bobbin DSI 0.97 O1H +0.03 l 2 53 Bobbin DSI 0.78 01H +0.03 l

'2 '57 MRPC MAI 0.70 O1H -0.10  !

l Bobbin DSI 0.54 01H +0.00 ,

2 68 Bobbin DSI 0.68 O1H -0.06 )

2 69 Bobbin DSI 0.45 01H +0.00 2 70 Bobbin DSI 0.75 02H -0.06 2 84 Bobbin DSI 0.40 O1H +0.06 i Bobbin DSI 0.37 02H -0.09 2 85 Bobbin DSI 0.59 03H -0.06 2 86 Bobbin DSI 0.89 02H -0.06 2 87 Bobbin DSI 0.45 02H -0.06 ,

i 2 92 MRPC SAI 0.84 O1H +0.00 Bobbin DSI 0.70 O1H +0.00 l 2 93 Bobbin 23 ODI 1.74 01C -0.09 i

, Bobbin 34 ODI 0.45 02C -0.03 3 3 Bobbin DSI 0.52 02H +0.09 3 8 MRPC NDF TSH +42.47

, Bobbin FSD 3.02 TSH +42.28

\ /

% 3 9 MRPC NDF O1H -0.03 l 3 11 Bobbin DSI 0.68 02H -0.06 3 19 Bobbin DSI 0.76 02H -0.06 3 21 MRPC NDF O1H +0.00 l

l l

___ m _ _ _ _ _ _ ___m .- . .. _ _ . . _ _ _. . .

                                • BWNS TUBAN II (Varsion 2.0) 05/16/1995 13:16:12 ****************
                                • Baavar Valley Unit 1 ****************
                                • SG A ****************
                                • 1/95 RFO (10R) ****************
                                • ' n obbin,MRPC ****************

e'  !

Y')g '

Page 2 of 16 l Steam Generator RC-E-1A  !

Location & Percent Through Wall Calls (%TW) For All Indications l ROW. COL TEST TYPE %TW IND VOLTS LOCATION Bobbin DSI 1.26 O1H -0.09 )

3 25 Bobbin DSI 0.48 O1H -0.09  !

3 29 Bobbin DSI 0.52 O1H -0.03- I 3- 32 MRPC MAI 0.77 02H -0.01 MRPC SAI 0.79 O1H +0.00 ,

Bobbin DSI 0.54 02H +0.05 Bobbin DSI 0.81 01H +0.13 3 35 Bobbin DSI 0.30 O1H -0.11 Bobbin DSI 0.37 O1H +0.00 1 3 36 Bobbin DSI 0.70 O1H -0.17 Bobbin DSI 0.78 O1H +0.00 3 47 MRPC NDF O1H +0.00 MRPC NDF 03H +0.00 3 55 Bobbin DSI 0.36 O1H -0.06 Bobbin DSI 0.68 O1H -0.09 3 58 Bobbin DSI 0.86 02H +0.00 Bobbin DSI 0.65 02H +0.06 i 3- 63 Bobbin DSI 0.50 02H -0.06 l Bobbin DSI 0.46 02H -0.14 l Bobbin DSI 0.32 07H +0.08 Bobbin DSI 0.58 O1H +0.09 Bobbin DSI 0.26 07H +0.03 Bobbin DSI 0.68 O1H +0.06 3 85 MRPC NDF O1H +0.00 '

Bobbin DSI 0.53 01H +0.00 4 1 Bobbin DSI 0.47 O1H +0.00 O 4 Bobbin 5 Bobbin Bobbin DSI DSI DSI 0.37 0.94 0.95 O1H O1H O1H

+0.00

+0.03

-0.06 4 7 Bobbin DSI 0.62 01H +0.06 4 9 MRPC NDF O1H +0.00 MRPC NDF 02H +0.00 Bobbin DSI 0.33 02H -0.06 Bobbin DSI 0.79 O1H +0.06 4 10 MRPC NDF 02H +0.06 Bobbin DSI 0.73 O1H -0.02 Bobbin DSI 0.67 O1H +0.00 4 17 Bobbin DSI 0.44 02H +0.00 Bobbin DSI 0.30 O1H +0.03 4 19 MRPC SAI 0.49 01H +0.00 Bobbin DSI 0.88 O1H -0.08 4 28 Bobbin DSI 0.49 O1H +0.03 Bobbin DSI 0.18 01H -0.08 to

  • 4 33 MRPC NDF 02H -0.03 MRPC NDF 02H -0.03 MRPC NDF 03H -0.14 MRPC NDF 03H -0.14 MRPC SAI 0.41 01H +0.00 MRPC SAI 0.87 01H. -0.02 i Bobbin DSI 0.47 02H -0.03 Bobbin DSI 0.95 03H -0.14 Bobbin DSI 0.92 01H +0.00 4 53 Bobbin DSI 0.64 O1H +0.00 4 54 MRPC SAI 0.53 01H +0.00 Bobbin DSI 0.65 01H +0.00 4 57 Bobbin DSI 0.39 O1H -0.03 4 60 Bobbin DSI 0.20 O1H -0.24 Bobbin DSI 0.56 02H -0.03 4 63 Bobbin DSI 0.61 02H +0.09 4 68 Bobbin DSI 0.37 01H +0.00 O 02H l 4 86 MRPC NDF +0.00 Bobbin DSI 2.04 02H +0.03

'S 1 Bobbin DSI 0.95 O1H +0.00 Bobbin 15 ODI 0.54 02C +0.00 5 11 Bobbin DSI 0.56 01H +0.00

, _ - .i

                                • BWNS TUBAN II (Varsion 2.0) 05/16/1995 13:16:12 ****************
                                • Bsavor Valley Unit 1 ****************
                                • SG A . ****************-
                                • 1/95 RFO (10R) ****************
                                • Bobbin,MRPC ****************

O Page 3 of 16 Steam Generator RC-E-1A Location & Percent Through Wall Calls (%TW) For All Indications ROW COL TEST TYPE %TW IND VOLTS LOCATION 1 5 19 Bobbin DSI 0.87 01H -0.03 5 22 MRPC SAI 0.91 01H +0.00 Bobbin DSI 0.73 O1H +0.00 5 25 Bobbin DSI 0.26. 02H +0.00 5 32 MRPC SAI 0.71 O1H -0.01 Bobbin DSI 0.80 O1H -0.09 5 34 MRPC NDF 01H +0.00 5 40 Bobbin DSI 0.76 01H +0.00 5 43 Bobbin DSI 0.67 02H +0.03 Bobbin DSI 0.43 01H +0.17 5 44 Bobbin DSI 0.60 02H +0.00 5 51 MRPC MAI 0.82 O1H +0.00 .i Bobbin DSI 0.86 O1H -0.06  !

5 61 Bobbin DSI .0.63 O1H +0.00 5 66 Bobbin DSI 0.46 O1H +0.00

-5 69 Bobbin DSI 0.35 O1H +0.00 5 73 Bobbin DSI 0.87 O1H -0.15 1 5 76 Bobbin DSI 0.73 02H +0.00 1 5 79 MRPC NDF 01H +0.00 1 Bobbin DSI 1.31 01H +0.06 5 80 Bobbin DSI 0.26 02H +0.06 Bobbin DSI 0.93 01H +0.00 5 82 Bobbin DSI 0.29 02H +0.00 5 87 Bobbin DSI 0.21 01H -0.21 5 90 Bobbin DSI 0.47 02H -0.12 l 5 91 Bobbin DSI 0.50 01H +0.00 6 5 Bobbin DSI 0.78 O1H +0.00 0$ 6 6

6 MRPC 9 MRPC NDF NDF O1H 03H

+0.00

-0.05 Bobbin DSI 0.68 01H +0.00 6 17 Bobbin DSI 0.52 O1H +0.06 6 22 Bobbin DSI 0.52 O1H +0.00 6 23 Bobbin DSI 0.73 02H +0.00 6 29 Bobbin DSI 0.76 O1H +0.00 6 35 Bobbin- DSI 0.70 O1H +0.00 6 44 Bobbin DSI 0.82 02H +0.00 Bobbin DSI 0.62 O1H +0.11 4 6 50 Bobbin DSI 0.61 O1H -0.03 j 6 59 Bobbin DSI 0.71 02H +0.21  ;

6 69 Bobbin DSI 0.25 02H +0.00 6 76 Bobbin DSI 0.55 02H +0.00 6 90 Bobbin DSI 0.25 03H -0.21 7 2 MRPC NDF 04H +0.00 7 4 Bobbin DSI 0.77 02H +0.00 7 5 MRPC NDF 03H +0.01 MRPC NDF 07H -0.01 Bobbin DSI 1.01 03H +0.00 7 10 MRPC NDF 02H +0.00 MRPC MAI 0.42 03H +0.00 MRPC SAI 0.40 O1H +0.00 Bobbin DSI 0.69 03H -0.14 Bobbin DSI 1.08 02H +0.06 Bobbin DSI 0.42 O1H -0.03 7 11 MRPC NDF 01H +0.00 Bobbin DSI 1.03 01H +0.00 7 16 Bobbin DSI 0.46 02H -0.15 7 24 Bobbin DSI 0.57 01H +0.09 7 36 MRPC NDF 03H +0.00 7 43 MRPC NDF O1H +0.00 Bobbin DSI 1.24 O1H -0.06 7 53 Bobbin DSI 0.46 O1H +0.00 O. 7 Bobbin 51 MRPC DSI MAI 0.34 0.46 02H 02H

+0.00

+0.00 MRPC SAI 0.67 O1H -0.10 Bobbin DSI 0.68 02H +0.00

. . . ~. _ - ~. . .., . .- .-- . - . - . _ . - - - -- .. . -.

l

                                • BWNS TUBAN II (Version 2.0) 05/16/1995 13:16:12 **************** ' I Batvar Valley Unit 1 **************** ,
                                • SG A ****************- 1
                                • 1/95 RFO (10R) . **************** l
                                • Bobbin,MRFC ****************

Page 4 of 16 Steam Generator RC-E-1A Location & Percent Through Wall Calls (%TW) For All Indications ROW COL TEST TYPE %TW .IND VOLTS LOCATION Bobbin DSI 0.62 01H +0.00 7 65 Bobbin DSI 0.54 02H -0.27 '

7 68 Bobbin DSI 0.37 02H +0.00 I 7 73 Bobbin DSI 0.66 O1H +0.06 l 7 76 Bobbin DSI 0.53 ' 01H +0.06 I

-7 77 Bobbin DSI 0.50 01H +0.03 '

7 81 Bobbin DSI 0.40 01H +0.13 i 7 82 Bobbin DSI 0.61 02H -0.06 l 7 87 Bobbin DSI 0.31 02H +0.09 7 88 Bobbin DSI 0.42 02H +0.06 7 90 Bobbin DSI 0.39 02H -0.12 8 4 MRPC NDF 02H +0.00 MRPC SAI 0.37 O1H +0.00 Bobbin DSI 0.36 02H +0.00 i Bobbin DSI 0.69 O1H -0.03 I 8 5 MRPC NDF O1H +0.00 MRPC NDF 02H +0.00 MRPC NDF 03H +0.00 Bobbin DSI 0.75 03H +0.00 Bobbin DSI 0.36 O1H -0.06 Bobbin DSI 0.54 02H +0.00 8 6 MRPC NDF 02H -0.16 Bobbin DSI 1.05 02H +0.06 I 8 10 MRPC NDF O1H +0.00 l 8 16 Bobbin DSI 0.27 O1H +0.00 8 22 Bobbin DSI 0.36 02H +0.00 8 25 MRPC NDF 04H +0.00

-0 8 8

52 Bobbin 54 MRPC DSI NDF 0.81 O1H O1H

+0.00

+0.00 Bobbin DSI 1.49 01H -0.12 8 59 Bobbin DSI 0.36 02H -0.03 8 60 Bobbin DSI 0.70 O1H -0.27 8 68 Bobbin DSI 0.41 02H +0.00 Bobbin DSI 0.90 01H +0.00 8 77 Bobbin DSI 0.65 01H +0.00 8 86 MRPC VOL 1.48 TSH +7.50 i Bobbin FSD 1.51 TSH +8.18 l 8 90 Bobbin DSI 0.35 03H -0.15 j 9 2 MRPC 25 ODI 1.09 02C -0.14 1 9 5 MRPC NDF 01H +0.00 I 9 7 MRPC NDF O1H +0.10 MRPC NDF 02H +0.10 MRPC NDF TSH +15.90 Bobbin FSD 1.81 TSH +16.37 9 8 MRPC NDF- 02H +0.10 9 9 MRPC NDF 03H +0.03 '

9 11 Bobbin DSI 0.21 03H +0.00 l 9 14 MRPC NDF 02H +0.00 9 15 MRPC SAI 0.62 01H +0.00 l Bobbin DSI 0.66 O1H +0.00 Bobbin DSI 0.76 01H +0.00 Bobbin DSI 0.58 01H +0.06 9 17 MRPC NDF 02H +0.00 Bobbin DSI 0.54 O1H +0.12 9 18 Bobbin DSI 0.41 O1H +0.12 9 21 Bobbin DSI 0.71 01H -0.06 9 23 Bobbin DSI 0.74 O1H +0.06 9 38 Bobbin DSI 0.60 O1H -0.03 9 57 MRPC NDF O1H +0.00

,_ Bobbin DSI 0.67 02H +0.00 9 62 Bobbin DSI 0.42 O1H +0.09 9 68 Bobbin DSI 0.52 O1H +0.00 9 75 Bobbin DSI 0.74 01H +0.06 9 76 Bobbin DSI 0.44 02H +0.03 9 78 Bobbin DSI 0.47 O1H +0.16

                                • BWNS TUBAN II (Varnion 2.0) 05/16/1995 13:16:12 ****************
                                • Banver Valley Unit 1 ****************
                                • SG A ****************

eee************* 1/95 RFO (10R) ****************

                                • Bobbin,MRPC ****************

/N U)

I Page 5 of 16 Steam Generator RC-E-1A Location & Percent Through Wall Calls (%TW) For All Indications ROW COL TEST TYPE %TW IND VOLTS LOCATION 9 82 Bobbin DSI 0.62 O1H +0.00 9 83 Bobbin DSI 0.81 O1H -0.09 9 84 Bobbin DSI 0.73 03H -0.03 9 86 MRPC NDF O1H +0.00 MRPC MAI 1.33 02H +0.00 Bobbin DSI 0.41 O1H +0.00 Bobbin DSI 0.95 02H +0.00 9 88 MRPC NDF 02H +0.00 Bobbin DSI 1.13 02H +0.15 9 90 Bobbin 'DSI 0.32 02H -0.21 10 2 Bobbin 4 ODI 0.72 02C +0.00 10 3 Bobbin DSI 0.64 O1H +0.00 10 4 Bobbin DSI 0.83 O1H +0.15 Bobbin DSI 0.34 02H +0.06 10 7 MRPC MAI 0.61 O1H +0.00 MRPC SAI 0.81 02H +0.00 Bobbin DSI 0.88 O1H -0.05 3

Bobbin DSI 0.82 02H +0.00 1 10 8 MRPC NDF 02H +0.00 l MRPC SAI 1.06 O1H +0.00 Bobbin DSI 0.22 02H +0.00 )

Bobbin DSI 0.21 O1H +0.00 l 10 10 MRPC MAI 0.47 O1H +0.09 Bobbin DSI 0.77 01H +0.00 10 15 MRPC NDF 01H +0.01 l Bobbin DSI 0.80 O1H +0.00 1

[3 10 18 MRPC NDF O1H +0.00 V} Bobbin Bobbin DSI DSI 0.25 1.44 02H O1H

-0.06

+0.03 10 19 Bobbin 10 ODI 0.41 05H +1.08 10 21 Bobbin DSI 0.60 O1H +0.00 Bobbin DSI 0.28 03H +0.03 10 22 Bobbin DSI 0.40 02H +0.00 10 23 MRPC NDF 01H +0.00 Bobbin DSI 1.06 01H +0.03 10 26 MRPC SAI 0.41 O1H -0.15 Bobbin DSI 0.93 O1H -0.06 10 30 MRPC NDF O1H +0.00 10 51 Bobbin DSI 0.69 O1H +0.00 10 54 MRPC NDF 02H +0.00 10 55 Bobbin DSI 0.42 02H +0.00 10 57 MRPC NDF O1H +0.00 Bobbin DSI 1.19 O1H -0.03 10 63 Bobbin DSI 0.63 O1H +0.00 10 66 MRPC MAI 0.66 O1H +0.20 Bobbin DSI 0.80 01H +0.00 10 76 Bobbin DSI 0.57 O1H +0.06 10 77 Bobbin DSI 0.67 O1H +0.00 10 80 Bobbin DSI 0.46 02H +0.00 10 81 Bobbin DSI 0.50 02H +0.00 10 90 Bobbin DSI 0.27 02H +0.09 11 2 Bobbin 6 ODI 0.75 02C +0.00 11 4 MRPC 18 ODI 0.62 01C -0.72 Bobbin DSI 0.64 O1H +0.06 11 11 MRPC NDF O1H -0.03 11 13 MRPC NDF 03H +0.00 11 16 Bobbin DSI 0.33 02H +0.00 11 18 MRPC SAI 0.28 01H +0.17 Bobbin DSI 0.36 O1H -0.06 11 21 MRPC NDF O1H +0.00 h

\_/

Bobbin Bobbin DSI DSI 1.20 0.65 O1H 02H

-0.06

+0.00 11 28 Bobbin DSI 0.70 O1H +0.00 11 55 MRPC NDF O1H +0.00 Bobbin DSI 1.02 O1H +0.00

. . - , - ~ ~ - - . . . - . . - -.- . _ . . . ~ . ~ - - . _ ~ . . ~ . . . . . . - . - . . - . _.._ -~

l

                                • 1BWNS TUBAN IIf (Varsion 2.0) - 05/16/1995 13:16:12 ****************
                                • Baavar Valley Unit 1 ****************  ;
                                • . SG A ****************  !
                                • 1/95 RFO (10R) ****************
                                • Bobbin,MRPC ****************

Steam Generator RC-E-1A Location & Percent Through Wall Calls (%TW) For All Indications ROW' COL TEST 4. 2 %TW IND VOLTS LOCATION 11 56 Bobbin DSI 0.33 02H +0.06 11 59 MRPC NDF 02H +0.19 ,

MRPC MAI 0.85 O1H -0.10 r Bobbin DSI 0.72 O1H +0.00 Bobbin DSI 0.69 02H +0.19 ,

11 77 Bobbin DSI 0.78 O1H +0.00

. 11 88' Bobbin DSI- 0.17 02H -0.15 ,

12 2 MRPC NDF 07H +0.00 Bobbin DNT 8.68 07H +0.00  !

12 4 MRPC 12' ODI 0.35 02C -0.10 12 19 Bobbin DSI 0.33 02H +0.00 12 21 MRPC SAI 0.88 O1H -0.02 ,

Bobbin DSI 0.90 O1H -0.05 >

12 22 Bobbin DSI 0.45 O1H +0.00 '

12 23 Bobbin DSI' O.51 O1H - +0.00 12 26 MRPC MAI 0.73 O1H +0.01 Bobbin' DSI 0.85 01H +0.00 12 40 Bobbin DSI 0.61 O1H -0.09 12 50 Bobbin DSI 0.81 01H +0.00  !

12 51 MRPC NDF O1H +0.00 I 12 54 MRPC NDF O1H +0.00  !

12 55 Bobbin DSI 0.48 O1H +0.00 .

12 56 Bobbin DSI 0.30 02H -0.03  !

Bobbin DSI 0.54 01H +0.15 12 59 Bobbin DSI 0.26 02H +0.09

' Bobbin DSI 0.59 O1H +0.15 '

12 61 Bobbin DSI 0.49 O1H +0.00

.. O 12 12 62 76 Bobbin Bobbin DSI' O.88 01H +0.06 DSI 0.35 01H~ +0.00 12 78 Bobbin DSI 0.68 02H +0.00 Bobbin DSI 0.45 01H +0.12

-13 3 MRPC NDF 07H +0.52 Bobbin DNT 5.58 07H +0.52 13 7 Bobbin DSI 0.25 02H +0.03 13 9 Bobbin DSI 0.53 O1H -0.06 13 12 Bobbin DSI 0.82 02H +0.00 13 15 Bobbin DSI 0.51 01H -0.06 13 17 Bobbin DSI 0.44 O1H +0.00 13 19 Bobbin DSI 0.63- O1H -0.03 13 21 Bobbin DSI 0.52 02H +0.09 13- 22 MRPC SAI 0.76 O1H +0.00 Bobbin DSI 0.97 O1H +0.03 13 23 Bobbin DNT 9.17 AV4 +9.07 13 43 Bobbin FSD '2.25 07H +14.04 13 56 MRPC NDF 01H 40.00 13- 62 Bobbin 'DSI 0.52 O1H +0.06 13 67 Bobbin DSI 0.62 O1H +0.00 13 78 Bobbin DSI 0.33 02H +0.00 14 3 Bobbin 15 ODI 0.98 01C +0.00 14 5 MRPC 30 ODI 1.55 01C -0.21 14 15 Bobbin DSI 0.44 01H -0.06 14- 18 Bobbin DSI 0.56 O1H +0.03 14 49 Bobbin DSI 0.49 O1H +0.06 1 14 53 Bobbin DSI 0.62 O1H +0.00 i 14 59 Bobbin DSI 0.50 02H +0.09  !

Bobbin DSI 0.81 O1H +0.00 14 63 MRPC MAI 0.32 01H +0.00

, MRPC SAI 1.18 02H -0.01 Bobbin DSI 0.41 02H -0.03 Bobbin DSI 0.52 01H -0.03 O 14 14 14 67 Bobbin 69 MRPC 78 Bobbin DSI NDF DSI 0.31 0.28 01H O1H 01H

+0.00

+0.00

+0.09 14 79 Bobbin DSI 0.34 01H -0.06 14 80 Bobbin DSI 0.42 02H +0.00 i

I **************** BWNS TUBAN.II (Version 2.0) 05/16/1995 13:16:12 ****************

              • e******** .Bsavar Valley Unit 1 ****************
                                • SG A ****************
                                • 1/95 RFO (10R) ****************
                                • Bobbin,MRPC ****************

l Page 7 of 16 Steam Generator RC-E-1A Location & Percent Through Wall Calls (%TW)' For All Indications ROW COL TEST. TYPE %TW .IND ~ VOLTS . LOCATION-14 87 Bobbin DSI 0.50 02H +0.06 14 92 MRPC 16 ODI 0.51 01C +0.00 i 15 60 Bobbin DSI 0.65 O1H +0.06 ]

15 61 Bobbin DSI 0.91 O1H -0.29 15 62 Bobbin DSI 0.67 01H +0.06 15 65 Bobbin DSI 0.27 O1H -0.09 15 70 Bobbin DSI 0.68 02H. +0.03 15 78 Bobbin DSI 0.75- O1H +0.00 15 81 Bobbin. DSI 0.70 01H +0.00 Bobbin DSI 0.55 02H -0.13 15 90 Bobbin 5 ODI 0.77 01C -0.12 16 4 Bobbin 12 ODI 1.12 01C +0.00 16 5 MRPC SAI 0.23 01H _ +0.00 Bobbin DSI 0.75 O1H -0.06 6 16 13 MRPC NDF 02H +0.00 ,

'MRPC NDF~ 02H +0.00 '

MRPC NDF- 03H +0.00 MRPC NDF 03H +0.00 ,

MRPC SAI 0.38 O1H +0.00 '

Bobbin DSI 0.66 O1H -0.08  !

Bobbin DSI 0.70 03H -0.14 i Bobbin DSI 1.23 02H +0.25 ,

16 22 MRPC SAI 0.73 O1H +0.00  ;

Bobbin DSI 0.59 O1H +0.00 '

16 23 MRPC SAI 0.75 O1H -0.15 Bobbin DSI 0.64 O1H +0.00 16 25 MRPC NDF 03H -0.07 Bobbin DSI 1.03 03H +0.03 Bobbin DSI 0.87 01H -0.09 16 28 MRPC SAI 1.10 01H +0.00- ':

Bobbin DSI 0.43 O1H +0.00 16 39 Bobbin DSI 0.52 01H +0.00 '

16 44 Bobbin DSI 0.48 O1H +0.06 16 49 Bobbin DSI 0.70 01H +0.00 i 16 54 Bobbin DSI 0.46 01H +0.06 '

16 58 Bobbin DSI 0.95 01H +0.09  !

16 59 MRPC NDF 02H +0.00 Bobbin DSI 1.07 02H -0.21 Bobbin DSI 0.83 01H -0.06 16 61 Bobbin DSI 0.24 03H -0.15 16 63 Bobbin DSI 0.39 O1H +0.12 16 73 Bobbin DSI 0.34 O1H +0.06 16 85 MRPC NDF 02H +0.00 ~

MRPC SAI 1.31 03H +0.00 Bobbin DSI 0.76 02H .+0.00 Bobbin DSI 0.58 03H +0.00 17 4 Bobbin 8 ODI 0.72 01C -0.12 17 5 Bobbin 8 ODI 0.93 02C +0.00 Bobbin 32 ODI 2.37 01C +0.00 '

17 13 Bobbin DSI 0.80 02H +0.00 17 24 Bobbin DSI 0.27 O1H -0.09 '

17 45 MRPC . SAI 0.78 O1H +0.00 Bobbin DSI 0.51 O1H +0.00 17 54 Bobbin DSI 0.73 O1H +0.00 17 60 Bobbin DSI 0.24 02H -0.18 i Bobbin DSI 0.53 01H +0.03 i 17 68 Bobbin DSI 0.95 02H +0.00 17 77 Bobbin DSI 0.55 02H +0.00 17 90 MRPC 15 ODI 0.49 02C +0.00 MRPC 24 ODI 0.98 01C +0.00 18 20 Bobbin DSI 0.74 O1H +0.03

.O 18 23 Bobbin DSI 0.74 O1H +0.00 18 42 Bobbin DSI 0.57 01H +0.00 18 51 Bobbin DSI 0.46 O1H +0.00 18 57 Bobbin DSI 0.43 O1H +0.00

. . - . . . . -__ - - - . . . - - ~.-._.-... _ _ _ ~.- ~.~ . ~ . . . ~ . . - . . . _ . - - . . . _ - .

Y 1

l***********************

BWNS TUBAN II '(Version 2.0) 05/16/1995 13:16:12 **************** l Baavar Valley Unit 1 **************** '

                                • SG A ****************

$ **************** 1/95 RFO (10R) ****************

**************** Bobbin,MRPC ****************
  1. 9*

' Steam Generator.RC-E-1A .

' Location & Percent Through Wall Calls (%TW) For All Indications l

ROW COL TEST TYPE %TW IND- VOLTS LOCATION -

1

.18 59 Bobbin' DSI 0.58 01H +0.00 18 61 Bobbin DSI 0.32 01H -0.09  ;

18. '69 Bobbin DSI 0.46 02H +0.06 ,

18 75 Bobbin DSI. 0.73 O1H +0.03 <

18 89 Bobbin' 8 ODI 1.44 01C -0.15  !

19 6 Bobbin 24 ODI 1.65 01C -0.15 '

19 9 Bobbin DSI 0.55 03H +0.00  !

19 22 Bobbin 21 ODI~ 2.12 03C ' +22.94 '

19- 27 MRPC NDF , 01H +0.00 19 30 MRPC. MAI 0.52 01H +0.00 Bobbin DSI- 0.73 O1H +0.00 .

19- 35 MRPC MAI 0.86 02H +0.00 MRPC. SAI 1.34 01H +0.00 l Bobbin DSI 0.98 .02H +0.00 Bobbin DSI 0.65 .01H- +0.03 i 19 38 MRPC SAI 2.14 O1H +0.18 l Bobbin DSI .0.76 O1H -0.17 1 19 45 Bobbin. DSI 0.32 -O1H +0.00 l 19 46 Bobbin DSI 0.62 O1H +0.00- .

19 54 MRPC MAI 1.16 01H +0.15 '

Bobbin DSI -0.69 01H -0.11 la 81 Bobbin DSI 0.57 01H +0.00 Bobbin DSI 0.26 02H -0.06 7 19 82 Bobbin DSI 0.56- O1H +0.00 Bobbin DSI 0.39 02H +0.00 '

20' l8 Bobbin 15 ODI 1.13 02C -0.15 i O 20 12 MRPC MRPC Bobbin NDF SAI DSI 0.94 0.94 02H 03H 03H

+0.00

+0.01

+0.00 i

i

. Bobbin DSI 0.65 02H. -0.05 20 19 MRPC NDF 01H +0.00  :

Bobbin DSI 0.69 03H +0.06 l

. Bobbin' 'DSI 0.80 02H -0.03 6 Bobbin DSI 1.11 O1H +0.12 20 20 Bobbin DSI 0.79 O1H +0.06 20 23 MRPC NDF O1H +0.00 20 36 MRPC NDF O1H +0.00 20 37 Bobbin DSI 0.37 O1H +0.11

-20 43 Bobbin DSI 0.86 01H +0.09 20 45 Bobbin DSI 0.72 02H +0.12 20 49 MRPC SAI 0.69 O1H +0.00 MRPC- SAI 1.20 O1H +0.12 Bobbin DSI 0.62 O1H +0.00 20 53 MRPC NDF 01H +0.00 201 56 Bobbin DSI 0.36 O1H +0.00 20 61 MRPC MAI 0.42 O1H +0.00 MRPC SAI 0.48 02H -0 08 Bobbin DSI 0.72 01H +0.00 Bobbin DSI 0.74 02H -0.08 20 63 MRPC SAI 1.33 O1H +0.00 MRPC SAI 1.66 01H -0.12 Bobbin DSI 0.66 O1H -0.03 20 65 MRPC NDF O1H +0.00 Bobbin DSI 1.12 O1H +0.06 20 66 MRPC MAI 0.44 O1H +0.00 Bobbin DSI 0.87 01H +0.03 20 70 Bobbin DSI 0.59 02H -0.03 Bobbin DSI 0.28 01H -0.24 20 85 Bobbin DSI 0.86 01H -0.12 20 88 Bobbin DSI 0.23 O1H -0.15 0 21 21 21 11 Bobbin 18 Bobbin 21 MRPC DSI DSI NDF 0.58 0.98 O1H 02H 01H

+0.00

+0.00

+0.00 21 22 Bobbin DSI 0.58 01H +0.09 21 28 Bobbin DSI 0.60 01H +0.00 l

. ~ _-- _ ..

. ,_ . = . , .

, . - -._ - = - . . - - ...__,-. - . - - . - - - - .. - . . . ..

BWNS TUBAN II (Varaion 2.0) 05/16/1995 13:16:12 ****************

Baavar Valley Unit 1 ****************

                                • . SG A **************** ,
                                • 1/95 RFO (10R) ****************
                                • Bobbin,MRPC ****************

Page 9 of 16 Steam Generator RC-E-1A Location & Percent Through Wall Calls - (%TW) For All Indications ROW COL TEST TYPE %TW IND VOLTS LOCATION 21 33 MRPC NDF O1H +0.00 Bobbin DSI 1.03 O1H +0.00 Bobbin DSI 0.80 02H +0.00 21 34 MRPC NDF . O1H +0.00 21 35 Bobbin DSI 0.43 O1H +0.06 21 38 Bobbin DSI 0.41 O1H +0.03 1 21 42 Bobbin DSI 0.39 O1H -0.09 21 46 Bobbin DSI 0.61 O1H -0.03 21 48 Bobbin DSI 0.71 01H +0.06 21 53 MRPC DNT 4.93 03H +0.00 Bobbin DNT 9.69 '

03H +0.00 l 21 54 MRPC NDF O1H +0.00 1 Bobbin DSI 1.30 O1H -0.03 )

21 55 Bobbin DSI 0.50 O1H +0.00 21 57 Bobbin DSI 0.89 O1H +0.00 l 21 59 MRPC NDF O1H +0.00 i Bobbin DSI 1.54 O1H -0.24 21 61 Bobbin DSI 0.75 01H +0.23 21 62 Bobbin DSI 0.82 O1H +0.00  :

21 63 Bobbin FSD 1.38 O1H +30.19  !

21 64 Bobbin DSI 0.53 02H +0.00 4 21 70 MRPC NDF 02H +0.00 l Bobbin DSI 1.24 02H -0.06 l 21 73 Bobbin 13 ODI 0.61 03H +21.82 l 21 77 Bobbin FSD 2.25 02C +19.49 I 21 79 Bobbin FSD 1.82 03C +18.49 l Bobbin FSD 1.36 03C +19.98 '

'O. 21 80 MRPC NDF O1H +0.00 MRPC SAI 1.04' 02H +0.00 l Bobbin DSI 0.69 O1H +0.00 Bobbin DSI 0.89 02H +0.00 1 21 88 MRPC 24 ODI 0.97 01C +0.00 l 22 9 Bobbin 29 ODI 2.04 01C +0.09 22 18 Bobbin DSI 0.50 01H +0.06 22 20 Bobbin DSI 0.47 02H -0.06 22 41 MRPC NDF O1H +0.00 22 43 Bobbin DSI 0.23 02H +0.00 Bobbin DSI 0.71 O1H +0.06 22 44 MRPC SAI 0.21 O1H +0.00 Bobbin DSI 0.51 01H +0.00 Bobbin DSI 0.65 O1H +0.00 22 45 MRPC SAI 1.14 O1H +0.00 Bobbin DSI 0.85 O1H +0.00 22 47 MRPC SAI 0.82 O1H +0.00 Bobbin DSI 0.46 O1H -0.12 22 53 MRPC SAI 1.61 O1H +0.00 Bobbin DSI 0.43 O1H -0.03 22 73 Bobbin DSI 0.50 02H +0.06 22 78 Bobbin DSI 0.37 01H +0.00 22 81 Bobbin DSI 0.67 01H +0.00 22 87 Bobbin DSI 0.39 02H +0.06 23 8 MRPC 16 ODI 0.55 01C +0.00 23 9 Bobbin DSI 0.76 01H +0.00 23 13 MRPC NDF 02H +0.00 23 20 Bobbin DSI 0.48 O1H +0.03 1' 23 22 Bobbin DSI 0.41 O1H +0.06 23 23 Bobbin DSI 0.58 O1H +0.00 23 24 Bobbin DSI 0.37 02H +0.00 23 25 MRPC NDF O1H +0.00 MRPC' NDF 02H +0.00 23 29 Bobbin DSI 0.61 02H +0.00 O' 23 Bobbin 34 Bobbin DSI DSI 0.56 0.71 01H O1H

+0.00

+0.00 23 35 Bobbin 19 ODI 0.98 02H +17.39 l 23 36 MRPC NDF O1H +0.00

i

                                • BWNS TUBAN II (Varsion 2.0) 05/16/1995 13:16:12 ****************

, ****************. Baaver Valley Unit 1 ****************

                                • SG A ****************
                                • 1/95 RFO (10R) ****************

1 ' **************** Bobbin,MRPC ****************

O .Page 10 of 16  !

Steam Generator RC-E-1A-Location & Percent Through Wall Calls (%TW) For All Indications ROW- COL TEST TYPE. %TW IND . VOLTS LOCATION  :

MRPC MAI' O.38 02H -0.08 Bobbin DSI 0.43 02H +0.00 23 38' Bobbin DSI 0.29 O1H +0.00 l 23 43= Bobbin DSI. 0.26 01H' +0.00 i 23 47 MRPC SAI- 0.65 O1H -0.01 Bobbin DSI 0.26 O1H -0.11 23 57 Bobbin DSI 0.57 O1H +0.00 23 60 MRPC NDF 02H - +0.00 23 67 Bobbin DSI 0.48 O1H +0.00 23 77 Bobbin 12 ODI 0.73 06C +13.76 23 78 Bobbin DSI 0.46 01H -0.12

.. Bobbin DSI 0.32 02H +0.13 24 8 MRPC 19 ODI 0.71 02C +0.03 MRPC 21 ODI 0.83 01C +0.00 24 11 MRPC NDF 05H- +0.00 MRPC NDF 05H +0.06 24 12 Bobbin DSI 0.47 03H +0.00 24 16 Bobbin DSI 0.21 O1H +0.06 24 19 MRPC- NDF 01H +0.00 24 21 MRPC NDF O1H +0.00 .

24 22 MRPC NDF O1H +0.00

4 2 27 MRPC NDF 01H +0.00 24 41 MRPC NDF 01H +0.00 24' 45 MRPC NDF 02H +0.00 Bobbin DSI 1.62 02H +0.06 24 46 Bobbin DSI 0.57 O1H +0.00 24 (7 MRPC NDF O1H +0.00

-0 24 51 Bobbin Bobbin 19 25 ODI ODI 0.83 1.44 AV3 AV2

+0.00

+0.00 r

Bobbin 26 ODI 1.53 AV4 +0.00 '

Bobbin 30- ODI 2.23 AV1 +0.00 24 54 MRPC SAI 0.64 01H +0.00 Bobbin DSI 0.75 01H +0.14 24 58 MRPC NDF 02H +0.00 24- 60'MRPC MAI 0.33 02H +0.00 MRPC SAI 0.75 O1H +0.00 Bobbin DSI 0.70 O1H +0.00 Bobbin DSI O.28 02H +0.00 24 ~68 Bobbin 15 ODI 0.66 AV2 +0.00 24 70 Bobbin DSI 0.50 02H- +0.03 24 73 Bobbin DSI 0.38 02H +0.09

-24 74 MRPC NDF 02H +0.00 25 11 MRPC 20 ODI 0.75 01C +0.00 25 12 MRPC NDF 02H -0.12 MRPC NDF 07H +0.03 25 14 MRPC SAI 0.43 02H +0.04  !

MRPC SAI 0.29 O1H +0.09 Bobbin DSI 0.99 02H +0.08 Bobbin DSI 0.42 O1H +0,00 25' 19 Bobbin DSI 0.44 02H +0.00 25 21 Bobbin DSI 0.51 01H +0.00 25- 22 MRPC SAI 0.34 O1H +0.03 '

l Bobbin DSI 0.50 01H +0.09 25 24'MRPC NDF 01H +0.00 Bobbin 4 ODI 0.82 02H +20.58 25 .36 Bobbin DSI 0.99 01H +0.00 25 38 Bobbin DSI 0.25 02H +0.00 25 39 MRPC NDF 01H +0.06 25 41 Bobbin DSI 0.50 O1H +0.06 25 42 Bobbin DSI 0.25 02H +0.09 O 25 25 Bobbin 45 Bobbin 46 Bobbin DSI DSI DSI 0.27 0.60 0.42 01H O1H O1H

+0.09

+0.06

+0.18 25 59 Bobbin DSI 0.50 02H -0.06 Bobbin DSI 0.63 O1H +0.03

~l

                                • BWNS TUBAN II (Varsion 2.0) 05/16/1995 13:16:12 ****************
                                • Beaver Vallcy Unit 1 ****************
                                • SG A **************** ,
                                • 1/95 RFO (10R) ****************
                                • Bobbin,MRPC ****************

/"%

i i V

Page 11 of 16 Steam Generator RC-E-1A Location & Percent Through Wall Calls (%TW) For All Indications ROW COL TEST TYPE %TW IND VOLTS LOCATION 25 61 Bobbin DSI 0.53 O1H -0.03 25 64 Bobbin DSI 0.56 O1H +0.03 25 65 Bobbin 23 ODI 1.56 AV4 +0.00 Bobbin 25 ODI 1.79 AV3 +0.00 25 71 Bobbin DSI 0.52 02H +0.03 26 23 Bobbin DSI 0.45 01H +0.00 26 26 MRPC SAI 0.79 O1H +0.00 Bobbin DSI 0.74 O1H +0.08 Bobbin 18 ODI 1.18 AV4 +0.32 26 27 MRPC NDF 01H +0.00 26 29 Bobbin DSI 0.55 O1H +0.00 26 30 Bobbin DSI 0.91 O1H +0.00 26 33 MRPC NDF 01H +0.00 26 34 Bobbin 10 ODI 0.38 AV1 +0.00 Bobbin 15 ODI 0.68 AV3 +0.00 Bobbin 21 ODI 1.14 AV2 +0.00 Bobbin 23 ODI 1.79 AV3 +15,62 Bobbin 24 ODI 1.54 AV4 +0.00 26 35 MRPC NDF O1H +0.00 26 36 Bobbin DSI 0.48 O1H +0.06 26 55 MRPC SAI 0.68 O1H +0.00 Bobbin DSI 0.58 01H +0.06 26 67 MRPC NDF 02H +0.00 Bobbin DSI 1.30 02H +0.15 26 82 Bobbin DSI 0.47 02H +0.00 27 15 Bobbin DSI 0.67 O1H +0.00

[-sT 27 19 MRPC SAI 0.94 01H +0.00

\m,/ Pobbin DSI 0.49 O1H -0.03 27 27 Bobbin DSI 0.75 O1H +0.00 Bobbin DSI 0.43 03H +0.12 1 27 31 Bobbin DSI 0.68 01H +0.00 l 27 32 Bobbin DSI 0.82 01H +0.00 27 33 Bobbin DSI 0.43 O1H +0.00 l

27 37 Bobbin DSI 0.33 O1H -0.09 27 38 Bobbin DSI 0.61 01H +0.03 l 27 40 MRPC NDF 02H +0.18  !

MRPC SAI 0.66 O1H +0.18 Bobbin DSI 0.90 01H +0.15 27 45 Bobbin DSI 0.39 O1H +0.03 27 53 MRPC SAI 1.05 01H +0.00 Bobbin DSI 0.83 O1H +0.09 27 59 Bobbin DSI 0.70 O1H +0.12 Bobbin DSI 0.53 02H +0.00 27 66 MRPC SAI 1.13 01H +0.04 Bobbin DSI 0.62 O1H +0.00 27 75 MRPC SAI 1.11 04H +0.00 MRPC SAI 0.81 04H +0.00 Bobbin DSI 0.68 04H +0.06 27 79 Bobbin DSI 0.38 02H +0.00 27 85 MRPC 23 ODI 0.87 02C +0.00 MRPC 25 ODI 1.03 01C +0.00 28 13 Bobbin 4 ODI 1.08 02C -0.09 28 17 MRPC SAI 0.85 O1H +0.00 Bobbin DSI 0.68 O1H +0.03 28 32 Bobbin DSI 0.49 01H +0.00 28 43 Bobbin DSI 0.60 O1H +0.03 28 44 Bobbin DSI 0.31 02H +0.09 28 46 Bobbin DSI O.74 02H +0.12 28 58 MRPC NDF O1H +0.00 28 62 Bobbin DSI 0.63 01H +0.09

[ \ 28 63 MRPC NDF 01H +0.11 (s l MRPC Bobbin NDF DSI 0.63 02H 02H

-0.06

-0.06 Bobbin DSI 0.88 O1H +0.11 28 69 Bobbin DSI 0.47 02H +0.09

                                • BWNS TUBAN II' (Vcreion 2.0) 05/16/1995 13:16:12 ****************
                                • Batysr Valley Unit 1 ****************
                                • SG A ****************
                                • 1/95 RFO - (10R) . ****************

'**************** Bobbin,MRPC ****************

O Page 12 of 16 Steam Generator RC-E-1A Location & Percent Through Wall Calls ' (%TW) For All Indications ROW COL TEST TYPE %TW IND VOLTS LOCATION.

28 71 Bobbin DSI 0.69 02H +0.06 Bobbin. DSI 0.33 03H +0.06 28 78 Bobbin DSI 0.25 O1H -0.06 28 79 Bobbin DSI 0.44 01H +0.00 28 84 Bobbin 8 ODI 0.59 01C -0.19 28 85 MRPC 10 ODI 0.29 01C +0.00 29 14 Bobbin 22 ODI 1.23 01C -0.28 29 15 MRPC NDF 02H +0.00 Bobbin DSI 1.25 02H +0.15 29 21 MRPC NDF 03H +0.00 MRPC MAI 1.04 02H +0.17 MRPC MAI 1.11 01H +0.01 Bobbin DSI 0.70 O1H +0.00 Bobbin- DSI 0.48 03H +0.05 Bobbin DSI 0.39 02H- +0.08 29 23 MRPC SAI 0.40 02H +0.00 MRPC SAI 0.84 O1H +0.00 .

Bobbin DSI 0.72 01H +0.03 Bobbin DSI 0.60 02H -0.03 29 34 Bobbin 21 ODI 1.63 AV4 +0.00 29 46 Bobbin DSI 0.79 O1H +0.03 29 50 MRPC NDF O1H +0.00 29 51 MRPC SAI 1.66 O1H +0.00 Bobbin DSI 0.59 O1H +0.00 29 60 Bobbin DSI 0.79 O1H +0.00 Bobbin 18 ODI 0.90 AV4 +0.09 Bobbin 25 ODI 1.64 AV2 +0.00 Bobbin 29 ODI 2.16 10/3 -0.12 29 61 Bobbin DSI 0.35 02H +0.00 Bobbin DSI 0.77 O1H +0.00 29 62 Bobbin DSI 0.68 01H +0.24 Bobbin DSI 0.56 02H -0.27 29 64 MRPC- SAI 1.00 01H -0.12 <

Bobbin DSI 0.65 O1H +0.06 l 29 69 Bobbin DSI 0.20 01H +0.06 l 29 84 Bobbin 11 ODI 1.00 03C -0.09 '

30 12 MRPC 15 ODI 0.50 01C +0.00' 30 13 MRPC 13 ODI 0.42 01C +0.00 MRPC 16 ODI 0.72 02C +0.17 30 14 Bobbin 27 ODI 1,66 01C -0.30 30 16 MRPC 17 ODI- 0.75 01C -0.37 30 24 MRPC NDF O1H +0.00 MRPC MAI 0.44 03H -0.12 Bobbin DSI 0.30 O1H -0.03 Bobbin DSI 0.58 03H -0.09 30 29 Bobbin DSI 0.74 01H +0.00 30 33 Bobbin DSI 0.62 02H +0.03 30 37 Bobbin DSI 0.16 01H +0.06 30 38 Bobbin DSI 0.57 02H +0.03 30 42 Bobbin DSI 0.96 O1H +0.00 30 45 MRPC SAI 1.24 02H +0.00 Bobbin DSI 0.61 02H +0.08 30 53 Bobbin 20 ODI 1.04 AV1 +0.00 Bobbin 26 ODI 1.76 AV2 +0.00 30 61 MRPC SAI 0.62 O1H -0.09 Bobbin DSI 0.47 01H +0.06 30 62 MRPC NDP 01H +0.00 30 70 Bobbin DSI 0.35 02H +0.00 30 74 MRPC SAI 0.79 01H -0.04 Bobbin DSI 0.65 O1H +0.09

\ 31 14 Bobbin 12 ODI 0.80 01C +0.00

- . 31 20 MRPC SAI 0.37 O1H +0.01 Bobbin DSI 0.82 O1H -0.03 31 26 MRPC NDF 03H +0.00 31 30 Bobbin DSI 0.43 02H +0.00 1

_ _ _ . _ - _ . _ . . _ . _ _. _ . - ..- ._ m _ __ ._ __

                                • BWNS TUBAN II (Varaion 2.0) 05/16/1995 13:16:12 ****************
                                • Boavsr Valley Unit 1 ****************

'**************** SG A ****************

                                • 1/95 RFO (10R) ****************
                                • Bobbin,MRPC ****************

O Page 13 of 16 Steam Generator RC-E-1A Location & Percent Through Wall Calls (%TW) For All Indications ROW COL TEST TYPE %TW IND VOLTS LOCATION 31 35 Bobbin 12 ODI 0.45 AV4 +0.00 >

Bobbin 15 ODI 0.68 AV2 +0.00 I 31 36 Bobbin DSI 0.63 01H +0.09 J 31 44 Bobbin DSI 0.27 O1H -0.03 )

31 52 Bobbin DSI 0.48 01H +0.00 Bobbin DSI 0.39 02H +0.00 31 56 MRPC . SAI 0.95 O1H +0.00 Bobbin DSI 0.69 O1H +0.00 i 31 59 Bobbin DSI 0.45 O1H -0.24 '

1 31 60 Bobbin .DSI 0.60 02H -0.09 31 69 Bobbin 17 ODI 0.83 AV1 +0.00 31 72 MRPC NDF O1H +0.00 31 74 MRPC NDF O1H +0.00 32 16 MRPC 19 ODI 0.87 01C -0.04 32 35 Bobbin DSI 0.36 O1H +0.03 32 40 MRPC SAI 2.03 O1H +0.15 Bobbin DSI 0.50 O1H +0.06 32 45 MRPC NDF O1H .+0.00 Bobbin DSI 0.76 O1H +0.00 32 46 Bobbin DSI. 0.33 02H +0.00

' 32 49 Bobbin FSD 1.99 04H +38.22-32 51 MRPC SAI 1.12 O1H -0.05 Bobbin DSI 0.79 01H -0.07' 33 17 Bobbin FSA 4.34 AV3 +17.36 33 18 Bobbin 30 ODI 2.27 Olc -0.18 33 33 MRPC NDF 02H +0.00 O MRPC MRPC Bobbin NDF SAI DSI 1.03 0.85 03H O1H O1H

+0.00

+0.18

+0.21 33 37 Bobbin DSI 0.48 O1H +0.14 33 38 Bobbin DSI 0.81 01H +0.11 33 40 MRPC NDF 03H +0.00 33 50 MRPC NDF O1H +0.00 1 34 16 MRPC- 8 ODI 0.22 01C +0.00 l 34 17 MRPC 6 ODI 0.22 02C -0.18 I MRPC 16 ODI 0.73 01C -0.12 34 20 Bobbin DSI 0.28 02H +0.09 Bobbin DSI 0.56 01H +0.12 34 26 MRPC NDF 02H +0.00 34 27 Bobbin DSI 0.57 02H +0.08 Bobbin DSI 0.64 O1H +0.06 34 29 MRPC NDF 02H +0.00 Bobbin DSI 0.56 O1H +0.00 34 30 MRPC SAI 0.71 O1H -0.01 l Bobbin DSI 0.40 O1H -0.09 34 31 MRPC MAI 0.92 O1H -0.08 MRPC SAI 0.60 02H +0.00 Bobbin DSI 0.57 01H -0.03 i Bobbin DSI 0.64 02H -0.03 34 32 Bobbin DSI 0.71 O1H -0.08 l 34 33 MRPC NDF 01H +0.00 34 38 Bobbin DSI 0.54 01H +0.00 34 40 MRPC NDF 02H +0.00 34 44 Bobbin DSI 0.34 01H +0.09 34 46 Bobbin DSI 0.21 02H +0.09 34 53 MRPC NDF 02H +0.00 34 58 Bobbin DSI 0.77 02H -0.06 34 61 Bobbin DSI 0.52 O1H +0.00 34 63 MRPC NDF 02H +0.00 Bobbin DSI 1.10 02H +0.00 O 34 64 Bobbin Bobbin Bobbin DSI DSI DSI 0.48 0.60 0.42 O1H 02H O1H

+0.06

+0.00

+0.06 35 17 Bobbin 26 ODI 1.49 02C -0.15 35 18 MRPC 13 ODI 0.53 02C +0.00

- ****************- BWNS TUBAN II (Varsion 2.0) 05/16/1995 13:16:12 '****************--

                                • ~

Baaver Valley Unit 1 ****************

'****************l SG A ****************

    • e************* 1/95 RFO (10R) ****************
                                • Bobbin,MRPC ****************

O

.- U

-Steam Generator RC-E-1A -

Location & Percent Through Wall Calls (%TW)' For All Indications

. ROW COL TEST TYPE %TW IND VOLTS LOCATION 35 19 MRPC '15 ODI 0.67 01C +0.00 35, 24 Bobbin DSI 0.34 02H -0.09

-35 28 MRPC NDF 01H +0.00 MRPC NDF 01H -0.10 MRPC NDF 02H '+0.00 MRPC NDF 03H- +0.00 Bobbin DSI 1.79 01H +0.00 35 33 Bobbin DSI 0.67 01H +0.00 35 62 Bobbin DSI 0.47 01H -0.18 36 19 Bobbin 22- ODI 1.75 01C -0.31 36 20 MRPC 13 ODI 0.54 01C -0.02 36 22 MRPC 23 ODI 1.15 01C -0.20 36 24 MRPC NDF O1H .+0.05 MRPC- NDF 03H -0.08 MRPC SAI 0.75 02H +0.03 Bobbin DSI 0.41 03H -0.08 Bobbin DSI 1.08 01H +0.00 Bobbin DSI 0.81 .02H +0.00 1 36 34 Bobbin DSI 0.43 01H +0.00 36 39 Bobbin DSI 0.62 03H +0.03 36 40 MRPC NDF 02H +0.06 MRPC NDF 03H +0.13 36 -42 Bobbin DSI' O.21 02H +0.15 36 48 MRPC NDF 02H +0.00 36 51 Bobbin DSI 0.44 O1H -0.06 Bobbin DSI 0.37 02H +0.03 O 36 36 52 Bobbin Bobbin 53 Bobbin DSI DSI DSI 0.80 0.59 0.48 02H 01H 02H

+0.00

+0.00'

+0.00

.36 54 MRPC NDF 02H +0.00 36 58 Bobbin DSI 0.25 02H +0.03 Bobbin DSI 0.15 02H +0.03 Bobbin DSI 0.37 02H +0.03 ,

Bobbin 15 ODI 0.68 ~ AV4 +0.00-Bobbin 16 ODI 1.01 AV3 +0.00 Bobbin 17 ODI 1.22 AV3 +0.00 Bobbin 17 ODI 1.12 AV4 +0.00 Bobbin 18 ODI 1.28 AV4 +0.00 Bobbin 18 ODI 1 17

. AV3 +0.00 36 63 Bobbin DSI 0.72 02H -0.12 36 75 MRPC 16 ODI 0.51 01C +0.15 37 19 MRPC NDF 03H +0.00 Bobbin 22 ODI 1.64 02C -0.18 37 22 MRPC NDF 04H +0.00 37 31 MRPC SAI 0.64 01H +0.00 Bobbin DSI 0.58 O1H +0.03 37 36 MRPC NDF 02H +0.00 37 37 Bobbin DSI 0.58 02H +0.09 37 67 MRPC SAI 1.05 02H +0.00 Bobbin DSI 0.95 02H +0.00 37 69 Bobbin DSI 0.27 01H +0.03 38 21 MRPC 7 ODI 0.26 02C +0.02

.MRPC 9 ODI 0.25 01C +0.00 38 22 Bobbin 5 ODI 0.97 03C -0.06 38 23 Bobbin 13 ODI 0.68 01C +0.00 38 24 Bobbin 13 ODI 1.08 01C -0.15 38 25 Bobbin 27 ODI 0.73 01C +0.00 38 40 MRPC NDF 02H +0.06

-38 55 MRPC MAI 0.35 02H +0.00 Bobbin DSI 0.56 02H +0.00 O 38 38 69 Bobbin Bobbin 70 MRPC DSI DSI NDF 0.76 0.49 02H O1H O1H

+0.06

-0.21

+0.00 Bobbin DSI 0.50 02H +0.09 39 24 Bobbin 18 ODI 1.27 01C -0.24 1

--r- << m <, r, , w , y v + - - - ,. v

                                • - BWNS TUBAN II.(Varsion 2.0)- 05/16/1995 13:16:12 ****************
                                • Baavor Valley Unit 1 ****************
                                • SG A ****************
                                • 1/95 RFO (10R) '****************
                                • Bobbin,MRPC ****************

Steam Generator RC-E-1A

- Location & Percent Through Wall Calls (%TW) For All Indicatione ROW COL TEST TYPE %TW IND VOLTS LOCATION Bobbin- 33 ODI 1.62 02C -0.06 39 26 MRPC. 8 ODI 0.30 01C -0.21 39 27 Bobbin DSI 0.39 02H +0.00 39 28 Bobbin DSI 0.57 01H +0.00 Bobbin DSI 0.51 03H +0.00 39 30 Bobbin DSI 0.39 03H +0.00 39- 33 MRPC NDF 04H +0.00 39 38 Bobbin DSI 0.43 02H +0.00

39. 51.MRPC NDF 29.25 01H +0.05 MRPC NDF 5.96 02H +0.00 Bobbin DSI .0.55 01H +0.00

. Bobbin' DSI 1.12 02H +0.03 39 59 Bobbin DSI 0.76 O1H +0.09 i Bobbin DSI 0.34 02H -0.03' 40 25 Bobbin 7 ODI 1.40 01C +0.00 Bobbin 19 ODI 0.89 02C 40.00 40 27 Bobbin 26 ODI 2.47 02C -0.14 40 28 MRPC 19 ODI 0.90 02C '

-0.09 40 39 Bobbin 16 ODI 1.04 TV4 +0.00 4 40 44 Bobbin FSD 4.22 kV2 +4.24' 40 50 MRPC NDF 04H +0.00 40 69 Bobbin 38 ODI 0.42 03C +0.00 40 71 MRPC 12 ODI 0.37 02C +0.00 41 27 Bobbin 3 ODI 0.95 01C +0.00 41 29 Bobbin 20- ODI 0.53 03C -0.03

. 41 30 MRPCL 12 ODI 0.51 01C -0.08 41 31 Bobbin 13 ODI 0.89 01C +0.00 41 52 Bobbin 19 ODI 0.83 AV3 +0.00 Bobbin 27 ODI 2.35 AV4 +0.00 '

41 58 Bobbin DSI 0.43 04H +0.00 42 28 MRPC 13 ODI 0.52 02C -0.36 42 29 Bobbin 3 ODI 0 . '.' 3 03C -0.17 Bobbin 20 ODI 1.91 01C +0.00 '

Bobbin 28 ODI 2.39 02C '- 0.23 42 31 MRPC 22 ODI 0.85 02C -0.18 MRPC 31 ODI 1,47 01C +0.00 42 32 MRPC 22 ODI- 0.85 02C -0.11 Bobbin 12 ODI 0.74 03C +0.00 42 33 Bobbin 20 ODI 0.57 02C +0.00 42 34 MRPC 8 ODI 0.21 02C +0.00 MRPC 14 ODI 0.45 01C +0.00 42 67 Bobbin 19 ODI 1.48 03C -0.18 43 30 MRPC 17 ODI 0.77 01C +0.20 MRPC 20 ODI 0.95 02C -0.24 Bobbin 13 ODI 1.33 03C +0.00 43 31 MRPC 17 ODI 0.77 02C -0.17

. . Bobbin 7 ODI 1.64 03C +0.00 ,

s43 33 Bobbin 19 ODI 1.67 02C -0.14 43 34 Bobbin 11 ODI 0.64 03C +0.00 Bobbin 12 ODI 1.12 01C +0.06 43 54 Bobbin DSI 0.46 02H +0.00 43 59 Bobbin DSI 0.26 01H -0.12 Bobbin FSD 2.82 TSC +31.30 44 33 Bobbin 15 ODI 1.38 03C -0.17 Bobbin 29 ODI 1.52 01C -0.08 44 37 Bobbin 15 ODI 1.24 03C -0.20 Bobbin 16 ODI 1.22 03C -0.17 44 38 Bobbin 25 ODI 1.49 01C +0.00 44 57 MRPC 15 ODI 0.47 01C +0.00 44 59 Bobbin 14 ODI 1.11 03C +0.12 44 60 MRPC NDP 02C +0.00 MRPC 23 ODI 0.90 01C -0.05 44 62 MRPC 10 ODI 0.28 02C +0.19 45 38 Bobbin 2 ODI 1.16 03C -0.17 45 39 MRPC 7 ODI 0.17 01C -0.21

I.

l

                                • - BWNS TUBAN II (Version 2.0) . 05/16/1995 13:16:12 **************** l
                                • ' Baavar Valley Unit 1 **************** I SG A **************** j
                                • 1/95 RFO (10R) **************** 'I
                                • Bobbin,MRPC **************** 1 I

(

j Page 16 of 16 i Steam Generator RC-E-1A L Location & Percent Through Wall Calls (%TW) For All Indications ROW COL TEST TYPE %TW IND VOLTS LOCATION l

\

Bobbin 27 ODI 1.82 04C +0.00 l 45 41 Bobbin 7 ODI 1.05 02C -0.12 I 45 44 Bobbin 6 ODI 1.02 01C +0.12 45 45.MRPC 7 ODI 0.19 01C +0.00 MRPC- 26 ODI 1.06 02C -0.48 L 45 48 Bobbin 15 ODI 0.63 03C +0.00

! 45 50 Bobbin 25 ODI 0.51 01C +0.00 l 46- 42 Bobbin 32 ODI 4.18 02C -0.18 4

'46 47 MRPC NDF 05H +0.00 46 50 Bobbin 17 ODI 0.93 03C -0.18 Total Indications Found = 985 Total-Tubes Found = 641 Total Tubes in Input File = 2653 t.

I l

j' i

t

-p I \w t

l l

l l

l 1

l i O

1 1

1

('>,

ATTACHMENT 1 A 1

TUBE PLUGGING IESULTS i l

FROM TIIE UNIT #1 10TH REFUELING OUTAGE (10R)

FOR STEAM GENERATOR 1

RC-E-1 A l l

l

/m 1 x

l l

l l

l

\

Ol l

1

. . . ~ _ . . _ . . _ _ m.. _ _ _ _ _ . . . . _ _ _ _ _ _ _- __

e l

l BWNS TUDAN H - 06/13/1995 08.35 05 t

...... gg .

......o......ge

................e g

..................e....

........................o

( .................g...

....ee......g..........e..g. ....

s g

=

.. e............................o.

...........e.............e....e

..e

....e.

e.....ee.e. . . . . . . . . g . . . e. . . . . . . . c03 o o0 . 0. 0 0. .e n .e...

.e w .e.......c...............ege....ee Q g

. e.

.e.......o...e..o.........ge.ge

........e.

...ee.....e..ee.4 ...........e..e..ese ..e

..........g e.........e.ee...e.e...e..

. ............ ....... E 5

.e...e...e..e.......e............e.....e.

.....e..eeg....e.

.e.......eee....e..

E 5

x 4

g] .e..e..............e.

.....ee...e.g.e..e...

....se.............

...o...... ..e................go...e..g

.......e..

o N

5 g

. e.... ...e.. g. . . . . .e...

e . . . 4.. ... .. e. .........

. . e..........e....

. . . . . . e . . e. . . .. ..e.. . e. e. . . egg ege ............g.....o.ge........g........

.......................e......e....e.e.g.e . g ,

.....e....e...

. .... ............go...sogee4

.e...pe..eg....e..geg...g.e.

.............e....g36...e3.......e..eeeg 4.ee..

..e 4

e..

........e...............go....e...e...e..g..

..........e.....e...g.eee.g.e..e...e. e..e.. g s...............ee.e.........e.o....ges..e....e..

e... .......e...e.........e......e.....e.eeese

................e.. ...... 0e. .. .g ....e.oe og..e........e..g...........

i g..e.........g.c..g. g

.......g.e..

........ee.... 4......go.....e....e......o...g.e

......g... e.. ........e......

........e .... ..g.s....g.e..............e..e..

.......g......g..g.eeg... 00.......e..e...e...e.e

...... . ..e.g....

.......................e........e....ee......e

.e........................g.......o.e.....e.g.

g gg e.......e.....e.......se.........ee..co...ee....e.

........ .... .........sge......e0 . 00....

s s ............................e...o.

..............g.g.......go....go... . . c o e ..ee 0.o so

. e e g . s e . e. . e. e.

p

. e . e. e . g e g g

    • .............e...e..e.e...g.........o

.e...........e..g

.see .e

.............e.e....o....e..o....et

..........o..

e.. o.oeseco.g.eep. o.g.4 geege .e y l g 0

1 .............g.e.e.... ... g...g..

g. .ee...e..egeoe.

..ee.. .

4..e g

......e...... 0e.....ee...e.g3 03..eeg.. .ee. g o.g........e.........e....go.o.gos.o...e.oe.e og ..e..........e......... e .

.e.gogoses.seeeceges.e P"

3 seg....e.e

....e........e.....e ee.......e..........e.......g.o. ..

e..e.....

co.gooo.ee e ege.se.e.e ...

..e g

e. . . . e. . * . .......g..............e.coe..soosee.

. 3000esece.eeg. gee.eg ,

() b

..e. ge ..e.4.....ee..*

e. .. ... ..... ..... .. ...cott.e.. s geste W

.. 4....S.e

.e.......g sees.o. ,

gg . . . . . . . e...e..g... ..g....

s . . . . e. . . . e. . . . . . e . . . . e . . ge.g.eg . .

c o. e g e . o o o. 4 0 g

. e.. ....................

. . . o . . . . . . . . . . . . . . . e. e. .....e

. g . . o. e

.oge..

o. geeg.e o . . e. e . g . e e .....

. . . . . . .e.............ee.........e...

. . . . . . e . g . . . . . . . . . e . . . g o g g e e g e. ee..e se. g

. ...g e...go.e....e.ee..ee.e...oe..e.e..

...o.a.ee*se.*.........g9..........og*. l

...........e...........g..g.e.e...g.e... ..

. e......g e . . . . . . s e o . . . . o. .. o. . . . . . e . g . . . g e. s..ege .. O pe

.......oese......es.........o.....e.g....g..e

. N J e..e.....e..............g...oe.g...

...eg..gg. ............gge..e...e.

. . .o.....g...............o....e..e .

e.o..*.**....**..***.oegg

....g.....e....e...e...e.....

4*e**e U

~

. 4............g........ee.g...

.e........g...e.........e.e ..

e.03.............e.0.........

O g e.se.........e.....g..g.e....

.........e. ......go.es.ee "

"O ..

9.*o9.........e.g

.. .........gge..e.....

.e.....e......e.eeg..

eet.e.e.

8

...go.e....g.g....e..

.. .....g e.e...

m m .......e.ee.. 4 gI . ...e..eeees o yg ....oo. g h kh k N b N h O h #

55 M>

<- oc O ) to --+- O

                                • BUMS TUBAN II (Varsion 2.0) 06/09/1995 08:51:42 ****************
                                • Bsaver Valley Unit 1 ****************
                                • SG A ****************
                                • 1/95 RFO (10R) ****************
                                • Bobbin,MRPC ****************

CN d

Steam Generator RC-E-1A Tubes Plugged 10R ROW COL TEST TYPE %TW IND VOLTS LOCATION 1 31 MRPC SAI 3.17 07H +3.70 1 85 MRPC SAI 4.99 07H +5.01 1 87 MRPC SAI 5.21 07H +4.02 2 50 MRPC SAI 0.58 01H +0.00 Bobbin DSI 1.05 01H +0.17 2 58 MRPC SAI 0.87 02H +0.13 Bobbin DSI 1.08 02H +0.00 3 30 MRPC MAI 0.49 01H +0.00 Bobbin DSI 1.21 O1H -0.17 4 23 MRPC SAI 0.38 TSH +0.19 4 30 MRPC SAI 0.71 O1H +0.00 Bobbin DSI 1.26 O1H +0.00 Bobbin DSI 0.85 02H -0.11 Bobbin DSI 0.89 02H +0.00 l

'. Bobbin DSI 1.22 O1H -0.14 )

4 38 MRPC SAI 0.55 01H +0.00 Bobbin DSI 1.94 O1H +0.14 Bobbin DSI 1.70 O1H +0.11 5 30 MRPC NDF 03H +0.00 Bobbin INF 03H -0.25 MRPC MAI 0.35 01H -0.05 Bobbin DSI 1.13 01H +0.00 7 18 MRPC NDF 01H +0.00 MRPC SAI 0.92 02H +0.00 Bobbin DSI 1.14 02H +0.09 Bobbin DSI 1.12 O1H +0.00

()

( ,)

7 37 MRPC Bobbin SAI DSI 1.65 1.03 O1H O1H

-0.05

+0.00 Bobbin DSI 0.80 02H -0.03 7 56 MRPC NDF 02H +0.00 Bobbin INR 02H +0.00  ;

MRPC SAI 0.68 O1H +0.00 l Bobbin DSI 1.14 O1H -0.09 i 7 80 MRPC SAI 0.53 01H -0.14 I Bobbin DSI 1.14 01H +0.00 8 36 MRPC NDF O1H +0.00 Bobbin INR O1H +0.00 MRPC VOL 0.69 TSH +0.43 Bobbin DSI 0.18 04H -0.03 Bobbin DTI 1.12 TSH +0.11 8 41 MRPC SAI 0.55 TSH +0,79 Bobbin DTI 1.82 TSH +0.41 8 43 MRPC SAI 0.64 TSH +0.50 Bobbin DTI 0.72 TSH +0.40 8 80 MRPC SAI 0.36 01H +0.02 Bobbin DSI 1.35 O1H -0.15 9 16 MRPC SAI 0.76 O1H +0.03 Bobbin DSI 1.53 01H -0.03 Bobbin DSI 0.56 02H +0.00 9 24 MRPC SAI 1.16 O1H +0.00 Bobbin _DSI 1.67 O1H +0.09 9 33 MRPC SAI 0.75 TSH +0.78 Bobbin DTI 0.56 TSH +0.74 9 34 MRPC SAI 0.39 TSH +0.78 Bobbin DTI 0.20 TSH +0.91 9 36 MRPC NDF 03H +0.00 Bobbin INR 03H -0.06 MRPC VOL 1.75 TSH +0.59 Bobbin DTI 1.57 TSH +0.38 9 41 MRPC VOL 0.37 TSH +1.09 Bobbin TSH +1.55 O 9 92 MRPC MRPC DTI NDF SAI 0.14 1.61 03C 02H

+3.14

+0.20 Bobbin DSI 1.35 02H +0.30 Bobbin FSI 6.88 03C +3.11

                                • BWNS TUBAN II- (Version 2.0) 06/09/1995'08:51:42 ****************
                                • -Beaver Valley Unit 1. ****************
                                • SG A ****************
                                • -1/95 RFO (10R) ****************

l **************** Bobbin,MRPC ****************

Steam Generator RC-E-1A Tubes Plugged 10R ROW COL TEST TYPE .%TW IND VOLTS LOCATION ,

J 10 11 MRPC MAI 0.66 O1H +0.00 <

I Bobbin DSI 1.09 O1H -0.09 Bobbin DSI 1.05 01H +0.00 10 31 Bobbin INR O1H +0.00 MRPC SAI 0.70 TSH +1.14 Bobbin DTI 0.69 TSH +1.08 10 32 MRPC NDF TSH +0.63 ,

'MRPC NDF TSH +1.64  :

MRPC NDF TSH +1.04 I Bobbin DSI 0.44 O1H. +0.00 j Bobbin DTI 0.94 TSH +0.63  :

Bobbin DTI 1.02 TSH +1.64 I Bobbin DTI 1.23 TSH +1.06 I 10 34 MRPC MAI 0.58 TSH +0.43 Bobbin DTI 2.08 TSH- +0.60 10 36 MRPC SAI 2.29 O1H +0.00 MRPC VOL 1.40 TSH +0.76 i

Bobbin DSI 0.76 02H +0.06 l

Bobbin DSI 2.60 01H +0.00 Bobbin DTI 3.39 TSH +0.38 10 38 MRPC SAI 0.28 TSH +0.60 Bobbin DTI 0.71 TSH +0.83 10 46 MRPC NDF TSH +0.97 Bobbin DTI 0.33 TSH +0.97 10 48 MRPC SAI 1.14 TSH +0.46 Bobbin DTI 1.61 TSH +0.36 Bobbin FSI 0.87 TSH +0.87 10 60 MRPC SAI 0.61 01H +0.00 Bobbin DSI 1.53 O1H +0.06 10 64 MRPC SAI 0.69 O1H -0.04 Bobbin DSI 1.59 O1H +0.12 Bobbin FSD 1.26 06C +14.81 11 26 MRPC NDF TSH +0.63 Bobbin DSI 0.67 O1H +0.00 Bobbin DTI 0.57 TSH +0.63

, 11 27 MRPC SAI 0.54 TSH +0.75 l Bobbin DSI 0.91 01H +0.00

! Bobbin DTI 1.16 TSH +0.61 11 29 MRPC NDF TSH +1.25 i MRPC NDF TSH +0.69 l Bobbin DTI 0.41 TSH +0.69 Bobbin DTI 0.32 TSH +1.30

, 11 42 MRPC MAI 0.65 TSH +1.79 Bobbin DTI 0.85 TSH +2.04  ;

! 11 44 MRPC NDF TSH +13.97 l

! MRPC NDF TSH +1.42 l Bobbin 18 ODI 0.27 TSH +14.03

!. Bobbin 30 ODI 0.38 TSH +1.35 I

Bobbin 36 ODI 0.31 TSH +1.66 i 11 47 MRPC NDF TSH +0.82 i Bobbin USI 0.51 01H +0.00 l Bobbin DTI 0.15 TSH +0.81 l 12 15 MRPC MAI 0.50 O1H -0.03 I Bobbin DSI 1.10 01H +0.00 l 12 47 MRPC NDF TSH +0.85 Bobbin DTI 0.54 TSH +0.43 l

Bobbin FSI 0.49 TSH +1.03

! 12 49 MRPC NDF TSH +0.35 Bobbin DTI 0.75 TSH +0.36 13 29 MRPC SAI 0.50 O1H -0.22 1 MRPC VOL 0.79 TSH +0.66 L

'O Bobbin Bobbin DSI DTI 1.15 1.19 O1H TSH

+0.00

+0.33

' 13 32 MRPC SAI 0.87 TSH +1.49 Bobbin DTI 0.47 TSH +2.12

l t

                                • BWNS TUBAN II (Version 2.0) 06/09/1995 08:51:42 ****************

( **************** Beaver Valley Unit 1 ****************

l *ee************* SG A ****************

j *e************** 1/95 RFO (10R) ****************

l

                                • Bobbin,MRPC ****************

l l ("'\

V Steam Generator RC-E-1A l Tubes Plugged 10R ROW COL TEST TYPE LTW IND VOLTS LOCATION ]

13 33 MRPC MAI 0.77 TSH +1.87 Bobbin DTI 0.47 TSH +3.02 i Bobbin DTI 0.30 TSH +2.53 I

Bobbin DTI 1.17 TSH +2.16 l 13 36 MRPC MAI 0.56 TSH +2.38 l Bobbin DTI 0.69 TSH +2.96 Bobbin DTI 0.34 TSH +1.98 13 38 MRPC NDF TSH +2.45 Bobbin DTI 0.27 TSH +2.22 Bobbin DTI 0.39 TSH +2.93 13 42 MRPC NDF TSH +1.57 Bobbin DTI 0.39 TSH +1.59 l 13 47 MRPC NDF O1H +0.00 l MRPC NDF TSH +0.87 Bobbin INF O1H +0.24 Bobbin DTI 0.54 TSH +0.43 Bobbin FSI 0.65 TSH +1.14 14 40 MRPC SAI O.40 TSH +1.71 Bobbin DSI 0.30 O1H +0.09 Bobbin DTI 0.68 TSH +1.38 14 46 MRPC NDF TSH +1.42 Bobbin DTI 0.24 TSH +1.35 15 33 MRPC NDF TSH +0.99 Bobbin DTI 0.56 TSH +0.99 l 15 34 MRPC NDF TSH +1.90 Bobbin DTI 0.38 TSH +1.81

/A 15 39 MRPC SAI 0.66 TSH +0.62

() Bobbin Bobbin DTI DTI 0.35 0.40 TSH TSH

+0.79

+1.40 l

1 15 59 MRPC MAI 0.47 01H -0.01 I Bobbin DSI 1.24 01H +0.00 16 34 MRPC NDF TSH +1.04 Bobbin DSI 0.75 O1H +0.00 Bobbin DTI 0.90 TSH +1.06 16 37 MRPC NDF TSH +0.69 i Bobbin DTI 0.70 TSH +0.69 l 16 38 MRPC VOL 0.64 TSH +0.46 l

Bobbin DTI 0.65 TSH +1.32 17 19 MRPC SAI 1.03 02H +0.00 i Bobbin DSI 1.72 02H +0.00 l l 17 35 MRPC NDF TSH +0.81 Bobbin DTI 1.03 TSH +0.71 17 44 MRPC SAI 0.80 O1H +0.00 Bobbin DSI 1.03 O1H +0.00 i 18 37 MRPC NDF TSH +0.69 l Bobbin DTI 0.68 TSH +0.68 18 38 MRPC SAI 0.63 O1H +0.18 Bobbin DSI 1.33 O1H +0.26 18 58 MRPC SAI 0.70 O1H -0.04 Bobbin DSI 1.00 01H +0.03 i 18 78 MRPC SAI 0.99 O1H +0.00 i

Bobbin DSI 1.72 01H +0.00 20 21 MRPC MAI 0.56 O1H +0.17 Bobbin DSI 1.31 O1H +0.15 20 32 MRPC MAI 1.68 02H +0.11 MRPC SAI 0.46 03H +0.25 Bobbin DSI 1.58 02H -0.28 20 40 MRPC SAI 0.57 01H +0.23 Bobbin DSI 1.08 O1H +0.18 20 42 MRPC SAI 0.98 O1H +0.00

' [~'i 21 Bobbin 45 MRPC DSI SAI 1.51 0.46 O1H O1H

+0.00

+0.00

( ,/

Bobbin DSI 1.07 O1H +0.00 21 67 MRPC SAI 1.49 O1H +0.06 Bobbin DSI 1.16 O1H -0.06 l

. ._ _ -m . . m... ___.-_... _. _ .__. .__ _ _ .~ ... _ ._ _ __ . . . __ _ . . . - . _ _ _ _ _ _ _ . _,

                                • BWNS TUBAN II (Version 2.0) 06/09/1995 08:51:42 ****************  ;
                                • Beaver Valley Unit 1 ****************  !
                                • SG A ****************
                                • ' 1/95 RFO (10R) **************** -
                                • Bobbin,MRPC ****************

Page 4 of 4 Steam Generator RC-E-1A

  • Tubes Plugged 10R I ROW COL TEST TYPE %TW IND VOLTS LOCATION 22 8 MRPC SAI 0.99 O1H +0.03 MRPC 14 ODI 0.44 01C +0.05 Bobbin DSI 1.36 O1H -0.06 R22 21 MRPC. MAI 1.78 O1H +0.00 Bobbin DSI 1.10 O1H +0.06 22 38 MRPC- SAI 0.60 O1H +0.00 i MRPC SAI 0.35 03H +0.00 I MRPC SAI 0.26 02H -0.10 Bobbin. DSI 0.44 02H +0.00 '

Bobbin DSI 0.64. O1H +0.09 1 Bobbin DSI 1.73 03H- +0.26 l 25 78 MRPC SAI 'O.27 04H- -0.03 Bobbin DSI 1.01 04H +0.00 25 79 MRPC SAI 0.39 O1H +0.00 Bobbin DSI 1.01 O1H +0.00 Bobbin DSI 0.53- 02H +0.00 27 21 MRPC SAI 0.28 O1H +0.04 Bobbin DSI 1.19 O1H +0.03 28 42 MRPC SAI 0.19 02H +0.00 MRPC SAI 0.39 O1H +0.00 Bobbin .DSI 0.72 O1H +0.00 1 l

Bobbin DSI 1.12 02H -0.09 30 15 MRPC SAI 1.02 O1H +0.13 Bobbin DSI 1.03 01H +0.21 30 20 MRPC- SAI 0.43 O1H +0.00 Bobbin DSI 1.10 01H -0.03 0 31 35 16 MRPC MRPC Bobbin 70 MRPC 20 SAI ODI DTI SAI 1.97 0.99 1.42 0.27 TSH 01C TSH 02H

+0.62

-0.08

+0.73

-0.06 Bobbin. DSI 1.01 02H +0.15 Bobbin DSI 0.45 01H +0.15 36 23 MRPC NDF 05H +0.00 Bobbin ~ INR 05H .+0.00 MRPC SAI' 2.11 03H +0.00 Bobbin DSI 1.56 03H +0.00 36 28 Bobbin 36 ODI 4.08 AV2 +0.20 Bobbin 41 ODI 5.28 AV3 +0.29 36 41 MRPC SAI 0.83 02H -0.18 Bobbin DSI 1.32 02H -0.03 45 37 MRPC SAI 2.16 02H +0.18 Bobbin DSI 1.15 02H +0.22 Bobbin DSI 1.22 02H +0.17 Total Indications Found = 238 Total Tubes Found = 88 Total Tubes in Input File = 88 I

l l

O

I 1

4 s

('#

' ATTACHMENT 2 EXAMINATION RESULTS

\

FROM THE UNIT #1 10TH REFUELING OUTAGE (10R)

FOR l

STEAM GENERATOR RC-E-1 B l

O i

O

l

                                • BWNS TUBAN II (Varzion 2.0) 05/16/1995 13:24:23 ****************
                                • B:avsr Valley Unit 1 ****************
                                • SG B **************** )

1

                                • 1/95 RFO (10R) ****************
                                • Bobbin,MRPC **************** l

/N l

(-) )

Page 1 of 14 Steam Generator RC-E-1B Location & Percent Through Wall Calls (%TW) For All Indications ROW COL TEST TYPE %TW IND VOLTS LOCATION 1 1 MRPC NDF 01H +0.00 MRPC SAI 0.64 02H 40.00 Bobbin DSI 0.76 02H +0.05 Bobbin DSI 0.28 O1H -0.08 1 4 Bobbin DSI 0.36 02H -0.19 Bobbin DSI 0.63 O1H -0.21 l 1 5 MRPC NDF O1H -0.13 i Bobbin DSI 1.07 O1H -0.13 1 1 13 Bobbin DSI 0.41 02H -0.30 Bobbin DSI 0.57 01H -0.22 1 14 Bobbin DSI 0.27 04H -0.22 Bobbin DSI 0.79 02H -0.32 1 16 MRPC NDF 02H +0.00 MRPC SAI 1.28 01H +0.00 Bobbin DSI 0.40 O1H +0.00 l Bobbin DSI 0.39 02H +0.00 )

1 23 MRPC NDF O1H -0.03 l 1 45 Bobbin DSI 0.49 O1H -0.08 1 48 MRPC NDF O1H +0.00 Bobbin DSI 1.04 01H -0.10 l 1 49 Bobbin DSI 0.60 02H -0.03 l 1 54 Bobbin DSI 0.27 O1H -0.08 1 55 Bobbin DSI 0.19 03H +0.05 1 62 Bobbin DSI 0.31 01H +0.03 1 66 MRPC NDF 02H +0.00 1 57 MRPC NDF 02H +0.00

( 'T 1 68 Bobbin DSI 0.47 02H -0.21

(,,/ 1 70 MRPC NDF 06H +0.00 MRPC NDF 07H +0.00 MRPC DNT 13.88 06H +9.49 I Bobbin DNT 9.18 06H +9.49 l Bobbin DSI 0.66 02H -0.16 1 92 MRPC VOL 0.60 TSH +17.02 Bobbin DSI 0.57 02H -0.03 Bobbin 28 ODI 0.52 TSH +17.52 1 93 MRPC VOL 1,74 TSH +17.10 Bobbin 33 ODI 1.99 TSH +17.56 1 94 Bobbin FSD 1.13 TSC +1.15 2 5 Bobbin DSI 0.55 02H -0.21 2 9 MRPC SAI 0.92 02H +0.00 MRPC SAI 1.28 O1H +0.00 Bobbin DSI 0.75 02H -0.05 Bobbin DSI 0.62 O1H -0.16 2 12 Bobbin DSI 0.58 O1H -0.19 2 13 MRPC NDF 03H +0.11 Bobbin DSI 0.54 O1H -0.21 2 19 Bobbin DSI 0.74 O1H -0.32 2 22 MRPC SAI 0.99 O1H +0.00 Bobbin DSI 0.34 O1H +0.00 2 23 Bobbin DSI 0.46 O1H -0.24 2 24 Bobbin DSI 0.54 02H +0.03 Bobbin DSI 0.55 01H +0.05 2 28 Bobbin DSI 0.66 02H -0.21 2 30 Bobbin DSI 0.24 02H -0.19 2 31 Bobbin DSI 0.68 01H -0.19 2 36 MRPC NDF 02H -0.05 2 40 MRPC NDF O1H -0.21 Bobbin DSI 1.20 O1H -0.21 2 41 Bobbin DSI 0.74 O1H -0.15 2 42 MRPC NDF 01H +0.00

[ ] 2 43 Bobbin DSI 0.27 O1H -0.08

\_,/ 2 46 MRPC NDF O1H +0.00 Bobbin DSI 1.17 O1H -0.13 2 47 Bobbin DSI 0.49 02H +0.00 2 52 Bobbin DSI 0.25 03H -0.13

                                • BWNS TUBAN II (Varsion 2.0) 05/16/1995 13:24:23 ****************
                                • Baevar Valley Unit 1 ****************
                                • SG B ****************

eeee************- 1/95 RFO (10R) -****************

                                • Bobbin,MRPC ****************

O Page 2 of 14 :

Steam Generator RC-E-1B (

Location & Percent Through Wall Calls (%TW) For All Indications' ROW COL TEST TYPE %TW IND VOLTS LOCATION Bobbin DSI 0.74 O1H -0.05 2 57 Bobbin DSI 0.30 O1H -0.03 2 60 MRPC SAI 1.17 01H -0.13 -

Bobbin DSI 0.74 01H -0.05 '

2 65 MRPC NDF 02H -0.09 '

MRPC- NDF 03H +0.00 2 66 Bobbin DSI 0.46 02H -0.08  !

2 69 Bobbin DSI 0.87 02H -0.19 2 72 MRPC SAI 0.58 03H +0.00 i Bobbin DSI 0.41 O1H +0.00 l Bobbin DSI 0.79 03H +0.05 i 2 73 Bobbin DSI 0.69 O1H -0.13 Bobbin DSI 0.74 02H -0.05 '

2 74 MRPC NDF O1H +0.23 Bobbin DSI 0.47 03H -0.03 Bobbin DSI 1.10 O1H +0.13 Bobbin DSI 0.39 02H -0.03 2 79 Bobbin DSI 0.69 02H -0.08 2 80 Bobbin FSD 2.63 04C +6.12  :

2 81 MRPC NDF- 03H +0.00 MRPC NDF 04H +0.00 2 83 Bobbin DSI 0.60 03H +0.03 2 85 MRPC' NDF 03H +0.05 ,

2 86 MRPC NDF 03H' -0.10 l MRPC NDF 04H +0.00 1 Bobbin DSI 0.66 03H -0.08 Bobbin O' 2 2

88 Bobbin 90 Bobbin DSI FSD DSI 1.09 0.09 0.49 04H TSC 04H

-0.10

+1.33

+0.03 2 93 Bobbin DSI 0.60 02H -0.03 2 94 Bobbin 9 ODI 1.05 01C- +0.10 3 1 Bobbin DSI 0.80 O1H -0.16 3 6 Bobbin DSI 0.44 01H -0.27 3 8 MRPC NDF 02H -0.24 MRPC SAI 0.44 04H -0.05 Bobbin DSI 1.07 02H -0.24 Bobbin DSI 0.71 04H +0.08 3 9 Bobbin DSI 0.27 02H +0.05 Bobbin DSI 0.71 O1H -0.21 3 18 Bobbin DSI 0.98 O1H -0.13 3 22 Bobbin DSI 0.77 O1H -0.27 3 24 Bobbin DSI 0.54 O1H -0.25 3 27 MRPC MAI 0.91 O1H +0.14 Bobbin DSI 0.52 O1H -0.11 3 35 MRPC NDF O1H +0.00 3 43 Bobbin DSI 0.47 01H -0.05 3 49 Bobbin DSI 0.70 02H -0.13 Bobbin DSI 0.92 O1H +0.08 3 53 Bobbin DSI 0.95 01H -0.03 Bobbin DSI 0.74 02H +0.00 3 55 MRPC SAI 1.30 O1H -0.03 Bobbin DSI 0.66 O1H -0.11 3 58 Bobbin DSI 0.49 O1H -0.08 3 61 Bobbin DSI 0.65 01H +0.03 3 63 MRPC NDF 03H +0.00 3 64 Bobbin DSI 0.88 03H -0.14 3 70 Bobbin DSI 0.63 O1H +0.05 3 92 MRPC SAI 0.73 02H +0.02 Bobbin DSI 0.86 02H +0.08 4 5 MRPC NDF 02H +0.00 Bobbin DSI 0.61 02H -0.11 O' 4 8 MRPC.

Bobbin NDF DSI 1.26 02H 02H

-0.24

-0.22 Bobbin DSI 0.70 03H -0.14 Bobbin DSI 1.28 02H -0.24 l

l i

. ~ . - . - - . . - - . - - - . . . - _ _ - - - - ~ . . . - . - . . - - - - _ . . -

                                • BWNS TUBAN II'(Varsion 2.0) 05/16/1995 13:24:23 ****************
                                • - Baavar Valley Unit 1 ****************
                                • SG B ****************
                                • 1/95 RFO (10R) ****************
                                • Bobbin,MRPC ****************

Page 3 of 14 Steam Generator RC-E-1B

. Location & Percent Through Wall Calls (%TW) For All Indications ROW COL TEST TYPE %TW IND VOLTS LOCATION Bobbin DSI 0.61 03H -0.24 4 10 Bobbin DSI 0.91 O1H +0.03 l Bobbin DSI 0.80 O1H +0.03 1 l 4 12 Bobbin DSI 0.61 01H' -0.22 l 1

4 13 MRPC NDF 02H +0.00 '

MRPC MAI 1.80 01H +0.00 Bobbin DSI 0.91- O1H -0.11 Bobbin DSI 0.42 02H -0.03 4 15 Bobbin DSI 0.41 O1H -0.24 l Bobbin- DSI 0.56 01H -0.18 4 25 Bobbin DSI 0.58 O1H -0.16 )

4 31 MRPC MAI 0.93 O1H +0.03 Bobbin DSI 0.87 O1H -0.08 4 34 Bobbin DSI 0.47 .03H -0.03 4- 35 Bobbin DSI 0.79 02H -0.19 4 44 Bobbin DSI 0.25 03H -0.05 Bobbin DSI 0.41 01H -0.08 4 49 Bobbin DSI 0.44 01H -0.13 4 50 Bobbin DSI 0.33 01H -0.05 4 57 Bobbin DSI 0.66 02H -0.03 l Bobbin DSI 0.92 O1H -0.08 1

4 60 MRPC SAI 0.58 O1H +0.00 MRPC SAI 0.53 O1H -0.04 Bobbin DSI O.81 O1H -0.05 4 65 Bobbin DSI 0.43 01H +0.03 Bobbin DSI 0.58 02H +0.00 O 4 Bobbin Bobbin 68 Bobbin DSI DSI DSI 0.55 0.39 0.61 02H 01H O1H

-0.16

-0.05

+0.05 Bobbin DSI 0.34 O1H -0.03 4 80 Bobbin FSA 5.30 06C -1.90 l Bobbin FSA 5.32 05H +38.22 Bobbin FSA 2.57 02H +34.98 Bobbin FSA 6.18 OSC +46.73 4 82 Bobbin DSI 0.36 O1H +0.03 l Bobbin DSI 0.49 O1H -0.08 .!

l Bobbin DSI 0.52 O1H +0.05 i 4 85 Bobbin DSI 0.96 04H +0.00 4 94 Bobbin 12 ODI 1.01 01C -0.10 5 3 Bobbin DSI 0.40 04H -0.08 5 4 Bobbin DSI 0.32 02H -0.08  !

5 8 MRPC NDF TSH +4.51 l Bobbin DSI 0.78 O1H -0.11 I Bobbin FSD 7.02 TSH +4.46 <

i 5 13 MRPC NDF 04H +0.00 l l Bobbin DSI 0.75 02H -0.08 5 14 Bobbin DSI 0.54 O1H -0.18 Bobbin DSI 0.29 02H -0.10 Bobbin 22 ODI 0.42 O1H +2.19 5 18 Bobbin DSI 0.80 02H -0.13 5 22 Bobbin DSI 0.46 01H -0.16 5 28 Bobbin DSI 0.38 01H +0.00 5 33 MRPC NDF TSH +26.88 Bobbin FSD 3.38 TSH +26.47 l

5 39 Bobbin DSI 0.67 02H -0.05 5 40 MRPC NDF O1H +0.08 Bobbin DSI 1.14 O1H +0.08 5 41 MRPC NDF 01H -0.03 Bobbin DSI 1.11 O1H -0.11 5 54 Bobbin DSI 0.82 02H -0.08 Bobbin DSI 0.45 O1H -0.03 5 57 Bobbin DSI 0.77 O1H +0.05 5 64 Bobbin DSI 0.43 01H +0.00 5 65 Bobbin DSI 0.52 O1H +0.11 5 67 Bobbin DSI 0.56 02H -0.03

- - - - - - - - . . - -. ~ . - .- - - . - _ - - =. . . . - _ - . -- ,

                                • BWNS TUBAN II (Varsion 2.0)~ 05/16/1995 13:24:23' ****************
                                • Batver Valley Unit 1 ****************
                                • SG B ****************
                                • 1/95 RFO (10R) ****************
                                • Bobbin,MRPC ****************

.O Page 4 of 14 Steam Generator RC-E-1B Location & Percent Through Wall Calls (%TW) For All Indications ROW COL TEST TYPE %TW IND VOLTS LOCATION '

5 78 Bobbin DSI 0.43 02H -0.05 5 79 MRPC SAI 1.32 02H -0.02 Bobbin DSI 0.87 02H -0.08 5 93 Bobbin DSI 0.45 04H -0.05 ,

Bobbin 7 ODI 1.05 01C +0.03 5 94 Bobbin 13 ODI 0.57 01C +0.00 Bobbin 16 ODI 1.41 02C -0.08 '

6 1 Bobbin DSI 0.42 01H -0.03 6 9 MRPC MAI 1.13 01H .+0.00 MRPC SAI 0.83 03H +0.00' Bobbin DSI 0.53 03H -0.05 ,

Bobbin DSI 0.78 O1H -0.05 6 14 Bobbin DSI 0.68 O1H -0.18 6 15 MRPC. NDF 01H +0.09 Bobbin DSI 2.52 O1H +0.14 6 17 Bobbin DSI 0.75 O1H -0.03 6 19 MRPC NDF O1H -0.13 Bobbin DSI 1.27 01H -0.13 ,

6 23 MRPC SAI 1.09 03H +0.01 MRPC SAI~ 1.05 O1H +0.22 Bobbin DSI 0.94 O1H -0.03 i Bobbin DSI 0.90 03H -0.05

6. 26 MRPC NDF O1H +0.00 Bobbin DSI 1.04 O1H -0.08 6 30 Bobbin DSI 0.84 O1H -0.03 6 31' Bobbin DSI 0.45 O1H +0.00 '

6 35 Bobbin DSI 0.47 O1H -0.11'

( 6 40 MRPC SAI 1.01 O1H +0.03 MRPC SAI 0.93 04H -0.01 Bobbin DSI 0.48 O1H +0.00-Bobbin DSI 0.68 04H -0.08 6 44 Bobbin DSI 0.64 01H -0.11 6 46 Bobbin DSI 0.78 01H +0.00 6 56 MRPC NDF O1H +0.05 6 65 Bobbin DSI 0.33 01H -0.03 6 78 MRPC SAI 0.97 03H +0.01 MRPC SAI 0.66 O1H +0.13 Bobbin DSI 0.61 03H +0.00 Bobbin DSI 0.83 O1H -0.03 6 81 MRPC NDF TSH +34.78 Bobbin FSA 4.96 TSH +34.78 ,

6 83' Bobbin DSI 0.44 O1H +0.11 I 7 1 Bobbin 32 ODI 0.76 02C +0.16 )

7 6 MRPC SAI 1.03 01H +0.00 i Bobbin DSI 0.91 O1H +0.03 l 7 10 Bobbin DSI 0.97 O1H -0.08 I 7 11 Bobbin DSI 0.43 O1H -0.05 l I

7 12 Bobbin DSI 0.67 02H -0.14 Bobbin DSI 0.39 O1H -0.14 7 21 MRPC SAI 0.62 01H +0.00 Bobbin DSI 0,53 O1H -0.05 7 38 Bobbin DSI 0.47 01H -0.11 7 44 Bobbin DSI 0.44 O1H -0.05 7 58 MRPC SAI 1.07 O1H +0.17 Bobbin DSI 0.88 O1H +0.00 7 65 Bobbin DSI 0.70 01H -0.11 7 70 MRPC NDF TSH +7.93 Bobbin DNG 1.79 TSH +8.37 7 71 Bobbin DNG 2.72 01C +34.54 l 7 72 Bobbin DSI 0.83 O1H +0.08 7 74 Bobbin DSI 0.65 O1H +0.06

.O 7 7

78

'81 Bobbin Bobbin FSA DSI 2.28 0.30 02H O1H

+17.16

+0.03 7 92 Bobbin 23 ODI 1.25 01C -0.05 7 94 Bobbin 19 ODI 0.44 01C +0.05

i

                                • BWHS TURAN II (Varsion 2.0) 05/16/1995 13:24:23 ****************
                                • Baever Valley Unit 1 **************** .
                                • -SG B ****************
                                • 1/95 RFO (10R) ****************
                                • - Bobbin,MRPC. '****************

Steam Generator RC-E-1B Location & Percent Through Wall Calls (%TW) For All Indications ROW COL-TEST TYPE %TW IND VOLTS LOCATION D

8' 2 Bobbin 13 ODI 0.84 02C +0.14 l 8 13-MRPC. MAI 0.59 O1H +0.01  ;

Bobbin DSI 0.90 O1H -0.03 8 18 MRPC SAI 1.58 O1H +0.00 Bobbin DSI^ 0.40 01H' +0.00-8 21 Bobbin DSI 0.39 01H +0.00 8 37 Bobbin DSI 0.67 -O1H +0.03 +

8 '44 Bobbin DSI' O.53 01H -0.03  !

8 45 Bobbin DSI 0.81 O1H -0.03 l 8 47 MRPC NDF O1H +0.00 Bobbin' DSI 0.68 O1H -0.08 8 50 MRPC SAI 0.42 O1H -0.04

  • Bobbin' DSI 0.86 O1H -0.19 8 82 Bobbin DSI 0.41 01H .+0.00 8 90 Bobbin- 15 ODI 0.16 04H +15.63 8- 92 Bobbin 26 ODI 2.09 01C -0.18 9 5 MRPC NDF 03H -0.14 9 8 MRPC- NDF . 02H -0.11 Bobbin DSI 0.'33 .01H- -0.03 9 10 MRPC SAI 1.01 01H +0.00 Bobbin DSI 0.53 01H -0.03

.9 15 MRPC NDF O1H +0.18 Bobbin DSI 1.02 O1H -0.10 Bobbin DSI 0.62 02H -0.13 9 19 MRPC SAI 0.76 01H +0.00 Bobbin DSI 0.83 O1H -0.11

-[ 9 22 MRPC SAI 0.80 O1H +0.00 ,

\, Bobbin DSI 0.49 01H -0.05 9 24 Bobbin DSI 0.49 O1H +0.00 9 48 MRPC NDF 01H +0.00 -

Bobbin DSI 0.75 02H -0.11  !

Bobbin DSI 1.68 01H -0.16 I

9 70 Bobbin DSI 0.41 03H +0.00 '

Bobbin DSI 0.80 01H +0.05' 9 72 MRPC SAI 1.32 O1H +0.04 Bobbin DSI 0.88 O1H -0.15 9 73 Bobbin DSI 0.38 02H -0.03 9 79 Bobbin DSI 0.44 O1H +0.14 Bobbin DSI 0.44 04H -0.06 Bobbin DSI 0.56 03H +0.17 Bobbin FSA 3.37 02C +41.65 9 82 MRPC NDF 02H +0.00 Bobbin DSI 0.44 02H -0.05 9 83 MRPC NDF 02H -0.05 Bobbin DSI 0.40 02H -0.03 9 84 Bobbin DSI 0.67 02H -0.03 9 86 Bobbin DSI 0.45 02H +0.00 9 91 Bobbin DSI 0.70 04H +0.05 Bobbin DSI 0.61 02H +0.05 9 93 Bobbin 23 ODI 1.55 02C +0.08 10 2 Bobbin 10 ODI 1.33 02C +0.00 10 4 MRPC SAI 1.29 01H +0.00 Bobbin DSI 0.69 01H +0.00 10 14 Bobbin DSI 0.47 02H -0.19 10 39 Bobbin DSI 0.53 O1H -0.11 10 69 Bobbin FSA 8.74 07H +14.21 10 72 Bobbin DSI 0.74 O1H +0.14 10 78 Bobbin DSI 0.29 02H +0.00 10 92 Bobbin 27 ODI 1.85 01C -0.16 11 9 Bobbin DSI 0.47 O1H -0.08 11 12 Bobbin DSI 0.72 01H -0.00 O' 11 11 14 19 Bobbin Bobbin DSI DSI 0.38 0.43 O1H O1H

-0.08

-0.08 11 60 Bobbin DSI 0.60 O1H -0.03 11 69 Bobbin DSI 0.80 01H +0.03

)

BWNS TUBAN II (Varsion 2.0) 05/16/1995 13:24:23 ****************

Basvar Valley Unit 1 ****************

                                • SG B ****************
                                • - 1/95 RFO (10R) ****************

4 .**************** -Bobbin,MRPC ****************

O '

Steam Generator RC-E-1B Location & Percent Through Wall Calls (%TW) For All Indications >

-ROW. COL TEST TYPE %TW IND VOLTS LOCATION  ;

11- 82 Bobbin DSI 0.74 O1H +0.00 11 83 Bobbin. FSD 1.58 TSC +1.62 '

12 3 Bobbin 17 .ODI 1.00 02C +0.08 '

12 11 MRPC -MAI 1.06 01H . +0.00 ,

Bobbin DSI 0.74 O1H -0.03 12 19 MRPC SAI 0.89 02H +0.00 Bobbin DSI 0.72 02H +0.00 12 32 MRPC SAI 0.82 02H +0.00 Bobbin DSI 0.51 02H -0.03 12 37 MRPC SAI 0.45 O1H +0.01 Bobbin DSI 0.38 O1H +0.00 >

12 44 Bobbin DSI 0.26 02H -0.16 12 50 Bobbin DSI 0.26 O1H -0.05 12 51 Bobbin DSI 0.57 O1H -0.16 l 12 53 Bobbin FSD 1.03 01H +5.54 12 58 Bobbin DSI 0.47 O1H -0.05 1 12 60 Bobbin DSI 'O.75 O1H >0.08 12 64 Bobbin DSI 0.56 02H +0.11 12 65 Bobbin DSI 0.60 O1H -0.08  !

12 69 Bobbin FSA 7.00 AV1 +0.00 12 70 Bobbin DSI 0.40 04H +0.00 12 80 MRPC SAI 0.87 O1H +0.08

  • Bobbin DSI 0.55 O1H +0.08 12 90 Bobbin DSI 0.32 04H +0.11 12 92 Bobbin 13 ODI 1.58 01C -0.03 .

13 4 Bobbin 25 ODI 1.07 02C +0.17 '

13 20 Bobbin DSI 0.52 02H -0.08

.O 13 22 MRPC Bobbin SAI DSI 0.51 0.88 O1H O1H

-0.01

-0.22 13 24 Bobbin DSI 0.61 02H -0.03 13 49 Bobbin DSI 0.73 O1H -0.05 13 66 Bobbin FSA 3.69 TSC +29.18 13 69 MRPC SAI 1.41 O1H +0.00 Bobbin DSI 0.82 O1H +0.00 13 73 MRPC NDF O1H +0.02 Bobbin DSI 0.65 01H -0.08 l 13 78 Bobbin DSI 0.75 02H +0.00 l Bobbin DSI 0.58 O1H +0.08 1 13 79 MRPC NDF TSH +3.42 1 13- 80 Bobbin DSI 0.70 01H +0.00 13 90 Bobbin 16 ODI 1.03 02C +0.16 13 91 Bobbin 21 ODI 0.64 01C -0.11 14 4 Bobbin 16 ODI 0.51 02C +0.11 14 11 Bobbin DSI 0.54 O1H -0.06 14 13 MRPC NDF O1H +0.00 l MRPC SAI 1.35 02H +0.00 Bobbin DSI 0.85 O1H +0.00 Bobbin DSI 0.62 02H -0.05 14 23 Bobbin DSI 0.73 01H -0.05 14 26 Bobbin DSI 0.61 02H -0.19 j 14 27 Bobbin DSI 0.39 01H +0.00 ,

14 36 MRPC NDF TSH +4.56 Bobbin FSD 1.39 TSH +5.05 14 41 MRPC MAI 1.07 O1H +0.02 Bobbin DSI 0.87 O1H -0.11 14 48 Bobbin DNT 12.89 AV3 -0.69 14 54 MRPC NDF TSH +14.15 Bobbin FSD 0.92 TSH +14.00 14 55 Bobbin DSI 0.18 02H +0.03 14 71 Bobbin DSI 0.92 01H +0.08 O 14 14 14 77 Bobbin 79 Bobbin 82 Bobbin DSI DSI DSI 0.78 0.62 0.55 O1H O1H 01P

+0.00

+0.03

+0.00 14 92 Bobbin 14 ODI 1.11 02C -0.16 15 3 Bobbin 33 ODI 1.41 01C +0.00

                                • - BWNS TUBAN II (Varsion 2.0) 05/16/1995 13:24:23 ****************
                                • Baavar Valley Unit 1 ****************
                                • SG B ****************
                                • . 1/95 RFO (10R) ****************
                                • Bobbin,MRPC ****************

Page 7 of 14

' Steam Generator RC-E-1B Location'& Percent Through Wall Calls (%TW) For All Indications ROW COL TEST TYPE %TW IND VOLTS LOCATION 15 5 Bobbin DSI 0.41 O1H -0.16  !

15 6 Bobbin 14 ODI 0.97 01C +0.24 <

Bobbin 33 ODI 0.77 01C +0.05 t 15 9 Bobbin DSI O.28 O1H -0.11 15 10 MRPC SAI 0.97 O1H +0.00 MRPC SAI 1.33'- 02H +0.00 Bobbin DSI 0.46 02H -0.08. 1 Bobbin DSI 0.40 O1H +0.00 15 11 MRPC NDF O1H -0.11 MRPC NDF 02H +0.11 Bobbin DSI 0.33 02H +0.11 Bobbin DSI 0.49 01H -0.11 15 12 MRPC SAI 0.61 02H +0.01 MRPC SAI 1.06 O1H +0.00 l Bobbin- DSI 0.54 O1H +0.03 Bobbin DSI 0.68 02H -0.14 15 13 Bobbin 18 ODI 0.59 01C +27.81 '

15 17. Bobbin DSI 0.46 O1H -0.11 15 29 Bobbin DSI 0.39 O1H -0.11

15. 37 MRPC NDF 02H -0.16 MRPC SAI 1.11 O1H -0.01 Bobbin DSI 0.69 O1H -0.08 Bobbin DSI 0.82 02H- -0.03 15- 39 MRPC SAI 1.38 O1H +0.03 Bobbin DSI 0.83 O1H -0.03 15 47 Bobbin DSI 0.52 O1H -0.16 .

/') 15 49 Bobbin DSI 0.78 O1H -0.22 l (s / . .

15 52 Bobbin DSI 0.31 02H -0.14 '

15 54 Bobbin DSI 0.26 02H +0.00 15 58 Bobbin DSI 0.15 04H +0.03 Bobbin DSI 0.67 02H -0.03 Bobbin DSI 0.48 O1H +0.00 Bobbin DSI 0.56 03H +0.00 15 61 Bobbin DSI 0.81 01H +0.06 15 72 Bobbin DSI 0.31 O1H +0.03 15 74 Bobbin 16 ODI 0.41 O1H +22.32 15 78 Bobbin DSI 0.50 O1H +0.03 15 79 Bobbin DSI 0.38 02H -0.03 15 81 Bobbin DSI 0.27 O1H -0.03 15 85 Bobbin DSI 0.31 04H +0.08 15 91 Bobbin 11 ODI 0.52 03H +11.53 Bobbin 16 ODI 1.28 01C +0.13 16 5 Bobbin 33 ODI 1.92 01C +0.00 16 6 Bobbin 30 ODI 1.30 01C +0.08 16 7 Bobbin DSI 0.69 015 -0.05 16 17 Bobbin DSI 0.34 O1H -0.19 16 20 Bobbin DSI 0.84 02H -0.16

-16 24 Bobbin DSI 0.79 O1H -0.11 16 53 Bobbin DSI 0.19 O1H +0.14 16 57 Bobbin DSI 0.42 O1H +0.14 16 58 Bobbin DSI 0.47 O1H +0.03 Bobbin DSI 0.58 03H +0.00 16 60 Bobbin DSI 0.69 O1H +0.06 16 67 Bobbin DSI 0.56 02H -0.03 16 78 MRPC NDF O1H -0.01 Bobbin DSI 1.05 01H +0.00 16 80 Bobbin DSI 0.29 O1H +0.05 16 82 Bobbin DSI 0.86 O1H +0.08 16 88 Bobbin DSI 0.45 03H +0.05 17 4 Bobbin 26 ODI 1.86 01C +0.00 0 17 17 6 Bobbin 13 MRPC Bobbin DSI SAI DSI 0.65 0.55 0.80 O1H 02H 02H

-0.13

+0.05

-0.08 17 16 MRPC NDF O1H +0.00 Bobbin DSI 0.36' 02H -0.05

- - -. - - - - - - .. . . . . . ~ - - - . .

i

~

etee************ BWNS TUBAN II (Varsion 2.0) 05/16/1995 13:24:23 ****************  ;

                                • Baavar-Vslley Unit 1 **************** '
                                • SG B ****************.
                                • 1/95 RFO (10R) ****************
                                • Bobbin,MRPC ****************
Page 8 of 14 l Steam Generator RC-E-1B i Location & Percent Through Wall Calls (%TW) For All Indications ROW- COL TEST TYPE %TW- IND VOLTS LOCATION 17 18 Bobbin FSA 4.73- 07H +39.01 17 23 MRPC. .SAI 0.79. O1H +0.02 Bobbin DSI 0.43 O1H +0.00 17 24 MRPC NDF 02H -0.20 MRPC SAI 0.70 01H +0.10 Bobbin DSI 0.69 O1H +0.03 Bobbin DSI 0.46 02H -0.11 17 28 Bobbin DSI 0.80 O1H -0.14 17 30 MRPC. NDF 01H +0.05 17 45 Bobbin 19 ODI 1.40 AV2 +0.00 17 48 MRPC SAI 0.51 02H -0.04 Bobbin DSI 0.47 02H +0.00 17' 55 Bobbin DSI 0.68 02H -0.08 Bobbin DSI 0.53 O1H +0.31 17 56 MRPC MAI 0.71 O1H +0.00 MRPC SAI 0.41 02H -0.02 Bobbin DSI 0.47 02H -0.08 Bobbin DSI 0.76 O1H -0.03 17 58 Bobbin DSI 0.26 02H +0.03 17 64 Bobbin DSI 0.53 O1H +0.05 17 70' Bobbin DSI 0.58 03H -0.05 17 71 Bobbin DSI 0.71 01H +0.00 17 73 Bobbin DSI 0.54 02H +0.00 17 82 Bobbin ~DSI 0.33 O1H +0.00

'17 84 Bobbin DSI 0.39 02H +0.00 18 8 Bobbin DSI 0.40 O1H -0.08 18 10 Bobbin DSI 0.33 02H -0.08

' O* ' 18 Bobbin 11 Bobbin DSI DSI 0.38 0.31 03H 01H

-0.08

-0.11 18 12 MRPC SAI 0.44 O1H -0.01 Bobbin DSI 0.71 O1H -0.03 18 23 Bobbin DSI 0.40 O1H -0.08 18 24 Bobbin DSI 0.53 O1H -0.14 18 30 Bobbin 12 ODI 0.73 AV3 +0.00 Bobbin 20 ODI 1.50 AV2 +0.00 18 50 MRPC NDF O1H +0.00 18 51 Bobbin DSI 0.26 02H +0.05 18 55 Bobbin DSI 0.28 02H -0.03 18 59 MRPC NDF 03H +0.00 18 61 Bobbin DSI 0.72 O1H +0.08 18 70 Bobbin DSI 0.59 O1H +0.05 18 79 Bobbin DSI 0.41 03H +0.00 18 89 Bobbin 23 ODI 1.24 02C -0.08 19 10 MRPC NDF 02H &O.00 MRPC NDF 04H +0.00 MRPC SAI 0.64 01H +0.00 Bobbin DSI 0.72 O1H +0.03 Bobbin DSI 0.72 02H -0.22 Bobbin DSI 0.47 04H +0.05 19 '13 Bobbin DSI 0.24 O1H -0.03 19 19 MRPC SAI 0.36 01H +0.09 Bobbin DSI 0.35 O1H -0.05 19 24 Bobbin DSI 0.37 O1H -0.03 19 28 Bobbin 15 ODI 1.01 AV1 +0.00 19 31 Bobbin DSI 0.44 02H -0.16 19 43 MRPC NDF 01H +0.05 19 53 Bobbin DSI 0.27 02H +0.00 l 19 58 Bobbin DSI 0.96 02H +0.03 19 62 MRPC NDF O1H +0.00 Bobbin DSI 0.76 O1H -0.03 I O 19 19 19 64 Bobbin 68 Bobbin 82 MRPC DSI DSI NDF 0.60 0.38 O1H O1H 03H

+0.00

+0.00

+0.03 i

i l

Bobbin DSI 1.12 03H -0.03 20 15 Bobbin DSI 0.50 01H -0.19

-, . .-~ . - .-

. . . . . -~ _

-~ -- . .. . - _ -.. -- - - - . . . - - - - - .

                                • .BWNS TUBAN II (Varsion 2.0) . 05/16/1995 13:24:23' ****************
                                • Bsavar Valley Unit 1 ****************

=**************** SG B- ****************

.****************- 1/95 RFO (10R). ****************

                                • Bobbin,MRPC ****************

Page 9 of 14 l Steam Generator RC-E-1B i Location & Percent Through Wall Calls ' (%TW) For All' Indications i ROW COL TEST TYPE %TW IND VOLTS LOCATION l

'20 21 Bobbin DSI 0.41 O1H -0.13 i 20 23 Bobbin DSI 0.43 02H -0.13 20 27 Bobbin DSI 0.36 01H -0.14  !

20 31 MRPC SAI 0.87 01H -0.03 Bobbin DSI 0.98 O1H -0.16 ,

20 35 Bobbin DSI 0.55 01H -0.16  !

20 37 Bobbin DSI 0.64 02H +0.00 l 20 42 MRPC NDF TSH +42.38 i Bobbin FSD 1.33 TSH +43.07 20 48 Bobbin DSI 0.89 O1H -0.08 20 52 Bobbin DSI 0.30 01H -0.03 20 64 Bobbin DSI 0.22 02H -0.08 )

Bobbin FSA 3.30 05C +36.51 20 69 MRPC SAI 2.00 02H +0.00 Bobbin DSI 0.79 02H -0.10 20 78 Bobbin DSI 0.44 O1H +0.00 20 83 Bobbin DSI 0.44 O1H +0.03 20 85 Bobbin DSI 0.77 O1H +0.00 21 6 Bobbin 9 ODI 1.55 01C +0.00 21 12 Bobbin DSI 0.67 O1H -0.13 21 13 Bobbin DSI 0.61 02H -0.19 21 18 MRPC NDF 02H +0.02 MRPC SAI 0.68 O1H +0.00 Bobbin DSI 0.66 O1H -0.11 Bobbin DSI 0.41 02H -0.03 21 20 MRPC MAI 0.84 01H -+0.00 O 21 21 Bobbin 24 Bobbin 25 MRPC DSI DSI NDF 0.69 0.66 O1H 01H O1H

-0.08

-0.19

-0.08 Bobbin DSI 0.36 05H -0.11 Bobbin DSI 0.32- 02H. -0.11 Bobbin DSI 1.03 O1H -0.08 21 26 Bobbin DSI 0.74 O1H -0.14 21' 27 MRPC NDF TSH +2.77

.. Bobbin FSD 2.14 TSH +2.89 21 33 MRPC SAI 0.95 02H +0.00 MRPC SAI 0.55 01H +0.02 Bobbin DSI 0.49 01H +0.00 Bobbin DSI 0.64 02H -0.11 21 39 Bobbin DSI 0.99 O1H -0.11  ;

21 40 Bobbin DSI 0.33 03H +0.00 l Bobbin DSI 0.60 O1H -0.16 Bobbin DSI 0.31 02H -0.11 21 41 MRPC DNG 3.01 TSH +26.37 Bobbin 11 ODI 0.39 TSH +26.89 )

21 46 MRPC SAI 1.87 O1H -0.01 i Bobbin DSI 0.53 O1H -0.08 l 21 47 Bobbin DSI 0.73 02H +0.00 21 49 MRPC NDF 02H +0.00 MRPC. SAI 1.48 01H +0.03 l Bobbin DSI 0.43 02H +0.00 Bobbin DSI 0.74 O1H -0.05 21 51 Bobbin DSI 0.33 O1H -0.16 '

i Bobbin DSI 0.58 03H -0.11 Bobbin DSI 0.56 02H -0.16 21 53 Bobbin DSI 0.65 02H -0.17 21 55 Bobbin DSI 0.65 O1H +0.20 21 57 Bobbin DSI 0.61 02H +0.00 Bobbin DSI 0.39 O1H +0.06 21 58 Bobbin DSI 0.79 O1H +0.00 O 21 21 Bobbin 66 Bobbin 80 Bobbin DSI DSI DSI 0.74 0.57 0.25 02H O1H O1H 40.05

+0.14

+0.08 21 83-Bobbin DSI 0.62 O1H +0.05 21 87 Bobbin 28 ODI 2.28 02C -0.19

. . _ _ .- . .. - - - - ~ ~

- -- - -- - "~~ ~^"~~ ' ^ ^ '~ '

                                • BWNS TUBAN II (Version 2.0) 05/16/1995 13:24:23 ****************

i

              • S$av=r va12=v unit 2 SG B

' **************** 1/95 RFO (10R) ****************

                                • Bobbin,MRPC ****************

l Steam Generator RC-E-1B Location & Percent Through Wall Calls (%TW) For All Indications

, ROW. COL TEST TYPE %TW IND VOLTS LOCATION l

22 10 MRPC SAI 1.27 O1H +0.07 Bobbin DSI 0.57 O1H +0.00

! 22 11 MRPC SAI 1.34 02H +0.08  !

Bobbin DSI 0.73 02H -0.03 22 12 Bobbin FSD 0.69 01H +32.99 22 17 Bobbin DSI 0.57 O1H -0.14 l 22 19 Bobbin DSI 0.95 02H -0.16 22 20 Bobbin DSI 0.60 03H -0.11 Bobbin DSI 0.41 O1H -0.11 22 22 MRPC SAI 1.02 O1H +0.00 MRPC SAI 1.12 02H -0.04 l Bobbin DSI 0.83 O1H -0.14 Bobbin DSI 0.77 02H -0.19 22 23 MRPC NDF O1H +0.00 Bobbin DSI 1.10 O1H -0.24 22 41 MRPC SAI 0.97 O1H +0.00 Bobbin DSI 0.55 01H -0.03 22 42 MRPC SAI 0.97 O1H +0.00 Bobbin DSI 0.72 O1H -0.08 22 54 Bobbin DSI 0.29 02H +0.06

-22 57 Bobbin DSI 0.15 O1H ~0.03

+

22 59 MRPC NDF O1H -0.01 Bobbin DSI 0.30 O1H -0.05 22 60 Bobbin DSI 0.41 02H +0.03 22 70 Bobbin DSI 0.50 02H +0.11 22 84 MRPC SAI 1.22 O1H +0.00 0 22 Bobbin Bobbin 85 Bobbin 9 DSI DSI ODI 0.33 0.37 0.79 O1H O1H 01C

-0.08

-0.08

-0.16 23 9 Bobbin 25 ODI 0.71 01C +0.05 23 34 MRPC DNG 4.40 TSH +48.90 Bobbin DNT 6.26 TSH +48.92 23 42 Bobbin DSI 0.30 03H +0.00

.23 51 Bobbin DSI 0.41 02H -0.14 23 52 MRPC NDF 02H +0.00 Bobbin DSI 0.48 O1H -0.05 23 55 Bobbin 12 ODI 0.75 AV3 +0.00 Bobbin 16 ODI 1.07 AV4 +0.25 23 64 Bobbin DSI 0.96 O1H -0.11 23 73 Bobbin DSI 0.97 02H +0.06 23 86 Bobbin 8 ODI 0.94 01C -0.08 Bobbin 23 ODI 0.99 02C -0.08 23 88 Bobbin 26 ODI 1,71 01C -0.11 24 11 Bobbin DSI 0.43 O1H -0.22 24 16 Bobbin DSI 0.47 O1H -0.03 24 36 MRPC NDF 01H +0.00 24 38 Bobbin DSI 0.73 01H +0.00 24 39 Bobbin DSI 0.30 02H -0.03 24 40 MRPC NDF 01H -0.10

'24 41 Bobbin DSI 0.69 01H -0.14 24 46 MRPC NDF 01H +0.00 24 55 Bobbin DSI 0.40 02H -0.06 Bobbin DSI 0.55 01H +0.31 24 56 Bobbin DSI 0.52 02H +0.08 Bobbin DSI 0.42 O1H +0.08

( 24 58 Bobbin DSI 0.59 02H -0.14 i

24 60 Bobbin DSI 0.46 02H +0.00 24 86 Bobbin 16 ODI 1.24 01C -0.11 24 ~ 87 Bobbin 15 ODI 1.34 01C +0.00 25 10 Bobbin 9 ODI 0.97 01C +0.00 i

l 0

25 25 Bobbin 18 Bobbin 20 Bobbin 29 ODI DSI DSI 1.06 0.44 0.50 02C 02H 02H

+0.25

-0.16

-0.14 25 21 MRPC NDF 02H -0.11 MRPC MAI 1.76 O1H +0.03

                                • BWNS TUBAN II (Varsion 2.0) 05/16/1995 13:24:23 ****************
                                • Bsivar Vallcy Unit 1 ****************
                                • SG B ****************
                                • 1/95 RFO (10R) ****************
                                • Bobbin,MRPC ****************

I'\

'\_-)

Page 11 of 14 Steam Generator RC-E-1B Location & Percent Through Wall Calls (%TW) For All Indications ROW COL TEST TYPE %TW IND VOLTS LOCATION Bobbin DSI 0.77 O1H -0.08 i Bobbin DSI 0.68 02H -0.11 25 161 Bobbin DSI 0.16 03H +0.08 25 68 Bobbin DSI 0.31 03H +0.00 25 71 Bobbin DSI 0.25 02H +0.00 25 84 Bobbin 26 ODI 0.82 01C -0.19 26 51 Bobbin DSI 0.24 03H -0.14 26 85 Bobbin 22 ODI 1.32 02C -0.13 27 13 Bobbin 22 ODI 0.66 01C +0.08 27 47 MRPC NDF O1H +0.00 27 51 Bobbin DSI 0.16 O1H +0.03 27 58 Bobbin DSI 0.45 02H -0.03 27 62 MRPC SAI 0.60 01H +0.00 Bobbin DSI 0.34 01H +0.00 27 72 MRPC NDF O1H +0.00 27 74 MRPC NDF O1H +0.00 27 80 Bobbin DSI 0.32 O1H +0.16 Bobbin DSI 0.37 02H +0.05 27 84 Bobbin 13 ODI 1.05 01C -0.14 27 85 Bobbin 16 ODI 1.09 01C -0.13 28 56 Bobbin DSI 0.29 02H +0.00 28 82 Bobbin 18 ODI 0.90 01C +0.05 29 12 Bobbin DSI 0.88 01H +0.22 Bobbin 17 ODI 1.95 01C +0.03 29 14 Bobbin 29 ODI 1.91 01C +0.00 29 16 Bobbin 14 ODI 0.89 AV1 +0.00

/, ) 29 84 Bobbin 12 ODI 2.18 01C -0.16

( ,/ 30 14 Bobbin 27 ODI 2.05 01C -0.11 30 16 Bobbin 6 ODI 0.66 01C -0.16 30 79 Bobbin 14 ODI 0.66 02C -0.08 30 80 Bobbin 3 ODI 0.90 01C -0.11 i 30 81 Bobbin 24 ODI 0.79 01C +0.00 l 30 82 Bobbin 11 ODI 1.58 Olc -0.03 l Bobbin 18 ODI 0.25 02C -0.05 l 31 15 Bobbin 28 ODI 1.77 Olc +0.00 1 31 17 Bobbin 4 ODI 1.56 01C -0.08 1 31 22 Bobbin DSI 0.77 02H -0.08 i 31 36 MRPC NDP O1H +0.00 1 Bobbin DSI 1.01 O1H -0.16 i Bobbin DSI 0.48 02H -0.14 l 31 64 Bobbin DSI 0.45 01H +0.03  ;

31 65 Bobbin DSI 0.31 02H +0.03 i Bobbin DSI 0.21 03H -0.03 l 31 66 MRPC NDF O1H -0.09 MRPC NDF 02H +0.04 Bobbin DSI 0.46 O1H -0.05 Bobbin DSI 0.48 02H -0.03 31 68 Bobbin DSI 0.49 O1H +0.14 31 73 MRPC NDF O1H +0.03 Bobbin DSI 1.18 01H +0.03 31 78 Bobbin 29 ODI 1.78 02C -0.11 31 80 Bobbin 29 ODI 2.80 01C +0.08 32 46 Bobbin 11 ODI 0.66 AV4 +0.00 Bobbin 24 ODI 1.98 AV2 +0.00 Bobbin 26 CDI 2.29 AV3 +0.00 32 53 Bobbin 16 ODI 1.13 AV1 +0.00 Bobbin 20 ODI 1.47 AV3 +0.00 Bobbin 32 ODI 3.19 AV2 +0.00 32 64 Bobbin DSI 0.63 01H +0.05 32 75 Bobbin DSI 0.80 01H +0.00 t)

32 78 Bobbin 11 ODI 1.49 02C +0.00

\_/ Bobbin 20 ODI 1.93 01C -0.11 33 34 MRPC NDF 05H +0.00 Bobbin DSI 0.50 02H -0.16 33 36 Bobbin DSI 0.19 O1H -0.05

~ - . - . - - _ ~ - . .. .-

                                • BWNS TUBAN II (Version 2.0) 05/16/1995 13:24:23- ****************
                                • . Banver Valley Unit 1 **************** j
                                • SG B **************** '
                                • 1/95 RFO (10R) ****************
                                • Bobbin,MRPC ****************

Page 12 of 14

-Steam Generator RC-E-1B Location & Percent Through Wall calls (%TW) For All Indications ROW COL TEST TYPE %TW IND VOLTS LOCATION.

33 39 MRPC- NDF O1H . +0.02 MRPC. NDF 03H +0.00 Bobbin DSI 1.12 O1H +0.00 Bobbin DSI 0.39 03H -0.05 33 40 MRPC SAI 0.97 O1H -0.01 Bobbin DSI 0.53 O1H -0.03 33 51 MRPC NDF 02H +0.00 MRPC SAI 1.58 01H +0.00 Bobbin DSI 0.66 01H -0.03 Bobbin DSI 0.90 02H -0.14 33 54 Bobbin DSI 0.60 02H +0.08 33 57 Bobbin DSI 0.25 03H -0.14 33 59 Bobbin DSI 0.43 02H +0.06 33 61 Bobbin DSI 0.62 O1H +0.08 1 33 79 Bobbin- 14 ODI 0.68 02C +0.11 Bobbin 14 ODI 1.37 01C +0.08 34 18 Bobbin 16 ODI 0.99 02C +0.22 34 24 MRPC NDF O1H +0.00 Bobbin DSI 0.77 O1H -0.11

34. 26 Bobbin DSI 0.62 O1H -0.08 34 28 Bobbin DSI 0.20 03H -0.05 34 33 MRPC NDF O1H +0.05 Bobbin DSI 1.28 01H +0.05 34 36 MRPC NDF O1H +0.00 MRPC NDF 03H +0.00

..s Bobbin DSI 0.48 O1H +0.00 l 34 41 MRPC NDF 01H +0.00 j MRPC SAI 1.49 02H -0.10 Bobbin DSI 0.44 O1H +0.08 Bobbin DSI 0.61 02H -0.11 34 43 MRPC SAI 1.21 05H +0.00 Bobbin DSI 0.53 05H +0.00 34' 44 MRPC NDF O1H +0.00 MRPC NDF 02H +0.00 34 45 MRPC 'NDF 03H +0.00 34 46 Bobbin DSI 0.53 01H -0.08 Bobbin 27 ODI 2.42 AV1 +0.03 Bobbin 31 ODI 3.13 AV3 +0.00 Bobbin 34 ODI 3.72 AV2 +0.00 34 51 Bobbin DSI 0.64 01H +0.03 34 53 Bobbin DSI 0.31 O1H -0.11 34 62 Bobbin DSI 0.77 O1H +0.05 34 68 Bobbin FSA 5.76 O1H +18.24 34 78 Bobbin 26 ODI 2.06 01C +0.00 34 79 Bobbin FSA 5.26 04H +12.98 Bobbin 9 ODI 1.44 01C +0.14 35 17 Bobbin 20 ODI 1.45 01C -0.11 35 26 MRPC MAI 0.87 O1H +0.03 Bobbin DSI 0.98 O1H +0.03 35 27 MRPC s SAI 1.02 O1H +0.00 Bobbin DSI 0.87 O1H -0.14 35 28 Bobbin DSI 0.52 03H -0.11 35 34 Bobbin DSI 0.49 O1H -0.05 Bobbin DSI 0.29 02H -0.13 35 37 Bobbin DSI 0.44 02H -0.08 35 73 Bobbin DSI 0.46 04H +0.03 35 75 Bobbin 35 ODI 3.85 02C -0.11 35 78 Bobbin 1 ODI 1.71 01C +0.00 36 23 Bobbin DSI 0.33 O1H -0.03 Bobbin DSI 0.23 03H -0.11

[\~ 36 26 Bobbin 16 ODI 1.06 AV2 +0.00

(_s/ Bobbin 28 ODI 2.57 AV3 +0.00 36 28 Bobbin 15 ODI 0.97 AV4 +0.00 36 30 Bobbin DSI O.54 O1H +0.00 36 67 Bobbin FSA 8.72 04H +36.37

                                • BWES TUBAN II (Varsion 2.0) 05/16/1995 13:24:23 ****************
                                • B3avar Valloy Unit 1 ****************
                                • SG B ****************
  • e************** 1/95 RFO (10R) ****************
                                • Bobbin,MRPC ****************

r'%

i I

%J Page 13 of 14 Steam Generator RC-E-1B 4

Location & Percent Through Wall Calls (%TW) For All Indications ROW COL TEST TYPE %TW IND VOLTS LOCATION 36 68 Bobbin FSA 8.07 03C +35.00 36 73 Bobbin 25 ODI 1.32 01C -0.03 36 75 Bobbin 11 ODI 0.55 01C +0.08 37 21 Bobbin 16 ODI 1,54 02C -0.08 37 22 Bobbin 8 ODI 1.26 02C -0.08 37 57 Bobbin DSI 0.58 02H -0.19 37 59 Bobbin 32 ODI 3.30 AV1 +0.00 Bobbin 39 ODI 4.63 AV2 +0.00 37 62 Bobbin 17 ODI 1.21 AV4 +0.00 Bobbin 32 ODI 3.31 AV3 +0.00 37 74 Bobbin 16 ODI 1.71 02C +0.13 l

37 76 Bobbin 11 ODI 0.80 02C -0.03 38 21 Bobbin 2 ODI 0.82 02C +0.05

38 27 Bobbin DSI 0.43 04H -0.14 Bobbin 26 ODI 0.94 02C -0.19 38 31 MRPC NDF O1H +0.00 i 38 32 Bobbin DSI 0.39 02H -0.13 l 38 54 Bobbin FSD 0.90 02H +39.59 l 38 69 Bobbin 24 ODI 0.36 02C -0.05 f 38 72 Bobbin 15 ODI 2.31 02C +0.00 l 39 23 Bobbin 15 ODI 1,67 02C -0.14 l 39 24 Bobbin 2 ODI 1.76 02C -0.05 39 25 Bobbin 20 ODI 2.13 02C +0.00 39 26 Bobbin 9 ODI 0.82 01C -0.03 39 29 Bobbin FSD 2.64 AV2 +29.52 39 30 Bobbin FSA 1.88 07H +136.75

[~')

(_/ 39 Bobbin 39 Bobbin 17 FSA ODI 2.29 1.16 07H AV4

+133.07

+0.00 Bobbin 20 ODI 1.52 AV3 +0.00 39 44 MRPC NDF 02H +0.11 Bobbin DSI 0.47 02H +0.00 39 52 Bobbin DSI 0.62 O1H +0.05 ,

39 56 Bobbin 16 ODI 1.06 AV4 +0.00 Bobbin 20 ODI 1.52 AV3 +0.00 )

39 58 Bobbin 20 ODI 1.53 AV3 +0.00 l 39 61 Bobbin 20 ODI 1.55 AV3 +0.00 l 39 72 Bobbin 19 ODI 2.23 02C +0.19 ,

39 73 Bobbin 9 ODI 1.13 02C +0.19 40 27 Bobbin 5 ODI 1.56 02C +0.00 .

40 28 Bobbin 20 ODI 0.19 02C +0.05 l 40 33 Bobbin 26 ODI 2.25 AV3 +0.00  !

40 39 MRPC NDF TSH +8.77 Bobbin 14 ODI 0.55 TSH +8.77 40 46 Bobbin 15 ODI 0.89 03C +5.57 40 66 Bobbin 15 ODI 0.92 02C +0.14 40 70 Bobbin 20 ODI 1.27 01C -0.16 Bobbin 25 ODI 1.50 02C -0.17 40 71 Bobbin DSI 0.78 02H +0.08 41 26 Bobbin 28 ODI 2.60 02C +0.00 41 27 Bobbin 33 ODI 2.74 02C -0.06 41 43 Bobbin 20 ODI 1.34 AV4 +0.00 Bobbin 29 ODI 2.52 AV3 +0.00 Bobbin 32 ODI 2.99 AV2 +0.00 41 51 Bobbin 14 ODI 0.92 AV3 +0.00 Bobbin 17 ODI 1.21 AV4 +0.00 41 66 Bobbin 19 ODI 1.44 01C -0.11 42 28 Bobbin 18 ODI 1.84 02C +0.19 42 29 Bobbin 25 ODI 1.01 02C +0.17 42 30 Bobbin 12 ODI 0.87 02C +0.00 42 33 Bobbin 26 ODI 2.21 02C +0.00

/ \ 42 34 Bobbin 28 ODI 0.89 01C +0.11

(_,) 42 36 Bobbin 22 ODI 0.92 01C +0.08 42 45 Bobbin DSI 0.25 05H -0.11 42 51 MRPC SAI 2.17 O1H +0.00 Bobbin DSI 0.95 01H -0.05

,. . ~ . _ . _ . _ _ . _ - _ _ .. _ _ . . __m .. ._..m.___... _ .

I '

i j .****************

BWNS TUBAN II (Varsion'2.0) 05/16/1995'13:24:23- **************** '

Batvar Valley Unit <1 ****************

' **************** SG B ****************

i ' **************** 1/95 RFO (10R) **************** '

I **************** Bobbin,MRPC ****************

l Page 14 of 14 l

Steam Generator RC-E-1B .

Location & Percent Through Wall Calls (%TW) For All Indications i ROW. COL TEST TYPE %TW IND VOLTS LOCATION i 42 57 Bobbin DNT 6.32 07H +34.13 l Bobbin 7 ODI 0.63 01C -0.22 1 43 34 Bobbin 14 ODI 1.18 02C +0.19 l l Bobbin 21 ODI 1.49 01C +0.00 l

43 48 Bobbin DSI 0.78 O1H +0.00 I l 43 59 Bobbin 8 ODI 1.63 01C -0.11 )

! 43 63 Bobbin 7 ODI 0.77 02C +0.05 '

i 43- 65 Bobbin 23 ODI 1.48 02C +0.08 j l 44 36 MRPC NDF TSH +24.69 ,

Bobbin 4 ODI 0.75 TSH +24.45 '

Bobbin 27 ODI 1.30 02C +0.27 I

j. 44 37 Bobbin 6 ODI 0.64 .02C +0.16 '

i Bobbin 6 ODI 0.78 01C +0 08 44 38 Bobbin 10 ODI 1.04 01C +0.03 Bobbin 16 ODI 2.01 02C +0.00 l 44 43 Bobbin 14 ODI 1.30 02C -0.08 ,

44 44 Bobbin 30 ODI 0.36 01C +0.05 I 44 47 Bobbin 9 ODI 0.58 02H +18.68 44 50 Bobbin 10 ODI 0.44 01C +0.17 Bobbin 11 ODI 1.03 02C +0.00 44 53 Bobbin 29 ODI 1.75 01C +0.00 l l 44 54 Bobbin FSD 2.43 AV4 +10.07 44 57 Bobbin 12 ODI 0.86 02C +0.00 l Bobbin 17 ODI 0.56 01C +0.00

! 44 58 Bobbin 14 ODI 0.80 Olc -0.03 I

44 59 Bobbin 11 ODI 0.81 02C -0.03 i

! Bobbin 27 ODI 0.72 01C -0.03 -

! 44 62 Bobbin DSI 0.77 01H +0.03 L Bobbin 22 ODI 2.15 02C -0.19

! 45 36 Bobbin 3 ODI 0.62 01C +0.16 l Bobbin 32 ODI 1.88 02C +0.22 45 37 Bobbin 33 ODI 2.09 02C +0.03

<4 5 38 Bobbin 11 ODI 1.19 02C +0.19 45 40 Bobbin DSI 0.59 03H +0.08 l 45 42 Bobbin 17 ODI 1.17 01C -0.03

! Bobbin 20 ODI 2.31 02C +0.00 45 43 Bobbin 20 ODI 0.93 01C +0.11 '

Bobbin 29 ODI 0.94 02C +0.14 i- 45 44 Bobbin 14 ODI 1.27 01C +0.00 l Bobbin 15 ODI 0.67 02C +0.00 t 45 46 Bobbin 12 ODI 0.47 01C +0.00

, 45 47 Bobbin 15 ODI 0.85 01C -0.11 l 45 49 Bobbin 25 ODI 1.58 01C +0.08 45 53 Bobbin 33 ODI 1.53 01C -0.08 45 56 Bobbin 12 ODI 1.05 02C -0.03 j 45 57 Bobbin FSD 2.02 O1H +9.71 l Bobbin 9 ODI 0.96 01C -0.03 1 45 58 Bobbin 13 ODI 0.75 01C +0.00 46 43 Bobbin 4 ODI 1.10 O1H +43.57 46 44 Bobbin 28 ODI 1.03 01C +0.22 46 45 Bobbin 33 ODI 1.96 02C +0.00 46 46 Bobbin 28 ODI 1.12 01C +0.00 Bobbin 31 ODI 1.20 02C +0.16 Total Indications Found = 898 l Total Tubes Found = 595 Total Tubes in Input File = 2905 I

4 ,

a d

i i.

j 4

ATTACHMENT 2A-l l

TUBE PLUGGING RESULTS l

l FROM THE UNIT #1 10TH REFUELING OUTAGE (10R) j FOR STEAM GENERATOR 1

i RC-E-1B i l

I i

O-1 l

i 1

l I

?

2 I

, i O 1 6

l BWNS TUBAN N - 06/13/1995 09.17.28 I l

.e.....

.....ee.....

g$  !

....e.......g....

.. .........g..

....e..............e

..e.o.e.............e...

. g

..p.................gegge

( 03.............

s z

.............e.... ..........

.....................z

..g.................

...e...

g  ;

e e...................g........

n e ..........g....e.....e .......

..e ..............e.....g..e.......e

............. ...........g....

g

..g.e......................e..g..g.. .

eeo.s.......................e.......e

.. ...............e........e....e...

..............ee........e..e.....e.. W $

e 8

......................e........e......e

. .e..................

..............................g........

... 30.c......o.e N g 3

g j

M g3 ...............................e......e.e..

.e....................g......g...

...ee

.g.....e

. O

~ 5 a

..g....e...e...ee.

. g e.......o..g............ee......e......... ..

..........................s..e..........*.o

........................e0

.........................e.................

..........e...... h g

.........e.......g.......go..e..............

e........................e.................e e.....................e.............e..g.g.

g .....................g .e.eeese Q

..e......................o...ee......e..g.co.ee

......................g.o.g.................

.e.........e i

..............ee

..e30...e...................e................sg.

g i

4

... ......................g...............

e........................... 0.e...g...e.........e l

.g........................g.....o.....e.......e ... ....

. I

.............g..............

..g........g................. ......... l

..g...g..................gge..................

.......g.....ee g

.e.....e....................eg0..o........ee... .

y) O ............................e.....o..e..g..e.e..

.........................g.. .... ....... e g ...g..e.g.........................o..e.e.....e...e. .g y

....................e..

............g................o.o.......e..g..e...

    • I

........................g.... ....g..

1 ...........eg...........g.g...gego.e.e...eg...e

............g..........g..

e . . . . . . . . . . o g . . . . . . . . . . . . . e . . . g . e. e. o . . . e . . . . . e ge....

.. . . g . . . . .e g

g g

m 1 f

l ym . . e. . . . . . . . . . ...............o.

.. ........ . e . . . . . . . . . . . . . . o .og..g....... . o . o . . e . e . o. .ge .e.  !

...........o.................c.00.e...e...ee*o*e.

.e.......................... eo.... ...e... g O

+

(y s

.............e........so...

es.......e.............g

........e................e.g.o.s.og.

......ge ............e.g.

..co coo.

.oe.o.o.

e

.g......e.

.e...g

.o......

co..so...g...

g i

j OE g.g.....e...................e300.g.o.....e.g

......g...............e.g.O.o....oge....e.g Qb O 000 ...

.......g..............e.o

. . . . . g . . . . . . . . . . . . o . . ..e.e.e....... . e. e . e. soo.o..e.

..ee..ge.

e...................o......e.....e...e.e

..e...g...........e.g..g..........o.0...

e.e n

....................e.g ...ee....geo... l

.................g*..ee .*. gee *g*e..

.e...............g..o......e....g..G.ge

..........g..e..g .....

.ee..e..e.e egge g

m ege.........e.....g.e.s....g..g.a.ee0.e

...e...........g.e.g......g.....s ...e...go e..g e

...e............ ..op.. -,

.ges................e..e.o..e....e.g

........e....e....e.....g..o e W "

. .............e....e....e..eee.

ge.e.........ege .g.eeggg...ge..

............goog........ee.o.e

..eee..g.g..g g..ges...oog..e O

. . ...**e

. . . g e. .......e*... g . . . g o . e . . g . . e . . e. seo. g

......e.g.e..e....eze...ge ..e.

I

".. . g ....e...e.

e e . . . . . . e. . ....eg.ee

.....g.......g.g...

e . e . g e o. g. e.

m E

3 .......g.....gge.

a ..e.....e...eeg }

q .......eeeee

..oo.og o g

> 2 k h m O m O W O e O 5y W T M M N N e e E

_I 15 m> <- E O k (A -> O

                                • BWMS TUBAN II (Version 2.0) 06/12/1995 11:07:14 ****************
                                • Beaver Valley Unit 1 ****************
                                • SG B ****************
                                • 1/95 RFO (10R) *****************
                                • Bobbin,MRPC ****************

A Page 1 of 3 Steam Generator RC-E-1B Tubes Plugged 10R ROW COL TEST TYPE %TW IND VOLTS LOCATION 1 40 MRPC SAI 2.33 07H +8.49 Bobbin DSI 0.30 O1H -0.05 1 65 MRPC SAI 0.64 O1H -0.13 Bobbin DSI 0.79 04H +0.00 Bobbin DSI 1.17 O1H +0.05 3 7 MRPC MAI 0.29 O1H +0.00 Bobbin DSI 1.04 O1H +0.03 3 12 MRPC SAI 0.27 O1H +0.00 Bobbin DSI 1.48 O1H -0.21 3 15 MRPC MAI 0.46 O1H -0.03 Bobbin DSI 1.31 O1H -0.19 4 23 MRPC NDF TSH +0.47 Bobbin DTI 0.83 TSH +0.47 4 24 MRPC NDF TSH +0.08 Bobbin DSI 0.39 O1H +0.14 Bobbin DTI 0.94 TSH +0.08 4 38 MRPC SCI 0.83 TSH -0.33 6 11 MRPC NDF O1H -0.11 MRPC SAI 19.30 TSH -0.51 Bobbin DSI 1.07 01H -0.11 Bobbin DSI 0.44 02H -0.11 Bobbin DSI 0.44 02H -0.11 Bobbin DSI 1.04 O1H -0.14 Bobbin DTI 21.90 TSH -0.64 Bobbin DTI 22.55 TSH -0.48 6 24 MRPC NDF TSH +1.45

[-) Bobbin DSI 0.62 O1H +0.00

\m / Bobbin DTI 0.39 TSH +1.45 7 18 MRPC MAI 0.52 O1H -0.03 Bobbin DSI 1.04 O1H -0.21 7 32 MRPC MAI 0.65 01H -0.11 MRPC SAI 0.90 TSH +0.63 i Bobbin DSI 1.25 O1H -0.11 I Bobbin DTI 0.53 TSH +0.91 l 8 31 MRPC SAI 0.20 TSH +1.04 i Bobbin DTI 1.18 TSH +1.28  !

9 9 MRPC SAI 0.86 O1H +0.00 l Bobbin DSI 1.06 01H -0.11 9 28 MRPC SAI 0.40 TSH +0.99 i Bobbin DSI 0.41 O1H +0.00 1 Bobbin DTI 0.49 TSH +0.78 l 9 30 MRPC SAI 0.48 TSH +1.24 l Bobbin DTI 0.37 TSH +1.42 l 10 16 MRPC MAI 0.80 O1H -0.03 Bobbin DSI 1.04 01H +0.05 10 33 MRPC NDF TSH +1.91 Bobbin DTI 0.64 TSH +1.94 10 73 MRPC MAI 1.11 02H -0.02 Bobbin DSI 1.39 02H -0.08 Bobbin DSI 0.48 O1H +0.03 11 27 MRPC NDF TSH +1.77 Bobbin DSI 0.83 01H -0.08 Bobbin DTI 0.16 TSH +1.77 11 28 MRPC SAI 0.62 TSH +1.28 MRPC VOL 0.48 TSH +0.64 Bobbin DSI 0.27 02H -0.03 Bobbin DTI 0.36 TSH +2.16 Bobbin DTI 0.40 TSH +1.37 11 29 MRPC SAI 0.40 TSH +1.52 MRPC SAI 0.39 TSH +0.46 fs

( ) Bobbin DTI 0.26 TSH +1.63

\d 11 34 MRPC NDF TSH +2.03 Bobbin DTI 0.21 TSH +2.03 11 38 MRPC NDF TSH +2.32 Bobbin DTI 0.38 TSH +2.32

i

                                • BWNS TUBAN II-(Version 2.0) 06/12/1995 11:07:14 ' ****************
                                • Baaver Valley Unit 1 **************** ,
                                • . SG B ****************
                                • 1/95.RFO (10R) ****************
                                • Bobbin,MRPC ****************

Steam Generator RC-E-1B Tubes Plugged 10R ROW COL TEST. TYPE %TW IND VOLTS LOCATION <

11 39 MRPC- NDF TSH +2.47 Bobbin DSI 0.75 O1H -0.08 Bobbin DTI 0.88 TSH +2.47 -

-12 27 MRPC NDF TSH +1.88 Bobbin DTI 0.18 TSH +1.90 12 28 MRPC NDF TSH +1.08 Bobbin DTI 0.46 TSH +1.08 12 31 MRPC NDF TSH +2.37 Bobbin DTI 0.37 TSH +2.37

.12 54 MRPC NDF TSH +0.58 Bobbin DSI 0.51 02H -0.08 Bobbin DTI 0.46 TSH +0.58 ,

13 28 MRPC SAI 0.37 TSH +1.11 Bobbin DTI 0.33 TSH +1.19 Bobbin DTI 0.63 .TSH +0.87 l 13 30 MRPC NDF TSH +1.71 '

l MRPC NDF TSH +1.41 Bobbin DTI 0.63 TSH +1.41 )

Bobbin DTI 0.65 TSH +1.71 -

13 31 MRPC NDF TSH +2.53 )

MRPC NDF TSH +2.20 MRPC NDF TSH +1.86 Bobbin DTI 0.23 TSH +1.86 Bobbin 14 ODI 0.16 TSH +2.53 Bobbin 22 ODI 0.28 TSH +2.21 13 32 MRPC NDF TSH +1.83 J MRPC SAI 0.37 01H -0.05

(,- Bobbin DSI 0.73 01H -0.05 Bobbin DTI 0.53 TSH +1.83 13 34 MRPC NDF TSH +2.76 Bobbin D7/I 0.19 TSH +2.76 l 13 38 MRPC N11F TSH +2.64 I Bobbin D7 I 0.29 TSH +2.64 13 41 MRPC NDF TSH +2.60 Bobbin DS '. 0.32 04H -0.06 Bobbin DTI 0.47 TSH +2.60 13 44 MRPC SAI 0.54 TSH +2.03 Bobbin DTI 0.31 TSH +1 60 13 47 MRPC NDF TSH +0.56 j Bobbin DSI 0.30 :01H -0.11 Bobbin DTI 0.90 TSH +0.56 13 48 MRPC SAI 0.51 TSH +0.51 Bobbin DTI 0.38 TSH +0.56 13 54 MRPC NDF TSH +0.68 Bobbin DTI 0.65 TSH +0.68 1 14 30 MRPC NDF TSH +1.17 )

Bobbin DTI 0.54 TSH +1.17 1 14 35 MRPC NDF TSH +2.58 l Bobbin DTI 0.22 TSH +2.58 14 45 MRPC NDF TSH +0.62 Bobbin DTI 0.73 TSH +0.62 14 51 MRPC VOL 1.26 TSH +1.03 Bobbin DTI 0.90 TSH +0.93 14 52 MRPC NDF TSH +1.00 Bobbin DTI 0.24 TSH +1.00 15 28 MRPC NDF TSH +0.69 Bobbin DTI 0.29 TSH +0.69 15 34 MRPC NDF TSH +1.34 Bobbin DTI 0.18 TSH +1.34 15 36 MRPC NDF TSH +2.10 O MRPC Bobbin Bobbin NDF DTI DTI 0.19 0.21 TSH TSH TSH

+2.61

+2.61

+2.10 16 29 MRPC SAI 0.61 O1H +0.13 Bobbin DSI 1.13 O1H -0.14

.. . .. .._. ~ _ _ ._. ._ . . . . _ _ __ _ - . .

i

                                • ~ BWNS TUBAN II - (Version 2.0)' 06/12/1995 11:07:14 ****************
                                • Beaver Valley Unit 1 ****************
                                • oSG B ****************
                                • 1/95'RFO (10R) ****************
                                • Bobbin,MRPC ****************

Steam Generator RC-E-1B Tubes Plugged 10R ROW COL TEST TYPE %TW, IND VOLTS -LOCATION Bobbin DSI 0.78 02H -0.08 16 32 MRPC NDF TSH +0.83 Bobbin DTI 0.33 TSH +0.83 16 33 MRPC NDF. TSH +0.92-Bobbin DTI 0.78 .TSH +0.92 Bobbin 13 ODI 0.71 TSH +0.54 ,

16 36 MRPC NDF TSH +1.64 Bobbin DTI 0.43 TSH +1.64

'16 38 MRPC NDF TSH +1.94 Bobbin DTI 1.02 TSH +1.94 16 40 MRPC NDF TSH +1.59 Bobbin DSI 0.36 O1H -0.11 Bobbin DTI 0.50 TSH +1.59 Bobbin DTI 0.50 TSH +1.56 16 42 MRPC NDF TSH +1.76 ,

Bobbin DSI 0.49 01H -0.14 '

Bobbin DTI 0.27 TSH +1.76 17 33 MRPC NDF TSH +0.73 l Bobbin DSI 0.35 03H -0.11 Bobbin DSI 0.67 02H -0.11 ,

Bobbin DTI' 1.73 TSH +0.73 1 17 37 MRPC NDF TSH +1.54 MRPC SAI 0.77 O1H -0.08 Bobbin DSI 1.01 01H -0.24 Bobbin DTI 0.25 TSH +1.54 17 43 MRPC SAI 0.55 TSH +0.92 Bobbin O DTI 0.45 TSH +1.29 4 17- 67 MRPC SAI 1.30 02H +0.02 l Bobbin. DSI 1.33 02H -0.05  !

18 53 MRPC SAI 0.53 O1H +0.11 i Bobbin DSI 1.01 O1H +0.06 i 18 65 MRPC SAI 0.82 01H -0.04 )

Bobbin DSI 1.04 O1H ' +0.00 Bobbin 23 ODI 1,67 AV1 +0.39

.19 37 MRPC MAI 0.45 O1H -0.07 Bobbin DSI 1.62 O1H. -0.19

'19 40 MRPC NDF TSH +0.76 Bobbin DTI 1.06 TSH +0.76 19 88 MRPC SAI 1.88 02H +0.00 Bobbin DSI 1.09 02H +0.00 21 34 MRPC SAI 0.72 O1H -0.03 I Bobbin DSI 1.21 01H -0.08 l 22 27 MRPC MAI 1.07 O1H +0.00 l Bobbin DSI 1.82 O1H +0.00 Bobbin DSI 0.51 03H +0.00 24 85 MRPC NDF TSH +1.14 Bobbin DTI 0.27 TSH +1.14 25 22 MRPC MAI 1.00 O1H -0.02 l Bobbin DSI 1.23 01H -0.08 34 66 MRPC VOL 0.88 TSH +1.57 Bobbin 16 ODI 0.86 TSH +1.60 45 54 MRPC NDF TSH +3.05 MRPC VOL 0.75 TSH +10.93 MRPC VOL 1.79 TSH +10.23 Bobbin 7 ODI 0.55 TSC +37.84 Bobbin 12 ODI 1.33 TSH +10.54 Bobbin 15 ODI 1.40 01C +0.19 Bobbin 18 ODI 1.15 02C -0.11 Bobbin 23 ODI 0.85 TSH +11.36 Total Indications Found = 189 O Total Total Tubes Tubes inFound Input = 70=

File 70

l O ATTACHMENT 3 I

EXAMINATION RESULTS FROM THE UNIT #1 10TH REFUELING OUTAGE (10R) l

)

FOR l

STEAM GENERATOR l RC-E-1C ,

4 i

O O

, , , . - - . . , , , . , , - , , , , . , _ , . . , , , . , , . , , . . , , , . . . , - - , - , , , , . . . , , . . , , , . - , . . , . . - , . , ,,,.-.r -,,

- . - . . - . - - - - -- - - - - - -- - ' ' ' - "" ^^-^

~^^3 l

i

                                • BWNS TUBAN II (Varsion 2.0)' 05/16/1995 13:33:09 **************** I Sa=v=r vallar unit 1 SG C 1/95 RFO (10R) ****************

Bobbin,MRPC ****************

Page 1 of 6 Steam Generator RC-E-1C ,

Location & Percent Through Wall Calls (%TW) For All' Indications l ROW COL TEST TYPE %TW IND VOLTS LOCATION j 1 5 MRPC VOL 0.88 TSH +17.31 Bobbin 32 ODI 0.47 TSH +17.17 1 17 MRPC NDF 06H +0.00 1 44 Bobbin DSI 0.46 02H +0.08 Bobbin DSI 0.37 01H +0.03 1 45 Bobbin DSI 0.95 O1H -0.03 1 46 Bobbin DSI 0.36 02H +0.05 1 47 Bobbin DSI 0.72 O1H -0.14 1 94 Bobbin DSI 0.37- 02H +0.03 2 3 Bobbin DSI 0.62 04H -0.05 2 6 Bobbin DSI 0.64 02H -0.11 2 7 Bobbin DSI 0.73 02H +0.22 Bobbin DSI 0.83 O1H- -0.03-2 8 Bobbin DSI 0.50 01H -0.19 2- 10 Bobbin DSI 0.64 O1H -0.06 2 11 Bobbin DSI 0.85 O1H -0.05 2 13 Bobbin DSI 0.60 O1H -0.17 2 14 Bobbin DSI 0.77 O1H -0.08 2 15 Bobbin DSI 0.79 O1H -0.11 Bobbin DSI 0.58 02H -0.05 2 18 Bobbin DSI 0.67 02H -0.11 2 19 Bobbin DSI 0.44 02H +0.05 Bobbin DSI 0.61 O1H +0.17 2 23 Bobbin DSI 0.38 O1H -0.16

i. 2 25 Bobbin DSI 0.91 02H -0.06 l' Bobbin DSI 0.77 O1H -0.08 2 26 Bobbin DSI 0.71 O1H -0.11 l
:(s 2 33 Bobbin DSI 0.68 O1H +0.03

! 2 65 Bobbin DSI 0.28 02H +0.20 f._ 2 76 Bobbin DSI 0.67 02H +0.18 2- 87 MRPC NDF 02H +0.00 2 89 Bobbin DSI 0.63 02H +0.16 3 11 Bobbin DSI 0.26 02H -0.03 l 3 13 Bobbin DSI 0.46 01H +0.00 l-3 14 Bobbin DSI 0.50 02H -0.03 3 22 MRPC NDF 02H +0.00 3 26 Bobbin DSI 0.35 02H -0.05 Bobbin DSI 0.74 O1H -0.11 3 36 MRPC NDF 01H +0.00 Bobbin DSI 1.23 O1H -0.05 3 39 Bobbin DSI 0.50 O1H +0.00 3 47 Bobbin DSI 0.75 O1H +0.05 3 48 Bobbin DSI 0.46 O1H -0.05 3 50 Bobbin DSI 0.49 02H +0.19 Bobbin DSI 0.79 01H -0.11 3 51 Bobbin DSI 0.40 O1H -0.1) I I 3 52 Bobbin DSI 0.77 01H -0.05 I 3 58 Bobbin DSI 0.68 O1H -0.03 l

3 62 Bobbin DSI 0.54 O1H -0.03 3 81 Bobbin DSI 0.33 02H +0.13 3 94 Bobbin 20 ODI 1.06 01C -0.06 4 3 Bobbin DSI 0.64 O1H -0.03 i Bobbin DSI 0.45 02H +0.00 4 7 Bobbin DSI 0.35 02H -0.08 4 35 MRPC NDF 01H +0.00 4 43 Bobbin DSI 0.58 01H +0.00 4 48 Bobbin DNG 19.45 07H +9.43 4 49 Bobbin DNG 20.17 07H +9.46 4 50 Bobbin DNG 15.49 07H +9.39 Bobbin DSI 0.51 02H -0.05 4 57 Bobbin DNG 9.25 07H +9.33 4- 60 Bobbin DNG 8.24 07H +9.52 4 61 Bobbin DSI 0.46 01H +0.03 4 87 Bobbin. DNG 12.71 07H +9.14 4 88 Bobbin DNG 10.20 07H +8.75

                                • BWNS TUBAN II (Varsion 2.0) 05/16/1995 13:33:09 ****************
                                • Bsevar Valley Unit 1 ****************
                                • SG C ****************
                                • 1/95 RFO (10R) ****************
                                • Bobbin,MRPC ****************

/3 U

Page 2 of 6 Steam Generator RC-E-1C Location & Percent Through Wall Calls (%TW) For All Indications l ROW COL TEST TYPE %TW IND VOLTS LOCATION 4 89 Bobbin DNG 11.29 07H +9.21 4 93 Bobbin DNG 8.41 07H +8.61 4 94 Bobbin DNG 11.88 07H +8.38 5 25 Bobbin DSI 0.43 02H -0.03 Bobbin DSI 0.84 O1H +0.00 5 26 Bobbin DSI 0.44 O1H +0.00 5 29 Bobbin DSI 0.46 02H +0.00 5 49 Bobbin DSI 0.43 O1H -0.11 5 54 Bobbin DSI 0.57 O1H +0.06 Bobbin DSI 0.67 O1H +0.00 5 58 Bobbin DSI 0.37 O1H +0.08 Bobbin DSI 0.48 01H +0.00 5 61 Bobbin DSI 0.54 02H -0.08 Bobbin DSI 0.29 O1H +0.00 5 62 Bobbin DSI 0.25 03H +0.00 5 63 Bobbin 35 ODI 0.44 02C +0.06 5 81 MRPC NDF O1H +0.00 5 85 MRPC NDF 02H +0.00 6 36 Bobbin DSI 0.45 O1H +0.00 6 38 Bobbin DSI 0.62 O1H +0.05 6 43 Bobbin DSI 0.82 O1H -0.03 1 6 81 MRPC NDF O1H +0.00 Bobbin DSI 0.92 04H -0.08 6 82 Bobbin DSI 0.64 O1H -0.03 6 92 Bobbin 30 ODI 0.95 01C -0.23 fs 6 94 Bobbin 17 ODI 1.44 01C -0.11

/ i 7 5 Bobbin DSI 0.96 O1H +0.08

(_/ 7 19 MRPC NDF O1H +0.00 l 7 41 Bobbin DSI 0.46 O1H -0.11 i Bobbin DSI 0.26 03H +0.00 I 7 46 Bobbin DSI 0.44 03H -0.16 7 68 Bobbin DSI 0.64 O1H +0.00 7 71 Bobbin DSI 0.40 O1H +0.00 7 90 Bobbin DSI 0.84 02H +0.00 7 91 Bobbin DSI 0.49 01H +0.00 7 92 Bobbin DSI 0.71 03H +0.00 7 93 Bobbin DSI 0.44 O1H +0.00 7 94 Bobbin DSI 0.59 03H +0.03 8 4 MRPC DNT 3.67 07H +0.28 Bobbin DNT 6.51 07H +0.35 Bobbin DNT 7.04 07H +0.06 8 13 Bobbin DSI 0.28 01H +0.06 8 81 Bobbin DSI 0.80 O1H -0.03 9 4 MRPC DNT 2.15 07H +0.34 Bobbin DNT 9.51 07H +0.00 9 8 MRPC NDF 01H +0.00 Bobbin DSI 1.09 O1H -0.03 9 10 MRPC NDF O1H +0.00 MRPC NDF 02H +0.00 Bobbin DSI 1.22 02H -0.23 Bobbin DSI 0.84 03H +0.00 Bobbin DSI 1.12 O1H +0.11 9 14 Bobbin DSI 0.40 O1H -0.08 9 93 Bobbin 29 ODI 2.47 01C +0.00 10 48 Bobbin DSI 0.88 O1H +0.00 10 56 Bobbin DSI 0.73 O1H +0.00 10 66 Bobbin DSI 0.84 O1H +0.08 10 67 MRPC NDF 01H +0.00 10 70 Bobbin DSI 0.55 02H +0.06 11 4 MRPC DNT 2.91 07H +0.23 I \

Bobbin DNT 6.51 07H +0.14 N ss/ 12 2 MRPC DNT 2.97 07H +0.08 Bobbin DNT 11.43 07H -0.14 12 93 Bobbin 34 ODI 1.56 01C +0.00 13 3 MRPC DNT 8.24 07H +0.47

I l

                                • BWNS TUBAN II (Vcrzion 2.0) 05/16/1995 13:33:09 **************** l
                                • Bsavsr Valley Unit 1 ****************
                                • **************** l SG C
                                • 1/95 RFO (10R) ****************
                                • Bobbin,MRPC ****************

Page 3 of 6 Steam Generator RC-E-1C Location & Percent Through Wall Calls (%TW) For All Indications i ROW COL TEST TYPE %TW IND VOLTS LOCATION Bobbin DNT 9.31 07H -0.03 Bobbin DNT 14.23 07H +0.37 13 92 Bobbin 30 ODI 0.64 01C +0.00 14 62 Bobbin DNT 5.67 AV4 +15.88 1 14 89 MRPC NDP 97H +0.00 i 14 92 Bobbin DSI 0.71 L1H +0.00 l 15 4 Bobbin 20 ODI 0.61 02C +0.19 15 8 Bobbin DSI 0.57 01H +0.03 15 52 Bobbin DSI 0.72 O1H -0.06 15 53 Bobbin DSI 0.90 O1H +0.00 i 15 56 Bobbin DSI 0.61 O1H +0.00  !

Bobbin DSI 0.93 02H +0.03 l 15 58 MRPC NDF O1H +0.00 15 62 MRPC NDF 01H +0.00 Bcbbin DSI 0.72 02H +0.00 j Bobbin DSI 0.44 03H -0.03 i Bobbin DSI 1.31 O1H +0.00 l 15 63 Bobbin DSI 0.61 03H +0.00 -

I Bobbin DSI 0.99 O1H +0.00 15 91 Bobbin 34 ODI 2.10 01C +0.00 ]

16 4 Bobbin 31 ODI 0.90 02C +0.14 16 90 Bobbin 32 ODI 2.09 01C -0.11 17 16 MRPC NDF 01H +0.00 l 17 81 Bobbin DSI 0.31 02H +0.00 l 17 84 Bobbin DSI 0.35 05H +0.05 '

i Bobbin DSI 0.34 02H -0.03

. 17 85 Bobbin DSI 0.50 02H -0.13 I

\m- 17 89 Bobbin 24 ODI 1.66 01C +0.00 18 19 MRPC NDF 02H +0.00 MRPC NDF 03H +0.00 Bobbin DSI 0.38 01H -0.09 18 36 MRPC NDF O1H +0.00 18 39 MRPC NDF 02H +0.00 18 43 Bobbin DSI 0.39 O1H +0.00 18 71 Bobbin DSI 0.38 02H -0.20 19 57 MRPC NDF O1H +0.50 19 87 Bobbin 36 ODI 0.45 01C -0.25 19 90 Bobbin 14 ODI 1.08 01C +0.00 20 34 MRPC NDF O1H +0.00 Bobbin DSI 0.67 02H -0.17 20 44 Bobbin DSI 0.79 01H -0.27 ,

20 72 Bobbin DSI 0.47 01H +0.00 1 Bobbin DSI 0.40 02H -0.03 I 21 42 Bobbin DSI 0.42 01H +0.00 23 9 Bobbin DSI 0.58 02H +0.08 Bobbin DSI 0.52 01H -0.03 23 27 Bobbin DSI 0.57 03H +0.03 23 42 MRPC NDF O1H +0.00 I Bobbin DSI 0.30 02H +0.00 l 23 63 MRPC NDF O1H +0.00 i 23 73 Bobbin DSI 0.33 02H -0.03 I Bobbin DSI 0.61 O1H +0.00 I' 23 74 Bobbin DSI 0.40 O1H +0.00 23 87 Bobbin 11 ODI 1.17 01C +0.11 24 13 MRPC NDF O1H +0.00 Bobbin DSI 1.21 O1H -0.14 24 21 Bobbin DSI 0.66 O1H -0.03 24 22 Bobbin DSI 0.51 02H -0.11 24 25 Bobbin 20 ODI 1.35 AV3 +0.06

(\.

24 24 27 31 Bobbin Bobbin Bobbin 23 23 ODI ODI DSI 1.88 1.79 0.51 AV2 AV2 O1H

+0.00

+0.32

-0.08 24 40 Bobbin DSI 0.39 01H +0.00 24 42 Bobbin DSI 0.30 O1H +0.00 24 45 Bobbin DSI 0.23 O1H -0.17

l 1

                                • BWNS TUBAN II (Version 2.0) 05/16/1995 13:33:09 ****************
                                • Bsavar Valley U nit 1 ****************
                                • SG C ****************
                                • 1/95 RFO (10R) ****************
                                • Bobbin,MRPC ****************

~

Steam Generator RC-E-1C Location & Percent Through Wall Calls (%TW) For-All Indications ROW COL TEST TYPE %TW- IND VOLTS LOCATION 24 69 Bobbin DSI 0.59 02H +0.00 Bobbin DSI 0.81 O1H -0.03 24 86 Bobbin 25 ODI 1.14 01C -0.10 25 9 Bobbin ' 18 ODI 1.36 AV2 +0.00 25' 14 Bobbin DSI 0.37 02H +0.00 25 31 Bobbin DSI 0.44 01H -0.06 25 38 Bobbin DSI 0.94 01H -0.06 25 41 Bobbin DSI 0.19 O1H -0.03 25 45 Bobbin DSI 0.85 O1H -0.11 25 68 Bobbin DSI 0.56 02H +0.05 25 86 Bobbin 31 ODI 1.86 01C -0.03 26 22 Bobbin DSI 0.54 02H +0.00 26 29 Bobbin .DSI 0.79 O1H -0.11 26 31 Bobbin DSI 0.63 01H -0.08 26 32 Bobbin DSI. 0.82 O1H +0.00 26 35 Bobbin DSI 0.62 02H -0.06 26 36 Bobbin DSI 0.79 02H -0.08 26 38 Bobbin DSI 0.84 01H -0.06 26 40 Bobbin DSI 0.55 O1H -0.14 26 51 Bobbin DSI 0.91 O1H -0.06 26 62 Bobbin DNT' 27.91 04C +32.54 Bobbin DNT 12.65 TSC +47.32 36 67 Bobbin DSI 0.85 01H +0.00 Bobbin DSI 0.52 02H +0.00 26 70 Bobbin DSI 0.40 01H +0.08 Bobbin DSI 0.34 02H -0.03 26 84 Bobbin 14 ODI 1.05 01C +0.00 O. 27 27 26 Bobbin 42 Bobbin 28 ODI DSI 2.30 0.42 AV2 O1H

+0.17

-0.03 27 44 Bobbin DSI 0.65 O1H -0.14 27 51 MRPC NDF O1H +0.00 27 84 Bobbin 16 ODI 0.55 01C -0.03 28 10 Bobbin DSI 0.49 02H +0.33 Bobbin DSI 0.40. O1H +0.20 28 52 Bobbin DSI 0.75 02H +0.03 28 58 Bobbin DSI 0.47 02H +0.03 Bobbin DSI 0.39 O1H +0.00 28 83 Bobbin 33 ODI 1.37 Olc +0.00 29 40 MRPC NDF O1H +0.00

. Bobbin DSI 1.10 O1H +0.06 29 46 Bobbin 21 ODI 1.82 AV2 -0.28 Bobbin 22 ODI 1.87 AV3 -0.71 Bobbin 26 ODI 2.46 AV4 +0.00 Bobbin 27 ODI 2.53 AV1 +0.00 Bobbin 31 ODI 3.26 AV2 +0.48 Bobbin 31 ODI 3.23 AV3 +0.00 29 57 Bobbin DSI 0.57 02H +0.00 l 29 69 MRPC NDF TSH +0.53 i Bobbin FSA 5.34 TSH +8.51 29 84 Bobbin 27 ODI 1.57 01C +0.00 30 14 Btbbin 36 ODI 3.20 02C -0.03 30 36 MRPC NDF O1H +0.00 Bobbin DSI 0.86 02H -0.22 30 43 Bobbin DSI 0.70 O1H +0.03 30 55 Bobbin 8 ODI 1.46 TSC +39.08 30 56 Bobbin DSI 0.50 02H -0.22 30 57 Bobbin DSI 0.66 02H +0.03 30 61 MRPC NDF 02H +0.00 i 30 83 Bobbin 15 ODI 0.66 01C +0.00  !

31 17 Bobbin DSI 0.67 O1H +0.00 O 31 31 31 22 Bobbin 38 Bobbin 62 Bobbin DSI DSI DSI 0.60 0.71 0.43 O1H O1H 03H

-0.06

+0.00

+0.00 l 32 18 Bobbin DSI 0.80 01H -0.11 32 32 Bobbin DSI 0.57 02H +0.03

. . . - - . . . . ~ . - ~ ~ . - . - . ~ . . . - -- . _ . -. . . . - - . . . . ~ . . . - . .

l i I

                                • BWNS TUBAN II - (Varsion 2.0) 05/16/1995 13:33:09 ****************

Baavar Valley Unit 1 **************** 2

                                • SG C **************** l
                                • 1/95 RFO (10R) ****************
                                • Bobbin.MRPC **************** l l

l Page 5 of 6' l l Steam Generator RC-E-1C

.)

i Location & Percent Through Wall Calls (%TW) For All Indications i ROW COL TEST TYPE %TW -IND VOLTS LOCATION 32 33 Bobbin DSI 0.89 O1H -0.06 32 34 MRPC MAI 0.51 02H -0.02' Bobbin DSI 0.78 02H -0.09 i 32 39 MRPC NDF 02H -0.11 1 Bobbin DSI 1.02 02H -0.11; 32- 41 Bobbin DSI 0.47 O1H -0.03-32 42 Bobbin DSI 0.62 O1H +0.00 32 69 Bobbin DSI 0.26 01H -0.08 ,

32 70 Bobbin DSI 0.46 02H +0.11 i 33 18 Bobbin 38 ODI 2.58 Olc +0.00 33 36 MRPC NDF O1H +0.00 133 45 Bobbin DSI 0.49 02H +0.00 33 78 Bobbin 6 ODI 0.53 01C- +0.23 34 21 Bobbin -DSI 0.42 O1H -0.06 34 40 MRPC NDF 03H -0.23 Bobbin DSI 0.84 01H . -0.11 34- 47 Bobbin 13 ODI 0.97 AV2 +0.00 34 63 Bobbin DSI 0.77 O1H +0.00 34 77 Bobbin 37 ODI 1.36 01C -0.06 34 79 Bobbin 21 ODI 1.01 01C +0.20 Bobbin 36 ODI 2.28 02C +0.00 35 20 MRPC NDF O1H +0.00 Bobbin DSI 0.65 02H -0.14 35 22 Bobbin FSD 3.62 AV1 '+5.18

.35 35 MRPC NDF 02H +0.04 1 35 43 Bobbin DSI 0.81 O1H +0.00 35 44 Bobbin DSI 0.89 O1H +0.00 0' ' 35 35 61 Bobbin 78 Bobbin 37 DSI ODI 0.61 1.52 02H 04C

+0.00

+0.00 36 20 MRPC NDF 07H +0.00 36 31 Bobbin DSI 0.60 O1H -0.06 36 35 MRPC NDF 02H +0.12 MRPC MAI 0.37 01H . +0.00 Bobbin DSI 0.55 01H +0.03 36 42 MRPC NDF 01H. +0.11-36- 47 Bobbin 10 ODI 0.72 AV1 +0.00 Bobbin- 23 ODI 2.03' AV2 -0.53 36 72 Bobbin FSD 2.11 AV1 +8.30

.37 19 Bobbin 32 ODI 0.74 01C +0.00 37 25 MRPC NDF O1H +0.00 37 '29 Bobbin DSI 0.33 01H +0.08 37 44 Bobbin DSI 0.55 O1H ' -0.14 37 65 Bobbin DSI 0.47 01H +0.00 ,

37- 74 Bobbin 23 ODI 0.92 01C +0.06 j 38 23 Bobbin 36 ODI 1.67 01C -0.22 ,

38 27 Bobbin DSI 0.68 02H +0.00 l 38 30 MRPC NDF O1H +0.18 38 44 Bobbin 7 ODI 0.66 01C +17.23 Bobbin 15 ODI 0.92 06H +38.13 38 67 MRPC NDF O1H +0.00 Bobbin DNT 8.83 O1H +0.00 39 27 Bobbin 20 ODI 0.87 01C -0.11 39 30 Bobbin DSI 0.39 O1H +0.06  !

39 37 Bobbin DSI 0.68 01H -0.17 39 58 Bobbin 27 ODI 2.44 AV4 +0.00 39 63 Bobbin 21 ODI 1.47 AV2 +0.00 l Bobbin 23 ODI 1.77 AV1 +0.00 39 71 Bobbin 24 ODI 0.94 02C -0.06 Bobbin 37 ODI 0.85 02C +0.03 40 25 Bobbin 31 ODI 1.67 01C -0.19 40 41 Bobbin DSI 0.65 02H +0.00 O-t Bobbin 16 ODI 1.06 AV2 +0.00 l 40 50 Bobbin 19 ODI 1.44 AV2 +0.00 40 52. Bobbin 18 ODI 1.37 AV3 +0.00 Bobbin 24 ODI 2.16 AV4 +0.00 l

. ~ _ . . - . . - . . _ - _ . _ . _ _ _ _ _ _ ~ . . . _ . . . . _ . . _ _ . _ _ . _ _ _ . _ . . . . . - _ _ _ .. _.. .

l l  :

l- **************** BWNS TUBAN II (Varsion 2.0) 05/16/1995 13:33:09 **************** -  !

                                • Batvar. Valley. Unit 1 **************** ,
                                • SG C ****************  !
                                • 1/95 RFO (10R) ***********e**** 4
      • e************ Bobbin,MRPC ****************

O-Page 6 of 6 ,

Steam Generator RC-E-1C Location & Percent Through Wall Calls (%TW) For All Indications l- -ROW COL TEST TYPE %TW. IND VOLTS LOCATION 40' 63 Bobbin DSI 0.40 02H +0.00 40 66 Bobbin DSI 0.69 02H +0.00 41 26 MRPC NDF O1H +0.20

  • Bobbin' 19 'ODI 2.16 04C +0.14' 41 29 MRPC NDF~ 04H +0.00 Bobbin 33 ODI 1.78 04C +0.26 -
41. 33 Bobbin DSI 0.88 O1H +0.11  !

41 39 Bobbin DSI .0.52 O1H -0.17

~41 48 Bobbin DSI 0.31 02H +0.00 > s 41 56 Bobbin DSI 0.56 03H -0.16

41. 66 Bobbin 31 ODI 1.49 01C -0.11 -

41 69 Bobbin 30 ODI 0.69 01C -0.11' I 42 28 Bobbin 29 ODI- 1.04. 04C +0.20 l 42 .31 Bobbin 22 ODI' O.87 03C -0.14 l 42 34 Bobbin- 36 ODI 2.11 01C. +0.14  ;

4:2 42 Bobbin- DSI 0.52 03H +0.03 'l 42 44 Bobbin 14 ODI 0.71 03H +2.33  !

42 53 Bobbin -23 ODI 1.18 02C -0.06  ;

43 '34 MRPC DNT 4.43 04H +0.38  :)

Bobbin DNT 5.31 '04H +0.69-43 45 MRPC. -NDF 02H -0.03 MRPC NDF 05H +0.00 '

43 48 MRPC .NDF 01H +0.00 Bobbin .18 ODI 1.48 AV3 +0.08 43 64 Bobbin 17 ODI 1.07 AV1 +0.00 -

Bobbin 30 ODI 1.08 02C +0.11 l 44 33 Bobbin DNG 19.76 .AV4- +22.32

. Os, Bobbin- 16 ODI 0.51 04C -0.16 l

Bobbin 35 ODI 2.22 03C -0.16 44 '36 Bobbin 24 ODI 1.59 03C +0.22 i 14-4 39 Bobbin. 31 ODI 1.23 03C -0.06 44 49 Bobbin 19 ODI 0.91 03C +0.17 44 57 Bobbin 21 ODI 0.69 01C +0.00 44 60 Bobbin 19 ODI 0.94 02C -0.14 44 62. Bobbin 35 ODI 1.83 01C -0.08 45 36 Bobbin 27 ODI 0.83 04C +0.28 45 37 Bobbin 10 ODI 0.80 04C +0.22 45 38 Bobbin -DNT 5.33 AV2 +23.65 45 39 Bobbin . DSI 0.94 02H +0.00' Bobbin 24 ODI 2.2) 04C +0.38 45 50 Bobbin 32 ODI 0.57 04C +0.31 i 46 46 Bobbin 14 ODI 1.05 03C- +0.30

46. 47 Bobbin

- DNT 8.82 AV3 +0.00

' Bobbin DNT 7.19 AV2 +0.00

46. 49 Bobbin DNT 5.65 AV3 +0.00 46 53 Bobbin 10 ODI 0.69 01C -0.06 Total Indications Found = 371 Total Tubes Found = 289 Total Tubes in Input File = 2966 O-

a

/W f.

ATTACHMENT 3A TUBE PLUGGING RESULTS FROM THE UNIT #1 10TH REFUELING OUTAGE (10R)

FOR STEAM GENERATOR RC-E-1C O

v

. .O) we, .

y' 1

RC-E-1C TUBES PLUGGED 1OR Beaver Vasey Unit 1 SG C Total Tubes  : 3388 Tubes Selected : 422 Out Of Service ( ) : N/A a ..............

$ .......................e

.......q......e.......ee......

O.0....e............................

...........O........O..............e..e.

0e.........................................

40 ...e ..........ee...............................

.......e..e0......e.................................

..........ee.e..e

...e...e........e..e..e.....e...O...e...e..ee..e.........

...ee..e................e...

....e.e.g.e.......e....e.e.e....e..............e............

35 ....... e...e-ee.-e.e...e....e.O..e..e.e ......e...e........ee.

......e eeg.eeeep e........e......e..e..e.....................e.

e..e.....eeg. gee...................e..e.........e...e..........O tR 30 e. 4e..e.0000...... 3e0....e.330..e....eet etee..e.e....ecoce....ee.=OO..ee9..O*ee.=.....e==.*.O................e

.e.................e.

..e...-e.e.. ...

.. . ..eeee..e....eee......e.......e....ee..e...........e...........e.. ee..ee- ........eee.o.....e..--.O........ee...-. ..e..

O g .ee..e.ee eeee..oeooe.ee

......Ose.e.. e.e....e..e....Oe......e.....e.......................

.e.........e.....e...ees......... .....e...................O..

.e.e......ee. 9.ge.g....ee......ee.e....Oe...e.O.e.e............=e=...........

e...e...e.....e.ee.ee.e.e.ee............e............e.......e..............e...

S. 25 ..eee.ee..........e.e....ee........e...............e..e..e......e.....ee.....e.e f e..e.e..co.....e.........e..e...... 9eet...ee.ee...e.g.e..e.....e.................

...............ee...O......e0.......................................*..=............

20 . .. .... ...............e...........e...........................e.e..............

.. ..... ..................o............................................................

...............e.e.....oo...o........................................................e

.e.......................o..................................................e...........

........................ 000..O......e..... 90..........**...........................*

  • 15 e..........................e.......................................e................

...e..........................................eee..ee.e.eeO..eeee.e

....................... 00.o.0e..O.0..........*....................

t

.................................................e..............p....O......................

......................................O......e=. 000..................... ...........=....e.

10 .......................... ..... ........... . . .......e.ee...ee..ee................. ... -

.e..........................O.............................e.................................

...e...e..e.e...e..eeeeee.....................e...............................................

..............................q.e..........O..................................e...............

$ 9e.........................e..............................ee............e.....................

................................................. 3e3ee..ee...................................

9993.e........................e..e...........O.............e.......e..eee.....................

e...e...e......O....ee.e.........................................e....e....................e..

.0ee.........................................................e...e............................

5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 94 NOZZLE N.ET (hot Leg) - Primary Face <- COLIASIS -> MANWAY w

N z

O O TUBES PWGGS 10R - 28 O RBES 0.0.5, PRE 1CR - 384 E w

Z m

t O

G N

N O

C O

m ,

U G

N a

l I

1

                                • BWNS TURAN II (Version 2.0) 06/12/1995 11:02:51 **************** l
                                • Baaver Valley Unit 1 **************** I
                                • SG C **************** l
                                • 1/95 RFO (10R) **************** 1
                                • Bobbin,MRPC ****************

Page 1 of Steam Generator RC-E-1C Tubes Plugged 10R ROW COL TEST TYPE %TW IND VOLTS LOCATION 9 30 MRPC NDF TSH +1.04 Bobbin DTI 0.34 TSH +1.04 i 11 40 MRPC NDF TSH +1.02 I Bobbin DTI 0.18 TSH +1.02 l 13 27 MRPC VOL 0.23 TSH +0.96 j Bobbin DTI 0.45 TSH +1.29  !

13 28 MRPC NDF TSH +0.84 i Bobbin DTI 0.71 TSH +0.84 l 13 30 MRPC NDF TSH +2.60 Bobbin DTI 0.27 TSH +2.63 13 36 MRPC NDF TSH +1.68 Bobbin DTI 0.46 TSH +1.68 i 13 38 MRPC NDF TSH +1.94 l Bobbin DTI 0.49 TSH +1.90 l Bobbin DTI 0.71 TSH +1.95 15 61 MRPC MAI 0.75 O1H +0.00 Bobbin DSI 1.57 O1H +0.03 16 29 Bobbin DTI 0.57 TSH +1.12 Bobbin DTI 0.28 TSH +1.80 16 30 MRPC NDF TSH +1.67 Bobbin DTI 1.00 TSH +1.67 16 31 MRPC NDF TSH +2.20 Bobbin DTI 0.64 TSH +2.20 l 16 34 MRPC SAI 0.33 TSH +0.81  !

Bobbin DTI 0.46 TSH +0.87 17 29 MRPC NDF TSH +1.43

[D

(,s/ 18 Bobbin 28 MRPC DTI NDF 0.29 TSH TSH

+1.43

+1.00 Bobbin DTI 0.82 TSH +1.05 18 29 MRPC NDF TSH +1.03 Bobbin DTI 0.52 TSH +1.01 18 33 MRPC NDF TSH +1.59 Bobbin DTI 0.35 TSH +1.59 19 30 MRPC NDF TSH +0.90 Bobbin DTI 0.27 TSH +0.90 21 26 MRPC NDF TSH +0.96 Bobbin DTI 0.21 TSH +0.96 26 49 MRPC MAI 0.50 01H +0.13 Bobbin DSI 1.16 O1H +0.06 26 56 MRPC NDF TSH +0.05 Bobbin DTI 0.29 TSH +0.49 27 16 MRPC SAI 1.80 O1H +0.00 Bobbin DSI 1.14 O1H -0.05 l Bobbin DSI 0.65 02H -0.22 1 27 83 Bobbin 42 ODI 1.67 01C +0.00 l 28 49 MRPC SAI 0.64 02H +0.00 J Bobbin DSI 1.27 02H +0.00 1 30 44 MRPC SAI 0.36 O1H -0.01 Bobbin DSI 1.35 01H -0.11 33 79 MRPC SAI 1.65 O1H +0.27 Bobbin DSI 1.02 01H +0.12 Bobbin 15 ODI 0.50 01C +0.08 Bobbin 21 ODI 0.72 02C +0.09 34 32 MRPC MAI 0.29 O1H +0.00 Bobbin DSI 1.01 O1H -0.11 35 47 MRPC MAI 0.39 O1H +0.00 Bobbin DSI 1.20 O1H +0.06 43 30 Bobbin 42 ODI 0.75 04C -0.09 Total Indications Found = 58

/-s\ Total Tubes Found = 28 (s,) Total Tubes in Input File = 28 1

i i

I

Ay__Jg-.,_4.me da a.4IJ ama 4 Am es et

  • Jah W aJ-Mh a-aan4.,e..a.a$a.:-,-4J i.a Me 4++,UJh44 4 hf,44 M M ,C M.J.S4m hma, 4..m4ae,, a eng .p_4,-.w.agga4,e,yu m 4,2 a s a,4p.s%,4_,,mg,y , na mu.g,ww%g,,a. , _ , .,,.

1 ATTACHMENT 4 W

I l

EXAMINATION RESULTS i

FROM THE UNIT #2 STH REFUELING OUTAGE (SR)

FOR STEAM GENERATOR t

2RCS-SG21A ,

i 4

O  ;

f a

A b

6 P

I f

1 I

O ,

l

. - - - 5 p y,a m wy y.y7.5,n .-m 4--- m 9 .,,3. >e-yw--.+ - - ,e--r - -- eyme- - - -

BWNS TUBAN II (Varsion 2.0) 06/12/1995 11:23:35 Baaver Valley Unit 2 SG A 5R 03/95 BOBBIN, Loose Parts Testing,MRPC 4R DSIs,MRPC SR DSIs,MRPC Special Int.,MRPC TSH,MRPC U-Bend,Sp O Page 1 of 16 Steam Generator 2RCS-SG21A Location & Percent Through Wall Calls (%TW) For All Indications ROW COL TEST TYPE %TW IND VOLTS LOCATION 1 17 MRPC Special In NDF 8C -2.55 MRPC Special In DNT- 8.35 BC +0.26 MRPC Special In DNT 2.66 BC -0.74 1 18 MRPC Special In NDF 8C -2.34 2 1 BOBBIN FSA 1.76 5H +22.63 2 14 BOBBIN DSI 1.30 3H +0.11 MRPC Special In NDF 3H +0.00  !

Special Interes NDF 3H +0.00 2 29 MRPC 4R DSIs NDF SH +0.00 BOBBIN DSI 1.67 SH +0.08 Special Interes NDF 5H +0.00

2 35 MRPC 4R DSIs NDF 2H +0.00 BOBBIN DSI 0.87 2H +0.00 Special Interes NDF 2H +0.00 2 44 BOBBIN DSI 0.78 2H -0.02 MRPC Special In NDF 2H +0.00 Special Interes NDF 2H +0.00 2 59 BOBBIN FSA 2.16 6C +45.80 MRPC Special In NDF 7C -4.70 2 93 BOBBIN DNG 16.75 7H +48.16 BOBBIN DNG 6.14 1H +7.77 BOBBIN DNG 5.40 7H +47.29 BOBBIN DNG 5.93 7H +44.40 BOBBIN DNT 12.20 8H -0.17 BOBBIN DNT 16.18 8H +0.15 3 6 MRPC 5R DSIs NDF 5H +0.00 BOBBIN DSI 0.76 5H +0.03 O- 3 Special Interes 45 BOBBIN NDF FSA 4.65 5H 2H

+0.00

+28.77 3 47 BOBBIN DNG 16.08 6C +30.03 BOBBIN DNG 18.63 TSC +8 76 3 50 BOBBIN DNG 16.99 7C +27.68 BOBBIN DNG 6.66 7H +28.56 BOBBIN DNG 13.34 7C +26.94 BOBBIN DNG 21.96 7H +29.21 3 54 BOBBIN DNG 5.09 7H +27.85 BOBBIN DNG 8.55 7H +28.61 4 15 MRPC 4R DSIs NDF 4H +0.00 Special Interes NDF 4H +0.00 4 21 MRPC SR DSIs NDF 3H +0.00 BOBBIN DSI 1.05 3H +0.00 Special Interes NDF 3H +0.00 4 24 BOBBIN DNG 6.19 2C +8.13 4 34 MRPC SR DSIs NDF 2H +0.00 BOBBIN DSI 1.45 2H +0.10 Special Interes NDF 2H +0.00 4 48 MRPC 4R DSIs NDF 6H +0.00 Special Interes NDF 6H +0.00 4 49 BOBBIN FSA 1.86 TSC +31.69

-4 50 MRPC SR DSIs NDF 3H +0.00 MRPC SR DSIs NDF .

4H +0.00 BOBBIN DSI 1.49 3H +0.00 BOBBIN DSI 1.31 4H +0.08 Special Interes NDF 3H +0.00 Special Interes NDF 4H +0.00 4 57 BOBBIN DNG 7.28 7C +27.98 BOBBIN DNG 5.58 7C +27.24 BOBBIN DNG 7.94 7H +29.74 4 63 MRPC SR DSIs NDF 2H +0.00 BOBBIN DSI 1.18 2H -0.05 2H O 4 Special Interes 78 MRPC SR DSIs BOBBIN Special Interes NDF NDF DSI NDF 0.37 5H 5H 5H

+0.00

+0.00

+0.05

+0.00 4 89 BOBBIN FSA 0.64 3H +16.68

BWNS TUBAN II (Varsion 2.0) 06/12/1995 11:23:35 Beaver Valley Unit 2 SG A 5R 03/95 BOBBIN, Loose Parts Testing,MRPC 4R DSIs,MRPC SR DSIs,MRPC Special Int.,MRPC TSH,MRPC U-Bend,Sp b(,

Page 2 of 16 Steam Generator 2RCS-SG21A Location & Percent Through Wall Calls (%TW) For All Indications ROW COL TEST TYPE %TW IND VOLTS LOCATION 5 8 MRPC 4R DSIs NDF 2H +0.00 Special Interes NDF 2H +0.00 5 10 MRPC 5R DSIs NDF 2H +0.00 BOBBIN DSI 1.75 2H -0.03 Special Interes NDF 2H +0.00 5 14 MRPC SR DSIs NDF 3H +0.00 BOBBIN DSI 0.92 3H +0.03 Special Interes NDF 3H +0.00 5 17 MRPC SR DSIs NDF 2H +0.00 BOBBIN DSI 1.02 2H +0.16 Special Interes NDF 2H +0.00 5 19 BOBBIN FSA 4.12 3H +8.18 5 30 MRPC 4R DSIs NDF 2H +0.00 BOBBIN DSI 0.46 2H + 0 . 21 -  !

Special Interes NDF 2H +0.00 5 31 BOBBIN DSI 1.05 3H +0.08 Special Interes NDF 3H +0.08 5 34 MRPC 5R DSIs NDF 2H +0.00 l BOBBIN DSI 0.61 2H +0.11 l Special Interes NDF 2H +0.00 i 5 35 MRPC SR DSIs NDF 3H +0.00 l BOBBIN DSI 0.69 3H -0.11 <

Special Interes NDF 3H +0.00 5 48 MRPC 4R DSIs NDF 6H +0.00 BOBBIN DNG 5.64 7H +8.13 Special Interes NDF 6H +0.00 5 80 MRPC 5R DSIs NDF 5H +0.00 0- BOBBIN Special Interes DSI NDF 0.46 5H 5H

+0.21

+0.00 6 2 MRPC SR DSIs NDF 6H +0.00 BOBBIN DSI 0.51 6H +0.05 Special Interes NDF 6H +0.00 i 6 14 MRPC SR DSIs NDF 3H +0.00 ,

BOBBIN DSI 0.52 3H +0.03 l Special Interes NDF 3H +0.00 i 6 32 MRPC 4R DSIs NDF 2H +0.00 I BOBBIN DSI 0.87 2H +0.00 Special Interes NDF 2H +0.00 6 34 MRPC SR DSIs NDF 2H +0.00 BOBBIN DSI 1.14 2H +0.08 Special Interes NDF 2H +0.00 6 36 MRPC 5R DSIs NDF 2H +0.00 BOBBIN DSI 1.27 2H +0.11 BOBBIN FSA 2.63 3H +20.59 Special Interes NDF 2H +0.00 6 39 BOBBIN DNG 5.61 4H +7.20 6 40 MRPC SR DSIs NDF 2H +0.00 MRPC SR DSIs NDF 3H +0.00 MRPC SR DSIs NDF 4H +0.00 BOBBIN DSI 1.13 2H +0.03 BOBBIN DSI 0.64 4H +0.20 BOBBIN DSI 0.65 3H +0.17 Special Interes NDF 2H +0.00 Special Interes NDF 3H +0.00 Special Interes NDF 4H +0.00  ;

6 43 MRPC 4R DSIs NDF 2H +0.00 BOBBIN DSI 1.53 2H +0.10 Special Interes NDF 2H +0.00 6 47 BOBBIN DNT 19.51 2C +0.12 6 48 BOBBIN DNG 21.92 6H +46.93

+0.00 (N

g'/

6 50 MRPC 5R DSIs MRPC SR DSIs NDF NDF 2H 4H 4H

+0.00

+0.00 BOBBIN DSI 1.07 BOBBIN DSI 1.42 2H -0.19 Special Interes NDF 2H +0.00

BWNS TUBAN II (Version 2.0) . 06/12/1995 11:23:35 Beaver Valley Unit 2 SG A 5R 03/95 '

BOBBIN, Loose Parts Testing,MRPC 4R DSIs,MRPC SR DSIs,MRPC Special Int.,MRPC TSH,MRPC U-Bend,Sp f\

G Page 3 of 16 Steam Generator 2RCS-SG21A Location & Percent Through Wall Calls (%TW) For All Indications ROW COL TEST TYPE %TW IND VOLTS LOCATION Special Interes NDF 4H +0.00 6 81 MRPC SR DSIs NDF 3H +0.00 BOBBIN DSI 0.43 3H +0.03 Special Interes NDF 3H +0.00 6 91 MRPC TSH NDF 5H +0.00 BOBBIN DSI 0.31 5H -0.08 Special Interes NDF 5H +0.00 7 3 MRPC SR DSIs NDF 3H +0.00 BOBBIN DSI 1.28 3H +0.05 Special Interes NDF 3H +0.00 7 7 MRPC SR DSIs NDF 3H +0.00 BOBBIN .nSI 1.47 3H -0.05 ,

Special Interes NDF 3H +0.00 1 7 36 MRPC SR DSIs NDF 5H +0.00 I l

BOBBIN DSI 0.59 5H +0.03 Special Interes NDF 5H +0.00 7 50 MRPC 4R DSIs NDF 3H +0.00 l BOBBIN DSI 0.60 3H -0.03 l Special Interes NDF 3H +0.00 )

7 55 MRPC SR DSIs NDF 3H +0.00 i BOBBIN DSI 0.97 3H +0.00 l Special Interes NDF 3H +0.00 7 64 BOBBIN FSA 1.78 7C +49.03 7 71 BOBBIN DNG 21.21 6C +32.47 7 75 MRPC SR DSIs NDF 3H +0.00 BOBBIN DSI 0.59 3H +0.00

()

/ 7 Special Interes 78 MRPC 4R DSIs NDF NDF 3H 2H

+0.00

+0.00 MRPC 4R DSIs NDF 3H +0.00 Special Interes NDF 2H +0.00 Special Interes NDF 3H +0.00 7 79 MRPC SR DSIs NDF 4H +0.00 BOBBIN DSI 0.80 4H +0.11 Special Interes NDF 4H +0.00 7 81 MRPC 4R DSIs NDF 4H +0.00 BOBBIN DSI 0.50 4H +0.11 Special Interes NDF 4H +0.00 7 83 MRPC 4R DSIs NDF 4H +0.00 Special Interes NDF 4H +0.00 8 3 BOBBIN FSA 1.40 7C +30.45 8 7 MRPC SR DSIs NDF 3H +0.00 BOBBIN DSI 0.91 3H +0.00 Special Interes NDF 3H +0.00 8 11 MRPC 4R DSIs NDF 2H +0.00 Special Interes NDF 2H +0.00 8 12 BOBBIN DNG 11.97 8H +4.52 MRPC Special In NDF 8H +4.52 8 16 BOBBIN DNG 11.21 8H +4.65 MRPC Special In NDF 8H +4.65 8 19 MRPC 4R DSIs NDF 2H +0.00 Special Interes NDF 2H +0.00 8 29 MRPC 4R DSIs NDF 2H +0.00

) BOBBIN DSI 0.91 2H +0.00 l Special Interes NDF 2H +0.00 l 8 34 MRPC 4R DSIs NDF 2H +0.00 l Special Interes NDF 2H +0.00 l 8 36 MRPC 4R DSIs NDF SH +0.00 i Special Interes NDF 5H +0.00 8 42 MRPC 4R DSIs NDF 3H -0.09 Special Interes NDF 3H -0.09 48 MRPC 4R DSIs NDF 2H +0.00 0 8 8

8 Special Interes 57 BOBBIN 58 MRPC 4R DSIs NDF FSA NDF 2.15 2H 6C 2H

+0.00

+40.06

+0.00 Special Interes NDF 2H +0.00 l

_ _ _ _ . . _ . ~ . _ . _ _ _ _ _ _ _ _ . _ _ . . . _ _ _ __ . __ . _ .__ _ _ _ _ m ... _ __

4 BWNS TUBAN II (Version 2.0) 06/12/1995 11:23:35

'Baavar Valley Unit 2 SG A SR 03/95 BOBBIN, Loose Parts Testing,MRPC 4R DSIs,MRPC SR DSIs,MRPC Special Int.,MRPC TSH,MRPC U-Bend,Sp O-Page 4 of 16 Steam Generator 2RCS-SG21A l Location & Percent Through Wall Calls (%TW) For All Indications ROW COL TEST TYPE %TW IND VOLTS LOCATION ,

8 59 MRPC 4R DSIs NDF 2H +0.00 '

4 BOBBIN DSI 0.61 2H +0.03 Special Interes NDF 2H +0.00 8 75 BOBBIN -

FSA . 1.70 8H +10.13 MRPC Special In NDF- 8H +10.13 Special Interes NDF 8H +10.13  ;

8 76 MRPC 5R DSIs NDF 3H +0.00 MRPC 5R DSIs NDF 5H +0.00 BOBBIN DSI 1.10 SH +0.18 BOBBIN DSI 0.81 3H -0.03 BOBBIN FSA 1.65 3C +47.26 Special Interes NDF 3H +0.00 Special-Interes NDF 5H- +0.00 8 85 MRPC SR DSIs NDF 2H +0.00 BOBBIN DSI 0.67 2H +0.08 Special Interes NDF 2H +0.00

8. 89 MRPC 5R DSIs NDF 3H +0.00 BOBBIN- DSI 0.60 3H +0.03  !

Special Interes NDF 3H +0.00 9- 5 MRPC SR DSIs NDF 3H +0.00 '

BOBBIN DSI 1.62 3H +0.03 Special Interes NDF 3H +0.00

9. 13 MRPC SR DSIs NDF 3H +0.00 BOBBIN DSI 1.09 3H +0.00 Special Interes NDF 3H +0.00 9 14 MRPC SR DSIs NDF 3H +0.00 O 9 16 BOBBIN Special Interes MRPC 4R DSIs DSI NDF NDF 1.18 3H 3H 4H

+0.00

+0.00

+0.00 BOBBIN DSI 0.85 4H +0.00 Special Interes NDF 4H +0.00 .

9 22 MRPC 4R DSIs NDF 3H +0.00 l BOBBIN DSI 1.07 3H +0.00 l Special Interes NDF 3H +0.00 l 9 24 MRPC 4R DSIs NDF 2H +0.00 Special Interes NDF 2H +0.00 9 31 MRPC 4R DSIs NDF 2H +0.00 Special Interes NDF 2H +0.00 9 39 MRPC 4R DSIs NDF 3H +0.00 Special Interes NDF 3H +0.00 9 40 MRPC SR DSIs NDF 3H +0.00-BOBBIN DSI 0.67 3H +0.05 Special Interes NDF 3H +0.00 9 48 MRPC 4R DSIs NDF 2H +0.00 Special Interes NDF 2H +0.00 9 57 MRPC 4R DSIs NDF 3H +0.00 l Special Interes NDF 3H +0.00 j 9 59 MRPC SR DSIs NDF 2H +0.00 j BOBBIN DSI 1.13 2H +0.05 '

Special Interes NDF 2H +0.00 9 74 MRPC 4R DSIs NDF 3H +0.00 Special Interes NDF 3H +0.00 9 -78 MRPC SR DSIs NDF 3H +0.00 BOBBIN DSI 0.69 3H +0.00 Special Interes NDF 3H +0.00 9 32 MRPC 5R DSIs NDF 5H +0.00 BOBBIN DSI 0.67 SH +0.13 l Special Interes NDF 5H +0.00 10 2 MRPC 5R DSIs NDF 4H +0.00 BOBBIN DSI 0.79 4H +0.03 Special Interes NDF 4H +0.00 O' 10 4 MRPC SR DSIs BOBBIN NDF DSI 0.94 3H 3H

+0.00

+0.08 Special Interes NDF 3H +0.00 10 5 BOBBIN FSA 1.60 4C +44.26

- - - , _ . _ _ _ . _ ~ . - _ _ . . _ _ _, _ . . _ . .

.- -.- . .- ~ ..... - - . - . . . . - . - - . _ . . - - . . . .~

BUNS TUBAN II (Varsion 2.0) 06/12/1995 11:23:35 Beaver Valley Unit 2 SG A 5R 03/95 BOBBIN, Loose Parts Testing,MRPC 4R DSIs,MRPC SR DSIs,MRPC Special Int.,MRPC TSH,MRPC U-Bend,Sp Steam Generator 2RCS-SG21A

. Location & Percent Through Wall Calls (%TW) For All Indications ROW COL TEST TYPE %TW IND VOLTS . LOCATION 10 8 MRPC 4R DSIs NDF 2H +0.00 Special Interes' NDF 2H +0.00

  • 10 24 BOBBIP DNG 5.33 6C +40.42 10 25 MRPC 4k DSIs NDF 2H +0.00 Special Interes NDF 2H +0.00 10 26 BOBBIN DNG' 6.82 4H +44.26 ,

10 37 MRPC SR DSIs NDF 3H +0.00 i BOBBIN DSI 0.49 3H ~+0.11 Special Interes NDF 3H +0.00-10 38 MRPC 4R DSIs NDF 6H +0.07 Special Interes NDF 6H +0.07 10 '50 MRPC 5R DSIs NDF . 3H +0.00 BOBBIN . DSI 0.78 3H -0.14 i Special Interes -NDF 3H +0.00 10 63 MRPC 5R DSIs NDF 3H +0.00 BOBBIN DSI 0.93 3H +0.32.

Special Interes NDP 3H +0.00 l 10 72 BOBBIN DNG 5.13 6H +5.77 10 79 MRPC 4R DSIs NDF 3H +0.00

~Special Interes NDF 3H +0.00 10 86 MRPC SR DSIs NDF 3H +0.00 BOBBIN DSI 0.51 3H +0.08 Special Interes NDF 3H +0.00 11 5 MRPC 5R DSIs NDF 3H +0.00 BOBBIN DSI 1.82 3H +0.03 Special Interes NDF 3H +0.00 11 '6 MRPC 4R DSIs NDF 4H +0.00 Special Interes NDF 4H +0.00 11 20 BOBBIN FSD 0.09 6H +22.42 MRPC Special In NDF 6H +22.42 Special Interes NDF 6H +22.42 11 30 BOBBIN FSA 2.95 1H +5.50 MRPC Special In NDF 1H +5.99 Special Interes NDF 1H +5.99

~ 11 48 MRPC 5R DSIs NDF 2H +0.00 ,

BOBBIN DSI 1.46 2H -0.06 1 Special Interes NDF 2H +0.00 j 11 60 BOBBIN 22 ODI 1.64 AV4 +0.00 l 11 61 BOBBIN 26 ODI 2.16 AV4 +0.00 l 11 66 MRPC 4R DSIs NDF 3H +0.00 BOBBIN DSI 0.48 3H +0.32 Special Interes NDF 3H +0.00 11 72 MRPC SR DSIs NDF 3H +0.00 BOBBIN DSI 0.70 3H +0.03 Special Interes NDF 3H +0.00 11 75 MRPC TSH NDF 3H +0.00 BOBBIN DSI 0.69 3H +0.03 Special Interes NDF 3H +0.00 11 76 MRPC SR DSIs NDF 4H +0.00 BOBBIN DSI 0.71 4H +0.00 Special Interes NDF 4H +0.00 11 77 MRPC 4R DSIs NDF 3H +0.00 MRPC SR DSIs NDF 5H +0.00 BOBBIN DSI 1.01 3H +0.16 BOBBIN DSI 1.90 3H +0.33 ,

MRPC Special In NDF 2H +0.00 Special Interes NDF 2H +0.00 Special Interes NDF 3H +0.00 Special Interes NDF 5H +0.00 11 80 MRPC 5R DSIs NDF 3H +0.00

0. 11 BOBBIN Special Interes 8:L MRPC SR DSIs BOBBIN DSI NDF NDF DSI 0.95 0.57 3H 3H 3H 3H

+0.08

+0.00

+0.00

+0.08 Special Interes NDF 3H +0.00

BWNS TUBAN II (Version 2.0) 06/12/1995 11:23:35 I Beaver Valley Unit 2 SG A 5R 03/95 BOBBIN, Loose Parts Testing,MRPC 4R DSIs,MRPC SR DSIs,MRPC Special Int.,MRPC TSH,MRPC U-Bend,Sp 1 I

Steam Generator 2RCS-SG21A Location & Percent Through Wall Calls (%TW) For All Indications ROW COL TEST TYPE %TW IND VOLTS LOCATION 11 83 MRPC SR DSIs NDF 3H +0.00 1 BOBBIN DSI 0.75 3H +0.08 l Special Interes NDF 3H +0.00 11 84 BOBBIN FSA 2.25 4C +17.64 MRPC Special In VOL 0.66 4C +17.57 l 11 86 BOBBIN FSA 2.13 3H +41.41 12 4 MRPC 4R DSIs NDF 3H +0.00 Special Interes NDF 3H +0.00 12 17 BOBBIN DNG 5.10 TSH +15.35 12 24 BOBBIN FSA 1.54 TSH +1.10 l 12 44 MRPC 4R DSIs NDF 3H -0.11-BOBBIN DSI 0.76 3H +0.13  ;

Special Interes NDF 3H -0.11 12 54 BOBBIN FSA 4.63 SC +13.26 MRPC Special In VOL 0.64 SC +13.54 12 64 MRPC 4R DSIs NDF 2H +0.00 Special Interes NDF 2H +0.00 12 72 MRPC 4R DSIs NDF 2H +0.00 Special Interes NDF 2H +0.00 12 74 MRPC SR DSIs NDF 2H +0.00 MRPC SR DSIs NDF 3H +0.00 BOBBIN DSI 0.89 2H +0.08 BOBBIN DSI 0.89 3H +0.03 Special Interes NDF 2H +0.00 Special Interes NDF 3H +0.00 12 82 MRPC SR DSIs NDF 2H +0.00

\ BOBBIN DSI 0.51 2H +0.05

["'/

%,j 12 Special 86 MRPC SR Interes DSIs NDF NDF 2H 2H

+0.00

+0.00 BOBBIN DSI 0.88 2H +0.00 Special Interes NDF 2H +0.00 13 4 MRPC SR DSIs NDF 3H +0.00 BOBBIN DSI 0.97 3H +0.05 Special Interes NDF 3H +0.00 13 7 BOBBIN DNG 10.62 6H +40.64 13 15 BOBBIN FSA 2.27 3H +22.88 13 18 MRPC 4R DSIs NDF 2H +0.00 Special Interes NDF 2H +0.00 13 22 BOBBIN FSD 2.42 6H +38.78 MRPC Special In VOL 1.44 7H -11.46 Special Interes VOL 1.44 7H -11.46 13 42 MRPC SR DSIs NDF 3H +0.00 BOBBIN DSI 0.31 3H +0.08 Special Interes NDF 3H +0.00 13 43 MRPC SR DSIs NDF 2H +0.00 BOBBIN DSI 0.50 2H +0.05 Special Interes NDF 2H +0.00 13 45 BOBBIN FSA 1.57 SC +27.76 13 48 BOBBIN DNG 8.22 2H +32.53 BOBBIN DNG 15.80 2H +33.11 )

BOBBIN DNG 5.18 7H +28.54 ,

13 84 MRPC 5R DSIs NDF 2H +0.00 BOBBIN DSI 1.06 2H +0.11 Special Interes NDF 2H +0.00 .

13 85 MRPC SR DSIs NDF 2H +0.00 I BOBBIN DSI 0.97 2H +0.08 Special Interes NDF 2H +0.00 14 27 MRPC 4R DSIs NDF 5H +0.00 Special Interes NDF 5H +0.00 14 31 MRPC SR DSIs NDF 2H +0.00 BOBBIN DSI 0.54 2H +0.16 O 14 Special 47 BOBBIN Interes NDF DNG 11.23 2H 6H

+0.00

+41.83 14 48 MRPC TSH NDF 2H +0.00 BOBBIN DSI 1.30 2H -0.03

~. .

BWNS TUBAN II (Version 2.0) 06/12/1995 11:23:35 Beaver Ve.lley Unit 2 SG A 5R 03/95 BOBBIN, Loose Parts Testing,MRPC 4R DSIs,MRPC SR DSIs,MRPC Special Int. ,MRPC TSH,MRPC U-Bend, Sp O

.N, Page 7 of 16 Steam Generator 2RCS-SG21A Location & Percent Through Wall Calls (%TW) For All Indications ROW COL TEST TYPE tTW IND VOLTS LOCATION Special Interes NDF 2H +0.00 14 51 BOBBIN DNG 5.14 7H +32.53 14 60 MRPC SR DSIs NDF 2H +0.00 JOBBIN DSI 1.60 2H -0.08 Special Interes NDF 2H +0.00 14 62 MRPC 4R DSIs NDF 3H +0.00 BOBBIN DSI 1.20 3H -0.16 Special Interes NDF 3H +0.00 14 68 MRPC 4R DSIs NDF 2H +0.00 BOBBIN DSI 2.30 2H -0.05 MRPC Special In NDF 3H +0.00 Special Interes NDF 2H +0.00 Special Interes NDF 3H +0.00 14 71 MRPC SR DSIs NDF 2H +0.00 BOBBIN DSI 0.55 2H +0.08 Special Interes NDF 2H +0.00 14 86 MRPC SR DSIs NDF 2H +0 00 BOBBIN DSI 0.65 2H +0.05 Special Interes NDF 2H +0.00 15 10 BOBBIN FSA 2.45 7C +31.94 BOBBIN FSA 1.06 1H +17.48 15 17 MRPC 4R DSIs NDF 2H +0.00 Special Interes NDF 2H +0.00 15 47 BOBBIN DNG 5.99 6C +34.95 15 48 BOBBIN DNG 5.04 6H +40.01 15 49 BOBBIN FSA 1.60 4H +36.36

[j

\,

T 15 54 MRPC SR DSIs BOBBIN Special Interes NDF DSI NDF 0.84 3H 3H 3H

+0.00

-0.14

+0.00 15 73 MRPC SR DSIs NDF 4H +0.00 BOBBIN DSI 0.94 4H +0.05 Special Interes NDF 4H +0.00 15 85 MRPC SR DSIs NDF 3H +0.00 BOBBIN DSI 1.01 3H +0.08 Special Interes NDF 3H +0.00 15 89 MRPC SR DSIs NDF 4H +0.00 BOBBIN DSI 0.62 4H -0.06 Special Interes NDF 4H +0.00 16 11 MRPC SR DSIs NDF 2H +0.00 BOBBIN DSI 0.40 2H +0.08 Special Interes NDF 2H +0.00 16 32 BOBBIN DNG 7.61 1C +2.37 BOBBIN DNG 14.82 1C +3.14 BOBBIN FSD 1,69 1H +24.50 BOBBIN DNG 7.45 TSC +17.78 MRPC Special In VOL 0.60 1H +24.04 Special Interes VOL 0.60 1H +24.04 16 37 MRPC SR DSIs NDF 3H +0.00 BOBBIN DSI 0.30 3H +0.05 Special Interes NDF 3H +0.00 16 40 MRPC 4R DSIs NDF 3H +0.00 Special Interes NDF 3H +0.00 16 42 MRPC SR DSIs NDF 3H +0.00 BOBBIN DSI 0.74 3H +0.03 Special Interes NDF 3H +0.00 16 44 BOBBIN DSI 1.11 3H +0.00 16 50 MRPC SR DSIs NDF 3H +0.00 BOBBIN DSI 1.27 3H -0.16 Special Interes NDF 3H +0.00 16 78 MRPC 4R DSIs NDF 5H +0.00 BOBBIN DSI 0.72 5H +0.08 Os 17 Special 10 MRPC 4R Interes DSIs NDF NDF 5H 3H

+0.00

+0.00 BOBBIN DSI 0.44 3H +0.03 Special Interes NDF 3H +0.00

BUNS TUBAN II (Version 2.0) 06/12/1995 11:23:35 Beaver Valley Unit 2 SG A 5R 03/95 BOBBIN, Loose Parts Testing,MRPC 4R DSIs,MRPC SR DSIs,MRPC Special Int.,MRPC TSH,MRPC U-Bend,Sp C\

V Page 8 of 16 Steam Generator 2RCS-SG21A Location & Percent Through Wall Calls (%TW) For All Indications ROW- COL TEST TYPE %TW IND VOLTS LOCATION 17 18 BOBBIN FSA 1.27 3H +14.69 17 23 BOBBIN FSA 3.73 1H +27.60 17 32 MRPC SR DSIs NDF 2H +0.00 BOBBIN DSI 0.59 2H +0.00 Special Interes NDF 2H +0.00 17 36 MRPC SR DSIs NDF 2H +0.00 BOBBIN DSI 0.48 2H +0.00 Special Interes NDF 2H +0.00 17 44 MRPC 4R DSIs NDF 4H +0.00 Special Interes NDF 4H +0.00 17 47 BOBBIN DNG 8.34 2H +0.49 17 48 BOBBIN DNG 8.41 2H +25.34 BOBBIN DNG 29.63 6H +47.90 17 53 MRPC 5R DSIs NDF 2H +0.00 BOBBIN DSI 0.87 2H +0.03 Special Interes NDF 2H +0.00 17 56 MRPC SR DSIs NDF 2H +0.00 BOBBIN DSI 0.68 2H -0.03 Special Interes NDF 2H +0.00 17 59 MRPC 4R DSIs NDF 2H +0.00 BOBBIN DSI 0.87 2H +0.11 Special Interes NDF 2H +0.00 17 66 MRPC SR DSIs NDF 3H +0.00 BOBBIN DSI 0.93 ?H +0.30 Special Interes NDF 3H +0.00 17 81 MRPC Special In NDF TEC +10.12

[~') 18 6 MRPC SR DSIs BOBBIN NDF DSI 0.28 2H 2H

+0.00

-0.05

(,,/

Special Interes NDF 2H +0.00 1 18 7 MRPC SR DSIs NDF 4H +0.00 BOBBIN DSI 0.78 4H +0.00 l Special Interes NDF 4H +0.00 l 18 15 MRPC SR DSIs NDF 3H +0.00 BOBBIN DSI 0.51 3H +0.00 Special Interes NDF 3H +0.00 18 19 BOBBIN DNG 6.50 TSH +5.55 18 38 MRPC 5R DSIe NDF 4H +0.00 i BOBBIN DSI 0.58 4H +0.13 l Special Interes NDF 4H +0.00 18 39 BOBBIN DNG 6.79 1H +7.37 BOBBIN FSA 1.45 3H +42.89 MRPC Special In NDF 3H +43.20 Special Interes NDF 3H +43.20  ;

18 44 MRPC SR DSIs NDF 2H +0.00 1 BOBBIN DSI 0.79 2H +0.00 Special Interes NDF 2H +0.00 18 45 MRPC SR DSIs NDF 3H +0.00 BOBBIN DSI 0.64 3H -0.05 l Special Interes NDF 3H +0.00 18 46 MRPC SR DSIs NDF 2H +0.00 BOBBIN DSI 1.00 2H +0.03 i Special Interes NDF 2H +0.00 l 18 48 BOBBIN DNG 33.18 2C +32.33 1 18 53 MRPC Special In NDF TEC +16.29 19 11 MRPC SR DSIs NDF 2H +0.00 BOBBIN DSI 0.52 2H +0.06 Special Interes NDF 2H +0.00 19 15 MRPC 4R DSIs NDF 3H +0.00 Special Interes NDF 3H +0.00 19 19 MRPC 4R DSIs NDF 2H +0.00

/~N BOBBIN DSI 0.52 2H +0.05

( ,) 19 26 Special Interes MRPC 4R DSIs NDF NDF 2H 2H

+0.00

+0.00 Special Interes NDF 2H +0.00 19 32 BOBBIN DNG 6.76 1H +6.83

. . _ .~. _ _ . . _ .. _ . _ _ _ _ _ . . ._-=._._.m._ . _ _ _ _ ._ _ .m __ _ . _ _ _ . ._.

BWNS TUBAN II (Varsion 2.0) 06/12/1995'11:23:35 .

4 Baaver Valley Unit 2 '

SG A SR 03/95 BOBBIN, Loose Parts Testing,MRPC 4R DSIs,MRPC SR DSIs,MRPC Special. Int.,MRPC TSH,MRPC U-Bend,Sp.

r~ '

\ /.  :

~

Steam Generator 2RCS-SG21A Location & Percent Through Wall Calls (%TW) For All Indications ROW COL TEST TYPE %TW IND VOLTS LOCATION BOBBIN DNG 7.56 1H +7.58 19 33 MRPC SR DSIs NDF 2H +0.00 BOBBIN DSI 0.56 2H +0.05 +

Special Interes NDF 2H +0.00 i 19 34 MRPC SR DSIs NDF 2H +0.00 BOBBIN DSI 0.89 2H +0.05 '

Special Interes. NDF 2H +0.00 '

19 36 MRPC SR DSIs NDF 2H +0.00 BOBBIN DSI 0.80 2H +0.11 Special Interes NDF 2H +0.00 19 37 MRPC 4R DSIs NDF 3H +0.00 BOBBIN DSI 0.89 3H +0.03 Special Interes NDF 3H. +0.00-19 45 MRPC 5R DSIs NDF 2H +0.00 BOBBIN DSI. 0.62 2H +0.03

-Special Interes NDF 2H ' +0.00 19 57 MRPC TSH NDF 2H +0.00 BOB 3IN DSI 0.90 2H +0.08 Special Interes NDF 2H +0.00 19 84 MRPC SR DSIs NDF 2H +0.00 BOBBIN DSI 0.49 2H +0.13 Special Interec NDF. 2H +0.00 20 16 MRPC SR DSIs NDP 2H +0.00 BOBBIN DSI 0.70 2H '+0.00 Special Interes NDF 2H +0.00 20 20 MRPC SR DSIs NDF 4H +0.00 0 20 BOBBIN Special Interes 27 MRPC SR DSIs BOBBIN DSI NDF NDF DSI 1.14 0.55 4H 4H 2H 2H

+0.09

+0.00

+0.00

+0.22

.i Special Interes NDF 2H +0.00 20 45 MRPC SR DSIs NDF 2H +0.00 BOBBIN DSI 0.44 2H +0.03 Special Interes NDF 2R +0.00 20 51 MRPC 4R DSIs' NDP 3H +0.00 Special Interes NDF 3H +0.00 20 57 MRPC 5R DSIs NDP 3H +0.00 BOBBIN DSI 0.53 3H -0.05 Special Interes NDF 3H +0.00 20 60 MRPC 4R DSIs NDF 2H +0.00 Special Interes NDF 2H +0.00 20 78 MRPC SR DSIs NDF 4H +0.00 BOBBIN DSI 0.64 4H +0.13 Special Interes NDF 4H +0.00 20 82 MRPC SR DSIs NDF 3H +0.00 BOBBIN DSI 0.73 3H +0.08 Special Interes NDF 3H +0.00 21 9 MRPC SR DSIs NDF 2H +0.00 BOBBIN DSI 0.60 2H +0.11 Special Interes NDF 2H +0.00 21 31 BOBBIN FSD 0.83 2C +6.09 MRPC Special In NDF 2C +6.09 21 33 MRPC SR DSIs NDF 2H +0.00 BOBBIN DSI 0.28 2H +0.11 Special Interes NDF 2H +0.00 21 34 MRPC 4R DSIs NDF 2H +0.00 BOBBIN DSI 0.81 2H +0.05 Special Interes NDF 2H +0.00 21 44 MRPC.5R DSIs NDF 3H +0.00 BOBBIN DSI 0.70 3H +0.00 Special Interes NDF 3H +0.00 21 46 MRPC 5R DSIs NDF 2H +0.00 BOBBIN DSI 0.58 2H -0.09 Special Interes NDF 2H +0.00 21 74 MRPC SR DSIs NDF 4H +0.00

,- - ~, .

BWNS TUBAN II (Version 2.0) 06/12/1995 11:23:35 Bravar Valley Unit 2 SG A 5R 03/95 BO,BBIN,

,m Loose Parts Testing,MRPC 4R DSIs,MRPC SR DSIs,MRPC Special Int.,MRPC TSH,MRPC U-Bend,Sp t

v)

Page 10 of 16 Steam Generator 2RCS-SG21A Location & Percent Through Wall Calls (%TW) For All Indications ROW COL TEST TYPE %TW IND VOLTS LOCATION BOBBIN DSI 0.48 4H +0.05 Special Interes NDF 4H +0.00 21 80 MRPC 5R DSIs NDF 4H +0.00 BOBBIN DSI 0.56 4H +0.00 Special Interes NDF 4H +0.00 22 7 MRPC SR DSIs NDF 2H +0.00 BOBBIN DSI 0.66 2H +0.37 Special Interes NDF 2H +0.00 22 8 MRPC 4R DSIs NDF 4H +0.00 BOBBIN DSI 0.91 4H +0.35 Special Interes NDF 4H +0.00 22 17 MRPC 4R DSIs NDF 2H +0.00 BOBBIN DSI 1.00 2H +0.00 Special Interes NDF 2H +0.00 22 22 MRPC SR DSIs NDF 2H +0.00 MRPC SR DSIs NDF 6H +0.00 BOBBIN DSI 0.66 2H +0.03 BOBBIN DSI 0.61 6H -0.11 Special Interes NDF 2H +0.00 Special Interes NDF 6H +0.00 22 23 MRPC 5R DSIs NDF 2H +0.00 BOBBIN DSI 1.33 2H -0.08 Special Interes NDF 2H +0.00 22 44 BOBBIN FSA 4.44 4H +22.07 MRPC Special In VOL 0.50 4H +21.55 Special Interes VOL 0.50 4H +21.55

[h 22 68 MRPC 4R DSIs BOBBIN .

NDF DSI 0.85 4H 4H

+0.00

-0.17 Special Interes NDF 4H +0.00 22 69 BOBBIN FSA 1.06 2H +12.86 22 70 MRPC 4R DSIs NDF 6H +0.00 Special Interes NDF 6H +0.00 23 10 MRPC SR DSIs NDF 4H +0.00 BOBBIN DSI 1.09 4H -0.05 Special Interes NDF 4H +0.00 23 11 MRPC 4R DSIs NDF 3H +0.00 Special Interes NDF 3H +0.00 23 20 MRPC SR DSIs NDF 2H +0.00 BOBBIN DSI 1.52 2H +0.03 MRPC Special In NDF 3H +0.00 Special Interes NDF 2H +0.00 Special Interes NDF 3H +0.00 23 21 MRPC SR DSIs NDF 3H +0.00 BOBBIN DSI 1.46 3H +0.11 MRPC Special In NDF 2H +0.00 Special Interes NDF 2H +0.00 Special Interes NDF 3H +0.00 23 27 MRPC 4R DSIs NDF 5H +0.00 MRPC SR DSIs NDF 2H +0.00 BOBBIN DSI 0.96 2H +0.03 Special Interes NDF 2H +0.00 Special Interes NDF 5H +0.00 23 32 MRPC 4R DSIs NDF 2H +0.00 Special Interes NDF 2H +0.00 23 42 MRPC 4R DSIs NDF 2H +0.00 Special Interes NDF 2H +0.00 23 43 MRPC SR DSIs NDF 2H +0.00 BOBBIN DSI 0.43 2H +0.00 Special Interes NDF 2H +0.00 23 74 MRPC SR DSIs NDF 4H +0.00

'\ BOBBIN DSI 0.39 4H +0.05 Special Interes NDF 4H +0.00 23 81 MRPC SR DSIs NDF 3H +0.00 MRPC SR DSIs NDF 4H +0.00 BOBBIN DSI 0.49 3H +0.03

BWNS'TUBAN II (Varsion 2.0) . 06/12/1995 11:23:35' ,

Banver Valley Unit 2 SG A 5R 03/95 BOBBIN, Loose Parts Testing,MRPC 4R DSIs,MRPC 5R DSIs,MRPC Special Int.,MRPC TSH,MRPC U-Bend,Sp i'

Page 11 of 16 Steam Generator 2RCS-SG21A

. Location & Percent Through Wall Calls - (%TW) For All Indications ROW . COL TEST. TYPE %TW IND VOLTS LOCATION i

BOBBIN DSI 0.96- 4H +0.11 Special Interes NDF 3H +0.00 l Special Interes NDF 4H +0.00 l 23 85 BOBBIN FSA 1.55 2C +01.08 '

24 16 MRPC SR DSIs MDF 2H +J.00 BOBBIN DSI 0.50 2H +0.08 Special Interes NDF 2H +0.00 24 24 MRPC 4R DSIs NDF- 2H +0.00 BOBBIN DSI 0.61 2H +0.03 Special Interes NDF 2H +0.00 24 29 MRPC.4R DSIs VOL 0.22 2H +0.54 J Special Interes VOL 0.22 2H +0.54 24 33 MRPC SR DSIs NDF 3H +0.00 ,

BOBBIN DSI. 0.70. 3H +0.03 i Special Interes NDF 3H +0.00 i 24 40 MRPC SR DSIs- NDF 2H +0.00 BOBBIN- DSI 0.70 2H +0.00 l Special Interes NDF 2H +0.00 24 47 MRPC SR DSIs NDF 4H +0.00 BOBBIN DSI 0.45 4H +0.03 Special Interes NDF 4H +0.00 24 53 MRPC SR DSIs NDF 2H +0.00 BOBBIN DSI 0.46 2H -0.09 Special Interes NDF 2H +0.00 24 56 BOBBIN FSA 1.72 6C +38.23 25- 9 MRPC 4R DSIs NDF 4H +0.00 MRPC 4R DSIs NDF 4H +0.00 BOBBIN DSI 0.97 4H +0.00 Special Interes NDF 4H +0.00 Special Interes NDF 4H +0.00 25 10 MRPC SR DSIs NDF 4H +0.00 BOBBIN DSI 1.66 4H +0.03.

Special Interes NDF 4H +0.00 25 12 MRPC 4R DSIs NDF 3H +0.00 BOBBIN DSI 0.49 3H +0.04 Special Interes NDF 3H +0.00 25 21 BOBBIN FSA 2.00 4H +34.17 25 22 MRPC 4R DSIs NDF 2H +0.00 Special Interes NDF 2H +0.00 25 34 MRPC 5R DSIs NDF 2H +0.00 BOBBIN DSI 0.92 2H +0.11 Special Interes NDF 2H +0.00 25 39 BOBBIN FSA 1,79 SC +34.83 25 44 MRPC SR DSIs NDF 6H +0.00 BOBBIN DSI 0.28 6H -0.03 Special Interes NDF 6H +0.00 25 54 MRPC SR DSIs NDF 3H +0.00 BOBBIN DSI 0.30 3H +0.03 .

l Special Interes NDF 3H +0.00 26 15 MRPC SR DSIs NDF 2H +0.00 MRPC SR DSIs NDF 3H +0.00 ,

BOBBIN DSI 0.26 2H -0.13 l BOBBIN DSI 0.62 3H +0.00 l Special'Interes NDF 2H +0.00 l Special Interes NDF 3H +0.00 26 28 MRPC SR DSIs NDF 2H +0.00 BOBBIN DSI 0.75 2H +0.11 Special Interes NDF 2H +0.00 26 35 MRPC 4R DSIs NDP 2H +0.00 BOBBIN . DSI 1.14 2H +0.11 Special Interes NDF 2H +0.00

'O 26 26 36 BOBBIN 51 MRPC SR DSIs BOBBIN DNG NDF DSI 8.95 0.47 4C 3H 3H

+14.71

+0.00

-0.06 Special Interes NDF 3H +0.00

BWHS TUBAN II (Version 2.0) 06/12/1995 11:23:35 Baavar Valley Unit 2 SG A SR 03/95 BOBBIN, Loose Parts Testing,MRPC 4R DSIs,MRPC SR DSIs,MRPC Special Int.,MRPC TSH,MRPC U-Bend,Sp IQ Page 12 of 16 Steam Generator 2RCS-SG21A Location & Percent Through Wall Calls (%TW) For All Indications ROW COL TEST TYPE %TW IND VOLTS LOCATION 26 76 MRPC SR DSIs NDF 5H +0.00 BOBBIN DSI 0.80 SH +0.11 Special Interes NDF 5H +0.00 27 32 MRPC SR DSIs NDF 2H +0.00 BOBBIN DSI 0.73 2H +0.03 Special Interes NDF 2H +0.00 27 33 BOBBIN DNG 6.69 7C +31.07 27 35 MRPC SR DSIs NDF 2H +0.00 BOBBIN DSI 0.41 2H +0.03 Special Interes NDF 2H +0.00 27 47 BOBBIN DNG 7.42 1C +4.58 BOBBIN DNG 12.69 1C +5.45 27 52 MRPC SR DSIs NDF 3H +0.00 BOBBIN DSI 0.55 3H -0.03 Special Interes NDF 3H +0.00 27 72 BOBBIN 16 ODI 1.47 AV1 +0.00 27 76 MRPC 5R DSIs NDF 3H +0.00 BOBBIN DSI 0.47 3H +0.21 )

Special Interes NDF 3H +0.00 28 21 MRPC SR DSIs NDF 3H +0.00 BOBBIN DSI 0.98 3H +0.09 Special Interes NDP 3H +0.00 28 33 MRPC 5R DSIs NDF 2H +0.00 BOBBIN DSI 0.42 2H +0.00 Special Interes NDF 2H +0.00 28 35 MRPC SR DSIs NDF 2H +0.00

/h MRPC SR DSIs NDF 4H +0.00 (s,/ BOBBIN DSI 1.04 2H +0.10 BOBBIN DSI 1.30 4H +0.03 1 Special Interes NDF 2H +0.00 i Special Interes NDF 4H +0.00 i 28 38 MRPC SR DSIs NDF 2H +0.00 i BOBBIN DSI 0.67 2H +0.03 Special Interes NDF 2H +0.00 28 46 MRPC SR DSIs NDF 2H +0.00 MRPC 5R DSIs NDF 3H +0.00 BOBBIN DSI 0.48 2H -0.08 BOBBIN DSI 0.42 3H -0.03 Special Interes NDF 2H +0.00 Special Interes NDF 3H +0.00 28 50 MRPC 4R DSIs NDF 3H +0.00 Special Interes NDF 3H +0.00 28 61 MRPC 4R DSIs NDF 5H +0.00 Special Interes NDF 5H +0.00 28 77 BOBBIN FSA 1.26 5C +33.21 28 85 BOBBIN DNT 10.08 4C -0.33 29 48 BOBBIN FSA 1.60 2H +18.14 29 50 MRPC SR DSIs NDF 3H +0.00 BOBBIN DSI 0.53 3H -0.03 Special Interes NDF 3H +0.00 29 64 MRPC 4R DSIs NDF 2H +0.00 Special Interes NDF 2H +0.00 30 15 BOBBIN FSA 2.67 2H +43.29 30 19 MRPC 4R DSIs NDF 2H +0.00 BOBBIN DSI 0.94 2H +0.06 Special Interes NDF 2H +0.00 30 22 MRPC 4R DSIs NDF 2H +0.00 Special Interes NDF 2H +0.00 30 35 MRPC SR DSIs NDF 2H +0.00 BOBBIN DSI 0.99 2H +0.11

/ Special Interes NDF 2H +0.00

( j) 30 43 BOBBIN DNG 9.03 3H 2H

+6.70

+0.00 30 50 MRPC 4R DSIs NDF Special Interes NDF 2H +0.00 30 51 MRPC 4R DSIs NDF 4H +0.00

J BWNS TUBAN II (Varsion 2.0) 06/12/1995 11:23:35 l Beaver Valley Unit 2 SG A 1 5R 03/95 BOBBIN, Loose Parts Testing,MRPC 4R DSIs,MRPC SR DSIs,MRPC Special Int.,MRPC TSH,MRPC U-Bend,Sp (3

Page 13 of 16 Steam Generator 2RCS-SG21A l

Location & Percent Through Wall Calls (%TW) For All Indications ROW COL TEST TYPE %TW IND VOLTS LOCATION Special Interes NDF 4H +0.00 30 74 MRPC SR DSIs NDF 3H +0.00 BOBBIN DSI 0.71 3H +0.05 l Special Interes NDF 3H +0.00  ;

31 18 MRPC 4R DSIs ' NDF 2H +0.00 l BOBBIN DSI 1.37 2H +0.11 l Special Interes NDF 2H +0.00 31 39 BOBBIN FSA 1.64 1H +20.73 31 44 BOBBIN DNG 5.14 6C +48.64 31 47 MRPC SR DSIs NDF 2H +0.15 i BOBBIN DSI 0.66 2H +0.15 I Special Interes NDF 2:1 +0.15 ,

31 52 BOBBIN FSA 2.38 8H +32.51 l MRPC Special In NDF 8H +32.51 Special Interes NDF 8H +32.51 32 23 BOBBIN FSA 3.96 TSH +4.17 ,

32 33 MRPC SR DSIs NDF 4H +0.00 l BOBBIN DSI 0.52 4H +0.03 1 Special Interes NDF 4H +0.00 i 32 34 MRPC SR DSIs NDF 3H +0.00 i BOBBIN DSI 0.96 3H -0.05 Special Interes NDF 3H +0.00 32 38 MRPC SR DSIs NDF 2H +0.00 BOBBIN DSI 0.95 2H +0.05 Special Interes NDF 2H +0.00 32 45 MRPC 5R DSIs NDF 2H +0.00 BOBBIN DNT 7.58 1C +0.19

(

/

BOBBIN DSI 1.16 2H +0.08 Special Interes NDF 2H +0.00 32 49 MRPC SR DSIs NDF 3H +0.00 t BOBBIN DSI 0.45 3H +0.00 Special Interes NDF 3H +0.00 32 51 MRPC 4R DSIs NDF 2H +0.00 Special Interes NDF 2H +0.00 32 55 BOBBIN FSA 1.27 2C +27.90 32 65 BOBBIN FSA 3.46 AV4 +2.73 MRPC Special In NDF AV4 +2.73 Special Interes NDF AV4 +2.73 33 18 MRPC 4R DSIs NDF 2H +0.00 MRPC 5R DSIs NDF 3H +0.00 BOBBIN DSI 0.49 3H -0.10 BOBBIN DSI 0.74 2H +0.05 Special Interes NDF 2H +0.00 Special Interes NDF 3H +0.00 33 26 MRPC 4R DSIs NDF 3H +0.00 Special Interes NDF 3H +0.00 33 29 MRPC SR DSIs NDF 3H +0.00 BOBBIN DSI 0.77 3H +0.03 Special Interes NDF 3H +0.00 33 37 BOBBIN DNG 9.08 4C +13.22 l 33 45 BOBBIN DNG 7.88 1C +22.98 1 BOBBIN DNG 6.46 4C +3.82 33 46. BOBBIN DNT 13.88 1C -0.37 '

33 52 BOBBIN FSA 1.17 7C +30.67 33 53 BOBBIN DNG 9.68 1C +7.63 BOBBIN DNG 14.17 1C +3.10 BOBBIN DNG 16.71 1C +3.84 I 33 54 BOBBIN DNG 5.23 4H +44.18 33 63 MRPC SR DSIs NDF 3H +0.00 l BOBBIN DSI 1.20 3H -0.11 )

Special Interes NDF 3H +0.00 i

( 33 70 BOBBIN 20 ODI 1.15 AV1 +0.00 l 33 71 BOBBIN FSA 1.83 3H +16.54 34 29 BOBBIN FSD 0.68 AV2 +13.76 34 35 MRPC 4R DSIs NDF 3H +0.00 l

I i

BWNS TUBAN II (Varsion 2.0) 06/12/1995 11:23:35 Bsaver Valley Unit 2 SG A SR 03/95 BOBBIN, Loose Parts Testing,MRPC 4R DSIs,MRPC SR P9Is,MRPC Special Int.,MRPC TSH,MRPC U-Bend,Sp

%.)

Page 14 of 16 Steam Generator 2RCS-SG21A

-Location & Percent Through Wall Calls (%TW) For All Indications ROW COL TEST TYPE %TW IND VOLTS LOCATION MRPC 5R DSIs NDF 2H +0.00 BOBBIN DSI 0.45 3H +0.05 BOBBIN DSI 0.65 2H +0.11 Special Interes NDF 2H +0.00 Special Interes NDF 3H +0.00 34 36 MRPC SR DSIs NDF 2H +0.00 MRPC SR DSIs NDF 3H +0.00 BOBBIN DSI 0.54 2H +0.05 BOBBIN DSI 0.42 3H +0.03 Special Interes NDF 2H +0.00 Special Interes NDF 3H +0.00 34 40 BOBBIN DNG 6.97 7H +39.73 34 48 MRPC SR DSIs NDF 2H +0.00 BOBBIN DSI 1.30 2H +0.03 MRPC Special In NDF 3H +0.00 Special Interes NDF 2H +0.00 Special Interes NDF 3H +0.00 34 52 BOBBIN DNG 12.66 5H +46.97 34 53 MRPC 4R DSIs NDF 2H +0.00 BOBBIN DSI 1.45 2H +0.05 Special Interes NDF 2H +0.00 34 58 BOBBIN DNG 11.50 2H +33.37 BOBBIN DNG 10.60 7C +10.32 BOBBIN DNG 33.61 2C +28.07 34 77 BOBBIN FSD 0.52 2C +39.42 MRPC Special In NDF 3C -12.00

/~_\ 35 27 MRPC SR DSIs NDF 3H +0.00

( ,) BOBBIN DSI 0.48 3H -0.06 Special Interes NDF 3H +0.00 35 70 BOBBIN 15 ODI 1.01 AV3 +0.00 35 71 MRPC Special In NDF TSH +0.00 to

  • 35 72 MRPC TSH NDF 3H +0.00 Special Interes NDF 3H +0.00 MRPC Special In NDF TSH +0.00 to
  • 35 73 MRPC Special In NDF TSH +0.00 to
  • 36 23 MRPC 4R DSIs NDF 3H +0.00 Special Interes NDF 3H +0.00 36 35 MRPC 4R DSIs NDF 6H +0.00 Special Interes NDF 6H +0.00 36 36 MRPC SR DSIs NDF 2H +0.00 BOBBIN DSI 0.38 2H +0.05 Special Interes NDF 2H +0.00 36 37 MRPC SR DSIs NDF 2H +0.00 MRPC 5R DSIs NDP 3H +0.00 BOBBIN DSI 1.51 2H +0.16 BOBBIN DSI 1.11 3H +0.03 Special Interes NDF 2H +0.00 Special Interes NDF 3H +0.00 36 41 MRPC 5R DSIs NDF 4H +0.00 BOBBIN DSI 0.50 4H +0.00 Special Interes NDF 4H +0.00 36 44 MRPC 4R DSIs NDF 3H +0.00 BOBBIN DSI 0.72 3H +0.05 Special Interes NDF 3H +0.00 36 45 BOBBIN DNG 5.19 2H +17.09 NDF TSH +0.00 to
  • 36 71 MRPC Special In 36 73 MRPC Special In NDF TSH +0.00 to
  • 37 26 MRPC 4R DSIs NDF 3H +0.00 Special Interes NDF 3H +0.00 37 39 MRPC SR DSIs NDF 2H +0.00

-('~g* MRPC 5R DSIs NDF 3H +0.00 BOBBIN DSI 0.22 2H +0.05

BOBBIN DSI 0.55 3H +0.14 Special Interes NDF 2H +0.00 Special Interes NDF 3H +0.00

BWNS TUBAN II (Version 2.0) 06/12/1995 11:23:35 Bsavar Valley Unit 2 SG A SR 03/95 BOBBIN, Loose Parts Testing,MRPC 4R DSIs,MRPC SR DSIs,MRPC Special Int.,MRPC TSH,MRPC U-Bend,Sp gs t

Page 15 of 16 Steam Generator 2RCS-SG21A Location & Percent Through Wall Calls (%TW) For All Indications ROW COL TEST TYPE %TW IND VOLTS LOCATION 37 71 MRPC Special In NDF TSH +0.00 to

  • 37 73 MRPC Special In NDF TSH +0.00 to
  • 38 33 MRPC SR DSIs NDF 2H +0.00 BOBBIN DSI 0.59 2H +0.11 Special Interes NDF 2H +0.00 38 38 MRPC 5R DSIs NDF 2H +0.00 BOBBIN DSI 0.65 2H +0.03 Special Interes NDF 2H +0.00 38 48 MRPC 5R DSIs NDF 2H +0.00 BOBBIN DSI 1.98 2H +0.13 Special Interes NDF 2H +0.00 38 71 MRPC Special In NDF TSH +0.00 to
  • 38 72 MRPC Special In NDF TSH +0.00 to
  • 38 73 MRPC Special In NDF TSH +0.00 to
  • 39 35 BOBBIN DNG 8.18 1H +1.55 BOBBIN DNG 11.20 1H -0.67 BOBBIN DNG 13.21 1H +2.25 BOBBIN DNG 14.30 TSH +18.27 BOBBIN DNG 17.68 TSH +17.41 BOBBIN DNG 7.21 TSH +16.73 39 37 BOBBIN DNG 5.70 2C +27.48 39 48 BOBBIN FSA 1.12 1C +13.60 39 69 BOBBIN DNG 7.55 3C +34.42 40 27 MRPC 4R DSIs NDF 4H +0.00 BOBBIN FSA 5.77 7H +39.69 Special Interes NDF 4H +0.00

[)

'\,,/

MRPC Special In Special Interes VOL VOL 1.91 1.91 8H BH

-10.60

-10.60 40 35 MRPC SR DSIs NDF 4H +0.00 BOBBIN DNG 5.15 2C +28.07 BOBBIN DSI 0.62 4H +0.13 Special Interes NDF 4H +0.00 40 37 MRPC 4R DSIs NDF 3H +0.00 BOBBIN DSI 1.16 3H +0.00 Special Interes NDF 3H +0.00 40 68 BOBBIN 20 ODI 1.21 AV1 +0.00 BOBBIN 26 ODI 1.82 AV4 +0.00 BOBBIN 28 ODI 2.02 AV2 +0.00 41 28 MRPC 4R DSIs NDF 3H +0.00 Special Interes NDF 3H +0.00 41 36 BOBBIN DNG 16.50 1H +26.31 BOBBIN DNG 7.30 1H +24.92 BOBBIN DNG 11.37 1H +25.69 BOBBIN DNG 5.42 6H +43.41 41 41 MRPC 4R DSIs NDF 3H +0.00 BOBBIN DSI 0.40 3H +0.05 Special Interes NDF 3H +0.00 41 42 BOBBIN DNG 5.09 TSH +7.91 41 60 BOBBIN DNG 5.74 AV3 +9.97 42 33 MRPC 4R DSIs NDF 5H +0.00 Special Interes NDF 5H +0.00 42 37 BOBBIN DNG 7.93 7H +35.74 42 39 BOBBIN FSA 2.24 3C +5.52 42 47 MRPC 4R DSIs NDP 3H +0.00 Special Interes NDF 3H +0.00 42 55 BOBBIN FSA 0.92 2H +16.73 43 31 BOBBIN DNG 7.13 7H +46.18 BOBBIN DNG 8.46 7H +45.47 43 32 BOBBIN DNG 8.25 7C +47,94 43 36 BOBBIN FSA 2.55 2C +6.90

) MRPC Special In NDF 2C +6.90

(/

( 43 38 BOBBIN MRPC Special In FSA VOL 2.37 0.48 3C 3C

+7.64

+7.37 43 40 MRPC 4R DSIs NDF 3H +0.00 Special Interes NDF 3H +0.00

~ . ~ . . . , - .. - . ~ . ..= . - . .- .. -.. .-. . . . ~ . . ~ - . . . - ~ . . -. .

BWNS TUBAN II (Version 2.0) _

06/12/1995 11:23:35 Bsavar Valley Unit 2 SG A i . SR 03/95

, -BOBBIN, Loose. Parts Testing,MRPC 4R DSIs,MRPC SR DSIs,MRPC Special Int.,MRPC TSH,MRPC U-Bend,Sp O

-g-Page 16 of 16 Steam Generator 2RCS-SG21A Location & Percent Through Wall Calls (%TW) For All Indications ROW COL TEST TYPE- %TW IND VOLTS LOCATION-43 42 BOBBIN DNG 5.52 7H +33.47 BOBBIN DNG 5.62 7H +32.84 43 51 BOBBIN .DNG 7.09- AV1 +25.50 43 59 BOBBIN DNG' 6.73 TSC +14.59 1 44' 35 MRPC Special In- :NDF SC +0.02 44 36 MRPC Special In NDF SC +0.00 44 37 MRPC Special In NDF SC +0.00.

44 45 MRPC 4R DSIs NDF 4H +0.00 BOBBIN DSI 0.35 4H +0.14 Special Interes NDF 4H +0.00 1 44 52 BOBBIN .

FSA 3.95 SH +16.51 '

44 54 MRPC Special.In- NDF TSH +1.30 Special Interes NDF TSH +1.30 44 55 BOBBIN . 21 .ODI 1.22 AV4 +0.00 MRPC Special In NDF TSH +0.95 l Special Interes NDF. TSH +0.95 l 45 37 BOBBIN DNT- 13.74 8C +0.34 i BOBBIN DNT 19.09 SH -0.31 MRPC Special In NDF SC +0.00 <

MRPC U-Bend DNT 17.31 8H -0.38 '

MRPC Special In DNT 3.67 BC -0.47 45 38 BOBBIN DNT 29.16 8H -0.26 BOBBIN DNT 24.76 8H +0.37 MRPC U-Bend DNT 20.97 8H -0.38 MRPC U-Bend DNT 24.88 BH +0.38 '

45 47 MRPC Special In NDP TSH +1.70 Special Interes NDF TSH- +1.70 46 47 MRPC Special In NDF TSH +1.52 Special Interes NDF TSH +1.52 Total Indications Found = 1004 Total Tubes Found = 392 Total Tubes in Input File = 3312 I

l l

O

ATTACHMENT 4A TUBE PLUGGING RESULTS FROM THE UNIT #2 5TH REFUELING OUTAGE (5R)

FC" STEAM GENERATOR 2RCS-SG21A 1

)

r U) e l

i i

- 1

5 - I n

e M Em . I

. 4(

+

B OON N\_ 0P. . 1hU.

.. . .. 4 Y 9 A v . .e....

.o g W

N

.... .... .... 0 A e....

9 M

..o..*....

..g.

A . .... ....

.c.} .- .... ....=....

/ . * . - . . . . .... g... .... . o 5 N . . * . .... ....og....g... . .0 8

- . . * . .... .. 3o......... .. 3.

. ..*...... .( } . 3 o... .... ....

g...

)

(

. .0

.... .. 3

  • - . . . . .. 3 .... .... ....

3g*....

....=....

0 8

e .... ..*...... . 3. .... .... ....

i c

v r

- =....

e- .... . *. - . . .

s e * . . . . . .

..g.

e . ... 5 S ..- .... ..*. ....

.... ........ .... .... 7 f

.. ) .... ..*...... .... .... .... ....

AO . . o. .

(

t .... .... ..*...... .............. .... 0 Gu . .... .... ..*...... .... ......... .... 7 SO . .... . . * . . ... .. .... ....

.. .... .... ..*...... .... .... ....=....

... .... .... ..*...... .... .... .... .... 5

... .... .... ..*...... .... .... .... ... 6 R ... .... .... ..*...... .... .... .... ....

. ... .... .... ..*.... . .... .... ....=....

5 g... .... p

.a. . ..*...... .... .... .... ....

.g.. .... .... ..*.. ... .... .... .... .... 0 D e....

e....

.... ..*...... .... .... .... ..g..

.... .. 6 E .... .... . . * . . , . . . .... ....- .

G ..... ....=....

. * . - . . . . .... .... .... .... 5 G .....

..... .... ....=....

..... ....=....

.... ...o...g......

5 >

U ..... .... .... ..*...... .... ......... ....

L ..... .... .... ..*...... .............. .. . -

P ..... .... g... ..*...... .... .........

..o..

...g 0 S d S ..... .... .... .. .... 5 e

..... .... .... ..*... .... ..*.......- .... ......... . . .... .... m E ..... .... .... ..*... . .... .... .........

i L

..... .... .... ..*...... .... .... .... .... O vB U 4 6 .... .... .... ..*. .... ...g .... ....=.... 5 4C s a

T  : g... .... .... ..*. .... .... .... .... ....

- n e

A d e .... .... .... . . * . - . . u e

... ....*.... ..*. .. o .... ....o.... .... .... ....

t - ..g- ..*....- . . . .... .... .... .... 0 n 1 c e... .... .... ..*.. . ...... .... .... 4 2 e =

l . ....- .... .... a

.e .... .... .... ..*. ....

G S .... .... ....

o.... ..*. .... .... .... .... .o..

.g.. a S s

... . .. 5 e s

- s e . ... .... .... ..*. .... .... .... .... . .. 3 e n

S t T

u . ... .... .... ..*. .... .... .... .... .... u T

C ...

O...~.e..

e R ... .... .... ..*...... .... .... ....*.... 0 c 3 aF 2 .. .... .... ..*...... .... .... .... ....

.. ....=.... ..*. .... .... ... .... . ..

. .... .... ..*. .... .... ... .... .... y r

. .... . .. a

.... ..*. .... .... .... .... . .. 25 mr

....=.... ..*. .... .... .... .... . .. i

.... .... . . * . - . . . . . .... . P

... ....- .- ..o. - .... ..g..

0 )

2 g e

.... ..*. .... .... L o.. ....*.- ..*. .... .... . .. . . ....

....o.... . .. t o

. - . . * . - . . . . .... .... .... .. . 5 H

..o..

1 (

e- . . * . - . . . .o.... .... ....

T

. . * . - . . . . .... .... .... g=.. E.

6 . * . - . . . . .... .... .... . .. 0 EB s 7 . - . . . . .... .... .... . .. 1 i 23 .... .... .... .... . .. -

t 3 . . . .... .... .... . .. n H: . .... .... .... . ..

5 EL a

L y

. .- ...g.

2

=

n e

s s Z e ae . . .... . ..

.o.. O m Vm i N s e

r T 0 0 0 m

v e vl a at 6e 4 4 5

3 3 5

2 0

2 5

1 1 5 u T

eo BT t R Q W S .4 O

        • BWNS TUBAN II (Version 2.0)
        • 06/12/1995 15:09:33 ****

l Bamver Valley Unit 2 ****

! **** SG A ****

        • SR 03/95 ****
        • BOBBIN,MRPC 4R DSIs,MRPC SR DSIs,MRPC Special Int.,MRPC TSH,MRPC U-Bend, SLUDGE ****

l l

("'

A/

Steam Generator 2RCS-SG21A Tubes Plugged SR ROW COL TEST TYPE %TW IND VOLTS LOCATION 1 85 BOBBIN DTI 15.05 TSC -0.16 l 2 15 MRPC TSH VOL 0.37 5H +0.24 l 2 52 BOBBIN FSI 0.97 2C +35.61 1 BOBBIN FSI 0.54 2C +37.59 I MRPC Special In VOL 0.83 3C -14.18 l 2 85 BOBBIN DTI 12.06 TSC -0.11 l 3 1 BOBBIN NOI 5.02 2H +30.58 to +* )

MRPC Special In NOI 0.45 2H +31.37 i 3 93 BOBBIN DNT 12.93 7H +47.91 l MRPC U-Bend DNT 26.95 8H -3.15 to

  • 1 9 32 BOBBIN DSI 0.63 2H +0.05 MRPC SR DSIs VOL 0.49 2H -0.30 11 54 BOBBIN DTI 7.81 TSC -0.05 12 22 BOBBIN NQI 0.25 TSC +2.85 MRPC Special In VOL 0.69 TSC +3.13 17 88 BOBBIN DSI 0.92 3H +0.00 MRPC SR DSIs VOL 0.61 3H +0.00 18 82 BOBBIN DSI 0.50 2H +0.19 MRPC 4R DSIs VOL 0.35 2H -0.13 18 86 MRPC TSH VOL 0.69 TSH +0.29 MRPC TSH VOL 0.45 TSH +1.74 20 13 MRPC TSH VOL 0.36 TSH +2.37 21 41 MRPC TSH VOL 0.69 TSH +0.38 MRPC TSH VOL 0.79 TSH +1.93 MRPC TSH VOL 0.48 TSH +1.19 27 81 BOBBIN NQI 0.27 TSH +2.82 MRPC Special In VOL 0.17 TSH +2.35 k'~_',N

/ 34 17 BOBBIN DSI 0.76 4H +0.17 MRPC SR DSIs VOL 0.33 4H +0.13 36 72 MRPC Special In PLP 0.82 TSH +2.53 37 72 MRPC Special In PLP 0.38 TSH +2.54 45 36 BOBBIN DNT 55.31 8H -0.28 j MRPC U-Bend DNT ****** 8H +0.51 '

MRPC Special In DNT 6.37 BC -2.64 MRPC Special In PLP 0.34 SC -3.03 to

  • Total Indications Found = 35 Total Tubes Found = 19 Total Tubes in Input File = 19

)

l i

I

(')

' ATTACHMENT 5 EXAMINATION RESULTS FROM THE UNIT #2 STH REFUELING OUTAGE (5R)

FOR STEAM GENERATOR 2RCS-SG21B i

O l

- ~ ~ _ . - - . - - - . . - . ~ . -~ - ._ ..-- -.. ~- .- ..- .- - - - . ~-

BWNS TUBAN II. (Varsion 2.0) . 06/12/1995 14:02:47

, Baavar Valley Unit 2 SG B l SR 03/95 1 i BOBBIN, BOBBIN - 24 IPS, BOBBIN - 40 IPS, Loose Parts Testing,MRPC 4R DSIs,MRPC SR DSIs,MRPC Spec '

Page 1 of 30.  !

Steam Generator 2RCS-SG21B j i Location & Percent Through Wall Calls (%TW) For All Indications l ROW COL TEST TYPE %TW 'IND VOLTS LOCATION '

l 1 2 MRPC SR DSIs NDF 4H -0.06 '

' BOBBIN DSI 0.30 4H -0.06 1 6 MRPC 5R DSIs NDF 6H +0.00 BOBBIN . DSI 0.21 6H -0.14 i

1 45 MRPC SR DSIs NDF 2H +0.03

, BOBBIN DSI 0.38 2H +0.03 1 50 MRPC SR DSIs NDF 5H +0.00 BOBBIN DSI 0.73 5H -0.06 l 1 52 MRPC SR DSIs NDF 2H +0.00 1

! MRPC SR DSIs NDF 2H +0.00 MRPC SR DSIs NDF SH- +0.00 l BOBBIN DSI 0.92 5H +0.00 i BOBBIN DSI 0.55 2H. +0.00 l

1 57 MRPC 4R DSIs NDF 4H +0.00 MRPC SR DSIs NDF 2H +0.00 BOBBIN DSI 0.63 2H +0.08 BOBBIN DSI 0.99 4H -0.06 2 3 MRPC SR DSIs NDF 3H +0.09 BOBBIN DSI 0.51 3H +0.09 l 2 14 MRPC U-Bend NDF 8C +0.44 l MRPC 5R DSIs NDF. 2H -0.03 BOBBIN DSI 0.90 2H -0.03 BOBBIN NQI 1,72 BC +0.44 l

2 17 MRPC 4R DSIs NDF 4H +0.00 BOBBIN DSI 0.88 4H -0.03 2 20 MRPC 5R DSIs NDF 3H +0.00 O 2 BOBBIN 21 MRPC SR BOBBIN DSIs DSI NDF DSI 0.63 0.65 3H 4H 4H

+0.00

-0.06

-0.06 2 22 MRPC SR DSIs NDF - 2H -0.08 BOBBIN DSI 0.56 2H -0.08 2 23 MRPC SR DSIs NDF- 2H -0.03 MRPC 5R DSIs NDF 3H +0.00 MRPC SR DSIs NDF 5H -0.06 BOBBIN DSI 0.63 3H +0.00

[. BOBBIN DSI 0.67 2H -0.03 l BOBBIN DSI- 0.59 5H -0.06 l 2 24 MRPC 5R DSIs NDF 2H +0.03 i BOBBIN DSI 0.96 2H +0.03 2 28 MRPC 5R DSIs NDF 2H -0.06 BOBBIN DSI 1.35 2H -0.06 2 31 MRPC SR DSIs NDF 2H -0.08 BOBBIN DSI 0.73 2H -0.08 2 32 MRPC SR DSIs NDF 2H -0.06 BOBBIN DSI 1.29 2H -0.06 2 34 BOBBIN FSA 1.06 2H +32.48 2 42 BOBBIN DSI 1.05 2H -0.17 MRPC Special In NDF 2H -0.17 2 44 MRPC 5R DSIs NDF 2H -0.03 BOBBIN DSI 0.85 2H -0.08 2 54 MRPC 4R DSIs NDF 4H +0.00 l

BOBBIN DSI 1.17 4H -0.08 2 56 MRPC SR DSIs NDF 6H +0.00 BOBBIN DSI 0.50 6H +0.00 2 58 MRPC SR DSIs NDF 2H -0.05 i

BOBBIN DSI 0.69 2H -0.03 2 63 MRPC 4R DSIs NDF 4H -0.03 i BOBBIN DSI 0.60 4H +0.00 2 64 MRPC SR DSIs NDF 2H +0.00 4 BOBBIN DSI 0.56 2H +0.00 2 69 MRPC SR DSIs NDF 5H -0.03 BOBBIN DSI 0.55 5H -0.03 2 81 MRPC 5R DSIs NDF 4H +0.09 BOBBIN DSI 0.91 4H +0.09 2 84 MRPC SR DSIs NDF 4H -0.03 l

i I . . , , , . ,

BWNS TUBAN II (Varsion 2.0) 06/12/1995 14:02:47 Bravsr Valley Unit 2 SG B SR 03/95

[

BOBBIN, BOBBIN - 24 IPS, BOBBIN - 40 IPS, Loose Parts Testing,MRPC 4R DSIs,MRPC 1R DSIs,MRPC Spec I

r3 a Nl Page 2 of 30 Steam Generator 2RCS-SG21B Location & Percent Through Wall Calls (%TW) For All Indications ROW COL TEST TYPE %TW IND VOLTS LOCATION BOBBIN DSI 0.81 4H -0.03 2 85 BOBBIN DSI 0.63 4H -0.03 2 92 BOBBIN DSI 0.79 4H +0.06 MRPC Special In NDF 4H +0.06 3 4 MRPC SR DSIs NDF 3H +0.00 BOBBIN DSI 0.31 3H +0.00 3 16 MRPC SR DSIs NDF 3H -0.06 BOBBIN DSI 0.99 3H -0.06 l 3 21 MRPC 5R DSIs NDF 3H -0.03 BOBBIN DSI 0.54 3H -0.03 3 22 MRPC SR DSIs NDF 2H +0.00 MRPC 5R DSIs NDF 3H +0.00 BOBBIN DSI 0.61 3H +0.00 BOBBIN DSI 0.40 2H +0.00 3 25 MRPC 4R DSIs NDF 3H +0.00 MRPC SR DSIs NDF 4H -0.03 BOBBIN DSI 0.54 3H +0.06 BOBBIN DSI 0.35 4H -0.03 ,

3 28 MRPC 5R DSIs NDF 2H +0.00 l MRPC SR DSIs NDF 4H -0.14 l BOBBIN DSI 1.07 2H +0.00 I BOBBIN 4H DSI 0.35 -0.14 3 31 MRPC SR DSIs NDF 2H +0.00 BOBBIN DSI 0.76 2H +0.00 3 32 MRPC 4R DSIs NDF 3H +0.00 BOBBIN DSI 0.66 3H -0.03

/f')

(,,/

3 46 MRPC SR DSIs MRPC 5R DSIs NDF NDF 2H 3H

-0.06

-0.08 MRPC SR DSIs NDF 4H +0.06 BOBBIN DSI 0.63 2H -0.06 BOBBIN DSI 0.49 4H +0.06 BOBBIN DSI 0.59 3H -0.08 3 47 MRPC SR DSIs NDF 2H +0.22 BOBBIN DSI 0.55 2H +0.22 3 49 BOBBIN FSA 1.25 5C +27.85 MRPC Special In NDF SC +27.85 3 52 MRPC SR DSIs NDF 2H +0.00 BOBBIN DSI 1.64 2H -0.03 3 54 MRPC 4R DS1s NDF 2H +0.00 BOBBIN DSI 1.36 2H +0.06 BOBBIN - 24 IPS DSI 0.88 2H -0.03 BOBBIN - 24 IPS DSI 1.01 2H -0.03 BOBBIN - 24 IPS DSI 0.99 2H -0.03 BOBBIN - 40 IPS DSI 1.13 2H +0.13 BOBBIN - 40 IPS DSI 1.07 2H -0.10 BOBBIN - 40 IPS DSI 1.03 2H -0.03 3 56 MRPC SR DSIs NDF 2H +0.00 BOBBIN DSI 0.57 2H +0.00 3 57 MRPC 5R DSIs NDF 4H +0.00 BOBBIN DSI 0.38 4H +0.03 BOBBIN FSD 0.63 2H +24.20 3 60 MRPC 4R DSIs NDF 2H +0.00 BOBBIN DSI 0.85 2H +0.03 3 61 MRPC SR DSIs NDF 2H +0.00 BOBBIN DSI 0.96 2H +0.00 3 62 MRPC SR DSIs NDF 4H +0.00 BOBBIN DSI 0.38 4H -0.03 3 63 MRPC SR DSIs NDF 3H +0.00 BOBBIN DSI 0.45 3H +0.00 3 66 MRPC SR DSIs PDF 3H -0.06

/j

\

5 BOBBIN BOBBIN MRPC Special In DSI FSA NDF 0.51 2.46 3H 7C TEC

-0.06

+3.04

+11.08 3 68 BOBBIN FSA 2.32 3C +47.29 3 71 BOBBIN DSI 0.65 4H -0.06 e

4 j

BWNS TUBAN II (Varsion 2.0) . 06/12/1995 14:02:47- i Baaver Valley Unit 2  ;

SG B i 5R 03/95  ;

j BOBBIN, BOBBIN - 24 IPS, BOBBIN .- 40 IPS, Loose Parts Testing,MRPC 4R DSIs,MRPC . 5R DSIs,MRPC Spec-Page 3 of 30

! Steam Generator 2RCS-SG21B  ;

Location & Percent Through Wall Calls (%TW) For All Indications t i _ ROW COL TEST TYPE. %TW IND VOLTS LOCATION i 3- 72 MRPC 4R DSIs NDF '3H +0.12- i BOBBIN DSI 0.65 3H -0.03 ,

, 3 76 MRPC 5R DSIs NDF'- 2H -0.11

BOBBIN DSI 1.00 2H -0.11 3 79lMRPC SR DSIs NDF 3H -0.09 BOBBIN DSI 1.14 3H -0.09 >

l 3 80 MRPC SR DSIs. NDF 2H +0.03  ;

BOBBIN DSI 0.46 2H +0.03 1 i

3 83 MRPC SR DSIs NDF 4H +0.09 .!

I BOBBIN DSI 0.85 4H +0.09 '

4 19 MRPC SR DSIs NDF 3H +0.14 BOBBIN DSI 0.31 3H +0.14 4 23 MRPC SR DSIs NDF 2H +0.22

  • i MRPC SR DSIs NDF 3H +0.05 l BOBBIN DSI 0.95 2H +0.22
BOBBIN DSI 0.78 3H +0.05 5 4 31 MRPC 5R DSIs NDF 3H +0.14 (

) BOBBIN DSI 0.65 3H +0.14 r

' 4 32 MRPC 4R DSIs NDF 3H +0.00 '

-4 33 MRPC 5R DSIs NDF 3H +0.08 e . BOBBIN DSI 0.35 3H +0.08 l' 4 41 BOBBIN DSI 1.50 4H -0.20  ;

MRPC Special In' NDF 4H -0.20  ;

. 4 42 MRPC SR DSIs NDF 4H -0.08 >

l

. BOBBIN DSI 0.79 4H -0.08 4 44 MRPC 5R DSIs NDF 2H +0.03 4 BOBBIN DSI 1.37 2H +0.03 4 47 MRPC 4R DSIs NDF 2H +0.00 49 MRPC SR DSIs 2H

.4 NDF +0.00 i j BOBBIN DSI 0.64 2H +0.04  ?

4 51 MRPC SR DSIs NDF' 2H +0.00

MRPC SR DSIs NDF 3H +0.00 i BOBBIN DSI 1 18 2H -0.12 4 52 MRPC SR DSIs NDF 2H +0.00 1

< BOBBIN DSI 1.08 2H -0.07 l 1 4 53 MRPC SR DSIs NDF 2H +0.00 I J BOBBIN DSI 0.77 2H -0.07 54 MRPC 4R DSIs 4 NDF 2H +0.00 i BOBBIN DSI 1.00 2H +0.02

4 55 MRPC 4R DSIs NDF 2H +0.00 BOBBIN DSI 0.86 2H +0.10 1 4 56 MRPC SR DSIs NDF 2H +0.00
MRPC 5R DSIs NDF 3H +0.00 4

MRPC SR DSIs NDF 4H +0.00

< BOBBIN DSI 1.08 3H +0.05 4 BOBBIN DSI 0.83 2H +0.17 BOBBIN DSI 0.52 4H +0.00 f 4 57 MRPC IR DSIs NDF 2H +0.00 i MRPC iR DSIs NDF 4H +0.00 j BOBB11 DSI 0.55 4H +0.02 BOBBld DSI 1.05 2H +0.05 4 58 MRPC 4R DSIs NDF 2H +0.00 BOBBIN DSI 1.30 2H +0.02 4 59 MRPC SR DSIs NDF 2H +0.00 MRPC SR DSIs NDF 3H +0.00 BOBBIN DSI 0.36 2H -0.07 BOBBIN DSI 0.48 3H +0.10 4 60 MRPC SR DSIs NDF 2H +0.00 BOBBIN DSI 0.68 2H -0.10 4 61 MRPC SR DSIs NDF 2H +0.00 BOBBIN DSI 0.83 2H -0.02 O' 4 62 MRPC SR DSIs BOBBIN NDF DSI 0.68 2H 2H

+0.00

+0.02

'4 -64 MRPC SR DSIs NDF 2H +0.11 BOBBIN DSI 0.46 2H +0.11

i BWNS TUBAN II (Version 2.0) 06/12/1995 14:02:47 Beaver Valley Unit 2 SG B 5R 03/95 BOBBIN, BOBBIN - 24 IPS, BOBBIN - 40 IPS, Loose Parts Testing,MRPC 4R DSIs,MRPC SR DSIs,MRPC Spec Is Page 4 of 30 Steam Generator 2RCS-SG21B Location & Percent Through Wall Calls (%TW) For All Indications ROW COL TEST TYPE %TW IND VOLTS LOCATION l 4 67 BOBBIN FSA 7.00 5C +23.13 MRPC Special In VOL 1.08 5C +23.41 4 88 MRPC SR DSIs NDF 4H' +0.03 BOBBIN DSI 0.60 4H +0.03 5 3 BOBBIN FSA 3.24 2H +39.96 5 4 MRPC 5R DSIs NDF 3H +0.03 BOBBIN DSI 0.56 3H +0.03 5 5 MRPC SR DSIs NDF 3H +0.03 MRPC SR DSIs NDF 4H +0.00 BOBBIN DSI 0.60 3H +0.03 BOBBIN DSI 0.19 4H +0.00 5 6 BOBBIN FSI 0.19 2C +26.64 MRPC Special In NDF 2C +26.64 5 9 MRPC SR DSIs NDF 2H +0.12 BOBBIN DSI 1.15 2H +0.12 5 13 MRPC SR DSIs NDF 2H +0.09 MRPC SR DSIs NDF 3H +0.00 BOBBIN DSI 0.50 3H +0.06 BOBBIN DSI 1.17 2H +0.09 5 15 MRPC SR DSIs NDF 3H +0.11 BOBBIN DSI 0.41 3H +0.11 5 20 MRPC SR DSIs NDF 2H +0.08 BOBBIN DSI 0.97 2H +0.08 5 28 MRPC SR DSIs NDF 2H +0.03 BOBBIN DSI 0.95 2H +0.03 5 29 MRPC SR DSIs NDF 3H +0.03 BOBBIN DSI 0.34 3H +0.03 Ox 5 30 MRPC SR DSIs MRPC SR DSIs NDF NDF 2H 3H

+0.00

+0.00 BOBBIN DSI 0.66 3H +0.08 BOBBIN DSI 0.55 2H +0.05 5 32 MRPC SR DSIs NDF 3H +0.11 BOBBIN DSI 0.65 3H +0.11 5 45 MRPC SR DSIs NDF 2H -0.02 BOBBIN DSI 0.66 2H -0.02 5 46 MRPC SR DSIs NDF 2H +0.00 5 49 BOBBIN FSA 1.35 3C +8.42 l 5 52 MRPC SR DSIs NDF 2H +0.00 i BOBBIN DSI 0.97 2H -0.09 l 5 53 MRPC 4R DSIs NDF 2H +0.00  :

BOBBIN DSI 0.54 2H -0.09 )

5 54 MRPC 5R DSIs NDF 2H +0.00 MRPC SR DSIs NDF 6H +0.00 BOBBIN DSI 0.83 2H +0.18 BOBBIN DSI 0.77 6H +0.06 5 55 MRPC SR DSIs NDF 2H +0.00 MRPC SR DSIs NDF 3H +0.00 BOBBIN DSI 0.72 2H +0.12 BOBBIN DSI 0.80 3H -0.09 5 56 MRPC SR DSIs NDF 3H +0.00 1 BOBBIN DSI 0.83 3H -0.03 l 5 58 MRPC SR DSIs NDF 2H +0.00 i 1

BOBBIN DSI 0.61 2H +0.03 5 59 MRPC 4R DSIs NDF 2H +0.00 BOBBIN DSI 1.22 2H -0.16 BOBBIN FSA 2.49 3C +29.82 5 61 MRPC 4R DSIs NDF 2H +0.00 5 71 MRPC SR DSIs NDF 3H +0.03 BOBBIN DSI 0.59 3H +0.03 5 74 BOBBIN FSA 3.87 6C +8.93 5 75 MRPC 4R DSIs NDF 4H +0.03 f, "' BOBBIN - 24 IPS DSI 0.50 4H +0.00 BOBBIN - 24 IPS DSI 0.66 3H +0.00 BOBBIN - 24 IPS DSI 0.60 3H +0.03 BOBBIN - 24 IPS DSI 0.54 4H +0.00

~ ~ . . . - _ . - - . . - - - . _ - - . - . . - . . - . - - - . _. -. -. . .~.. ~..

BWNS TUBAN II (Varsion 2.0) . 06/12/1995 14s02.47 Beavar Valley Unit 2 SG B 5R 03/95 .

' BOBBIN, BOBBIN - 24 IPS, BOBBIN - 40 IPS, Loose Parts Testing,MRPC.4R DSIs,MRPC SR DSIs,MRPC Spec

/ .

ks ,}/ I

.Page 5 of-30 Steam Generator 2RCS-SG21B .

Location &' Percent Through. Wall Calls (%TW) For All-Indications

' ROW COL TEST TYPE LTW IND VOLTS LOCATION .

BOBBIN - 24 IPS DSI 0.54 4H +0.00 BOBBIN - 24 IPS DSI 0.64 3H +0.00 i I

BOBBIN - 40 IPS DSI 0.51 4H +0.03 BOBBIN - 40 IPS DSI 0.64 3H +0.00

-BOBBIN - 40 IPS DSI 0.64 4H +0.00  !

BOBBIN - 40 IPS DSI 0.61 3H +0.00 BOBBIN - 40 IPS DSI 0.55 4H +0.03 i BOBBIN - 40 IPS DSI 0.62 3H +0.00 (

5 .88 MRPC 4R DSIs NDF 4H +0.00  ;

MRPC SR DSIs NDF 4H -0.06 ,

BOBBIN DSI 0.91 4H -0.06  :

6- 16 MRPC 4R DSIs NDF 3H +0,06 BOBBIN DSI 0.92 3H +0.09 6 23 MRPC SR DSIs. NDF 2H +0.19  ;

MRPC SR DSIs NDF 3H +0.03 ,

MRPC 5R DSIs NDF 4H +0.19 BOBBIN DSI 1.32 2H +0.19 BOBBIN DSI 0.63 3H +0.03  !

BOBBIN DSI 0.67 4H +0.19 6 28 MRPC 5R DSIs NDF 2H -0.03 i BOBBIN DSI 0.55 2H -0.03 l 6 30 MRPC SR DSIs NDF 5H +0.15 BOBBIN DSI 0.33 SH +0.15 6 53 MRPC SR DSIs NOF 2H -0.12 ,

BOBBIN DSI 1.87 2H -0.12 6 54 MRPC SR DSIs NDF 3H +0.00 O

BOBBIN DSI 0.42 3H -0.09 6 58 MRPC SR DSIs -NDF 2H +0.00 BOBBIN DSI 0.76 2H +0.00 6 63 MRPC SR DSIs. VOL 0.38 TSH -1.50 7 6 MRPC 4R DSIs NDF 4H +0.00 MRPC 5R'DSIs NDF -2H +0.00 MRPC SR DSIs NDF 3H- +0.03 BOBBIN DSI 0.73 2H +0.00  ;

BOBBIN DSI 0.92 3H +0.03 -t i

BOBBIN DSI 0.86 4H +0.03 7 10 MRPC 4R DSIs NDF 3H +0.00 f MRPC SR DSIs NDF 2H +0.00  ;

BOBBIN DSI 0.96 2H +0.03 i 7 12 MRPC 5R DSIs NDF 3H +0.03 BOBBIN DSI 0.84 3H +0.03 7 13 MRPC SR DSIs NDF 2H +0.21 '

BOBBIN DSI 1.13 2H +0.21 7 14 MRPC SR DSIs NDF 2H -0.06 BOBBIN DSI 0.66 2H -0.06 7 15 MRPC SR DSIs NDF 2H +0.06 BOBBIN DSI 0.54 2H +0.06 7 16 MRPC SR DSIs NDF 2H +0.23 BOBBIN DSI 0.34 2H +0.23 7 19 MRPC SR DSIs NDF 2H +0.08 MRPC SR DSIs NDF 3H +0.11 BOBBIN DSI 0.35 2H +0.08 BOBBIN DSI 0.46 3H +0.11 7 27 MRPC SR DSIs NDF 2H +0.05 BOBBIN DSI 0.79 2H +0.05 7 28 MRPC SR DSIs NDF 5H +0.06 '

BOBBIN DSI 0.35 5H +0 06 7 29 MRPC 4R DSIs NDF 2H -0.02 7 30 MRPC 4R DSIs NDF 4H +0.00 BOBBIN DSI 0.70 4H +0.00 7 32 MRPC SR DSIs NDP 3H +0.06 04 7 BOBBIN 49 MRPC SR DSIs DSI NDF 0.50 3H 2H

+0.06

+0.00 BOBBIN DSI 1.23 2H -0.06

'7 52 MRPC SR DSIs NDF 2H +0.00 i

l

. BWNS TUBAN II (Version 2.0) 06/12/1995 14:02:47 Beaver Valley Unit 2 SG B SR 03/95

, BOBBIN, BOBBIN - 24 IPS, BOBBIN - 40 IPS, Loose Parts Testing,MRPC 4R DSIs,MRPC SR DSIs,MRPC Spec

/ "N O

Page 6 of 30 Steam Generator 2RCS-SG21B Location & Percent Through Wall Calls (%TW) For All Indications ROW COL TEST TYPE %TW IND VOLTS LOCATION BOBBIN DSI 0.86 2H -0.03 7 53 MRPC SR DSIs NDF 2H +0.00 BOBBIN DSI 1.09 2H -0.21 7 55 MRPC 4R DSIs NDF 4H +0.00 l MRPC SR DSIs NDF 2H +0.00 BOBBIN DSI 0.83 4H -0.15 BOBBIN DSI 1.23 2H -0.06 BOBBIN FSA 1.82 TSC +40.70 7 56 MRPC 5R DSIs NDF 2H +0.00 BOBBIN DSI 1,49 2H +0.12 7 57 MRPC 4R DSIs NDF 2H +0.00 BOBBIN DSI 0.97 2H -0.12 BOBBIN - 24 IPS DSI 0.79 2H -0.23 BOBBIN - 24 IPS DSI 0.81 2H -0.20 BOBBIN - 24 IPS DSI 0.78 2H -0.25 BOBBIN - 40 IPS DSI 0.75 2H +0.00 BOBBIN - 40 IPS DSI 0.69 2H -0.16 BOBBIN - 40 IPS DSI 0.71 2H -0.23 7 84 MRPC 4R DSIs NDF 4H +0.08 7 87 BOBBIN FSA 2.33 1C +12.37 8 8 MRPC SR DSIs NDF 2H +0.19 BOBBIN DSI 0.76 2H +0.19 8 9 MRPC 5R DSIs NDF 2H +0.21 BOBBIN DSI 1.26 2H +0.21 8 12 MRPC 4R DSIs NDF 4H +0.00 BOBBIN DSI 0.59 4H +0.12

['h

\s 8 15 MRPC SR DSIs BOBBIN NDF DSI 0.93 2H 2H

+0.20

+0.20 8 17 MRPC 5R DSIs NDF 4H +0.09 BOBBIN DSI 0.12 4H +0.09 8 18 MRPC 5R DSIs NDF 2H +0.03 BOBBIN DSI 0.78 2H +0.03 8 19 MRPC 4R DSIs NDF 3H +0.00 BOBBIN DSI 0.38 3H +0.03 8 21 MRPC SR DSIs NDF 2H +0.09 BOBBIN DSI 1.47 2H +0.09 8 22 MRPC SR DSIs NDF 2H +0.14 BOBBIN DSI 0.90 2H +0.14 8 24 MRPC 4R DSIs NDF 4H +0.00 BOBBIN DSI 0.75 4H +0.22 8 30 MRPC SR DSIs NDF 3H +0.06 BOBBIN DSI 0.78 3H +0.06 8 31 MRPC 4R DSIs NDF 2H +0.00 8 32 MRPC 5R DSIs NDF 2H -0.08 BOBBIN DSI 1.11 2H -0.08 8 33 MRPC 4R DSIs NDF 3H 40.00 BOBBIN DSI 0.59 3H +0.11 8 42 BOBBIN DSI 0.50 3H -0.03 MRPC Special In NDF 3H -0.03 8 53 MRPC SR DSIs NDF 2H +0.00 BOBBIN DSI 0.62 2H -0.03 8 55 MRPC 4R DSIs NDF 2H +0.00 BOBBIN DSI 0.78 2H -0.09 8 59 MRPC 5R DSIs NDF TSH +0.00 MRPC 5R DSIs NDF TSH +0.00 BOBBIN DTI 39.60 TSH +0.00 8 63 MRPC 4R DSIs NDF 3H +0.03 MRPC 4R DSIs NDF 4H -0.10 BOBBIN DSI 0.43 3H +0.12 8 72 MRPC 4R DSIs NDF 4H -0.05

/)

(,,)

9 2 MRPC 5R BOBBIN DSIs NDF DSI 0.63 3H 3H

+0.00

+0.00 9 5 MRPC SR DSIs NDF 3H +0.08 BOBBIN DSI 0.50 3H +0.08 9 11 MRPC 5R DSIs NDF 3H +0.03

BWNS TUBAN II (Varsion 2.0) 06/12/1995 14:02:47 Beavar Valley Unit 2 SG B >

SR 03/95 BOBBIN, BOBBIN - 24 IPS, BOBBIN - 40 IPS, Loose Parts Testing,MRPC 4R DSIs,MRPC SR DSIs,MRPC Spec Page 7 of 30 Steam Generator 2RCS-SG21B Location & Percent Tnrough Wall Calls (%TW) For All Indications ROW COL TEST TYPE %TW IND VOLTS LOCATION BOBBIN DSI 0.47 3H +0.03 9 12 MPPC 4R DSIs NDF 3H +0.00 BOBBIN DSI 1.07 3H -0.03 9 13 M2PC SR DSIs NDF 3H +0.03 BOBBIN DSI 0.70 3H +0.03 9 14 MRPC 5R DSIs NDF 2H -0.06 BOBBIN DSI 0.49 2H -0.06 9 15 MRPC SR DSIs NDF 2H +0.17 MRPC 5R DSIs NDF 3H +0.09 BOBBIN DSI 0.59 3H +0.09 BOBBIN DSI 0.28 2H +0.17 9 17 MRPC 5R DSIs NDF 2H +0.12 BOBBIN DSI 1.04 2H +0.12 9 18 MRPC SR DSIs NDF 2H +0.15 MRPC SR DSIs NDF 6H +0.12 BOBBIN DSI 0.36 6H +0.12 BOBBIN DSI 1.04 2H +0.15 9 19 MRPC SR DSIs NDF 3H +0.11 BOBBIN DSI 0.99 3H +0.11 9 23 MRPC 4R DSIs NDF 2H +0.00 BOBBIN DSI 1.13 2H +0.19 BOBBIN - 24 IPS DSI 0.47 3H -0.03 BOBBIN - 24 IPS DSI 0.94 4H +0.03 BOBBIN - 24 IPS DSI 0.92 4H +0.03 BOBBIN - 24 IPS DSI 0.89 4H -0.03 BOBBIN - 24 IPS DSI 1.28 2H +0.00

/ h BOBBIN - 24 IPS DSI 0.43 3H +0.00

(_) BOBBIN - 24 IPS BOBBIN - 24 IPS DSI DSI 0.40 0.37 SH SH

-0.03

+0.00  !

BOBBIN - 24 IPS DSI 1.24 2H -0.05 1 BOBBIN - 24 IPS DSI 0.39 3H -0.05 I BOBBIN - 24 IPS DSI 0.39 SH -0.03  !

BOBBIN - 24 IPS DSI 1.31 2H +0.00 BOBBIN - 40 IPS DSI 0.47 3H -0.03 BOBBIN - 40 IPS DSI 0.47 3H -0.06 BOBBIN - 40 IPS DSI 1.38 2H +0.00 BOBBIN - 40 IPS DSI 1.38 2H -0.03 BOBBIN - 40 IPS DSI 1.45 2H -0.03 BOBBIN - 40 IPS DSI 1.02 4H -0.03 BOBBIN - 40 IPS DSI 0.35 5H -0.07 BOBBIN - 40 IPS DSI 0.46 3H -0.07 BOBBIN - 40 IPS DSI 0.92 4H +0.00 BOBBIN - 40 IPS DSI 0.99 4H -0.03 l BOBBIN - 40 IPS DSI 0.34 SH -0.10 l BOBBIN - 40 IPS DSI 0.34 SH -0.10 9 24 MRPC 4R DSIs NDF 3H +0.00 MRPC SR DSIs NDF 2H +0.18 BOBBIN DSI 0.66 3H +0.13 BOBBIN DSI 0.79 2H +0.18 9 25 MRPC 4R DSIs NDF 2H +0.00 BOBBIN DSI 0.66 2H +0.13 9 26 MRPC 4R DSIs NDF 3H +0.00 BOBBIN DSI 1.20 3H +0.05 9 34 MRPC SR DSIs NDF 7H +46.83 BOBBIN FSI 0.38 7H +46.83 9 35 MRPC SR DSIs NDF 2H +0.00 BOBBIN DSI 0.60 2H +0.00 9 37 BOBBIN FSA 1.11 TSC +15.13 9 40 MRPC SR DSIs NDF 3H +0.00 MRPC SR DSIs NDF 3H +0.00 9 46 MRPC 5R DSIs NDF 3H +0.00

' / MRPC SR DSIs NDF 3H +0.00 BOBBIN DSI 0.87 3H -0.06 9 50 MRPC SR DSIs NDF 2H +0.00 BOBBIN DSI 1.27 2H -0.03

A BWNS TUBAN II (Version 2.0) 06/12/1995 14:02:47 Baavor Valley Unit 2 SG B SR 03/95 BOBBIN, BOBBIN - 24.IPS, BOBBIN - 40 IPS, Loose Parts Testing,MRPC 4R DSIs,MRPC SR DSIs,MRPC Spec h

a Page 8 of 30 Steam Generator 2RCS-SG21B Location & Percent Through Wall Calls (%TW) For All Indications ROW COL TEST TYPE %TW IND VOLTS LOCATION 9 52 MRPC 4R DSIs NDF 2H +0.00 MRPC 4R DSIs NDF -5H +0.00 '

BOBBIN DSI 0.42 2H +0.00 9 55 MRPC SR DSIs NDF 2H +0.00 BOBBIN DSI 0.92 2H -0.06 9 57 MRPC SR DSIs NDF 2H +0.00 BOBBIN DSI 1.63 2H -0.19 9 59 MRPC 4R DSIs NDF 3H +0.00 BOBBIN DSI 1.28 3H -0.09 9 64 MRPC 4R DSIs NDF 2H +0.00 BOBBIN DSI 0.76 2H +0.08 9 74 MRPC SR DSIs NDF 3H +0.25 BOBBIN DSI 1.23 3H +0.25 9 76 MRPC 4R DSIs NDF 3H +0.06 BOBBIN DSI 1.60 3H -0.17 9 89 MRPC 4R DSIs NDF 2H +0.00 MRPC SR DSIs NDF 2H +0.00 BOBBIN DSI 0.57 2H +0.00 9 92 MRPC 5R DSIs NDF 2H +0.06 BOBBIN DSI 0.70 2H +0.00 10 6 MRPC 5R DSIs NDF 2H +0.08 BOBBIN DSI 1.62 2H +0.08 10 9 MRPC SR DSIs NDF 3H +0.06 BOBBIN DSI 0.68 3H +0.06 10 10 MRPC 5R DSIs NDF 3H -0.09 MRPC SR DSIs NDF 4H +0.18 O 10 BOBBIN BOBBIN 14 MRPC SR DSIs DSI DSI NDF 0.58 0.80 3H 4H 2H

-0.09

+0.18

+0.06 BOBBIN DSI 0.53 2H +0.06 10 17 MRPC SR DSIs NDF 2H +0.08 MRPC 5R DSIs NDF 8H +0.12 BOBBIN DSI 0.92 2H +0.08 BOBBIN DSI 0.31 8H +0.12

- 10 18 MRPC SR DSIs NDF 2H +0.00 BOBBIN DSI 1.25 2H +0.00 10 19 MRPC SR DSIs NDF 2H +0.11 BOBBIN DSI 0.78 2H +0.11 10 22 MRPC TSH VOL 0.30 TSH -0.21 10 26 MRPC SR DSIs NDF 2H +0.05 BOBBIN DSI 0.58 2H +0.05 10 29 MRPC SR DSIs NDF 2H +0.17 BOBBIN DSI 0.40 2H +0.17 10 30 MRPC SR DSIs NDF 3H +0.12 MRPC SR DSIs NDF 6H +0.06 BOBBIN DSI 0.29 3H +0.06 BOBBIN DSI 0.28 6H +0.06 10 31 MRPC 5R DSIs NDF 2H +0.17 MRPC 5R DSIs NDF 3H +0.09 BOBBIN DSI 0.75 2H +0.17 BOBBIN DSI 0.79 3H +0.09 10 32 MRPC 4R DSIs NDF 3H +0.00 MRPC SR DSIs NDF 2H -0.03 BOBBIN DSI 1.57 3H +0.03 BOBBIN DSI 1.60 2H -0.03 BOBBIN - 24 IPS DSI 1.69 2H -0.14 BOBBIN - 24 IPS DSI 1.63 3H -0.08 BOBBIN - 24 IPS DSI 1.70 2H -0.11 BOBBIN - 24 IPS DSI 1.71 2H -0.14 i BOBBIN - 24 IPS DSI 1.65 3H -0.08 BOBBIN - 24 IPS DSI 1.68 3H -0.05 O- BOBBIN BOBBIN 40 40 IPS IPS DSI DSI 1.75 1.76 3H 2H

-0.13

-0.16 BOBBIN - 40 IPS DSI 1.71 2H -0.16 BOBBIN - 40 IPS DSI 1,71 3H -0.07

BWNS TUBAN II (Varsion 2.0) 06/12/1995'14:02:47 Beaver Valley Unit 2 SG B SR 03/95 BOBBIN, BOBBIN - 24 IPS, BOBBIN - 40 IPS, Loose Parts Testing,MRPC 4R DSIs,MRPC 5R DSIs,MRPC Spec

\

Page 9 of 30 Steam Generator 2RCS-SG21B

-Location & Percent Through Wall Calls (%TW) For All Indications ROW COL TEST TYPE %TW IND VOLTS LOCATION BOBBIN - 40 IPS DSI 1.80 e 2H -0.16 BOBBIN - 40 IPS DSI 1.74 3H -0.10 10 44 MRPC SR DSIs NDF 2H +0.00 MRPC'5R DSIs NDF 3H +0.02 BOBBIN DSI 2.41 2H -0.19 BOBBIN DSI 1.40 3H +0.02 1c 48 MRPC 4R DSIs - NDF 3H. +0.00 10 50 MRPC SR DSIs NDF 4H .+0.00 MRPC 5R DSIs NDF 5H +0.00 BOBBIN DSI 0.32 4H. -0.11 BOBBIN DSI 0.42 5H +0.00 MRPC 5R DSIs VOL 0.20 4H +22.15 to +*

10 54 MRPC 4R DSIs NDF 2H +0.00 BOBBIN DSI 0.92 2H -0.12 10 58 MRPC 4R DSIs NDF 5H +0.00 MRPC SR DSIs NDF 3H +0.00 BOBBIN DSI 0.91 3H -0.12 BOBBIN DSI 0.42 5H -0.15 10 .59 MRPC 5R DSIs NDF 2H +0.00 MRPC SR DSIs NDF 3H +0.00-BOBBIN DSI 0.56 3H -0.09 10 61 MRPC 5R DSIs NDF 2H +0.00 BOBBIN DSI 0.41 2H -0.15 10 62 BOBBIN 22 ODI 0.23 4C +24.84 MRPC Special In NDF 4C +24.82 10 63 MRPC 4R DSIs NDF 2H -0.05 O 10 BOBBIN 64 MRPC 4R BOBBIN DSIs DSI NDF DSI 0.82 0.96 2H 2H 2H

+0.09

+0.00

+0.11 10 71 MRPC SR DSIs NDF 2H +0.13 BOBBIN DSI 0.85 2H +0.13 10 72 MRPC 4R DSIs NDF 4H +0.03-10 78 MRPC SR DSIs NDF 4H +0.03 BOBBIN DSI 0.58 4H +0.03 BOBBIN FSD 0.26 1C +20.64 10 89 MRPC SR DSIs NDF 2H +0.09 BOBBIN DSI 0.78 2H +0.09

10. 90 BOBBIN DSI 0.57 2H +0.09 MRPC Special In NDF 2H +0.06 10 92 BOBBIN FSA 3.29 2H +37.90 11 3 MRPC SR DSIs NDF 3H +0.00 MRPC'5R DSIs NDF 4H -0.06 BOBBIN DSI 0.91 4H -0.06 BOBBIN DSI 0.49 3H +0.00 11 4 MRPC 5R DSIs NDF 3H +0.05 BOBBIN DSI 0.55 3H +0.05 11 6 MRPC SR DSIs NDF 3H +0.16 BOBBIN DSI 0.28 3H +0.16 11 15 MRPC SR DSIs NDF 2H +0.09 BOBBIN DSI 0.82 2H +0.09 11 18 MRPC SR DSIs NDF 2H -0.03 BOBBIN DSI' 1.70 2H -0.16 11 19 MRPC SR DSIs NDF 3H +0.11 BOBBIN DSI 1.01 3H +0.11 11 20 MRPC SR DSIs NDF 2H +0.16 BOBBIN DSI 1.03 2H +0.16 11 21 MRPC SR DSIs NDF 3H +0.03 BOBBIN DSI 1.44 3H -0.03 11 22 MRPC 4R DSIs NDF 3H +0.00 MRPC 4R DSIs NDF 4H +0.00 BOBBIN DSI 1.28 4H +0.17 O' 11 BOBBIN 30 MRPC SR DSIs DSI NDF 1.18 3H 3H

+0.14

+0.12 MRPC SR DSIs NDF 4H +0.09 BOBBIN DSI 0.36 4H +0.09

BWNS TUBAN II (Version 2.0) 06/12/1995 14:02:47 Beaver Valley Unit 2 SG B 5R 03/95 BOBBIN, BOBBIN - 24 IPS, BOBBIN - 40 IPS, Loose Parts Testing,MRPC 4R DSIs,MRPC SR DSIs,MRPC Spec

/'N a i V

Page 10 of 30 Steam Generator 2RCS-SG21B Location & Percent Through Wall Calls (%TW) For All Indications ROW COL TEST TYPE %TW IND VOLTS LOCATION BOBBIN DSI 0.33 3H +0.12 11 40 MRPC SR DSIs NDF 2H -0.12 BOBBIN DSI 0.78 2H -0.12 BOBBIN FSI 0.19 3C +41.30 MRPC Special In NDF 4C -9.20 11 41 MRPC 5R DSIs NDF 3H +0.33 BOBBIN DSI 0.79 3H +0.00 11 44 MRPC SR DSIs NDF 3H +0.03 BOBBIN DSI 0.32 3H +0.03 11 45 MRPC SR DSIs NDF 2H +0.07 BOBBIN DSI 0.58 2H +0.07 11 47 MRPC SR DSIs NDF 2H -0.05 MRPC 5R DSIs NDF 3H -0.05 BOBBIN DSI 1.19 3H -0.05 BOBBIN DSI 0.29 BC +0.10 BOBBIN DSI 0.93 2H -0.05 MRPC Special In NDF 8C +0.10 11 48 MRPC 4R DSIs NDF 3H +0.00 11 56 MRPC 4R DSIs NDF 2H +0.00 BOBBIN DSI 0.88 2H -0.09 11 57 MRPC SR DSIs NDF 2H +0.00 MRPC SR DSIs NDF 3H +0.00 BOBBIN DSI 0.48 2H -0.03 BOBBIN DSI 0.34 3H -0.09 11 58 MRPC 4R DSIs NDF 2H +0.00 MRPC 4R DSIs NDF 3H +0.00 O, MRPC 4R MRPC 5R DSIs DSIs NDF NDF 4H 2H

+0.00

+0.00 MRPC 5R DSIs NDF 3H +0.00 MRPC SR DSIs NDF 4H +0.00 BOBBIN DSI 1.53 3H -0.03 BOBBIN DSI 1.48 4H +0.00 BOBBIN DSI 1.67 2H -0.09 11 59 MRPC 4R DSIs NDF 3H +0.00 MRPC 4R DSIs NDF 4H +0.00 11 60 BOBBIN DSI 1.32 3H +0.03 11 61 MRPC SR DSIs NDF 2H +0.00 MRPC SR DSIs NDF 2H +20.53 BOBBIN DSI 1.52 2H -0.06 BOBBIN FSA 1.94 2H +48.13 MRPC SR DSIs VOL 0.53 2H +47.93 11 70 MRPC SR DSIs NDF 2H +0.20 BOBBIN DSI 1.24 2H +0.20 11 71 MRPC SR DSIs NDF 4H +0.11 BOBBIN DSI 1.59 4H +0.11 11 74 BOBBIN FSA 2.45 6H +24.19 11 75 MRPC 4R DSIs NDF 5H -0.08 MRPC SR DSIs NDF 2H +0.06 MRPC SR DSIs NDF 3H +0.00 BOBBIN DSI 1.53 2H +0.06 BOBBIN DSI 1,42 3H +0.00 11 77 MRPC SR DSIs NDF 2H -0.03 BOBBIN DSI 1.35 2H -0.03 11 78 MRPC SR DSIs NDF 3H -0.03 BOBBIN DSI 1.29 3H -0.03 11 81 MRPC 5R DSIs NDF 2H -0.03 BOBBIN DSI 1.22 2H -0.03 11 82 MRPC 5R DSIs NDF 2H -0.03 BOBBIN DSI 1.31 2H -0.03 11 85 BOBBIN FSA 0.12 2C +33.65

\ 12 3 MRPC SR DSIs NDF 4H +0.00 BOBBIN DSI 0.45 4H +0.00 12 10 BOBBIN FSA 1.51 7H +48.57 12 14 MRPC 5R DSIs NDF 2H +0.00 BOBBIN DSI 0.25 2H +0.06

I BWNS TUBAN II (Version 2.0) 06/12/1995 14:02:47 Beaver Valley Unit 2 SG B SR 03/95 BOBBIN, BOBBIN - 24 IPS, BOBBIN - 40 IPS, Loose Parts Testing,MRPC 4R DSIs,MRPC SR DSIs,MRPC Spec

/~ h (U

Page 11 of 30 Steam Generator 2RCS-SG21B Location & Percent Through Wall Calls (%TW) For All Indications ROW COL TEST TYPE %TW IND VOLTS LOCATION 12 15 MRPC 5R DSIs NDF 2H +0.18 BOBBIN DSI 0.87 2H +0.18 12 17 MRPC SR DSIs NDF 2H +0.06 BOBBIN DSI 0.80 2H +0.06 12 24 MRPC SR DSIs NDF 2H +0.19 MRPC SR DSIs NDF 4H +0.08 BOBBIN DSI 0.60 4H +0.08 BOBBIN DSI 1.04 2H +0.19 12 25 MRPC SR DSIs NDF 3H +0.05 BCBBIN DSI 0.78 3H +0.05 12 26 MRPC SR DSIs NDF 2H +0.15 BOBBIN DSI 0.80 2H +0.15 12 44 MRPC SR DSIs NDF 2H +0.02 BOBBIN DSI 1,44 2H -0.20 BOBBIN DSI 1.26 2H +0.02 12 51 MRPC 5R DSIs NDF 2H +0.00 BOBBIN DSI 0.74 2H -0.06 12 61 MRPC 4R DSIs NDF 3H +0.00 BOBBIN DSI 1.29 3H -0.09 12 63 MRPC SR DSIs NDF 2H +0.03 BOBBIN DSI 0.67 2H +0.03 12 65 MRPC SR DSIs NDF 2H +0.09 BOBBIN DSI 0.46 2H +0.09 12 84 MRPC 5R DSIs NDF 4H +0.12 BOBBIN DSI 0.31 4H +0.12 13 15 MRPC SR DSIs NDF 2H +0.06

[~D BOBBIN DSI 0.98 2H +0.06

(,,/ 13 16 MRPC SR DSIs NDF 2H +0.06 MRPC SR DSIs NDF 3H +0.12 BOBBIN DSI 0.28 3H +0.12 BOBBIN DSI 0.78 2H +0.06 BOBBIN FSA 1.10 2H +39.62 13 21 BOBBIN FSA 1.44 2H +12.18 13 23 BOBBIN FSA 4.38 7C +35.74 13 27 MRPC SR DSIs NDF 2H +0.16 BOBBIN DSI 1.08 2H +0.16 13 30 MRPC 5R DSIs NDF 3H +0.15 BOBBIN DSI 0.56 3H +0.15 13 31 MRPC SR DSIs NDF 3H +0.06 BOBBIN DSI 0.58 3H +0.06 13 35 MRPC 4R DSIs NDF 3H +0.00 BOBBIN DSI 0.79 3H -0.03 13 37 MRPC 4R DSIs NDF 3H +0.00 BOBBIN DSI 0.84 3H +0.00 BOBBIN - 24 IPS DSI 0.86 3H -0.03 BOBBIN - 24 IPS DSI 0.86 3H -0.06 BOBBIN - 24 IPS DSI 0.84 3H -0.06 BOBBIN - 40 IPS DSI 0.88 3H -0.03 BOBBIN - 40 IPS DSI 0.88 3H -0.03 BOBBIN - 40 IPS DSI 0.86 3H -0.03 13 40 MRPC 5R DSIs NDF 3H +0.00 BOBBIN DSI 0.63 3H +0.00 13 43 MRPC SR DSIs NDF 2H -0.10 BOBBIN DSI 0.30 2H -0.10 13 46 MRPC SR DSIs NDF 3H -0.05 BOBBIN DSI 0.84 3H -0.05 13 51 MRPC SR DSIs NDF 3H +0.00 BOBBIN DSI 0.65 3H +0.03 13 54 MRPC SR DSIs NDF 2H +0.00 BOBBIN DSI 0.79 2H -0.04

/h 13 56 MRPC 5R DSIs BOBBIN NDF DSI 0.94 3H 3H

+0.00

-0.09

( ,/

13 62 MRPC 5R DSIs NDF 2H +0.00 BOBBIN DSI 0.69 2H -0.03 13 66 MRPC 4R DSIs NDF 2H +0.08

BWNS TUBAN II (Version 2.0) 06/12/1995 14:02:47 Bsavar Valley Unit 2 SG B SR 03/95 BOBBIN, BOBBIN - 24 IPS, BOBBIN - 40 IPS, Loose Parts Testing,MRPC 4R DSIs,MRPC 5R DSIs,MRPC Spec Page 12 of 30 Steam Generator 2RCS-SG21B Location & Percent Through Wall Calls (%TW) For All Indications ROW COL TEST TYPE %TW IND VOLTS LOCATION 13 68 MRPC SR DSIs NDF 2H +0.03 BOBBIN DSI 1.04 2H +0.03 13 73 MRPC SR DSIs NDF 2H +0.09 BOBBIN DSI 1.57 2H +0.09 MRPC SR DSIs VOL 0.59 2H -1.58 MRPC 5R DSIs VOL 0.39 2H +2.40 13 74 MRPC SR DSIs NDF 2H -0.09 BOBBIN DSI 1.47 2H -0.09 13 76 MRPC SR DSIs NDF 2H +0.09 BOBBIN DSI 1.33 2H +0.09 13 78 MRPC SR DSIs NDF 2H -0.12 BOBBIN DSI 0.74 2H -0.12 13 79 BOBBIN FSA 3.39 6H +6.02 13 80 MRPC SR DSIs NDF 2H -0.03 BOBBIN DSI 1.46 2H -0.03 13 81 MRPC SR DSIs NDF 3H +0.09 BOBBIN DSI 0.67 3H +0.09 13 85 MRPC 4R DSIs NDF 2H +0.00 MRPC 5R DSIs NDF 2H +0.00 BOBBIN DSI 0.76 2H +0.00 13 86 MRPC SR DSIs NDF 2H +0.18 BOBBIN DSI 0.88 2H +0.18 13 87 MRPC 4R DSIs NDF 2H +0.00 BOBBIN DSI 0.93 2H -0.03 13 90 MRPC SR DSIs NDF 2H +0.06 BOBBIN DSI 0.78 2H +0.06

/ 14 7 MRPC 4R DSIs NDF 3H +0.00

(_, BOBBIN DSI 0.80 3H +0.14 14 8 MRPC SR DSIs NDF 3H +0.00 BOBBIN DSI 0.93 3H +0.00 14 12 MRPC 5R DSIs NDF 3H +0.00 BOBBIN DSI 0.Si 3H +0.00 14 20 MRPC SR DSIs NDF 2H +0.22 BOBBIN DSI 0.58 2H +0.22 14 30 MRPC SR DSIs NDF 2H +0.19 MRPC SR DSIs NDF 2H +14.30 MRPC SR DSIs NDF 3H +0.00 BOBBIN DSI 0.73 3H +0.00 BOBBIN DSI 0.70 2H +0.19 BOBBIN FSA 2.33 2H +14.30 MRPC SR DSIs VOL 0.31 2H +16.84 14 32 MRPC 4R DSIs NDF 2H +0.00 BOBBIN DSI 0.99 2H +0.11 BOBBIN FSA 5.04 2H +5.76 14 36 MRPC 5R DSIs NDF 3H +0.20 BOBBIN DSI 0.45 3H +0.20 14 39 MRPC SR DSIs NDF 2H +0.06 BOBBIN DSI 0.63 2H +0.06 14 47 MRPC 5R DSIs NDF 2H +0.00 BOBBIN DSI 0.44 2H +0.00 14 54 MRPC SR DSIs NDF 2H +0.00 BOBBIN DSI 0.61 2H -0.06 14 55 MRPC 4R DSIs NDF 4H +0.00 BOBBIN DSI 0.50 4H +0.00 14 60 MRPC SR DSIs NDF 2H +0.00 BOBBIN DSI 0.38 2H -0.12 14 61 MRPC SR DSIs NDF 2H +0.00 BOBBIN DSI 0.55 2H -0.15 14 63 MRPC 5R DSIs NDF 3H +0.14 BOBBIN DSI 1.14 3H +0.14 14 75 MRPC 4R DSIs NDF 4H +0.00 f' BOBBIN - 24 IPS DSI 0 27 4H -0.09 BOBBIN - 24 IPS DSI 0.26 4H -0.09 BOBBIN - 24 IPS DSI 0.26 4H -0.11 BOBBIN - 40 IPS DSI 0.27 4H -0.13

. . . ~ . - ~ - - - - . -. . . _ . . - - , _ - . . .. - - - - . - - . .~ . . _ .

BWNS TUBAN II (Version 2.0) 06/12/1995 14:02:47 Bsaver Valley Unit 2 SG B SR 03/95 l BOBBIN, BOBBIN - 24'IPS, BOBBIN.- 40 IPS, Loose Parts Testing,MRPC 4R_DSIs,MRPC SR-DSIs,MRPC' Spec O

L Page 13 of 30 Steam Generator 2RCS-SG21B Location & Percent Through Wall Calls (%TW) For All Indications l

ROW COL TEST TYPE %TW IND VOLTS LOCATION BOBBIN - 40 IPS DSI 0.34 4H -0.10 BOBBIN - 40 IPS DSI 0.31 4H -0.14 14 77 MRPC SR DSIs NDF 2H -0.11 BOBBIN DSI 1.43 2H -0.11  :

'14 80 MRPC SR DSIs NDF 2H +0.06 BOBBIN DSI 0.41 2H +0.06 14 81 MRPC SR DSIs NDF 2H -0.06 BOBBIN DSI 1.50 2H -0.06 14 83 BOBBIN - 24 IPS FSA 2.92 7H +19.56 BOBBIN - 24 IPS FSA 2.85 7H +19.71 BOBBIN - 24 IPS. FSA 2.86 7H +19.82 BOBBIN - 40 IPS FSA 3.01 7H +19.48

[ BOBBIN - 40 IPS FSA '2.97 7H +19.44 i BOBBIN - 40 IPS FSA 3.11 7H +19.53 14 86 MRPC 4R DSIs NDF 2H +0.00 MRPC SR DSIs NDF 2H +0.03 BOBBIN DSI 0.65 2H +0.03 14 87 MRPC 4R DSIs NDF 4H +0.00 MRPC SR DSIs NDF 2H +0.15 l BOBBIN DSI 1.08 4H +0.15 l BOBBIN DSI 0.77 2H +0.15 14 89 MRPC SR DSIs NDF 2H +0.12 BOBBIN- DSI 0.71 2H +0.12 14 90 MRPC SR DSIs NDF 2H +0.17 BOBBIN DSI 0.82 2H -0.03

! BOBBIN FSA 2.72 2C +39.44 )

14 91 BOBBIN FSA 1.43 3H +5.11 1 lL (O ,/ 15 4 MRPC 5R BOBBIN DSIs NDF DSI 0.25 5H 5H

+0.22

+0.22 I

l 1 15 5 MRPC SR DSIs NDF 3H +0.08

! BOBBIN DSI 0.78 3H +0.08  ;

15 6 MRPC SR DSIs NDF 2H +0.05 1 l BOBBIN DSI 0.65 2H +0.05 15 11 MRPC 4R DSIs NDF 3H +0.00 15 12 MRPC SR DSIs NDF 3H +0.12 BOBBIN DSI 0.83 3H +0.12 15 14 MRPC 5R DSIs NDF 2H +0.06 BOBBIN DSI 0.78 2H +0.06 15 16.MRPC SR DSIs NDF 2H +0.06 BOBBIN DSI 0.83 2H +0.06 15 18 MRPC 5R DSIs NDF 3H +0.12 BOBBIN DSI 0.67 3H +0.12 15 20 MRPC 4R DSIs NDF 2H +0.00 15 25 MRPC SR DSIs NDF 2H +0.22 l BOBBIN DSI 0.78 2H +0.22
l. 15 26 MRPC 5R DSIs NDF 3H +0.03 MRPC SR DSIs NDF 3H +0.03 BOBBIN DSI 0.70 3H +0.03 15 27 MRPC SR DSIs NDF 2H +0.05 BOBBIN DSI 0.77 2H +0.05 15 30 MRPC SR DSIs NDF 2H 40.15 l BOBB1N DSI 0.46 2H +0.15 15 40 MRPC SR DSIs NDF 3H +0.06 BOBBIN DSI 0.53 3H +0.06 )

15 52 MRPC SR DSIs NDF 2H +0.00 BOBBIN DSI 1.08 2H -0.15 15 53 BOBBIN FSD 0.93 7C +32.39 i MRPC Special In NDF 8C -18.11 l

15 56 MRPC 5R DSIs NDF 3H +0.00 '

l BOBBIN 3H +0.03 DSI 1.13 15 NDF 2H +0.00 O

57 MRPC 5R DSIs BOBBIN BOBBIN DSI FSA 1.21 1.24 2H 7H

+0.00

+16.10

+0.00 15 60 MRPC SR DSIs NDF 3H i BOBBIN DSI 1.77 3H +0.00 l

BWNS TUBAN II (Version 2.0) 06/12/1995 14:02:47 Bsaver Valley Unit 2 SG B SR 03/95 BOB. BIN, BOBBIN - 24 IPS, BOBBIN - 40 IPS, Loose Parts Testing,MRPC 4R DSIs,MRPC SR DSIs,MRPC Spec

\ s/ 1 Page 14 of 30 Steam Generator 2RCS-SG21B 4 Location & Percent Through Wall Calls (%TW) For All Indications ROW COL TEST TYPE %TW IND VOLTS LOCATION 15 64 MRPC 4R DSIs NDF 2H +0.06 BOBBIN DSI 0.77 2H +0.03 15 70 BOBBIN FSD 0.97 6C +38.17 15 71 MRPC 4R DSIs NDF 2H +0.06 '

l MRPC 4R DSIs NDF 4H +0.03 15 72 BOBBIN FSA 4.39 6C +27.41 15 75 MRPC SR DSIs NDF 4H -0.03 BOBBIN DSI 1.17 4H -0.03 15 77 BOBBIN FSA 2.19 1C +18.69 15 78 MRPC SR DSIs NDF 2H -0.06 BOBBIN DSI 1.11 2H -0.06 15 81 MRPC SR DSIs NDF 2H +0.09 BOBBIN DSI 0.46 2H +0.09 15 82 MRPC SR DSIs NDF 2H -0.09 BOBBIN DSI 1.70 2H -0.09 15 85 MRPC 4R DSIs NDF 2H +0.00 MRPC SR DSIs NDF 2H +0.00 BOBBIN DSI 0.69 2H +0.00 15 87 MRPC 4R DSIs NDF 2H +0.00 BOBBIN DSI 1.06 2H -0.03 15 88 MRPC SR DSIs NDF 2H +0.12 ,

BOBBIN DSI 0.78 2H +0.12 l 16 15 MRPC SR DSIs NDF 2H -0.03 MRPC SR DSIs NDF 3H +0.03 BOBBIN DSI 0.57 2H -0.03 BOBBIN DSI 0.87 3H +0.03 l

/'.'T 16 28 MRPC 5R DSIs NDF 5H +0.03 l

(%,/ BOBBIN DSI 0.39 5H +0.03 l 16 29 MRPC SR DSIs NDF 2H +0.00 MRPC SR DSIs NDF 3H +0.06 MRPC SR DSIs NDF 5H +0.14 BOBBIN DSI 0.37 5H +0.14 '

i BOBBIN DSI 0.59 3H +0.06 16 30 MRPC SR DSIs NDF 2H +0.08 BOBBIN DSI 0.48 2H +0.08 16 31 MRPC 5R DSIs NDF 2H +0.22 MRPC SR DSIs NDF 3H -0.08 BOBBIN DSI 0.61 3H -0.08 BOBBIN DSI 0.80 2H +0.22 16 33 MRPC 5R DSIs NDF 2H +0.11 BOBBIN DSI 0.65 2H +0.11 16 37 MRPC SR DSIs NDF 2H +0.21 BOBBIN DSI 0.45 2H +0.21 16 42 MRPC SR DSIs NDF 3H +0.15 BOBBIN DSI 0.97 3H +0.15 16 54 MRPC 4R DSIs NDF 2H -0.06 BOBBIN DSI 0.83 2H -0.27 16 55 MRPC SR DSIs NDF 3H +0.00 BOBBIN DSI 0.77 3H +0.06 16 58 MRPC 4R DSIs NDF 3H +0.18 16 67 MRPC SR DSIs NDF 2H +0.03 BOBBIN DSI 0.68 2H +0.03 16 69 MRPC SR DSIs NOF 3H +0.06 MRPC SR DSIs NDF 4H -0.06 l BOBBIN DSI 0.91 4H -0.06 BOBBIN DSI 1.74 3H +0.06 16 72 MRPC SR DSIs NDF 5H +0.14 BOBBIN DSI 1.14 5H +0.14 16 75 BOBBIN FSA 4.90 AV4 +11.52 i MRPC Special In VOL 0.76 AV4 +11.70 1

/N 16 16 77 BOBBIN 86 MRPC 5R DSIs FSA NDF 4.83 6C 2H

+28.20

+0.15

( ,/

BOBBIN DSI 0.66 2H +0.15 16 87 MRPC SR DSIs NDF 2H +0.15 BOBBIN DSI 0.65 2H +0.15

BWNS TUBAN II (Version 2.0) 06/12/1995 14:02:47 Beaver Valley Unit 2 SG B -

SR 03/95 BOBBIN, BOBBIN - 24 IPS, BOBBIN - 40 IPS, Loose Parts Testing,MRPC 4R DSIs,MRPC SR DSIs,MRPC Spec-O Page 15 of 30 Steam Generator 2RCS-SG21B Location & Percent Through Wall Calls (%TW) . For All Indications ROW COL TEST TYPE %TW IND VOLTS LOCATION 17 5 MRPC SR DSIs NDF 3H +0.05 BOBBIN DSI 0.64 3H +0.05 BOBBIN FSA 0.79 4H +28.92 17 6 MRPC SR DSIs NDF 3H +0.05 MRPC SR DSIs NDF 4H +0.11 BOBBIN DSI 0.26 3H +0.05 BOBBIN DSI 0.65 4H +0.11

' 17 - 16 MRPC 5R DSIs NDF 2H +0.06 MRPC SR DSIs NDF 4H +0.12 BOBBIN DSI 0.54 2H +0.06 BOBBIN DSI 0.39 4H +0.12 17 30-MRPC SR DSIs NDF 2H +0.15 MRPC SR DSIs NDF 3H +0.03 BOBBIN DSI 0.64 3H +0.03 BOBBIN DSI 0.68 2H +0.15 ,

17 31 MRPC SR DSIs NDF 2H +0.09 i MRPC 5R DSIs NDF 3H +0.03 BOBBIN DSI 0.72 3H +0.00 BOBBIN DSI 0.76 2H +0.09 17 32 MRPC SR DSIs NDF 2H +0.22 BOBBIN DSI 0.77 2H +0.22 17 33 MRPC SR DSIs NDF 2H +0.19 MRPC SR DSIs NDF 3H +0.00 BOBBIN DSI 0.44 3H +0.00 BOBBIN DSI 0.56 2H +0.19 17 35 MRPC SR DSIs NDF 3H +0.09 O 17 41 BOBBIN MRPC SR BOBBIN DSIs DSI NDF DSI 0.42 0.12 3H 4H 4H

+0.09

+0.11

+0.11 17 42 BOBBIN FSA 2.21 4C +26.42 17 45 MRPC SR DSIs NDF 2H +0.00 BOBBIN DSI 1,29 2H -0.28 17 48 MRPC SR DSIs NDF 3H +0.00 BOBBIN -DSI 1.08 3H +0.06 17 54 MRPC SR DSIs NDF 2H +0.00 BOBBIN DSI 0.42 2H +0.00 17 55 MRPC 4R DSIs NDF 2H +0.00 17 56 MRPC 4R DSIs NDF 3H +0.03 17 57 MRPC 4R DSIs NDF 2H +0.03 l MRPC 4R DSIs NDF 3H +0.06 1 BOBBIN FSA 1.32 6C +20.34 MRPC Special In VOL 0.28 6C +19.71 17 59 MRPC SR DSIs NDF 2H +0.00 l BOBBIN DSI 0.95 2H -0.16 17 61 MRPC SR DSIs NDF 2H +0.00 BOBBIN DSI 0.77 2H -0.19 17 63 MRPC SR DSIs NDF 2H +0.22 BOBBIN DSI 0.69 2H +0.22 17 64 MRPC 4R DSIs NDF 2H +0.00 BOBBIN DSI 0.90 2H +0.05 17 70 MRPC SR DSIs NDF 3H +0.19 BOBBIN DSI 1.41 3H +0.19 17 71 MRPC 5R DSIs NDF 3H +0.16 BOBBIN DSI 0.97 3H +0.16 17 73 BOBBIN FSA 2.21 4H +5.42 17 79 MRPC 5R DSIs NDF 2H -0.15 BOBBIN DSI 1.15 2H -0.15 17 83 MRPC SR DSIs NDF 2H -0.03 BOBBIN DSI 1.90 2H -0.03 17 84 MRPC SR DSIs NDF 2H -0.06 MRPC SR DSIs NDF 3H +0.00

[~')N

(,, BOBBIN DSI 1.62 3H +0.00 BOBBIN DSI 1.31 2H -0.06 17 88 MRPC SR DSIs NDF 2H +0.09 MRPC SR DSIs NDF 3H +0.03

- ~ _ . . . - . . . . . _ ~ , .- - . . . - . - - - .

I BWNS TUBAN II (Version 2.0) 06/12/1995 14:02:47 .'

Beaver Valley Unit'2 SG B SR 03/95 .

3 BO BIN, BOBBIN - 24 IPS, BOBBIN '40 IPS, Loose Parts Testing,MRPC 4R DSIs,MRPC SR DSIs,MRPC Spec j t

Page 16 of 30'  !

Steam Generator 2RCS-SG21B f

-Location & Percent Through Wall Calls (%TW) For All Indications l ROW' COL TEST. TYPE +

%TW~ IND VOLTS LOCATION 6 BOBBIN- DSI 1.01- 3H +0.03 t

-BOBBIN DSI 0.92 2H +0.09  !

17 90 BOBBIN DSI 1.35 2H. +0.09 '

MRPC Special In . NDF 2H- +0.14 '

18 11 MRPC SR DSIs NDF 4H- +0.09 BOBBIN DSI 0.79 4H +0.09 l 18 ..12 MRPC SR DSIs NDF . 3H +0.06 i BOBBIN DSI 0.70 3H +0.06

  • 18 13 MRPC SR DSIs NDF 3H +0.06 t t

BOBBIN DSI 1.19 3H +0.06 18 15 MRPC SR DSIs NDF 3H +0.12 MRPC SR DSIs NDF 4H +0.12 ,

BOBBIN DSI 0.36 4H +0.12 t BOBBIN DSI 0.68 3H +0.12 BOBBIN FSA 0.43 6C +39.01  !

18 18 MRPC 4R DSIs NDF 2H +0.00 i MRPC SR DSIs NDF 3H +0.00 l BOBBIN DSI 1.32 2H +0.06 BOBBIN . DSI O.41 -3H +0.00 l BOBBIN - 24 IPS DSI 1.38 '2H -0.03 i BOBBIN - 24'IPS DSI 1.40 2H +0.00 l BOBBIN - 24 IPS DSI 1.36 2H +0.03 BOBBIN - 40 IPS DSI 1.39 2H -0.07 l BOBBIN - 40 IPS DSI 1.34 2H +0.00 BOBBIN -!40 IPS DSI 1.35' 2H +0.00 l

-1 8 22 MRPC 5R DSIs NDF 2H +0.19 0 18 BOBBIN BOBBIN 24 MRPC SR DSIs DSI FSA NDF 1.41 3.59 2H 7C 4H

+0.19

+48.62

+0.16 .

1 i

BOBBIN DSI 1.10 4H +0.16 [

18 28 MRPC SR-DSIs -NDF 2H +0.17 BOBBIN DSI 1.11 2H +0.17 18 29 MRPC SR DSIs NDF 2H +0.17 MRPC SR DSIs NDF 3H +0.14 BOBBIN- DSI 1.03 3H +0.14 BOBBIN DSI 0.96 2H +0.17 18 32 MRPC 5R DSIs NDF 2H +0.06 BOBBIN DSI 1.71 2H +0.06 18 36 MRPC SR DSIs NDF 3H -0.03 BOBBIN DSI 0.76 3H +0.00 18 40 MRPC SR DSIs NDF 2H +0.20 BOBBIN DSI 0.48 2H +0.20 18 41 MRPC 4R DSIs NDF 3H +0.00 BOBBIN DSI 1.07 3H +0.06 18 42 MRPC SR DSIs NDF 2H +0.07 BOBBIN DSI 0.73 2H +0.07

. 18 54 MRPC 5R DSIs NDF 2H +0.00 BOBBIN DSI 0.89 2H -0.27 18 57 MRPC SR DSIs NDF 3H +0.00 BOBBIN DSI 0.82 3H +0.12 18 58 MRPC 5R DSIs NDF 2H +0.00 MRPC SR DSIs NDF 3H +0.00 BOBBIN DSI 0.76 2H -0.19 BOBBIN DSI 1.28 3H -0.03 18 59 MRPC SR DSIs NDF 2H +0.00 i BOBBIN DSI 0.94 2H +0.03  ;

18 64 MRPC 5R DSIs NDF 3H +0.20  !

BOBBIN DSI 1.07 3H +0.20 1 18 71 BOBBIN - 24 IPS FSA 4.62 2H +8.89 I BOBBIN - 24 IPS FSA 4.64 2H +8.86 I O FSA 2H +8.91 i BOBBIN - 24 IPS 4.72 BOBBIN - 40 IPS FSA 5.26 2H +8.87 )

BOBBIN - 40 IPS FSA 5.27 2H +8.88 BOBBIN - 40 IPS FSA 5.12 2H +8.74 18 72 MRPC SR DSIs NDF 2H +0.05 1

BWNS TUBAN II (Version 2.0) 06/12/1995 14:02:47 Beavar Valley Unit 2 SG B 5R 03/95 BOBBIN, BOBBIN - 24 IPS, BOBBIN - 40 IPS, Loose Parts Testing,MRPC 4R DSIs,MRPC SR DSIo,MRPC Spec a

Page 17 of 30 Steam Generator 2RCS-SG21B Location & Percent Through Wall Calls (%TW) For All Indications ROW COL TEST TYPE %TW IND VOLTS LOCATION BOBBIN DSI 0.79 2H +0.05 18 74 MRPC SR DSIs NDF 2H +0.06 BOBBIN DSI 1.29 2H +0.06 18 86 MRPC SR DSIs NDF 2H +0.12 BOBBIN DSI 0.49 2H +0.12 19 14 MRPC SR DSIs NDF 2H +0.06 BOBBIN DSI 0.63 2H +0.06 19 17 MRPC SR DSIs NDF 2H +0.14 BOBBIN DSI 0.93 2H +0.14 19 21 MRPC 4R DSIs NDF 3H +0.00 BOBBIN DSI 0.92 3H +0.03 19 27 MRPC 4R DSIs NDF 2H +0.00 19 30 MRPC SR DSIs NDF 2H +0.03 MRPC SR DSIs NDF 3H +0.03 BOBBIN DSI 0.69 3H +0.03 BOBBIN DSI 1.28 2H +0.03 19 32 MRPC SR DSIs NDF 3H +0.03 MRPC SR DSIs NDF 5H +0.09 BOBBIN DSI 0.32 5H +0.09 BOBBIN DSI 0.43 3H +0.03 19 33 MRPC 5R DSIs NDF 2H +0.00 BOBBIN DSI 1.04 2H +0.06 19 36 MRPC 5R DSIs NDF 2H +0.14 MRPC 5R DSIs NDF 3H +0.14 MRPC SR DSIs NDF 5H +0.00 BOBBIN DSI 0.83 2H +0.14

/' % BOBBIN DSI 0.65 3H +0.14

!s ,) 19 37 MRPC SR DSIs NDF 2H +0.00 BOBBIN DSI 0.83 2H +0.00 19 39 MRPC 5R DSIs NDF 4H +0.23 BOBBIN DSI 0.29 4H +0.23 19 40 MRPC 4R DSIs NDF 3H +0.00 19 41 MRPC SR DSIs NDF 3H +0.09 BOBBIN DSI 0.32 3H +0.09 19 42 MRPC SR DSIs NDF 2H +0.24 l BOBBIN DSI 0.42 2H +0.24 l 19 48 MRPC SR DSIs NDF 2H +0.00 MRPC 5R DSIs NDF 3H +0.00 i MRPC SR DSIs NDF 4H +0.00 l BOBBIN DSI 1.38 2H +0.06 BOBBIN DSI 0.66 3H +0.21 BOBBIN DSI 0.70 4H +0.03 19 49 MRPC SR DSIs NDF 2H +0.00 BOBBIN DSI 0.87 2H -0.03 19 51 MRPC SR DSIs NDF 2H +0.00 MRPC SR DSIs NDF 3H +0.00 BOBBIN DSI 0.83 2H -0.12 BOBBIN DSI 0.56 3H -0.06 19 53 BOBBIN FSA 3.59 3H +47.69 1 19 54 MRPC 4R DSIs NDF 2H +0.00 l 19 64 MRPC SR DSIs NDF 2H +0.08 BOBBIN DSI 0.81 2H +0.08 19 67 MRPC 4R DSIs NDF 3H +0.00 19 72 MRPC SR DSIs NDF 2H +0.10 MRPC SR DSIs NDF 4H +0.13 BOBBIN DSI 1.41 2H +0.10 BOBBIN DSI 0.99 4H +0.13 i 19 74 MRPC 4R DSIs NDF 2H +0.03 i MRPC 4R DSIs NDF 3H +0.00 BOBBIN DSI 0.95 2H +0.09 f~h BOBBIN DSI 1.16 3H +0.12 sj 19 76 MRPC SR DSIs NDF DSI 3H 3H

-0.11

-0.11 BOBBIN 1.57 19 77 MRPC SR DSIs NDF 3H +0.03 BOBBIN DSI 1.39 3H +0.03 i

j

BWMS TUBAN II (Version 2.0) 06/12/1995 14:02:47 Beaver Valley Unit 2 SG B 5R 03/95 BOBBIN, BOBBIN - 24 IPS, BOBBIN - 40 IPS, Loose Parts Testing,MRPC 4R DSIs,MRPC SR DSIs,MRPC Spec O

Page 18 of 30 Steam Generator 2RCS-SG21B Location & Percent Through Wall Calls (%TW) For All Indications ROW COL TEST TYPE %TW IND VOLTS LOCATION 19 79 MRPC SR DSIs NDF 2H -0.03 BOBBIN DSI 1.30 2H -0.03 19 80 MRPC SR DSIs NDF 2H +0.03 BOBBIN DSI 0.98 2H +0.03 19 82 MRPC SR DSIs NDF 2H +0.00 BOBBIN DSI 1.65 2H +0.00 19 83 MRPC SR DSIs NDF 2H -0.03 BOBBIN DSI 0.97 2H -0.03 19 85 MRPC 4R DSIs NDF 2H +0.00 BOBBIN DSI 0.93 2H -0.03 19 86 BOBBIN FSA 3.05 3C +36.69 20 13 BOBBIN - 24 IPS DSI 2.45 1H +20.18 BOBBIN - 24 IPS FSA 2.46 1H +20.28 BOBBIN - 24 IPS FSA 2.47 1H +20.28 BOBBIN - 40 IPS FSA 2.64 1H +20.18 BOBBIN - 40 IPS FSA 2.77 1H +20.23 BOBBIN - 40 IPS FSA 2.78 1H +20.14 20 15 MRPC SR DSIs NDF 3H +0.12 BOBBIN DSI 0.36 3H +0.12 20 16 MRPC 4R DSIs NDF 3H +0.00 20 18 MRPC 4R DSIs NDF 2H +0.09 MRPC 4R DSIs NDF 4H +0.06 BOBBIN DSI 0.65 2H +0.08 20 19 BOBBIN FSA 2.88 3C +43.62 BOBBIN FSA 2.07 4C +5.58 20 20 BOBBIN FSA 0.80 7C +35.37

',-,N 20 22 MRPC SR DSIs NDF 3H +0.05

\,-) BOBBIN DSI 0.58 3H +0.05 20 23 MRPC 4R DSIs NDF 3H +0.00 20 31 MRPC SR DSIs NDF 5H +0.08 BOBBIN DSI 0.42 5H +0.08 20 34 BOBBIN FSA 0.91 1C +16.63 BOBBIN FSA 1.16 1C +13.39 20 40 MRPC 5R DSIs NDF 5H +0.14 BOBBIN DSI 0.41 5H +0.14 20 49 MRPC SR DSIs NDF 2H +0.00 BOBBIN DSI 0.53 2H -0.12 20 60 MRPC 5R DSIs NDF 2H +0.00 BOBBIN DSI 0.53 2H -0.15 BOBBIN FSA 2.59 AV3 +9.25 MRPC Special In NDF AV3 +9.25 20 62 MRPC 4R DSIs NDF 2H -0.05 BOBBIN DSI 0.61 2H -0.06 20 78 MRPC SR DSIs NDF 2H +0.17 BOBBIN DSI 1.03 2H +0.17 20 81 MRPC SR DSIs NDF 2H +0.00 BOBBIN DSI 1.24 2H +0.00 20 87 MRPC SR DSIs NDF 2H +0.18 BOBBIN DSI O.43 2H +0.18 20 88 BOBBIN DSI 0.84 2H -0.03 MRPC Special In NDF 2H +0.00 21 14 MRPC 5R DSIs NDF 7H +0.11 BOBBIN DSI 0.14 7H +0.11 21 23 BOBBIN FSA 1.93 4H +10.19 21 32 MRPC SR DSIs NDF 3H +0.00 BOBBIN DSI 0.27 3H +0.00 21 33 MRPC 5R DSIs NDF 6H +0.03 BOBBIN DSI 0.36 6H +0.03 21 41 BOBBIN FSD 0.63 3H +13.16 21 45 MRPC 4R DSIs NDF 4H +0.00 BOBBIN DSI 0.54 4H -0.12

/) +0.00

( ,1 21 47 MRPC 4R DSIs NDF 3H 21 49 MRPC SR DSIs NDF 2H +0.00 BOBBIN DSI 0.87 2H -0.12 21 52 MRPC SR DSIs NDF 3H +0.00

BWNS TUBAN II (Version 2.0) 06/12/1995 14:02:47 Bsaver Valley Unit 2 SG B SR 03/95 ,

BOBBIN, BOBBIN - 24 IPS, BOBBIN - 40 IPS, Loose Parts Testing,MRPC 4R DSIs,MRPC SR DSIs,MRPC Spec O Page 19 of 30 i Steam Generator 2RCS-SG21B Location & Percent Through Wall Calls (%TW) For All Indications ROW COL TEST TYPE %TW IND VOLTS LOCATION BOBBIN DSI 1.32 3H -0.15 21 55 MRPC SR DSIs NDF 2H +0.00 BOBBIN DSI 0.42 2H -0.09 21 59 MRPC 4R DSIs NDF 4H +0.00 MRPC 5R DSIs NDF 2H +0.00 BOBBIN DSI 1.02 2H -0.16 21 60 MRPC 5R DSIs NDF 3H +0.00 BOBBIN DSI 0.95 3H +0.06 '

21 74 MRPC 5R DSIs NDF 2H -0.03 BOBBIN DSI 1.23 2H -0.03 21 75 MRPC 5R DSIs NDF 2H +0.06 BOBBIN DSI 0.87 2H +0.06 21 86 MRPC 4R DSIs NDF 2H +0.00 BOBBIN DSI 0.50 2H -0.06 22 28 MRPC 4R DSIs NDF 3H +0.00 22 34 MRPC 5R DSIs NDF 3H +0.06 BOBBIN DSI 0.66 3H +0.06 22 36 MRPC SR DSIs NDF 2H +0.14 BOBBIN DSI 0.48 2H +0.14 22 42 MRPC SR DSIs NDF 2H +0.07 MRPC SR DSIs NDF 3H +0.15 MRPC SR DSIs NDF 4H +0.21 BOBBIN DSI 0.50 4H +0.21 BOBBIN DSI 0.88 3H +0.15 BOBBIN DSI 1.20 2H +0.07 22 43 MRPC 5R DSIs NDF 2H +0.00 BOBBIN DSI 0.69 2H -0.09 O. 22 22 44 MRPC 4R DSIs 52 MRPC 4R DSIs NDF NDP 3H 2H

+0.00

+0.00 BOBBIN DSI 1.00 2H -0.20 22 53 MRPC 4R DSIs NDF 2H +0.00 1 MRPC 4R DSIs NDF 3H +0.06 BOBBIN DSI 0.51 2H -0.22 l BOBBIN DSI 0.83 3H -0.03 22 56 MRPC 5R DSIs NDF 2H +0.00 BOBBIN DSI 0.86 2H -0.09 22 58 MRPC 4R DSIs NDF 2H +0.08 BOBBIN DSI 0.65 2H -0.09 22 62 MRPC SR DSIs NDF 3H +0.00 BOBBIN DSI 0.62 3H -0.06 22 64 MRPC 5R DSIs NDF 2H -0.03 MRPC 5R DSIs NDF 3H +0.00 BOBBIN DSI 1.25 2H -0.03 BOBBIN DSI 0.77 3H +0.00 22 67 MRPC 4R DSIs NDF 3H +0.06 BOBBIN DSI 0.79 3H +0.16 22 69 BOBBIN FSA 2.66 3C +35.98 i 22 71 MRPC SR DSIs NDF 2H +0.16 l BOBBIN DSI 0.97 2H +0.16 l 22 79 MRPC SR DSIs NDF 2H +0.06 i BOBBIN DSI 0.51 2H +0.06 22 84 MRPC SR DSIs NDF 2H +0.06 l BOBBIN DSI 0.33 2H +0.06 22 87 BOBBIN FSA 3.49 AV3 +5.18 MRPC Special In NDF AV3 +5.18 23 9 BOBBIN FSA 2.28 2C +47.14 23 28 MRPC 4R DSIs NDF 3H +0.00 MRPC SR DSIs NDF 2H +0.03 BOBBIN DSI 1.10 2H +0.03 23 31 MRPC SR DSIs NDF 3H +0.00 BOBBIN DSI 0.55 3H +0.00 Ot 23 32 MRPC SR DSIs BOBBIN NDF DSI 0.43 3H 3H

+0.08

+0.08 23 33 MRPC SR DSIs NDF 3H +0.14 BOBBIN DSI 0.56 3H +0.14

I BWNS TUBAN II (Varsion 2.0) 06/12/1995 14:02:47 J Bravar Valley Unit 2 SG B SR 03/95 B01 BIN, BOBBIN - 24 IPS, BOBBIN - 40 IPS, Loose Parts Testing,MRPC 4R DSIs,MRPC SR DSIs,MRPC Spec O Page 20 of 30 Steam Generator 2RCS-SG21B Location & Percent Through Wall Calls (%TW) For All Indications ROW COL TEST TYPE %TW IND VOLTS LOCATION 23 34 MRPC SR DSIs NDF 2H +0.14 BOBBIN DSI 0.42 2H +0.14 23 39 MRPC 4R DSIs NDF 2H +0.00 BOBBIN DSI 0.84 2H +0.18 23 55 MRPC SR DSIs NDF 2H +0.00 BOBBIN DSI 0.69 2H -0.16 23 56 MRPC 4R DSIs NDF 2H -0.06 MRPC SR DSIs NDF 3H +0.09 MRPC 5R DSIs NDF 4H +0.18 BOBBIN DSI 0.82 2H +0.24 BOBBIN DSI 0.73 4H +0.18 BOBBIN DSI 0.83 3H +0.09 23 58 MRPC 4R DSIs NDF 2H +0.00 23 62 MRPC SR DSIs NDF 3H +0.00 BOBBIN DSI 1.06 3H +0.12 23 66 MRPC SR DSIs NDF 2H -0.07 BOBBIN DSI 1.16 2H +0.03 23 70 MRPC SR DSIs NDF 3H +0.03 BOBBIN DSI 0.97 3H +0.03 23 72 BOBBIN FSA 2.93 3H +20.54 BOBBIN FSA 2.09 4H +18.08 23 83 MRPC SR DSIs NDF 2H +0.00 BOBBIN DSI 1.29 2H +0.00 23 84 MRPC 4R DSIs NDF 2H +0.00 23 85 MRPC 4R DSIs NDF 2H +0.00 MRPC SR DSIs NDF 2H +0.00

/~'\ BOBBIN DSI 0.56 2H +0.00

( ,/ 23 86 BOBBIN DSI 0.73 2H -0.06 BOBBIN 20 ODI 2.01 AV3 +0.40 MRPC Special In NDF 2H +0.00 23 87 BOBBIN DSI 0.61 2H +0.15 MRPC Special In NDF 2H +0.05 24 10 MRPC SR DSIs NDF 4H +0.03 BOBBIN DSI 0.41 4H +0.03 24 16 MRPC SR DSIa NDF 3H +0.09 BOBBIN DSI 0.59 3H +0.09 24 24 MRPC SR DSIs NDF 3H +0.08 BOBBIN DSI 0.61 3H +0.08 24 30 MRPC 4R DSIs NDF 3H +0.00 MRPC 5R DSIs NDF 2H -0.05 BOBBIN DSI 0.75 2H -0.16 BOBBIN DSI 0.42 3H -0.03 24 36 MRPC 5R DSIs NDF 2H +0.06 BOBBIN DSI 0.83 2H +0.06 24 39 MRPC 4R DSIs NDF 3H +0.00 24 41 MRPC 4R DSIs NDF 2H +0.00 BOBBIN DSI 0.69 2H +0.12 24 42 MRPC 4R DSIs NDF 2H +0.00 MRPC 4R DSIs NDF 4H +0.00 MRPC 5R DSIs NDF 3H +0.10 BOBBIN DSI 0.69 4H +0.06 BOBBIN DSI 0.38 3H +0.10 BOBBIN DSI 1.30 2H +0.02 BOBBIN FSA 3.66 7C +44.09 BOBBIN FSA 3.59 7C +45.15 24 52 MRPC SR DSIs NDF 2H +0.00 BOBBIN DSI 0.77 2H -0.09 24 53 MRPC SR DSIs NDF 2H +0.00 BOBBIN DSI 1.15 2H -0.28 24 56 MRPC SR DSIs NDF 2H +0.00

(N MRPC SR DSIs NDF 3H +0.00 t ,) BOBBIN BOBBIN DSI DSI 0.92 0.99 3H 2H

+0.00

-0.19 24 57 MRPC 5R DSIs NDF 3H +0.00 BOBBIN DSI 0.42 3H +0.06

BWNS TUBAN II- (Version 2.0) 06/12/1995 14:02:47 j Baavar Valley Unit 2 l SG B l SR 03/95 )

.. BOBBIN, BOBBIN - 24 IPS, BOBBIN - 40 IPS, Loose Parts Testing,MRPC 4R DSIs,MRPC SR DSIs,MRPC Spec ,

L(12)

Steam Generator'2RCS-SG21B I Location & Percent Through Wall Calls (%TW) For All Indications  !

ROW COL TEST TYPE %TW IND VOLTS LOCATION ,

24 58 MRPC 4R DSIs NDF 3H +0.00 I BOBBIN DSI 0.60 3H -0.06 24 60 MRPC SR DSIs NDF 2H +0.00 MRPC SR DSIs NDF 3H +0.00 BOBBIN DSI 0.94 3H -0.16 BOBBIN DSI 1.34 2H -0.22 24 62 MRPC 5R DSIs NDF 3H +0.00 BOBBIN DSI 0.72 3H ' -0.03 24 64 MRPC SR DSIs NDF 2H +0.00 .

BOBBIN DSI 0.40 2H +0.00 BOBBIN FSA 1.69 5C +3.15 ,

24 66 MRPC 4R DSIs NDF 2H +0.06 '

24 75 MRPC.4R DSIs NDF 3H +0.08 24 78 MRPC 4R DSIs NDF 2H +0.00 BOBBIN DSI 0.39 2H +0.06 24 79 MRPC 4R DSIs NDF 2H +0.00 BOBBIN DSI 0.75 2H +0.03 24 80 MRPC 5R DSIs NDF 2H +0.06 BOBBIN DSI 0.51 2H +0.06 24 82 MRPC 4R DSIs NDF 2H +0.08 BOBBIN DSI 1.03 2H -0.09 24 83 MRPC SR DSIs NDF 2H +0.12 BOBBIN DSI 0.47 2H +0.12 24 85 MRPC 4R DSIs NDF 2H +0.00 i 25 17 MRPC SR DSIs NDF 5H +0.06 BOBBIN DSI 0.34 5H +0.06 O 25 25 30 MRPC SR BOBBIN 32 MRPC'5R DSIs DSIs NDF DSI NDF 0.41 5H SH 3H

+0.00

+0.00

+0.00 BOBBIN . DSI 0.87 3H +0.00 25 33 MRPC SR DSIs NDF 2H +0.03 BOBBIN' DSI 0.66 2H +0.03 25 34 MRPC SR DSIs NDF 6H +0.09 i BOBBIN DSI 0.19 6H +0.09 25 38 MRPC SR DSIs NDF . 4H +0.16 BOBBIN DSI 0.31 4H +0.16 25 39 MRPC 4R DSIs NDF 4H +0.00 BOBBIN DSI 0.26 4H +0.11 BOBBIN - 24 IPS DSI 0.33 4H +0.03 BOBBIN - 24 IPS DSI 0.23 4H -0.03 BOBBIN - 24 IPS DSI 0.26 4H +0.00 BOBBIN - 40 IPS DSI 0.30 4H +0.00 BOBBIN - 40 IPS DSI 0.29 4H +0.00 BOBBIN - 40 IPS DSI 0.31 4H +0.00 25 40 MRPC 4R DSIs NDF 2H +0.00 BOBBIN DSI 0.31 2H +0.21 25 53 MRPC SR DSIs NDF' 2H +0.00 BOBBIN DSI 1.34 2H -0.34 25 54 MRPC 5R DSIs NDF 2H +0.00 BOBBIN DSI 0.43 2H -0.28 25 62 MRPC SR DSIs NDF 3H +0.00 BOBBIN DSI 1.24 3H +0.03  ;

25 67 MRPC SR DSIs NDF 4H +0.06  ;

BOBBIN DSI 0.63 4H +0.06 i 25 74 MRPC 4R DSIs NDF 3H +0.06 25 78 MRPC SR DSIs NDF 2H -0.03 BOBBIN DSI 1.09 2H -0.03 25 82 BOBBIN FSA 1.75 SC +43.26 25 84 MRPC 4R DSIs NDF 2H +0.09 -

I MRPC 5R DSIs NDF 2H +0.09 BOBBIN DSI 0.68 2H +0.09 O

i 25 85 MRPC SR DSIs NDF 2H +0.15 BOBBIN DSI 0.74 2H +0.15 26 15 MRPC SR DSIs NDF 2H +0.00 BOBBIN DSI 0.34 2H +0.00 )

l l

l BWNS'TUBAN II (Varsion 2.0) 06/12/1995 14:02:47 Baavar Valley Unit 2 i SG B  ;

SR 03/95

- BOBBIN, BOBBIN - 24 IPS, BOBBIN - 40 IPS, Loose Parts Testing,MRPC 4R DSIs,MRPC SR DSIs,MRPC Spec  ;

Page 22 of 30 J Steam Generator 2RCS-SG21B . .

Location & Percent Through Wall Calls '(tTW) For All' Indications-_ l ROW COL TEST TYPE' %TW IND VOLTS LOCATION  :

26 23 MRPC SR DSIs NDP 3H +0.08 BOBBIN DSI 0.47 3H +0.08

.26 29 BOBBIN . .

FSA 2.52 1H +21.44 BOBBIN - 24 IPS FSA 2.63 1H +22.09. 1 BOBBIN - 24 IPS FSA 2.60 1H +21.93 I BOBBIN - 24 IPS FSA 2.62 1H' +21.91 i BOBBIN - 40 IPS .FSA '2.90 1H +22.03 -l BOBBIN - 40 IPS FSA 2.90 1H +21.97  ;

BOBBIN - 40 IPS FSA 2.93 1H +21.98- 1 26 31 MRPC 4R DSIs NDF 3H +0.00 BOBBIN DSI 0.98 3H +0.16 26 36 MRPC 4R DSIs NDF . 2H +0.00 i BOBBIN DSI 0.71 2H +0.09 -j 26 37 MRPC 5R DSIs NDF 2H +0.09 .

MRPC SR DSIs NDF 3H +0.06 I BOBBIN DSI 1.19 3H +0.06 BOBBIN DSI 0.73 2H +0.09

26. 38 MRPC SR DSIs NDF 2H +0.00 l BOBBIN DSI 0.50 2H +0.00 l 26 39 MRPC 4R DSIs NDF' 3H +0.00 l BOBBIN DSI 0.63 3H +0.03

'26 42 MRPC.4R DSIs NDF 3H +0.00

.26 45 MRPC 4R DSIs NDF 3H +0.00 26 51 MRPC 4R DSIs NDF 2H +0.00 +

26 56 MRPC 4R DSIs NDF 2H +0.00 26 57.MRPC 4R DSIs NDF 2H +0.00  :

BOBBIN. DSI 1.19 2H -0.15  ;

\,, 26 59 BOBBIN FSA 2.61 7H +26.85 -

BOBBIN - 24 IPS FSA 2.67 7H +26.92

  • BOBBIN - 24 IPS FSA 2.67 7H +27.46 BOBBIN - 24 IPS FSA 2.45 7H +27.38 BOBBIN - 40 IPS FSA 2.88 7H +26.54 BOBBIN - 40 IPS FSA 2.84 7H +26.82 BOBBIN - 40 IPS FSA 2.74 7H +26.96-26 60 MRPC 4R DSIs NDF 2H +0.00 3 MRPC 4R DSIs NDF 3H +0.00  :

BOBBIN DSI 0.51 3H -0.06  !

26 62 MRPC 4R DSIs NDF 3H +0.00 i BOBBIN DSI 0.93 3H -0.06 BOBBIN - 24 IPS DSI 1.07 3H -0.03 BOBBIN - 24 IPS DSI 1.08 3H -0.03 BOBBIN - 24 IPS DSI 1.09 3H -0.06 BOBBIN - 40 IPS DSI 1.14 3H -0.07 BOBBIN - 40 IPS DSI 1.18 3H -0.10 BOBBIN - 40 IPS DSI 1.18 3H -0.07 26 68 MRPC 4R DSIs NDF 5H +0.08 26 75 MRPC 4R DSIs NDF 4H +0.00 26 81 BOBBIN FSD 0.67 SC +16.07 MRPC Special In NDF SC +16.07 27 16 MRPC SR DSIs NDF 2H +0.03 BOBBIN DSI 0.23 2H +0.03 27 36 BOBBIN FSA 1.30 4C +25.41

, 27 37 MRPC 5R DSIs NDF 2H +0.23

BOBBIN DSI 1.05 2H +0.23 27 52 MRPC SR DSIs NDF 2H +0.00 BOBBIN DSI 0.98 2H -0.21 27 53 MRPC SR DSIs NDF 3H +0.00 BOBBIN DSI 0.52 3H -0.03 27 61 MRPC 5R DSIs NDF 3H +0.00 LBOBBIN DSI 1.10 3H -0.22

+ 27 65 MRPC 4R DSIs NDF 4H +0.00 BOBBIN DSI 0.70 4H +0.09 27 67 MRPC 4R DSIs NDF 5H +0.00

~

MRPC SR DSIs NDF 4H +0.12 BOBBIN DSI 0.91 4H +0.12  ;

I m -A ---wy-- g n & -. ms --

-o-

. . - . . - . _ _ . - . - - . . , . , - . . . . . - ~ - - . - . - - -. - - - . . . .

1 l

BWNS TUBAN II (Version 2.0) 06/12/1995 14:02:47 Baaver Vclley Unit 2 SG B SR 03/95

. BOBBIN, BOBBIN - 24 IPS, BOBBIN - 40 IPS, Loose Parts Testing,MRPC 4R DSIs,MRPC SR DSIs,MRPC Spec.

0: Page 23 of 30 Steam Generator 2RCS-SG21B-Location & Percent Through Wall Calls (%TW) For All Indications i

. ROW COL TEST TYPE %TW IND VOLTS LOCATION )

BOBBIN DSI 0.65 SH +0.09 BOBBIN - 24 IPS DSI 0.63 5H +0.00 '

BOBBIN - 24 IPS DSI 0.67 5H +0.00 BOBBIN - 24 IPS DSI 0.65 5H- -0.03 BOBBIN - 40 IPS DSI 0.72 5H -0.03 BOBBIN - 40 IPS DSI 0.72 5H -0.03.

BOBBIN - 40 IPS DSI 0.74 5H -0.03 27 80 MRPC SR DSIs NDF 3H +0.12 BOBBIN DSI 0.49 3H +0.12 27 81 MRPC 5R DSIs NDF 2H +0.14 BOBBIN DSI 0.71 2H +0.14 6 28 17 MRPC 5R DSIs NDF 3H +0.03 BOBBIN DSI 0.79 3H -0.03 ,

28 18 MRPC 5R DSIs NDF 3H +0.03 I BOBBIN DSI 0.79 3H +0.03 5 28 19 BOBBIN FSA 1.20 6H +8.69 BOBBIN FSA 1.42 6H +3.91 i 28 34 MRPC SR DSIs NDF 5H +0.23 BOBBIN DSI 0.16 5H- +0.23 >

28 38 MRPC 4R DSIs NDF 2H +0.00 BOBBIN DSI 0.51 2H +0.09 e 28 39 MRPC 4R DSIs NDF 3H +0.00 BOBBIN DSI 0.62 3H +0.00 28 40 BOBBIN FSD 0.70 2C +28.74 28 41 MRPC 4R DSIs NDF 2H +0.00 r BOBBIN DSI 0.72 2H +0.00 28 50 MRPC 4R DSIs NDF 4H +0.00 O- 28 59 MRPC SR DSIs MRPC 5R DSIs

'NDF NDF 2H 3H

+0.00

+0.00 BOBBIN DSI 1.54 2H -0.24 ,

BOBBIN DSI 0.99 3H +0.03 28 60 MRPC SR DSIs NDF 2H +0.00 BOBBIN DSI 1.02 2H -0.15  :

28 62 MRPC SR DSIs NDF 3H +0.00 BOBBIN DSI 0.70 3H -0.03 28 71 MRPC 4R DSIs NDF SH +0.00 28 80 MRPC 4R DSIs NDF 2H +0.00 BOBBIN DSI 0.94 2H +0.09 28 81 MRPC 4R DSIs NDF 2H +0.00 BOBBIN DSI 0.80 2H -0.06 29 27 MRPC 4R DSIs NDF 3H +0.00 ,

BOBBIN DSI 1.09 3H +0.05 )

29 30 MRPC 5R DSIs NDF 3H +0.06 BOBBIN DSI 0.74 3H +0.06 i 29 31 MRPC 4R DSIs NDF 5H +0.00 i BOBBIN DSI 0.73 5H -0.03 l 29 32 MRPC 4R DSIs NDF 3H +0.00 i MRPC SR DSIs NDF 2H +0.00 '

MRPC 5R DSIs NDF 5H +0.14 BOBBIN DSI 1.35 2H +0.11 BOBBIN DSI 0.37 5H +0.14 BOBBIN DSI 0.59 3H +0.11 29 33 MRPC SR DSIs NDF 2H +0.22 MRPC SR DSIs NDF 3H +0.08 l MRPC 5R DSIs NDF 4H +0.08 i BOBBIN DSI 0.69 3H +0.08 i BOBBIN DSI 0.35 2H +0.22 BOBBIN DSI 0.45 4H +0.08 29 35 MRPC SR DSIs NDF 2H +0.14 MRPC SR DSIs NDF 3H +0.03 BOBBIN 2H +0.14 O

DSI 0.52 BOBBIN DSI 1.18 3H +0.03 29 37 MRPC 4R DSIs NDF 3H +0.00 29 38 MRPC SR DSIs NDF 2H +0.13 l' MRPC SR DSIs NDP 3H +0.04

B'?NS TUBAN II (Varsion 2.0) 06/12/1995 14:02:47 Bravar Valley Unit 2 SG B SR 03/95 BOBBIN, BOBBIN - 24 IPS,BOBB1N - 40 IPS, Loose Parts Testing,MRPC 4R DSIs,MRPC SR DSIs,MRPC Spec

(~-)

age O Steam Generator 2RCS-SG21B Location & Percent Through Wall Calls (%TW) For All Indications ROW COL TEST TYPE %TW IND VOLTS LOCATION BOBBIN DSI 0.85 2H +0.13 BOBBIN DSI 1.49 3H +0.04 29 39 MRPC SR DSIs NDF 2H +0.04 BOBBIN 'DSI 0.34 2H +0.04 29 40 MRPC 4R DSIs NDF 3H +0.00 BOBBIN DSI 1.18 3H +0.12 29 41 MRPC 4R DSIs NDF 2H +0.00 BOBBIN DSI 0.84 2H -0.02 29 44 BOBBIN FSA 1.01 4C +18.45 29 53 MRPC SR DSIs NDF 2H +0.00 BOBBIN DSI 0.78 2H -0.19 29 79 MRPC 5R DSIs NDF 2H -0.03 BOBBIN DSI 1.01 2H -0.03 30 15 MRPC SR DSIs NDF 3H +0.09 BOBBIN DSI 0.34 3H +0.09 BOBBIN FSA 1.67 2C +15.14 30 17 MRPC SR DSIs NDF 5H +0.15 BOBBIN DSI 0.82 5H +0.00 30 24 MRPC 4R DSIs NDF 4H +0.00 30 26 MRPC SR DSIs NDP 2H +0 13 BOBBIN DSI 0.55 2H +0.13 30 27 MRPC 5R DSIs NDF 2H +0.11 BOBBIN DSI 1.16 2H +0.11 30 28 MRPC SR DSIs NDF 2H +0.23 BOBBIN DSI 0.46 2H +0.23 30 32 MRPC 4R DSIs NDF 3H +0.00 BOBBIN DSI 0.97 3H +0.09 s-) 30 BOBBIN 37 MRPC 4R DSIs FSA NDF 1.66 2H 3H

+33.11

+0.00 BOBBIN DSI 0.55 3H +0.06 30 38 MRPC 5R DSIs NDF 2H +0.00 BOBBIN DSI 0.61 2H +0.00 30 40 MRPC 4R DSIs NDF 3H +0.00 MRPC SR DSIs NDF 2H +0.21 BOBBIN DSI 0.32 2H +0.21 BOBBIN DSI 0.80 3H +0.13 30 41 MRPC SR DSIs NDF 3H +0.14 BOBBIN DSI 0.28 3H +0.14 30 42 MRPC 5R DSIs NDF 4H +0.12 BOBBIN DSI 0.43 4H +0.12 30 48 MRPC SR DSIs NDF 2H +0.00 BOBBIN DSI 0.87 2H -0.15 30 49 MRPC 4R DSIs NDF 2H +0.00 BOBBIN DSI 0.43 2H -0.12 30 52 MRPC 4R DSIs NDF 2H +0.00 BOBBIN DSI 1.19 2H -0.20 30 55 MRPC SR DSIs NDF 2H +0.00 BOBBIN DSI 0.69 2H +0.00 30 59 MRPC 5R DSIs NDF 3H +0.00 BOBBIN DSI 0.89 3H +0.00 l 30 61 MRPC SR DSIs NDF 3H +0.00 BOBBIN DSI 0.56 3H -0.09 30 62 MRPC SR DSIs NDF 2H +0.00 BOBBIN DSI 0.84 2H +0.09 30 70 MRPC SR DSIs NDF 4H +0.08 BOBBIN DSI 0.72 4H +0.08 30 78 MRPC SR DSIs NDF 2H +0.11 BOBBIN DSI 0.56 2H +0.11 30 79 MRPC SR DSIs NDF 2H +0.09 BOBBIN DSI 0.58 2H +0.09 30 NDF 3H +0.00

(~')

( ,/

81 MRPC SR DSIs BOBBIN DSI 0.69 3H +0.00 4

l 31 17 BOBBIN FSA 0.52 3H +8.28 31 20 MRPC SR DSIs NDF 4H +0.11 BOBBIN DSI 0.72 4H +0.11 l

l

I l

BWNS TUBAN II (Version 2.0) 05/12/1995 14:02:47 Baavor Valley Unit 2 l SG B  !

SR 03/95 BOBBIN, BOBBIN IPS, BOBBIN - 40 IPS, Loose Parts Testing,MRPC 4R DSIs,MRPC SR DSIs,MRPC Spec V.

Page 25 of 30 i Steam Generator 2RCS-SG21B Location & Percent Through Wall Calls (%TW) For All Indications ROW COL TEST TYPE %TW IND VOLTS LOCATION 31 26 BOBBIN FSA 2.46 2C +12.96 MRPC Special In VOL 0.70 2C +11.34 31 27 MRPC SR DSIs NDF 3H +0.08 BOBBIN DSI 0.73 3H +0.08 31 30 MRPC SR DSIs NDF 2H +0.14 MRPC SR DSIs NDF 3H +0.17 MRPC SR DSIs NDF 4H +0.12 BOBBIN DSI 1.73 3H +0.17 BOBBIN DSI 0.93 2H +0.14 BOBBIN DSI 0.31 4H +0.12 31 31 MRPC SR DSIs NDF 3H +0.20 BOBBIN DSI 1 05 3H +0.20 31 32 MRPC 4R DSIs NDF 3H +0.00 BOBBIN DSI 1.26 3H +0.06 BOBBIN - 24 IPS DSI 1.14 3H -0.03 BOBBIN - 24 IPS DSI 1.15 3H -0.06 BOBBIN - 24 IPS DSI 1.16 3H -0.06 BOBBIN - 40 IPS DSI 1.19 3H -0.07 )

BOBBIN - 40 IPS DGI 1.30 3H -0.10 BOBBIN - 40 IPS DS1 1.31 3H -0.10 31 34 MRPC SR DSIs NDF 3H +0.09 BOBBIN DSI 0.94 3H +0.09 31 37 MRPC SR DSIs NDF 3H +0.07 BOBBIN DSI 0.00 3H +0.07 31 41 MRPC SR DSIs NDF 3H +0.05 MRPC SR DSIs NDF 5H +0.17 BOBBIN DSI 0.20 5H +0.17

(,,, 31 BOBBIN 47 MRPC 4R DSIs DSI NDF 0.39 3H 3H

+0.05

+0.00 31 52 MRPC SR DSIs NDF 2H +0.03 BOBBIN DSI 0.78 2H +0.03 31 53 MRPC 4R DSIs NDF 2H +0.00 BOBBIN DSI 0.77 2H +0.00 31 55 MRPC 4R DSIs NDF 2H +0.00 31 56 MRPC SR DSIs NDF 3H +0.03 BOBBIN DSI 0.99 3H +0.03 31 59 BOBBIN 20 ODI 1,62 AV3 +0.00 31 62 MRPC SR DSIs NDF 2H +0.09 BOBBIN DSI 0.25 2H +0.09 31 76 MRPC SR DSIs NDF 2H -0.06 BOBBIN DSI 1.18 2H -0.06 31 79 MRPC SR DSIs NDF 2H +0.03 BOBBIN DSI 0.57 2H +0.03 32 28 MRPC SR DSIs NDF 3H +0.06 BOBBIN DSI 0.86 3H +0.06 32 35 MRPC 5R DSIs NDF 2H +0.17 BOBBIN DSI 0.74 2H +0.17 32 39 MRPC SR DSIs NDF 3H +0.12 BOBBIN DSI 0.58 3H +0.12 32 47 MRPC SR DSIs NDF 3H +0.00 BOBBIN DSI 0.39 3H +0.00 32 48 BOBBIN DSI 0.26 8H +0.06 BOBBIN NOI 0.13 AV1 +16.19 MRPC Special In NDF 8H +0.06 MRPC Special In NDF AV1 +16.19 32 53 MRPC SR DSIs NDF 2H +0.06 BOBBIN DSI 0.83 2H +0.06 32 55 MRPC SR DSIs NDF 2H +0.00 BOBBIN DS1 0.59 2H +0.00 BOBBIN 20 ODI 1.55 AV4 +0.00

(~%i BOBBIN 25 ODI 2.23 AV3 +0.00 t 32 61 MRPC SR DSIs NDF 2H +0.13 b' BOBBIN DSI 0.53 2H +0.13 32 75 MRPC SR DSIs NDF 2H +0.09 BOBBIN DSI 0.68 2H +0.09

. .m. _ ~ . _ - - m . . _ _ . . ._ .. . _ . - . _ _ _.-._ .. , _ _ .._.__.___. _ _ _ . . . _ . . _ , _ ___ _ _ _ _

BWNS TUBAN II (Varsion 2.0) 06/12/1995 14:02:47 Bsaver Valley Unit 2 SG B 5R 03/95-4 s BOBBIN, BOBBIN'- 24'IPS, BOBBIN - 40"IPS, Loose Parts Testing,MRPC 4R DSIs,MRPC SR DSIs,MRPC Spec

. , ~ . >

b .

Page 26 of 30

. Steam Generator 2RCS-SG21B Location & Percent Through Wall Calls (%TW) For All Indications ROW COL. TEST: TYPE %TW IND VOLTS. LOCATION

'32 77 MRPC SR DSIs NDF 2H '+0.14

, BOBBIN . 'DSI 0.58 2H +0.14 33 , 18.MRPC SR DSIs NDF 5H -+0.06 BOBBIN DSI 0.42 SH ' +0.06 ,

'33- 29 MRPC SR DSIs .NDF' 2H +0.00 MRPC SR DSIs NDF 3H +0.06

.. BOBBIN DSI 0.76 3H +0.06 BOBBIN DSI 0.74 2H +0.11

.33' 30 MRPC SR DSIs NDF 2H +0.00

'MRPC SR DSIs NDF 3H +0.00 BOBBIN DSI 0.54 3H +0.06 '

BOBBIN' DSI 0.53 2H +0.17 33- 32 MRPC 4R DSIs NDF 2H +0.00 i

. BOBBIN DSI 1.33 2H +0.00 33 33 MRPC 5R DSIs NDF 3H +0.08 t MRPC SR DSIs NDF 4H +0.00 BOBBIN DSI 0.79 4H +0.08

  • BOBBIN DSI 0.52 3W +0.08 33 35 MRPC 4R DSIs NDF 3H +0.00 BOBBIN DSI 0.68 3H +0.09 BOBBIN.- 24 IPS DSI 0.66 3H -0.03 BOBBIN - 24 IPS DSI- 0.70 3H +0.00

' BOBBIN - 24 IPS DSI 0.68 3H -0.03 BOBBIN - 40 IPS DSI 0.79 3H -0.03  !

BOBBIN - 40 IPS DSI 0.65 3H -0.03 BOBBIN - 40.IPS DSI 0.65 3H -0.03

/f'\' 33 '37 MRPC 5R DSIs NDF 4H +0.00

(,,/ BOBBIN DSI 0.49 4H +0.09 33 39 MRPC SR DSIs NDF 2H +0.00 BOBBIN DSI 0.67 2H +0.15 33 41 BOBBIN 14 ODI 1.03 AV2 +0.00 .[

33 44 MRPC SR DSIs NDF 2H -0.09 i MRPC SR DSIs NDF .

4H -0.09 BOBBIN DSI 0.58 4H +0.00 BOBBIN DSI 0.62 2H -0.09 33 .45 MRPC'5R DSIs NDF 3H .+0.00 BOBBIN DSI 0.44 3H +0.17  ;

33 51 MRPC SR DSIs NDF 5H +0.03 BOBBIN DSI 0.25 5H +0.03 BOBBIN DSI 0.21 5H +0.16 .i' BOBBIN FSA 1.28 7H +43.06 BOBBIN FSA 1.30 7H +43.06 33 56 MRPC SR DSIs NDF 4H +0.03 l BOBBIN DSI 0.29 4H +0.03 i 33 57 MRPC SR DSIs NDF 2H +0.09 i BOBBIN DSI 0.42 2H- +0.09 BOBBIN 15 ODI 1.11 AV2 +0.00 BOBBIN - 24 IPS 13 ODI 0.75 AV2 +0.28 BOBBIN - 24 IPS 13 ODI 0.72 AV2 +0.40 BOBBIN - 24 IPS 14 ODI 0.80 AV2 +0.36 BOBBIN - 40 IPS 13 ODI 0.72 AV2 +0.27 BOBBIN - 40 IPS 13 ODI 0.72 AV2 +0.37 BOBBIN - 40 IPS 13 ODI 0.74 AV2 +0.40 33 60 MRPC 4R DSIs NDF 2H +0.00 MRPC SR DSIs NDF 3H +0.00 BOBBIN DSI 0.70 3H +0.00 33 62 MRPC SR DSIs NDF 2H +0.08 BOBBIN DSI 0.63 2H +0.08 BOBBIN FSA 2.24 3C +36.69 33 63 BOBBIN 34 ODI 4.05 AV2 +0.00 BOBBIN - 24 IPS DSI 0.85 3H -0.03 O- BOBBIN - 24 IPS BOBBIN - 24 IPS DSI DSI DSI 0.90 0.87 1.00 3H 3H 3H

+0.00

+0.00

-0.03 BOBBIN - 40 IPS BOBBIN - 40 IPS- DSI 0.86 3H -0.07

BWNS TUBAN II (Version 2.0) 06/12/1995 14:02:47 Beaver Valley Unit 2 l SG B SR 03/95 BOBBIN, BOBBIN - 24 IPS, BOBBIN - 40 IPS, Loose Parts Testing,MRPC 4R DSIs,MRPC SR DSIs,MRPC Spec Page 27 of 30

Steam Generator 2RCS-SG21B Location & Percent Through Wall Calls (%TW) For All Indications ROW COL TEST TYPE %TW IND VOLTS LOCATION BOBBIN - 40 IPS DSI 0.90 3H -0.03 BOBBIN - 24 IPS 30 ODI 2.75 AV2 -0.40 BOBBIN - 24 IPS 30 ODI 2.75 AV2 -0.62 BOBBIN - 24 IPS 30 ODI 2.67 AV2 -0.68 i BOBBIN - 40 IPS 28 ODI 2.35 AV2 -0.30 BOBBIN - 40 IPS 29 ODI 2.40 AV2 -0.34 ,

BOBBIN - 40 IPS 29 ODI 2.42 AV2 -0.30 l 33 75 MRPC 4R DSIs NDF 2H +0.00 i BOBBIN DSI 0.92 2H +0.12 1 33 79 BOBBIN FSA 2.98 6C +37.45 34 30 MRPC SR DSIs NDF 2H +0.00 BOBBIN DSI 0.49 2H +0.00 34 32 MRPC SR DSIs NDF 2H +0.00 MRPC SR DSIs NDF 3H +0.00 BOBBIN DSI 0.89 2H -0.03 i BOBBIN DSI 0.42 3H +0.14 34 34 MRPC SR DSIs NDF 4H +0.00 BOBBIN DSI 0.39 4H +0.08 34 35 MRPC SR DSIs NDF 3H +0.00 BOBBIN DSI 0.56 3H +0.12 34 36 MRPC SR DSIs NDF 3H +0.00 BOBBIN DSI 0.45 3H +0.06 1 34 37 MRPC SR DSIs NDF 3H +0.00 1 BOBBIN DSI 0.61 3H +0.12 34 45 MRPC 5R DSIs NDF 4H +0.00 i BOBBIN DSI 0.43 4H +0.19

34 50 BOBBIN 26 ODI 2.40 AV1 +0.00 1 \ 34 55 BOBBIN 23 ODI 0.91 6H +2.68

! BOBBIN 19 ODI 1.22 AV1 -0.21 BOBBIN 28 ODI 2.20 AV3 +0.15 MRPC Special In VOL 0.31 6H +2.77 34 57 BOBBIN 21 ODI 1.78 AV2 +0.00 34 60 BOBBIN FSA 3.29 AV4 +10.59 MRPC Special In NDF AV4 +10.59 34 61 MRPC 4R DSIs NDF 2H +0.00 34 62 MRPC 4R DSIs NDF 5H +0.00 MRPC SR DSIs NDF 2H +0.12 BOBBIN DSI 0.71 2H +0.12 BOBBIN FSA 1.56 5C +14.37 35 25 BOBBIN 21 ODI 1.87 AV3 +0.00 35 29 MRPC 4R DSIs NDF 5H +0.00 35 32 MRPC SR DSIs NDF 3H +0.00 BOBBIN DSI 0.37 3H +0.11 35 34 MRPC 4R DSIs NDF SH +0.00 BOBBIN DSI 0.43 5H +0.03 35 ,36 MRPC SR DSIs NDF 3H +0.00 BOBBIN DSI 0.54 3H +0.07 35 40 MRPC 4R DSIs NDF 2H +0.00 BOBBIN DSI v.77 2H +0.06 35 41 BOBBIN 16 ODI 1.28 AV2 +0.00 BOBBIN 18 ODI 1.60 AV4 +0.00 35 43 MRPC SR DSIs NDF 7H +0.00 BOBBIN DSI 0.23 7H +0.00 35 45 MRPC 4R DSIs NDF 5H +0.00 35 50 BOBBIN 16 ODI 1.19 AV1 -0.03 BOBBIN 16 ODI 1.24 AV3 +0.03 BOBBIN 19 ODI 1.49 AV2 +0.12 35 58 MRPC SR DSIs NDF 2H +0.00 MRPC 5R DSIs NDF 5H +0.03 BOBBIN DSI 0.37 5H +0.03 BOBBIN DSI 0.78 2H 40.00 O 35 59 MRPC SR DSIs BOBBIN 61 BOBBIN NDF DSI FSA 0.49 1.78 2H 2H 2C

-0.06

-0.06

+41.01 35 35 62 MRPC Special In NDF TEC +10.06

BWHS TUBAN II (Version 2.0) 06/12/1995 14:02:47 Beaver Valley Unit 2 SG B SR 03/95 BOBBIN, BOBBIN - 24 IPS, BOBBIN - 40 IPS, Loose Parts Testing,MRPC 4R DSIs,MRPC SR DSIs,MRPC Spec

%)

Page 28 of 30 Steam Generator 2RCS-SG21B Location & Percent Through Wall Calls (%TW) For All Indications ROW COL TEST TPE %TW IND VOLTS LOCATION-35 67 MRPC Special In NDF TEC +10.28 36 18 MRPC 4R DSIs NDF 3H +0.00 BOBBIN 19 ODI 0.67 6H +2.82 MRPC Special In VOL 0.31 6H +3.14 36 28 MRPC SR DSIs NDF 3H +0.00 BOBBIN DSI 0.63 3H +0.11 36 34 MRPC 5R DSIs NDF 2H +0.05 MRPC SR DSIs NDF 3H +0.00 MRPC SR DSIs NDF 7H +0.00 BOBBIN DSI 0.50 3H +0.07 BOBBIN DSI 0.63 2H +0.05 BOBBIN DSI 0.24 7H +0.11 36 37 MRPC SR DSIs NDF 3H +0.00 BOBBIN DSI 0.83 3H +0.12 36 40 MRPC SR DSIs NDF 2H +0.00 BOBBIN DSI 0.97 2H -0.02 36 41 BOBBIN 21 ODI 1.56 AV2 +0.12 BOBBIN 29 ODI 2.62 AV1 -0.09 BOBBIN 30 ODI 2.89 AV3 +0.50 36 42 MRPC SR DSIs NDF 2H +0.05 MRPC SR DSIs NDF 3H +0.03 BOBBIN DSI 0.52 3d +0.03 36 45 MRPC SR DSIs NDF 4H +0.00 BOBBIN DSI 0.49 4H +0.10 36 48 MRPC 4R DSIs NDF 4H +0.00 MRPC SR DSIs NDF 2H +0.03 BOBBIN DSI 2H +0.03 O

0.54 36 55 BOBBIN 15 ODI 1.15 AV2 +0.15 36 59 MRPC 4R DSIs NDF 3H +0.00 BOBBIN DSI 0.66 3H +0.15 36 63 BOBBIN 19 ODI 1.44 AV2 -0.06 BOBBIN 20 ODI 1.56 AV3 +0.06 BOBBIN - 24 IPS 17 ODI 1.03 AV3 -0.11 BOBEIN - 24 IPS 17 ODI 1.05 AV3 -0.11 BOBBIN - 24 IPS 18 ODI 1.10 AV3 -0.08 BOBBIN - 24 IPS 19 ODI 1.22 AV2 +0.53 BOBBIN - 24 IPS 20 ODI 1.33 AV2 +0.61 BOBBIN - 24 IPS 21 ODI 1.39 AV2 +0.53 BOBBIN - 40 IPS 14 ODI 0.83 AV3 -0.10 BOBBIN - 40 IPS 14 ODI 0.84 AV3 -0.13 BOBBIN - 40 IPS 14 ODI 0.84 AV3 -0.13 BOBBIN - 40 IPS 18 ODI 1.16 AV2 +0.47 BOBBIN - 40 IPS 18 ODI 1.16 AV2 +0.60 BOBBIN - 40 IPS 19 ODI 1.22 AV2 +0.54 37 26 MRPC 4R DSIs NDF 3H +0.00 37 32 MRPC SR DSIs NDF 3H +0.00 BOBBIN DSI 0.34 3H +0.11 37 35 MRPC SR DSIs NDF 3H +0.00 BOBBIN DSI 0.81 3H +0.17 37 46 MRPC SR DSIs NDF 3H +0.00 MRPC SR DSIs NDF 4H +0.06 BOBBIN DSI 0.27 4H +0.06 37 49 MRPC 4R DSIs NDF 2H +0.00 MRPC 4R DSIs NDF 4H +0.00 BOBBIN DSI 0.73 4H +0.15 37 57 MRPC SR DSIs NDF 2H +0.08 BOBBIN DSI 0.78 2H +0.08 BOBBIN 15 ODI 1.12 AV4 +0.00 BOBBIN 16 ODI 1.21 AV2 +0.00 BOBBIN - 24 IPS DSI 0.72 3H +0.00 BOBBIN - 24 IPS DSI 0.67 2H -0.06 BOBBIN - 24 IPS DSI 0.64 2H -0.03 C'). BOBBIN - 24 IPS DSI 0.64 2H -0.06 BOBBIN - 24 IPS DSI 0.65 3H -0.03 BOBBIN - 24 IPS DSI 0.65 3H -0.03

I BWNS TUBAN II (Version 2.0) 06/12/1995 14:02:47 i Beaver Valley Unit 2 l SG B j 5R 03/95 BOBBIN, BOBBIN - 24 IPS, BOBBIN - 40 IPS, Loose Parts Testing,MRPC 4R DSIs,MRPC SR DSIs,MRPC Spec n

%s l Page 29 of 30 Steam Generator 2RCS-SG21B Location & Percent Through Wall Calls (%TW) For All Indications ROW COL TEST TYPE %TW IND VOLTS LOCATION BOBBIN - e. IPS DSI 0.75 3H -0.03 BOBBIN - 40 IPS DSI 0.73 3H -0.07 BOBBIN - 40 IPS DSI 0.61 3H -0.03 BOBBIN - 40 IPS DSI 0.65 2H -0.03 ,

BOBBIN - 40 IPS DSI 0.65 2H -0.07  !

BOBBIN - 40 IPS DSI 0.62 2H -0.10 i BOBBIN - 24 IPS 23 ODI 1.64 AV4 +0.11  ;

BOBBIN - 24 IPS 23 ODI 1.56 AV4 +0.14 BOBBIN - 24 IPS 23 ODI 1.56 AV4 +0.14 ,

BOBBIN - 40 IPS 19 ODI 1.25 AV4 +0.13 )

BOBBIN - 40 IPS 19 ODI 1.19 AV4 +0.13 )

BOBBIN - 40 IPS 19 ODI 1.22 AV4 +0.17 37 61.MRPC SR DSIs NDF 2H +0.09 BOBBIN DSI 0.71 2H +0.09 i 37 62 MRPC 4R DSIs NDF 2H +0.00 <

37 63 BOBBIN FSA 1.16 1C +23.06 l BOBBIN FSD 1.09 4H +48.72 38 27 MRPC SR DSIs NDF 6H +4.49 BOBBIN NQI 0.08 6H +4.49 l 38 28 BOBBIN - 24 IPS 12 ODI 0.37 6H +4.16 i BOBBIN - 24 IPS 16 ODI 0.36 6H +4.20 )

BOBBIN - 24 IPS 18 ODI 0.36 6H +4.10 BOBBIN - 40 IPS 19 ODI 0.38 6H +4.08 BOBBIN - 40 IPS 20 ODI 0.43 6H +4.12 j BOBBIN - 40 IPS 20 ODI 0.42 6H +4.13 38 31 MRPC 4R DSIs NDF 5H +0.00

/T 38 34 MRPC SR DSIs BOBBIN NDF DSI 0.39 SH 5H

+0.00

+0.00

( ,/ 1 38 35 MRPC 4R DSIs NDF 2H +0.00 BOBBIN DSI 0.55 2H +0.03 38 36 MRPC 5R DSIs NDF 4H +0.00 BOBBIN DSI 0.53 4H +0.11 38 37 MRPC 4R DSIs NDF 3H +0.00 BOBBIN DSI 0.83 3H +0.06 38 42 MRPC 4R DSIs NDF 2H +0.00 30 57 BOBBIN FSA 2.61 8H +19.32 MRPC Special In VOL 0.17 BH +18.69 l 38 59 BOBBIN - 24 IPS FSI 0.57 4H +14.72 BOBBIN - 24 IPS FSI 0.55 4H +14.62 BOBBIN - 24 IPS FSI 0.56 4H +14.62 l BOBBIN - 40 IPS FSI 0.63 4H +14.59 BOBBIN - 40 IPS FSI 0.57 4H +14.56 a BOBBIN - 40 IPS FSI 0.74 4H +14.69  !

39 30 MRPC 5R DSIs NDF 5H +0.00 BOBBIN DSI 0.25 SH +0.19 39 33 MRPC SR DSIs NDF 3H +0.00 BOBBIN DSI 0.83 3H +0.13  ;

39 35 MRPC SR DSIs NDF 3H +0.00 BOBBIN DSI 0.77 3H +0.11 39 37 MRPC 5R DSIs NDF 3H +0.00 BOBBIN DSI 0.38 3H +0.08 39 54 BGBBIN 16 ODI 1.21 AV1 +0.46 39 70 BOBBIN 28 ODI 3.16 AV3 +0.00 BOBBIN - 24 IPS 30 ODI 2.64 AV3 +0.03 BOBBIN - 24 IPS 30 ODI 2.67 AV3 -0.03 BOBBIN - 24 IPS 30 ODI 2.59 AV3 -0.03 BOBBIN - 40 IPS 28 ODI 2.32 AV3 +0.00 BOBBIN - 40 IPS 28 ODI 2.33 AV3 +0.00 BOBBIN - 40 IPS 28 ODI 2.37 AV3 -0.03 39 71 MRPC 5R DSIs NDF 4H +0.21 BOBBIN DSI 0.91 4H +0.21 O 40 40 28 MRPC SR DSIs BOBBIN 34 BOBBIN NDF DSI DSI 0.45 0.47 4H 4H 4H

+0.00

+0.05

+0.00 40 44 MRPC SR DSIs NDF 2H +0.00

BWNS TUBAN II (Version 2.0) 06/12/1995 14:02:47 Daaver Valley Unit 2 SG B SR 03/95 BOBBIN, BOBBIN - 24 .S, BOBBIN - 40 IPS, Loose Parts Testing,MRPC 4R DSIs,MRPC SR DSIs,MRPC Spec

\

(O Page 30 of 30 Steam Generator 2RCS-SG21B Location & Percent Through Wall Calls (%TW) For All Indications ROW COL TEST TYPE %TW IND VOLTS LOCATION BOBBIN DSI 0.56 2H +0.10 40 57 BOBBIN FSA 6.19 8H +15.86 MRPC Special In VOL 0.33 8H +15.33 40 63 BOBBIN FSD 1.78 1C +6.80 40 69 MRPC 4R DSIs NDF 4H +0.00 41 57 BOBBIN FSD 0.29 4H +21.60 41 62 MRPC SR DSIs NDF 4H +0.15 BOBBIN DSI 0.88 4H +0.15 42 47 MRPC SR DSIs NDF 3H +0.00 BOBBIN DSI 0.19 3H +0.20 42 51 MRPC 4R DSIs NDF 4H +0.00 BOBBIN DSI 0.61 4H +0.18 42 57 MRPC SR DSIs NDF 4H +0.20 BOBBIN DSI 0.21 4H +0.20 43 31 MRPC SR DSIs NDF 2H +0.00 BOBBIN DSI 0.29 2H +0.11 43 43 MRPC SR DSIs NDF 5H +0.00 BOBBIN DSI 0.38 5H +0.09 43 62 MRPC SR DSIs NDF 4H +0.06 BOBBIN DSI 0.30 4H +0.06 45 50 MRPC 4R DSIs NDF 4H +0.00 BOBBIN DSI 1.13 4H +0.03 45 59 MRPC SR DSIs NDF 6H +0.00 BOBB114 NQI 1.12 6H +0.45 Total Indications Found = 1909 O Total TotalTubes Tubes inFound = 766 Input File = 3320 l

i l

l 1

0

O ATTACHMENT 5A TUBE PLUGGING RESULTS FROM THE UNIT #2 5TH REFUELING OUTAGE (5R)

FOR STEAM GENERATOR 2RCS-SG21B l l

O  !

l O 1 G i

m=zM 2mb !

omN NN N@@ aN.hG&O

. . .. 4 Y 9 A v . .

=.... ...* ....

....... ...= *...

...a * . .

W N

.... .... ...= ... 0 A

. ....=... ... *... 9 M

=...O

. . ...= *...

= . . . .... *...

A . .... .... ...= ...* =...

/ ... .... ....=...= . . .* *... 5 8

N .... ......... ...* ...= *...

..... .... .... ...=- ..= ....

...... .... ....=... . .===...

) ...... .... .... ... ...= =...

...... .... ....=........=.=... 0

( ......... .... .... .... . . . = *... 8 e

c

.......... .... .... . . . = ...= ....

i 9 ......... .... .... . . . . . . .. *...

r v 9*......... .... ....=.... . . .. *...

e .. ......... .... .... . . . = - . ... .... 5 S ... .............. .... ...* .... =... 7

.... ......... .... .... .... ...=.=...

f

.... ......... .... .... . . . . - . ..= =...

B O ..... ......... .... .... ......... a . ..

t ..... ..... ... .... .... .... .... .... 0 Gu ........... ... .... ....=.... ...= .... 7 SO ...... .e....... ... . ... *...

................. .... .... .... ....=... . ..===...

....... .............. .... .... ...=<....

........ ......... ..O. ......... .... *... 5

....... .............. .... .... .... = . .. 6 R ........=......... .... ....=.... . . .. *...

.........*......... .... ....=......... ....

5 ......... ......... .... ....=.... .... * . ..

......... .............. .... .... . ... *... 0 6

D .......... .e............ .... .... . ... . . .e E ..........=...................=.... . ... ....

..........e......... .... ....~.... . ... . . ..

G ....................*.... .... .... ...= ....

5 G ..........

....o......O......... ..o......

.... ... 0 ..=....O..

0 .... 5 >

U ........... ......... .... ....- . . . . . ... ....

L ..................... .... .... .... . ... .... -

P ........... ......... .... .... .... .... =...

0 S

........... e... .... . ..a . ... = . .. t S ........... ......... .........ee... ....=...= .... .... 5 e

. .... . . . = . . ... ....

. .... . ..= . . ...

W .

B vE 6 ...........*.........e....

.........*........... 9.... 9... .e.

5 I

O n

U 5 - ......... .... ....

4 C T  :

..........= ....

......... 0

....e....e.........

....e....

......... .... =...

. ........=...

. . . . . .. a . ..

- m B

1 d

t e

c

........e...

.........O..

..........*......... .... .... ...= . . . .

.. ....=

a . ..

0 4

u 2 l e .................... .... .... .... .... *...

=

G e =

.e..O....'.... .. . =...

S ....e.e..

S s

. *. 0 5 p

s

- e .........*....O.. . ... .... *.. 3 e S b u ......... ......... .... .... .. .... ....=.... .... =. 0 m n

C T ........ ......... .... ....

.... ....=... .e. .... =. 0 0 c e

. 0 R

2

.........o........

.......- 0..

. .... =..

. . . - ... =

3 aF o

....... ......... ....O.... . . . . ... =...

e.....

. ....... ....=....=....

5 y

r e

2 h ee... ......... .... .... . . . . - . ... ....

P r

............ .... .... . . . . - . . . . .... 0 )

2 g

e. ......... .... ....

..- ...- . . . . - . ... .... L e

t

......... .... .... . .. . - . ... =... O

...... .... .... . . . . - . ... .... 5 H 1

...... .... .... . . . . - . ... =o.. (

...... ......... . . . . - . ... =...

..... .... .... . . . . - . ... =... T

.... ..e. ....=.... .... .. E.

6

. . .. .... =o.. 0 a .

1 N 7 .. .... .... .... u 23 .... .... .... .... . -

t d

3 ... ....=.... .... =. .o.. m h:

t y

.. . . .O.

. .... ==... 5 ELZ e

sa e s Z -p

. . . . ... O... O V@

N s m

rT Q 0 5 0 0 o v e vl a at 4

5 3 3 t R O g S .f 2 2 5

1 1 5

o n

eO BT

.- . _ __m _-. ._ _ _ ._____ ~. _ - . . _ .._ _ - .. .. _ _ _ __

BWNS TUBAN II (Varsion 2.0) 06/12/1995 15:00:02 n

Baaver Valley U'it 2  ;

i SG B '

! SR 03/95

' - BOBBIN, BOBBIN - 24 IPS, BOBBIN - 40 IPS, Loose Parts Testing,MRPC 4R DSIs,MRPC 5R DSIs,MRPC Spec I Steam Generator 2RCS-SG21B'

-Tubes Plugged SR ROW COL TEST TYPE %TW IND VOLTS LOCATION l

1 31 BOBBIN DSI 0.98 2H +0.03  ;

i MRPC.U-Bend SAI 2.05 8H +3.42  ;

l 1 32 MRPC U-Bend SAI 1.61 8H +3.53 l 1 34 MRPC U-Bend SAI 0.44 8H +3.05

.1 :36 BOBBIN DSI 0.45 2H -0.06-MRPC U-Bend SAI 1.14 8H +3.25 ,

2 8 BOBBIN FSI 0.47 3H +29.81 l MRPC 5R DSIs VOL 0.17 3H +0.91 to' +*

3 11 BOBBIN FSI 0.77 1H ~ +15.45 MRPC 5R DSIs DNT 2.53 2H -1.61 MRPC Special In VOL 0.35 1H +16.12 3 14 BOBBIN FSI 1.35 6H +27.76 MRPC SR DSIs VOL 0.11 6H +27.27 4 2 BOBBIN DSI 0.36 4H +0.00 BOBBIN DSI 0.46 3H +0.00 MRPC SR DSIs VOL 0.34 4H +0.14 6 55 BOBBIN DSI 0.52 4H -0.03 BOBBIN DSI 0.65 2H -0.09 MRPC SR DSIs VOL 0.22 4H +0.11 i MRPC SR DSIs VOL 0.27 4H +2.99 l MRPC 5R DSIs VOL 0.17 4H +1.73 j 10 55 BOBBIN DSI 0.85 2H -0.21  !

MRPC 5R DSIs VOL 0.63 2H -0.02 11 5 BOBBIN DSI 0.42 4H +0.05 BOBBIN FSI 0.25 6C +48.74 MRPC Special In VOL 0.67 7C -1.92 O 11 89 BOBBIN MRPC Special In MRPC Special In FSI VOL VOL 0.43 0.60 0.61 3H 3H 3H

+12.49

+15.35

+12.87 15 54 BOBBIN DSI 0.83 3H +0.00 MRPC SR DSIs VOL 1.35 3H +0.00 20- 28 BOBBIN FSI 0.34 3H +20.08 BOBBIN FSI 0.21 4H +18.71 MRPC 5R DSIs VOL 0.18 3H +21.61 20 37 BOBBIN DSI 0.49 3H +0.03 j BOBBIN FSI 1.29 2H +48,10 l MRPC 5R DSIs VOL 1.08 3H -2.85 22 65 MRPC TSH VOL 0.39 TSH +1.66 30 35 BOBBIN DSI 0.74 3H +0.12 MRPC 5R DSIs VOL 0.30 3H -0.20 i MPPC SR DSIs VOL 0.38 3H -1.93 l 32 54-BOBBIN FSI 0.40 4C +47.41 i MRPC Special In VOL 0.50 SC -3.17 34 31 BOBBIN DSI 0.81 3H +0.06 BOBBIN FSI 0.37 6H +20.74 MRPC 5R DSIs VOL 0.40 6H +22.32 4 35 30 BOBBIN FSI 0.46 5H +47.59 BOBBIN FSI 0.32 7H +26.49 BOBBIN FSI 0.20 2H +23.13 4 MRPC SR DSIs VOL 0.45 6H -3.79 l MRPC SR DSIs VOL 0.53 7H +28.19 BOBBIN - 24 IPS FSI 0.41 7H +26.91 BOBBIN - 24 IPS FSI 0.38 7H +26.92  ;

BOBBIN - 24 IPS FSI 0.32 5H +47.52 BOBBIN - 24 IPS FSI 0.43 5H +47.61 BOBBIN - 24 IPS FSI 0.40 5H +47.53 BOBBIN + 24 IPS FSI 0.39 7H +26.50 BGBBIN - 40 IPS FSI 0.50 SH +47.34 BOBBIN - 40 IPS FSI 0.54 5H +47.37 BOBBIN - 40 IPS FSI 0.49 7H +26.56 O BOBBIN - 40 IPS BOBBIN - 40 IPS BOBBIN - 40 IPS FSI FSI FSI 0.37 0.48 0.48 5H 7H 7H

+47.41

+26.52

+26.13 35 55 BOBBIN 12 ODI 0.87 AV1 -0.33 BOBBIN 19 ODI 1.45 AV2 +0.15

_ . . _ _ . _ . . . _ _ _ _m.__ . . _ . ~ _ . _ _ _ _ . _ . . _.. . . . _ _ . _ - . . _ _ _ . _ _ . . . _ _ . _

BWNS TUBAN II (Version 2.0)' 06/12/1995 15:00:02 Baaver Valley Unit 2 SG B SR 03/95 B BIN, BOBBIN - 24 IPS, BOBBIN.- 40 IPS, Loose Parts Testing,MRPC 4R DSIs,MRPC SR DSIs,MRPC Spec Page 2 of 2 Steam Generator 2RCS-SG21B Tubes Plugged SR ROW COL TEST TYPE %TW IND VOLTS LOCATION BOBBIN 41 ODI 5.44 AV3 +0.06 BOBBIN - 24 IPS 22 ODI 1.49 AV2 +0.14 BOBBIN - 24 **S 73 ODI 1.64 AV2 +0.11 BOBBIN - 24 1. is ODI 1.64 AV2 +0.17 BOBBIN - 24 IP, 33 ODI 5.15 AV3 +0.40 BOBBIN - 24 IPS 38 ODI 5.16 AV3 +0.39 BOBBIN - 24 IPS 39- ODI 5.25 AV3 +0.42 BOBBIN - 40 IPS 18 ODI 1.14 AV2 +0.17 BOBBIN - 40 IPS 19 ODI 1.24 AV2 +0.10 BOBBIN - 40 IPS 20 ODI 1.27 AV2 +0.07 BOBBIN - 40 IPS 36 ODI 4.34 AV3 +0.43 BOBBIN - 40 IPS 37 ODI 4.39 AV3 +0.43 BOBBIN ~- 40 IPS 37 ODI 4.45 AV3 +0.47 36 43 BOBBIN FSI 0.50 2H +12.92 MRPC SR DSIs VOL 0.69 2H +14.07 37 42 BOBBIN DSI 0.35 3H +0.18 BOBBIN F3I 0.09 5C +39.44 MRPC Special In VOL 0.13 6C -9.75 42 54 BOBBIN FSI 0.06 4C +31.37 MRPC Special In VOL 0.45 5C -19.11 Total Indications Found = 85 Total Tubes Found = 24 Total Tubes in Input File = 24 l

l O

n ATTACHMENT 6 EXAMINATION RESULTS FROM THE UNIT #2 STH REFUELING OUTAGE (5R)

FOR STEAM GENERATOR 2RCS-SG21C

BWNS TUBAN II (Version 2.0) 06/12/1995 14:11:22 BCaver Valley Unit 2 SG C 5R 03/95 B BBIN, Loose Parts Testing,MRPC 4R DSIs,MRPC SR DSIs,MRPC Special Int.,MRPC TSH,MRPC U-Bend Steam Generator 2RCS-SG21C Location & Percent Through Wall Calls (%TW) For All Indications ROW COL TEST TYPE %TW IND VOLTS LOCATION 1 2 BOBBIN FSA 3.10 6C +38.18 1 22 MRPC 5R DSIs NDF 3H +0.00 BOBBIN DSI 0.66 3H -0.03 1 26 MRPC SR DSIs NDF 3H +0.00 BOBBIN DSI 0.52 3H +0.00 BOBBIN FSA 2.04 4H +33.81 1 33 BOBBIN FSA 1.46 2C +9.95 1 35 MRPC TSH NDF 2H +0.00 MRPC TSH NDF 3H +0.00 MRPC SR DSIs NDF 2H +0.00 MRPC SR DSIs NDF 3H +0.00 BOBBIN DSI 0.79 3H -0.03 I BOBBIN DSI 0.81 2H +0.00 l MRPC Special In NDF 2H +0.00 l MRPC Special In NDF 3H +0.00 l 2 12 BOBBIN FSA 1.99 2H +35.26 1 2 15 BOBBIN FSA 1.92 6H +25.71 l 2 16 MRPC 4R DSIs NDF 3H +0.00 BOBBIN DSI 0.97 3H -0.06 2 17 MRPC SE DSIs NDF 2H +0.00 BOBBIN DSI 0.41 2H -0.03 2 18 MRPC 4R DSIs NDF 5H +0.00 2 21 BOBBIN FSA 3.98 5C +14.20 2 34 MRPC TSH NDF 2H +0.00 MRPC 5R DSIs NDF 2H +0.00 BOBBIN DSI 0.30 2H -0.06 lem) MRPC Special In NDF 2H +0.00

' ,_/ 2 35 MRPC TSH NDF 2H -0.01 MRPC SE DSIs NDF 2H -0.01 BOBBIN DSI 1.00 2H -0.06 BOBBIN FSD 1.82 2C +9.69 MRPC Special In NDF 2H -0.01 MRPC Special In VOL 0.78 2C +9.96 2 53 MRPC SR DSIs NDF 3H -0.06 BOBBIN DSI 0.59 3H -0.06 2 60 DOBBIN FSA 1.09 TSC +10.11 BOBBIN FSD 0.42 TSH +36.44 2 62 BOBBIN FSD 0.67 6C +12.41 MRPC Special In VOL 0.42 6C +12.41 2 64 MRPC SR DSIs NDF 5H -0.06 BOBBIN DSI 0.50 5H -0.06 2 68 MRPC 5R DSIs NDF 5H -0.03 BOBBIN DSI 0.40 5H -0.03 2 78 MRPC 4R DSIs NDF 3H +0.00 BOBBIN DSI 0.67 3H -0.06 2 85 MRPC 4R DSIs NDF 3H +0.00 BOBBIN DSI 0.86 3H -0.06 BOBBIN FSA 1.77 6H +10.63 2 89 BOBBIN FSA 3.52 4H +46.35 3 18 MRPC 4R DSIs NDF 3H +0.00 BOBBIN DSI 0.62 3H +0.00 3 23 MRPC 4R DSIs NDF 3H +0.00 3 34 MRPC TSH NDF 2H +0.00 MRPC TSH NDF 3H +0.00 MRPC 5R DSIs NDF 2H +0.00 MRPC SR DSIs NDF 3H +0.00 BOBBIN DSI 0.94 2H -0.03 BOBBIN DSI 1.15 3H -0.06 MRPC Special In NDF 2H +0.00 MRPC Special In NDF 3H +0.00

[sj 3 35 MRPC 4R DSIs NDF 5H +0.00 (s,/ MRPC 5R DSIs NDF 5H +0.00 3 42 MRPC 4R DSIs NDF 5H +0.00 3 53 MRPC SR DSIs NDF 3H -0.03 BOBBIN DSI 0.71 3H -0.03

DWNS TUBAN II (Version 2.0) 06/12/1995 14:11:22 Beaver Valley Unit 2 SG C SR 03/95 B,OBBIN, Loose Parts Testing,MRPC 4R DSIs,MRPC SR DSIs,MRPC Special Int.,MRPC TSH,MRPC U-Bend I

(

Page 2 of 15 Steam Generator 2RCS-SG21C Location & Percent Through Wall Calls (%TW) For All Indications ROW COL TEST TYPE %TW IND VOLTS LOCATION 3 60 MRPC SR DSIs NDF 2H -0.06 MRPC 5R DSIs NDF 3H -0.06 BOBBIN DSI 0.62 3H -0.06 3 67 MRPC SR DSIs NDF 5H -0.06 BOBBIN DSI 0.45 5H -0.06 3 70 MRPC 4R DSIs NDF 3H -0.03 3 75 BOBBIN FSD 0.74 SC +42.56 MRPC Special In VOL 0.30 6C -8.00 4 8 MRPC 4R DSIs NDF 3H +0.00 4 12 MRPC 4R DSIs NDF 3H +0.00 4 23 MRPC 4R DSIs NDF 3H +0.00 4 31 MRPC 4R DSIs NDF 3H +0.00 4 33 MRPC 4R DSIs NDF 2H +0.00 MRPC SR DSIs NDF 2H +0.00 BOBBIN DSI 0.87 2H +0.09 4 43 MRPC TSH NDF 3H +0.08 MRPC SR DSIs NDF 3H +0.08 BOBBIN DSI 1.40 3H +0.00 MRPC Special In NDF 3H +0.08 4 44 MRPC 4R DSIs NDF 2H +0.00 BOBBIN DSI 1.14 2H +0.08 4 49 MRPC 5R DSIs NDF 2H +0.08 BOBBIN DSI 1.22 2H +0.08 4 51 MRPC SR DSIs NDF 2H +0.00 4 60 MRPC SR DSIs NDF 3H +0.00 7g 4 71 BOBBIN FSA 1.65 1C +7.75 g } 4 74 BOBBIN FSA 2.03 6H +38.58 V BOBBIN FSA 2.12 7H +41.51 4 77 MRPC 5R DSIs NDF 5H +0.05 BOBBIN DSI 0.43 5H +0.05 5 8 MRPC 4R DSIs NDF 2H +0.00 BOBBIN DSI 0.73 2H +0.09 5 12 MRPC 4R DSIs NDF 4H +0.00 BOBBIN DSI 0.59 4H +0.09 5 18 MRPC 4R DSIs NDF 2H +0.00 5 25 MRPC 4R DSIs NDF 4H +0.00 5 35 MRPC TSH NDF 2H +0.03 MRPC 5R DSIs NDF 2H +0.03 BOBBIN DSI 0.96 2H +0.03 MRPC Special In NDF 2H +0.03 5 37 MRPC 4R DSIs NDF 2H +0.00 BOBBIN DSI 0.69 2H +0.08 5 30 MRPC TSH NDF 3H +0.00 MRPC SR DSIs NDF 3H +0.00 BOBBIN DSI 0.44 3H +0.06 MRPC Special In NDF 3H +0.00 5 41 MRPC Special In NDF TEC +16.10 5 44 MRPC 4R DSIs NDF 5H +0.00 BOBBIN DSI 1.28 SH -0.05 5 46 MRPC TSH NDF 6H +0.00 MRPC SR DSIs NDF '6H +0.00 BOBBIN DSI 0.52 6H +0.00 MRPC Special In NDF 6H +0.00 5 47 BOBBIN FSD 0.99 7C +21.69 MRPC Special In VOL 1.09 7C +21.60 5 48 MRPC SR DSIs NDF 3H +0.00 5 55 MRPC SR DSIs NDF 2H +0.00 5 74 MRPC SR DSIs NDF 3H +0.08 MRPC 5R DSIs NDF 5H +0.03 BOBBIN DSI 0.74 3H +0.08 BOBBIN DSI 0.53 5H +0.03 k,s 6 8 MRPC SR DSIs NDF 3H -0.10 BOBBIN DSI 0.32 3H -0.10 6 9 MRPC SR DSIs NDF 3H +0.03 BOBBIN DSI 0.75 3H +0.03

_ . . _ . . - . . _ _ _ . _ . _ . . - _ . . _ . . _ __. _ _ . _ . _ _ _ _ _. __ . _ m..

BWNS TUBAN II (Version 2.0) . 06/12/1995 14:11:22 Bsaver Valley Unit 2 SG C SR 03/95 t . BOBBIN, Loose Parts Testing,MRPC 4R DSIs,MRPC SR DSIs,MRPC Special. Int.,MRPC TSH,MRPC U-Bend Page 3 of 15 Steam Generator 2RCS-SG21C Location & Percent Through Wall Calls (%TW) For All Indications ROW COL TEST TYPE %TW IND VOLTS LOCATION l~ 6- 19 MRPC 4R DSIs NDF 6H +0.00 6- 23 MRPC 4R DSIs NDF 2H +0.00 MRPC 4R DSIs NDF 3H +0.00 BOBBIN DSI 0.57 2H +0.06 6 25 BOBBIN FSA 2.04 8H +14.95 I 6 27 MRPC 4R DSIs NDF 3H +0.00 6 31 MRPC 4R DSIs NDF 2H +0.00 6 35 MRPC 4R DSIs NDF 4H +0.00 MRPC 4R DSIs NDF 6H +0.00 6 l45 BOBBIN FSA 1.44 4H +6.28 6 46 MRPC 4R DSIs NDF 5H +0.00 6 55 MRPC SR DSIs .NDF 2H +0.00-7 20 MRPC 4R DSIs 'NDF 2H' +0.00 7 27 MRPC 4R DSIs NDF 3H +0.00 BOBBIN DSI 0.82 3H +0.08 7 :28 MRPC 4R DSIs NDF 3H +0.00 7 31 MRPC 5R DSIs NDF 3H -0.07 BOBBIN DSI 0.33 3H -0.07 7 33 BOBBIN FSD 0.82 TSC +37.25 MRPC Special In VOL 1.08 TSC +37.89 7 37 MRPC 4R DSIs NDF 5H +0.00 BOBBIN DSI 0.90 SH +0.03 7 40 MRPC 4R DSIs NDF 3H +0.00 BOBBIN DSI 0.73 3H +0.00 7 42 MRPC 4R DSIs NDF 5H +0.01 8 8 MRPC 4R DSIs NDF 3H +0.00 MRPC 4R DSIs NDF 4H +0.00-O. 8 8

11 MRPC 4R DSIs 15 BOBBIN NDF FSD 1.25 2H 5H

+0.00

+15.85 8 19 BOBBIN FSD 1.30 6H +16.73 BOBBIN FSD 1.31 3H +35.74 BOBBIN 13 ODI 1.24 7H +1.55 MRPC Special In VOL 0.97 7H +1.29 8 22 MRPC 4R DSIs NDF 3H +0.00 8 23 MRPC 4R DSIa NDF 2H +0.00 BOBBIN DSI 0.93 2H +0.06 8 36 MRPC 4R DSIs NDF 2H +0.00 8 43 MRPC TSH NDF 3H +0.00 MRPC SR DSIs NDF 3H +0.00 BOBBIN DSI 0.68 3H +0.00 MRPC Special In NDF 3H +0.00 8 44 MRPC TSH NDF 3H +0.08 MRPC SR DSIs NDF 3H +0.08 BOBBIN DSI 0.60 3H +0.08 MRPC Special In NDF 3H +0.08 8 45 MRPC 4R DSIs NDF 4H +0.00 8 54 MRPC SR DSIs NDF 3H +0.00 8 59 MRPC SR DSIs NDF 2H +0.00 BOBBIN DSI 0.91 2H -0.05 8 79 MRPC 4R DSIs NDF 3H +0.05 8 87 MRPC 4R DSIs NDP 3H +0.00 8 88 BOBBIN FSA 2.20 7H +27.12 9 4 MRPC 4R DSIs NDF 3H +0.00 9 6 MRPC 4R DSIs NDF 3H +0.00 9 14 MRPC 4R DSIs NDF 2H +0.00 9 16 MRPC 4R DSIs- NDF 3H +0.00 9 19 MRPC 4R DSIs NDF 4H +0.00 9 24 MRPC 4R DSIs NDF 5H +0.00 9 32 MRPC 4R DSIs NDF 2H +0.00 MRPC 4R DSIs NDF 3H +0.00 BOBBIN DSI 1.14 2H +0.13 9 34 MRPC 4R DSIs NDF 3H +0.00 MRPC SR DSIs NDF 3H +0.00 BOBBIN DSI 1.17 3H -0.06 9 35 MRPC 4R DSIs NDF 2H +0.00

I l

BWNS TUBAN II (Version 2.0) 06/12/1995 14:11:22 Beaver Valley Unit 2 ,

SG C i SR 03/95 BOBBIN, Loose Parts Testing,MRPC 4R DSIs,MRPC SR DSIs,MRPC Special Int.,MRPC TSH,MRPC U-Bend  ;

f

\s)) '

Page 4 of 15 Steam Generator 2RCS-SG21C Location & Percent Through Wall Calls (%TW) For All Indications ROW COL TEST TYPE %TW IND VOLTS LOCATION MRPC SR DSIs NDF 2H +0.00 9 38 MRPC 4R DSIs NDF 3H +0.00 BOBBIN DSI 0.53 3H +0.03 '

9 40 MRPC TSH NDF 3H -0.03  !

MRPC 4R DSIs NDF 4H +0.00 l MRPC 5R DSIs NDF 3H -0.03  !

BOBBIN DSI 0.86 3H -0.03 i BOBBIN DSI 1.10 4H +0.00 '

MRPC Special In NDF 3H -0.03 9 41 MRPC 4R DSIs NDF 2H +0.00 MRPC 4R DSIs NDF 5H +0.00 BOBBIN DSI 0.63 2H +0.00 9 42 MRPC TSH NDF 5H +0.10 MRPC SR DSIs NDF 5H +0.10 BOBBIN DSI 0.51 5H +0.10 MRPC Special In NDF 5H +0.10 9 43 MRPC 4R DSIs NDF 2H +0.00 BOBBIN DSI 0.82 2H +0.05 9 45 MRPC 4R DSIs NDF SH +0.00 BOBBIN DSI 0.67 5H +0.00 BOBBIN FSD 0.74 4H +30.50 MRPC Special In VOL 0.16 4H +31.35 9 46 MRPC 4R DSIs NDF 3H +0.00 BOBBIN DSI 0.94 3H -0.03 9 47 MRPC 4R DSIs NDF 2H +0.00 BOBBIN DSI 2.30 2H

(,-) 9 48 MRPC 5R DSIs NDF 2H

+0.03

+0.00

\ /- MRPC SR DSIs NDF 3H +0.00 BOBBIN DSI 0.86 3H +0.00 BOBBIN DSI 1.04 2H +0.00 9 61 BOBBIN FSA 1.40 6C +4.83 9 69 MRPC TSH NDF 3H +0.00 MRPC SR DSIs NDF 3H +0.00 BOBBIN DSI 0.93 3H +0.04 MRPC Special In NDF 3H +0.00 9 79 MRPC SR DSIs NDF 3H +0.14 BOBBIN DSI 0.22 3H +0.14 9 83 MRPC 4R DSIs NDF 2H +0.02 10 9 MRPC 4R DSIs NDF 3H +0.00 BOBBIN DSI 0.64 3H +0.14 10 10 MRPC SR DSIs NDF 2H -0.03 BOBBIN DSI 0.95 2H -0.03 10 22 MRPC 4R DSIs NDF 3H +0.00 BOBBIN DSI 0.69 3H +0.02 10 24 MRPC 4R DSIs NDF 3H +0.00 BOBBIN DSI 0.98 3H +0.11 I 10 33 MRPC 4R DSIs NDF 2H +0.00 MRPC 4R DSIs NDF 4H +0.00  ;

BOBBIN DSI 1.10 2H +0.00 10 35 MRPC 4R DSIs NDF 5H +0.00 i i

10 38 MRPC 4R DSIs NDF 3H +0.00 MRPC 4R DSIs NDF 7H +0.00 10 40 MRPC TSH NDF 5H +0.12 MRPC 4R DSIs NDF 3H +0.00 MRPC SR DSIs NDF 5H +0.12 BOBBIN DSI 0.50 SH +0.12 BOBBIN DSI 0.69 3H -0.06 MRPC Special In NDF 5H +0.12 10 47 MRPC 4R DSIs NDF 3H +0.00 11 9 MRPC SR DSIs NDF 3H +0.13 O 11 BOBBIN 13 MRPC 4R DSIs MRPC 5R DSIs DSI NDF NDF 1.00 3H 3H 4H

+0.13

+0.00

+0.06 BOBBIN DSI 0.51 4H +0.06 11 20 MRPC 4R DSIs NDF 5H +0.00

BWNS TUBAN II (Varsion 2.0) 05/12/1995 14:11:22 Bsavsr Valley Unit 'i SG C 5R 03/95 BOBBIN, Loose Parts Testing,MRPC 4R DSIs,MRPC SR DSIs,MRPC Special Int.,MRPC TSH,MRPC U-Bend  !

\

(V Page 5 of 15 Steam Generator 2RCS-SG21C Location & Percent Through Wall Calls (%TW) For All Indications ROW COL TEST TYPE %TW IND VOLTS LOCATION MRPC SR DSIs NDF 5H +0.08 BOBBIN DSI 0.94 5H -0.11 11 22 MRPC 4R DSIs NDF 4H +0.00 MRPC SR DSIs NDF 4H +0.00 BOBBIN DSI 1.16 4H +0.00 11 25 BOBBIN FSA 1.24 2C +20.85 11 30 MRPC 5R DSIs NDF 6H +0.03 BOBBIN DSI 0.31 6H +0.03 11 33 MRPC TSH NDF 4H +0.00 MRPC SR DSIs NDP 4H +0.00 BOBBIN DSI 0.74 4H -0.08 MRPC Special In NDF 4H +0.00 ,

11 34 MRPC 4R DSIs NDF 3H +0.00 )

BOBBIN DSI 1.15 3H +0.07 1 11 38 MRPC 4R DSIs NDF 3H +0.00 11 43 MRPC 4R DSIs NDF 3H +0.00 MRPC 4R DSIs NDF 5H +0.00 BOBBIN DSI 0.85 5H +0.11 BOBBIN DSI 0.53 3H +0.05 11 44 MRPC TSH NDF 3H +0.14 MRPC SR DSIs NDF 3H +0.14 i BOBBIN DSI 1.57 3H +0.14 MRPC Special In NDF 3H +0.14 11 45 MRPC 4R DSIs NDF 5H +0.00 BOBBIN DSI 0.63 5H +0.03 11 46 MRPC TSH NDF SH -0.05

/

' MRPC SR DSIs NDF 5H -0.05 BOBBIN DSI 0.39 5H -0.05 MRPC Special In NDF 5H -0.05 1 11 70 MRPC 4R DSIs NDF 2H +0.00 l MRPC SR DSIs NDF 2H +0.00 '

11 72 MRPC 4R DSIs NDF 2H +0.00 MRPC 4R DSIs NDF 3H +0.00 l MRPC SR DSIs NDF 2H +0.00 l MRPC SR DSIs NDF 3H +0.00 l 11 74 MRPC SR DSIs NDF 3H +0.03 ,

BOBBIN DSI 0.39 3H +0.03 1 11 86 BOBBIN FSA 1.39 4C +43.45 12 24 BOBBIN FSA 1.19 2H +24.62 12 30 MRPC 4R DSIs NDF 2H +0.00 l 12 34 MRPC 4R DSIs NDF 2H +0.00 12 35 MRPC 4R DSIs NDF 5H +0.00 12 37 MRPC 4R DSIs NDF 3H +0.00 MRPC 4R DSIs NDP 6H +0.00 BOBBIN DSI 0.64 3H -0.03 12 38 MRPC 4R DSIs NDF 2H +0.00 MRPC 4R DSIs NDF 3H +0.00 MRPC 5R DSIs NDF 3H +0.00 BOBBIN DSI 0.47 2H -0.06 BOBBIN DSI 1.09 3H -0.08 12 40 MRPC 4R DSIs NDF 3H +0.00 MRPC SR DSIs NDF 3H +0.00 12 42 MRPC 4R DSIs NDF 3H +0.00 BOBBIN DSI 0.53 3H +0.05 12 43 MRPC 4R DSIs NDF 3H +0.00 BOBBIN DSI 0.90 3H +0.11 12 53 MRPC SR DSIs NDF 4H +0.00 12 60 BOBBIN FSA 1.47 2H +8.01 12 72 MRPC SR DSIs NDF 2H +0.03 MRPC SR DSIs NDF 2H +0.03 BOBBIN DSI 0.54 2H +0.03

\ 12 77 MRPC SR DSIs NDF 2H +0.00 BOBBIN DSI 0.41 2H +0.00 12 79 MRPC SR DSIs NDF 3H +0.05 BOBBIN DSI 0.75 3H +0.05

I l

[ BWNS TUBAN II (Version 2.0) 06/12/1995 14:11:22 I

Bravar Valloy Unit 2 l SG C SR 03/95 BOBBIN, Loose Parts Testing,MRPC 4R DSIs,MRPC SR DSIs,MRPC Special Int.,MRPC TSH,MRPC U-Bend

/' h O

l Page 6 of 15 Steam Generator 2RCS-SG21C l

Location & Percent Through Wall Calls (%TW) For All Indications ROW COL TEST TYPE %TW IND VOLTS LOCATION 12 80 MRPC 4R DSIs NDF 3H +0.00 12 83 MRPC 4R DSIs NDF 3H +0.06 BOBBIN DSI 0.54 3H +0.08 l 13 9 MRPC 4R DSIs NDF 2H +0.00 13 19 MRPC 4R DSIs NDF 3H +0.00 13 20 MRPC 4R DSIs NDF 5H +0.00 BOBBIN 9 ODI 0.62 2H +2.64 MRPC Special In VOL 0.58 2H +2.86 13 32 MRPC 4R DSIs NDF 5H +0.00 l 13 36 MRPC 4R DSIs NDF 3H +0.00 '

BOBBIN DSI 1.16 3H -0.13 13 37 MRPC 4R DSIs NDF 4H +0.00 13 38 MRPC 4R DSIs NDF 3H +0.00 BOBBIN DSI 0.75 3H +0.06 j 13 39 MRPC 4R DSIs NDF 3H +0.00 13 40 MRPC 4R DSIs NDF 3H +0.00 BOBBIN DSI 0.70 3H +0.14 13 42 MRPC 4R DSIs NDF 5H +0.00 13 43 MRPC 4R DSIs NDF 3H +0.00 ,

BOBBIN DSI 1.09 3H +0.08 l 13 47 MRPC 4R DSIs NDF 3H +0.00 13 51 MRPC SR DSIs NDF 3H +0.00 l 13 56 MRPC SR DSIs NDF 3H +0.00 l BOBBIN DSI 0.82 3H +0.07 13 70 MRPC 4R DSIs NDF 4H +0.00 MRPC 5R DSIs NDF 4H +0.00 )

[\ \

13 71 MRPC 4R DSIs MRPC SR DSIs NDF NDF 4H 2H

+0.00

+0.08 l

MRPC 5R DSIs NDF 2H +0.08 MRPC SR DSIs NDF 4H +0.00 BOBBIN DSI 0.71 2H +0.08 13 73 BOBBIN 14 ODI 0.58 7H +20.43 MRPC Special In NDF 7H +20.43 ,

13 78 MRPC 4R DSIs NDF 3H +0.00 1 14 17 MRPC 4R DSIs NDF 4H +0.00 14 32 MRPC 4R DSIs NDF 3H +0.00 MRPC 4R DSIs NDF 4H +0.00 MRPC SR DSIs NDF 3H +0.00 14 37 MRPC TSH NDF 3H +0.00 MRPC 4R DSIs NDF 2H +0.00 MRPC 5R DSIs NDF 3H +0.00 BOBBIN DSI 0.55 2H +0.05 BOBBIN DSI 0.62 3H +0.12 l MRPC Special In NDF 3H +0.00 l l

14 38 MRPC 4R DSIs NDF 2H -0.04 1 BOBBIN DSI 2H '

1.16 +0.06 MRPC 4R DSIs VOL 0.40 2H +1.26 14 39 MRPC 4R DSIs NDF 3H +0.00 MRPC SR DSIs NDF 5H +0.03 l BOBBIN DSI 0.75 3H +0.09 )

BOBBIN DSI 0.86 5H +0.03 1 14 45 MRPC 5R DSIs NDF 2H +0.05 BOBBIN DSI 0.96 2H +0.05 14 47 MRPC TSH NDF 3H +0.00 MRPC SR DSIs NDF 3H +0.00 BOBBIN DSI 0.87 3H +0.00 MRPC Special In NDF 3H +0.00 14 48 MRPC SR DSIs NDF 3H +0.00 BOBBIN DSI 1.32 3H +0.00 14 50 MRPC SR DSIs NDF 5H +0.00

[\,,'\ 14 14 56 59 MRPC 4R MRPC 4R DSIs DSIs NDF NDF 3H 3H

+0.00

+0.00 14 64 MRPC 4R DSIs NDF 3H +0.02 14 65 BOBBIN FSA 2.20 4C +43.59 MRPC Special In VOL 0.54 SC -6.91 l

BWNS TUBAN II (Version 2.0) 06/12/1995 14:11:22 BL:ver Valley Unit 2 SG C SR 03/95 BOBBIN , Loose Parts Testing,MRPC 4R DSIs,MRPC SR DSIs,MRPC Special Int.,MRPC TSH,MRPC U-Bend O

Steam Generator 2RCS-SG21C Location & Percent Through Wall Calls (%TW) For All Indications ROW COL TEST TYPE %TW IND VOLTS LOCATION 14 66 BOBBIN FSA 2.06 2C +31.97 BOBBIN FSA 2.20 2C +28.68 l 14 67 MRPC 4R DSIs NDF 3H -0.08 BOBBIN DSI 0.92 3H +0.00 14 68 MRPC 4R DSIs NDF 5H -0.15 14 69 MRPC SR DSIs NDF 2H +0.08 MRPC SR DSIs NDF 2H +0.08 BOBBIN DSI 0.50 2H +0.08 14 82 MRPC 4R DSIs NDF 3H +0.06 14 92 BOBBIN FSA 1.89 6C +19.40 15 14 MRPC 4R DSIs NDF 3H +0.00 MRPC 4R DSIs NDF 3H +0.00 15 35 MRPC TSH NDF 3H -0.03 MRPC SR DSIs NDF 3H -0.03 BOBBIN DSI 1.03 3H -0.03 MRPC Special In NDF 3H -0.03 15 40 MRPC TSH NDF 3H +0.00 MRPC SR DSIs NDF 3H +0.00 BOBBIN DSI 0.85 3H +0.05 MRPC Special In NDF 3H +0.00 15 41 MRPC 4R DSIs NDF 3H +0.00 15 42 MRPC 4R DSIs NDF 3H +0.00 BOBBIN DSI 0.86 3H +0.08 15 44 BOBBIN FSD 0.81 7H +34.65 MRPC Special In VOL 0.27 7H +34.94 7s 15 45 MRPC TSH NDF 5H +0.00 l ) MRPC 4R DSIs NDF 3H +0.00 k/ m MRPC 5R DSIs NDF 5H +0.00 BOBBIN DSI 0.83 5H +0.00 BOBBIN DSI 0.84 3H +0.05 MRPC Special In NDF 5H +0.00 15 50 MRPC SR DSIs NDF 3H +0.00 15 55 MRPC SR DSIs NDF 5H +0.00 15 61 MRPC 4R DSIo NDF 3H +0.00 MRPC SR DSIs NDF 2H +0.08 MRPC SR DSIs NDF 2H +0.08 BOBBIN DSI 0.84 2H +0.08 15 65 MRPC 4R DSIs NDF 2H +0.00 BOBBIN DSI 0.88 2H +0.08 15 71 MRPC 4R DSIs NDF 4H +0.00 MRPC SR DSIs NDF 4H +0.00 15 72 MRPC 4R DSIs NDF 2H +0.00 MRPC 5R DSIs NDF 2H +0.00 15 74 MRPC 4R DSIs NDF 3H +0.00 MRPC SR DSIs NDF 3H +0.00 15 75 BOBBIN FSA 1.50 6C +38.53 15 80 MRPC 4R DSIs NDF 3H +0.03 BOBBIN DSI 0.94 3H +0.08 16 14 MRPC SR DSIs NDF 3H +0.15 BOBBIN DSI 0.69 3H +0.15 16 15 MRPC 4R DSIs NDF 2H +0.00 BOBBIN DSI 0.57 2H +0.06 16 17 MRPC SR DSIs NDF 3H +0.12 BOBBIN DSI 1.21 3H +0.12 16 22 MRPC 4R DSIs NDF 3H +0.00 BOBBIN DSI 0.59 3H +0.14 16 24 MRPC 4R DSIs NDF 3H +0.00 16 26 MRPC 4R DSIs NDF 3H +0.00 BOBBIN FSA 5.05 3C +47.91

,_s 16 29 MRPC 4R DSIs NDF 3H +0.00

/ ) 16 31 MRPC 4R DSIs NDF 4H +0.00

(,/ 16 50 MRPC 4R DSIs NDF 2H +0.00 16 51 MRPC 4R DSIs NDF 3H +0.00 BOBBIN DSI 0.52 3H -0.03 16 52 MRPC 4R DSIs NDF 2H +0.04

J BWNS TUBAN II (Version 2.0) .

06/12/1995 14:11:22 Beaver Valley Unit 2

[- SG C l- .

SR 03/95

--. BOBBIN, Loose Parts Testing,MRPC 4R DSIs,MRPC 5R DSIs,MRPC Special Int. ,MRPC TSH,MRPC U-Bend .

Page 8 of 15 l Steam Generator 2RCS-SG21C j' Location & Percent Through Wall Calls . (%TW) For All Indications l ROW COL TEST TYPE. %TW IND- VOLTS LOCATION

~

16 53 MRPC 4R DSIs NDF 5H -0.11 t 16 54 MRPC 4R DSIs NDF 7H -0.04 16 56 BOBBIN . FSA 2.65 1H +27.83 16 57 MRPC 4R DSIs. NDF 3H +0.00 l BOBBIN DSI 0.96 3H +0.03 16 59 MRPC 4R DSIs NDF 3H +0.02 16 61.MRPC 4R DSIs .NDF 3H +0.00 MRPC 5R DSIs NDF 3H +0.00 16 62 MRPC 4R DSIs NDF 3H +0.00 MRPC 5R DSIs NDF 3H +0.00 BOBBIN. DSI 0.58' 3H -0.03

.16 63 MRPC 4R DSIs NDF 2H -0.06. r MRPC 4R DSIs NDF 3H -0.02 16 73 MRPC 4R DSIs .NDF 2H +0.00 ICRPC 5R DSIs NDF 2H +0.00 BOBBIN DSI 0.74 2H +0.06 16 77 MRPC SR DSIs NDF 2H +0.00 BOBBIN DSI- 0.38 2H +0.00 .

16 78 MRPC SR DSIs NDF 2H +0.08 '

BOBBIN DSI 0.60 -2H +0.08 16- 90 BOBBIN FSA 1.59 4C +29.24 16 91 BOBBIN . FSA- 5.93 4H +49.32 17 5 MRPC Special In NDF 2C +0.00 17 9 MRPC 4R DSIs NDF 2H +0.00 BOBBIN DSI 0.68 2H +0.00 17 22 BOBBIN FSA 1.30 4C +17.10

[~s . 17 30 MRPC 4R DSIs NDF 5H +0.00 MRPC SR DSIs NDF 4H +0.10 BOBBIN DSI 1.70 4H +0.10 17 32 MRPC 5R DSIs NDF 3H +0.16 BOBBIN DSI 0.85 3H +0.16 17 33 MRPC 4R DSIs NDF 2H +0.00 BOBBIN DSI 1.16 2H +0.00 17 45 MRPC SR DSIs NDF 3H +0.00 17 47 MRPC 5R DSIs NDF 3H +0.12 BOBBIN DSI- 0.78 3H +0.12 17 49 MRPC 4R DSIs NDF 3H +0.04 BOBBIN DSI 0.64 3H +0.06 17 50 MRPC 4R DSIs NDF 4H -0.04 BOBBIN DSI 0.55 4H +0.09 17 54 MRPC 4R DSIs NDF 3H +0.02 BOBBIN DSI 0.83 3H +0.03 17 61 MRPC 4R-DSIs NDF 3H +0.00 MRPC SR DSIs NDF 2H +0.00 MRPC SR DSIs NDF 2H -0.01 MRPC SR DSIs' NDF 3H +0.00 BOBBIN DSI 1.02 2H -0.07 17 66 MRPC 4R DSIs NDF 2H +0.00 MRPC SR DSIs NDF 2H +0.00 17 70 MRPC 4R DSIs NDF 5H +0.00 MRPC-5R DSIs NDF 5H +0.00-17- 74 MRPC 4R DSIs' NDF 4H +0.00 MRPC 5R DSIs NDF 4H +0.00 BOBBIN DSI 0.29 4H +0.03 17 75 MRPC 4R DSIs NDF 2H +0.00 MRPC SR DSIs NDF 2H +0.00

-17 76 MRPC 5R DSIs NDF 3H -0.05 BOBBIN DSI 0.46 3H -0.05 17 79 MRPC SR DSIs NDF 2H +0.03 BOBBIN DSI 0.19 1H +0.03 O 18 18 10 BOBBIN 15 MRPC 5R DSIs BOBBIN FSA NDF DSI 1.76 1.08 1H 2H 2H

+24.00

+0.00

+0.00 18 19 MRPC 4R DSIs NDF 4H +0.00 l

18 36 MRPC SR DSIs NDF 3H +0.03 1

l

. .. . _ -. ._. . __ _ _. ______m__ _

l

'BWNS TUBAN II (Version 2.0) 06/12/1995 14:11:22 Banvar Valley Unit 2 SG C

-SR 03/95 BOBBIN, Loose Parts Testing,MRPC 4R DSIs,MRPC SR DSIs,MRPC Special Int.,MRPC TSH,MRPC U-Bend fN l

(j Steam Generator 2RCS-SG21C Location & Percent Through Wall Calls (%TW) For All Indications .i ROW -COL TEST TYPE %TW IND VOLTS . LOCATION

' BOBBIN DSI 0.88 3H +0.03 18 39 MRPC SR DSIs NDF 3H .+0.03

'MRPC SR DSIs NDF 4H +0.19 BOBBIN DSI 0.93 4H +0.19 BOBBIN DSI 1.05 3H +0.03 18 40 MRPC 4R DSIs NDF 7H +0.00 l 18 47 MRPC 5R DSIs NDF .

3H -0.03 l BOBBIN DSI 0.86 3H -0.03 i 18 52 MRPC 4R DSIs NDF 4H -0.09  !

18 55 MRPC 5R DSIs NDF 4H +0.00 I MRPC SR DSIs NDF 4H -0.03 BOBBIN DSI 1.28 4H -0.03 18 56 MRPC 4R DSIs NDF 3H +0.00 MRPC 4R DSIs NDF 5H +0.00 MRPC SR DSIs NDF 5H +0.00 18 62 MRPC 4R DSIs NDF 3H -0.09 18 64 BOBBIN FSA 1.72' 6H +38.58 18 69 MRPC 4R DSIs NDF 2H +0.00 18 71 MRPC 4R DSIs NDF 3H -0.09 BOBBIN DSI 0.60 3H +0.00 1 18 75 MRPC 4R DSIs NDF 3H +0.02 l MRPC 5R DSIs NDF 3H +0.17 BOBBIN DSI 0.68 3H +0.17 18 77 MRPC SR DSIs NDF 3H +0.08 MRPC SR DSIs NDF 5H +0.10 I BOBBIN DSI 0.75 3H +0.08 O BOBBIN BOBBIN MRPC Special In DSI FSD VOL 0.38 1.17 0.33 5H SC SC

+0.10

+34.84

+34.84 19 30 BOBBIN FSA 2.72 AV4 +18.19 19 35 MRPC SR DSIs NDF 3H +0.00 BOBBIN DSI 1.42 3H +0.00 19 38 MRPC 4R DSIs NDF 3H +0.00 MRPC SR DSIs NDF 5H +0.12 BOBBIN- DSI 1.46 5H +0.12 19 44 MRPC 4R DSIs NDF 3H +0.00 MRPC SR DSIs NDF 3H -+0.00 19 45 MRPC 4R DSIs NDF 3H +0.00 MRPC 5R DSIs NDF 3H +0.00 19 49 MRPC 4R DSIs NDF 2H -0.06 MRPC 4R DSIs NDF 3H +0.00 MRPC 5R DSIs NDF 3H +0.00 19 58 MRPC 4R DSIs NDF 5H +0.00 19 60 MRPC 4R DSIs NDF 2H -0.04 19 74 MRPC 4R DSIs NDF 3H -0.02 20 34 MRPC 4R DSIs NDF 2H +0.00 20 37 MRPC 4R DSIs NDF 3H +0.00 20 42 MRPC 4R DSIs NDF 3H +0.00 20 46 MRPC 4R DSIs NDF 2H +0.00 BOBBIN DSI 0.86 2H -0.12 20 50 MRPC 4R DSIs NDF 5H -0.04 20 51 BOBBIN FSA 1.37 5C +12.05 20 52 MRPC 4R DSIs NDF 5H -0.02 20 54 MRPC 4R DSIs NDF 3H -0.08 MRPC 4R DSIs NDF 4H +0.00 MRPC SR DSIs NDP 4H +0.00 20 60 BOBBIN FSA 1.64 6H +45.72 20 75 MRPC 4R DSIs NDF 2H -0.04 BOBBIN DSI 0.82 2H +0.05 BOBBIN FSA 2.58 7H +21.96

/~ \ BOBBIN FSA 1.98 6C +30.41 k/

s BOBBIN FSA 2.10 6C +14.11 20 76 MRPC 4R DSIs NDF 3H +0.06 20 83 MRPC 4R DSIs NDF 2H +0.06 21 25 BOBBIN FSA 2.79 1H +11.29

.- - .. _ . . - . - -- . - . - . . - , . . . . - . . _ _ . . . . ~ . . - . - . . . - -

BWNS.TUBAN-II (Version 2.0) 06/12/1995 14:11:22 Beaver Valley Unit 2 SG C l SR 03/95 L BOBBIN, Loose Parts Testing,MRPC 4R DSIs,MRPC SR DSIs,MRPC Special Int.,MRPC TSH,MRPC U-Bend

(\

l \~,) '

! Page 10 of.15 l Steam Generator 2RCS-SG21C l Location & Percent Through Wall Calls (%TW) For All Indice.tions ROW COL TEST TYPE %TW IND VOLTS LOCATION 21 37 BOBBIN FSA 1.30 1H - +12.92 21 38 MRPC 4R DSIs NDF 3H +0.00 21 41 MRPC 4R DSIs NDF 2H +0.00 21 58 MRPC 4R DSIs NDF 3H -0.06 21 60 MRPC 4R DSIs .NDF 2H +0.04 MRPC 4R DSIs NDF 3H +0.04 21' 63 MRPC 4R DSIs NDF 2H -0.09 MRPC 4R DSIs NDF 3H +0.02 MRPC 4R DSIs NDF' 5H +0.04 21 64 MRPC 4R DSIs NDF 3H -0.02

21 65 MRPC 4R DSIs NDF 3H +0.00-MRPC 4R DSIs NDF 5H +0.02-21 67 MRPC SR DSIs NDF 4H +0.05 MRPC SR DSIs NDF 4H +0.05 BOBBIN DSI 0.44 4H +0.05 21 76 MRPC 4R DSIs NDF 2H +0.06 21 78 MRPC SR DSIs NDF 6H -0.05 BOBBIN DSI- 0.35 6H -0.05

-BOBBIN FSD 0.84 6C +42.87 MRPC Special In VOL 0.20 7C -7.10 l 21 81 MRPC 4R DSIs NDF 2H +0.03 i

MRPC 4R DSIs NDF 2H +0.03 22 7 MRPC 5R DSIs NDF 3H +0.03 BOBBIN DSI 0.57 3H +0.03 22 12 MRPC 4R DSIs NDF 2H +0.00 22 28 BOBBIN FSA 3.67 TSH +17.47 O 22 22 36 MRPC 4R DSIs BOBBIN 38 MRPC 4R DSIs NDF DSI NDF 1.37 3H 3H 3H

+0.00

+0.06

+0.00 BOBBIN DSI 0.91 3H +0.12 22 39 MRPC SR DSIs NDF 3H +0.19 BOBBIN DSI 0.72 3H +0.19 22 43 MRPC 4R DSIs NDF 3H +0.00 22 53 BOBBIN FSA 5.50 TSC +1.74 22 54 MRPC 4R DSIs NDF 3H +0.06 22 59 MRPC 5R DSIs NDF 3H +0.00 MRPC'5R DSIs NDF 3H +0.00 BOBBIN DSI 0.78 3H +0.00 22 63 BOBBIN FSA 2.22 7C +39.62 22 64 MRPC 4R DSIs NDF 3H +0.00 22 67 MRPC 4R DSIs NDF 2H +0.03 22 68 MRPC 4R DSIs NDF 2H +0.03 22 76 MRPC 4R DSIs NDF 5H +0.09 BOBBIN DSI 0.88 SH +0.11 23 8 MRPC SR DSIs NDF 4H +0.14 BOBBIN DSI 0.50 4H +0.14 23 37 MRPC SR DSIs NDF 2H +0.06 MRPC SR DSIs NDF 5H +0.00 BOBBIN DSI 1.09 5H +0.06 BOBBIN DSI 2H 1.22 +0.06

'23 42 MRPC 4R DSIs NDF 2H +0.00 MRPC 4R DSIs NDF 2H +0.00 MRPC 4R DSIs NDF 3H +0.00 MRPC SR DSIs NDF 3H +0.00 BOBBIN DSI 1.22 3H +0.05 BOBBIN DSI 1.16 2H +0.10 l 23 55 MRPC 4R DSIs NDF 3H +0.00 l 23 58 MRPC 4R DSIs NDF 2H +0.00 l MRPC 4R DSIs NDF 3H +0.00 l 24 19 MRPC SR DSIs NDF 3H -0.05 BOBBIN DSI 0.83 3H -0.05 24 46 MRPC 4R DSIs NDF 2H +0.00

! BOBBIN DSI 0.63 2H -0.06 24 47 MRPC 4R DSIs NDF 3H +0.00 24 48 MRPC 4R DSIs NDF 3H +0.04

. .- ._. _ ~ .. .

l 1

BWNS TUBAN II (Version 2.0) 06/12/1995 14:11:22 Beaver Valley Unit 2 SG C i SR 03/95  !

BOBBIN, Loose Parts Testing,MRPC 4R DSIs,MRPC SR DSIs,MRPC Special Int.,MRPC TSH,MRPC U-Bend (V)

Page 11 of 15 l Steam Generator 2RCS-SG21C Location & Percent Through Wall Calls (%TW) For All Indications I ROW COL TEST TYPE %TW IND VOLTS LOCATION 24 51 MRPC 4R DSIs NDF 2H -0.04 I MRPC 4R DSIs NDF 4H -0.06 1 24 55 MRPC 4R DSIs NDF 3H +0.00 I MRPC 4R DSIs NDF 5H +0.02 BOBBIN DSI 0.99 3H +0.00 24 56 MRPC 4R DSIs NDF 2H +0.00 l MRPC 4R DSIs NDF 3H +0.00 i BOBBIN DSI 0.87 3H +0.06 l 24 61 BOBBIN FSA 3.36 4H +16.11 24 68 MRPC 4R DSIs NDF 3H +0.00 24 69 MRPC 4R DSIs NDF 2H +0.00 24 85 BOBBIN FSA 1.00 SC +13.97 BOBBIN FSA 2.09 5C +7.90 25 9 MRPC SR DSIs NDF 3H +0,18 BOBBIN DSI 0.66 3H +0.18 25 16 BOBBIN FSA 1.53 3H +40.24 25 23 BOBBIN FSA 1.80 TSH +11.98 25 24 MRPC Special In NDF 1C +1.71 MRPC Special In NDF 1C +6.66 BOBBIN FSA 12.32 1C +1.71 to

  • 25 29 MRPC SR DSIs NDF 4H +0.10 BOBBIN DSI 1.32 4H +0.10 25 31 MRPC 4R DSIs NDF 2H +0.00 25 34 MRPC 4R DSIs NDF 2H +0.00 25 35 MRPC SR DSIs NDF 5H +0.13 BOBBIN DSI 1.30 5H +0.13
  1. ~ \ 25 36 MRPC 4R DSIs NDF 2H +0.00 ks ,'/ 25 37 MRPC SR DSIs NDF 4H +0.00 BOBBIN DSI 1.30 4H +0.09 25 47 MRPC 4R DSIs NDF 2H +0.00 25 48 MRPC 4R DSIs NDF 4H +0.00 25 51 MRPC 4R DSIs NDF 2H +0.00 MRPC 4R DSIs NDF 3H +0.00 25 54 MRPC 4R DSIs NDF 2H +0.00 BOBBIN DSI 1.18 2H -0.03 25 56 MRPC 4R DSIs NDF 3H +0.00 25 57 MRPC 4R DSIs NDF 2H +0.00 25 60 MRPC 4R DSIs NDF 3H +0.00 MRPC SR DSIs NDF 2H +0.06 BOBBIN DSI 0.85 2H +0.06 25 65 MRPC SR DSIs NDF 2H +0.06 MRPC SR DSIs NDF 2H +0.06 BOBBIN DSI 1.15 2H +0.06 25 69 MRPC 4R DSIs VDF 2H +0.00 BOBBIN DSI 0.85 2H +0.08 25 73 MRPC 4R DSIs NDF 3H +0.00 BOBBIN DSI 0.35 3H +0.05 25 78 MRPC SR DSIs NDF 3H -0.03 BOBBIN DSI 0.54 3H -0.03 26 14 MRPC 4R DSIs NDF 5H +0.00 26 26 MRPC Special In NDF TEC +15.96 26 31 MRPC 4R DSIs NDF 4H +0.00 26 34 MRPC SR DSIs NDF 2H +0.00 BOBBIN DSI 0.69 2H +0.06 26 37 MRPC 4R DSIs NDF 2H +0.00 26 39 MRPC 4R DSIs NDF 5H +0.00 MRPC 4R DSIs NDF 7H +0.00 BOBBIN FSA 3.82 2H +35.71 26 41 MRPC 4R DSIs NDF 3H +0.00 26 42 MRPC 4R DSIs NDF 2H +0.00

[~') BOBBIN DSI 1.02 2H +0.05

\j 26 49 MRPC 4R DSIs NDF 2H +0.00 BOBBIN DSI 0.68 2H -0.06 26 53 MRPC 4R DSIs ~s r 2H +0.00 MRPC 4R DSIs NDF 3H +0.00

BWMS TUBAN II (Version 2.0) 06/12/1995 14:11:22 l l Baaver Valley Unit 2 SG C 5R 03/95 BOBBIN, Loose Parts Testing,MRPC 4R DSIs,MRPC SR DSIs,MRPC Special Int.,MRPC TSH,MRPC U-Bend r' 'g O

Steam Generator 2RCS-SG21C I Location & Percent Through Wall Calls (%TW) For All Indications I ROW COL TEST TYPE %TW IND VOLTS LOCATION BOBBIN DSI 1.06 3H +0.03 26 55 MRPC 4R DSIs NDF 5H +0.00 MRPC SR DSIs NDF 3H +0.00 )

MRPC SR DSIs NDF 3H +0.00 i BOBBIN DSI 0.86 3H +0.00 26 59 MRPC 4R DSIs NDF 3H +0.00 26 60 MRPC 4R DSIs NDF 3H +0.00 26 64 MRPC 4R DSIs NDF 5H +0.00 27 19 MRPC 4R DSIs NDF 3H +0.00 27 30 MRPC SR DSIs NDF 4H +0.00 BOBBIN DSI 0.67 4H +0.07 27 32 MRPC 4R DSIs NDF 2H +0.00 27 36 MRPC 4R DSIs NDF 5H +0.00 27 41 MRPC 4R DSIs NDF 3H +0.00 MRPC 4R DSIs NDF 5H +0.00 BOBBIN DSI 0.46 3H +0.08 BOBBIN DSI 0.32 5H +0.16 27 42 MRPC 4R DSIs NDF 2H +0.00 MRPC 4R DSIs NDF 3H +0.00 BOBBIN DSI 0.57 2H +0.03 BOBBIN DSI 0.76 3H +0.08 27 45 MRPC 4R DSIs NDF 2H +0.00 27 48 MRPC 4R DSIs NDF 2H +0.00 BOBBIN DSI 0.85 2H -0.03 27 51 MRPC 4R DSIs NDF 3H +0.00 27 58 MRPC 4R DSIs NDF 5H +0.00 lN 27 60 MRPC SR DSIs NDF 2H -0.03

'\_,/ BOBBIN DSI 0.79 2H -0.03 27 79 MRPC SR DSIs NDF 2H +0.05 BOBBIN DSI 0.54 2H +0.05 27 82 BOBBIN FSA 2,06 AV1 +5.57 28 16 MRPC SR DSIs NDF 3H -0.03 BOBBIN DSI 0.62 3H -0.03 28 19 BOBBIN DSI 1.66 3H -0.03 28 27 MRPC 4R DSIs NDF 5H +0.00 28 28 MRPC 4R DSIs NDF 3H +0.00 BOBBIN DSI 0.54 3H +0.10 29 31 MRPC 4R DSIs NDF 3H +0.00 MRPC 4R DSIs NDF 4H +0.00 28 35 MRPC 5R DSIs NDF 2H +0.00 BOBBIN DSI 1.77 2H +0.00 28 36 MRPC 4R DSIs NDF 2H +0.00 28 40 MRPC 4R DSIs NDF 2H +0.00 MRPC 4R DSIs NDF 3H +0.00 MRPC 4R DSIs NDF 4H +0.00 BOBBIN DSI 0.87 2H +0.07 28 41 MRPC 4R DSIs NDF 2H +0.00 MRPC 4R DSIs NDF 3H +0.00 28 42 MRPC 4R DSIs NDF 2H +0.00 MRPC 4R DSIs NDF 3H +0.00 MRPC SR DSIs NDF 2H +0.00 BOBBIN FSD 0.45 6H +21.91 28 44 MRPC 4R DSIs NDF 2H +0.00 28 45 BOBBIN FSA 1.94 3H +18.84 28 46 MRPC 4R DSIs NDF 3H +0.00 MRPC SR DSIs NDF 3H -0.03 BOBBIN DSI 0.51 3H -0.03 28 47 MRPC 4R DSIs NDF 2H +0.00 MRPC 4R DSIs NDF 3H +0.00 MRPC SR DSIs NDF 5H +0.03

[ BOBBIN DSI 0.97 3H -0.03

( BOBBIN BOBBIN DSI DSI 0.44 1.23 5H 2H

+0.03

-0.03 28 50 MRPC 4R DSIs NDF 3H +0.00 MRPC 4R DSIs NDF 5H +0.00 l

l BWNS TUBAN II (Version 2.0) 06/12/1995 14:11:22 Baaver Valley Unit 2 SG C i SR 03/95 l BOBBIN, Loose Parts Testing,MRPC 4R DSIs,MRPC SR DSIs,MRPC Special Int.,MRPC TSH,MRPC U-Bend

\

l l Page 13 of 15 l Steam Generator 2RCS-SG21C l Location & Percent Through Wall Calls (%TW) For All Indications l ROW COL TEST TYPE %TW IND VOLTS LOCATION BOBBIN DSI 0.79 3H -0.06 BOBBIN DSI 0.46 5H +0.00 28 51 BOBBIN FSA 3.00 5H +4.23 28 70 BOBBIN FSA 2.89 7C +38.95 29 23 BOBBIN FSA 1.20 1C '+19.10 29 24 MRPC 4R DSIs NDF 5H +0.00 29 29 MRPC SR DSIs NDF 4H +0.10 BOBBIN DSI 1.35 4H +0.10 29 34 MRPC 4R DSIs NDF 3H +0.00 29 36 MRPC 4R DSIs NDF 3H +0.00 BOBBIN DSI 1.13 3H +0.09 29 38 MRPC 4R DSIs NDF 5H +0.00 29 47 MRPC 4P DSIs NDF 2H +0.00 29 48 MRPC 4R DSIs NDF 2H +0.00 MRPC 4R DSIs NDF 3H +0.00 BOBBIN DSI 1.30 3H +0.00 29 49 MRPC SR DSIs NDF 2H -0.06 BOBBIN DSI 1.18 2H -0.06 29 50 MRPC 4R DSIs NDF 2H +0.00 MRPC 4R DSIs NDF 5H +0.00 29 57 MRPC 4R DSIs NDF 3H +0.00 MRPC 4R DSIs NDF 5H +0.00 29 60 MRPC 4R DSIs NDF 3H +0.00 BOBBIN DSI 0.62 3E +0.00 29 61 MRPC 4R DSIs NDF 3H +0.00 30 13 BOBBIN FSA 1.23 7H +16.32

[)

\m /

30 18 MRPC SR DSIs BOBBIN NDF DSI 0.83 3H 3H

+0.03

+0.03 30 30 MRPC 4R DSIs NDF 4H +0.00 30 31 MRPC 4R DSIs NDF 4H +0.00 30 36 MRPC 4R DSIs NDF 3H +0.00 BOBBIN DSI 0.90 3H +0.06 30 39 MRPC 4R DSIs NDP 3H +0.00 30 41 MRPC 4R DSIs NDF 2H +0.00 30 42 MRPC 4R DSIs NDF 2H +0.00 BOBBIN DSI 0.95 2H +0.00 30 44 MRPC 4R DSIs NDF 2H +0.00 30 48 MRPC 4R DSIs NDF 2H +0.00 MRPC 4R DSIs NDP 3H +0.00 30 49 MRPC 4R DSIs NDF 2H +0.00 30 50 MRPC 4R DSIs NDF 2H +0.00 30 52 BOBBIN FSA 3.90 4C +20.15 MRPC Special In VOL 1.50 4C +20.75 30 57 MRPC 4R DSIs NDF 3H +0.00 BOBBIN DSI 1.12 3H +0.03 30 60 MRPC 4R DSIs NDF 2H +0.00 30 61 MRPC 4R DSIs NDF 2H +0.00 MRPC 4R DSIs NDF 4H +0.00 BOBBIN DSI 1.17 2H -0.07 30 62 MRPC 4R DSIs NDF 3H +0.00 30 63 BOBBIN FSA 2.52 1C +14.81 30 64 MRPC 4R DSIs NDF 2H +0.00 30 81 BOBBIN FSD 1.01 4C +14.90 MRPC Special In VOL 0.54 4C +14.90 31 40 BOBBIN FSA 1.97 4H +20.62 31 42 BOBBIN FSA 3.28 2H +23.37 31 47 MRPC 4R DSIs NDF 2H +0.00 31 49 BOBBIN FSA 1.95 2H +17.88 31 53 BOBBIN FSA 1.71 3H +22.89 31 54 MRPC 4R DSIs NDF 3H +0.00

[h

\_,)

31 31 55 MRPC 4R DSIs 56 MRPC 4R DSIs NDF NDF 3H 2H

+0.00

+0.00 MRPC SR DSIs NDF 2H +0.00 31 80 BOBBIN FSD 0.68 2C +13.26 MRPC Special In VOL 0.23 2C +13.26 l

. . . _ __ ___._ __ _ .. ____ _-._ _ _ . - . . _ . ~ . _ _ _ . _ _ _ _ .

I i

BWNS TUBAN II (Version 2.0) 06/12/1995 14:11:22 Beaver Valley Unit 2 SG C SR 03/95 BOBBIN, Loose Parts Testing,MRPC 4R DSIs,MRPC 5R DSIs,MRPC Special Int.,MRPC TSH,MRPC U-Bend O Page 14 of 15 l

! . Steam Generator 2RCS-SG21C

! Location & Percent Through Wall Calls (%TW) For All Indications ROW COL TEST TYPE- .%TW IND VOLTS. LOCATION 32~ 27 MRPC SR DSIs NDF 2H +0.00 BOBEIN DSI 0.53 2H +0.03 i 32 34 MRPC 5R DSIs NDF 2H -0.03 1 BOBBIN DSI 1,64 2H -0.03 32 40 BOBBIN FSA 2.17 2H +20.53 i 32 42 MRPC 4R DSIs NDF 4H +0.00 l BOBBIN FSA 3.75 2C +16.85 32 44 BOBBIN FSA 1,41 2H +34.25 I BOBBIN FSA' 2.08 4C +13.14 l 32 45 BOBBIN FSA 1.91 3H +17.21 i 32 52 MRPC 4R DSIs NDF 2H +0.00 l MRPC 4R DSIs NDF 4H +0.00 I MRPC SR DSIs NDF 3H +0.08 l MRPC 5R DSIs NDF 3H +0.08 BOBBIN DSI 0.54 3H +0.08 BOBBIN DSI 0.58 4H +0.03 BOBBIN- DSI 0.83 2H- +0.03 32 53 MRPC SR DSIs NDF 3H +0.03 MRPC SR DSIs NDF 3H +0.03 BOBBIN DSI 0.84 3H +0.03 32 55 MRPC 4R DSIs NDF 3H +0.00 32 60 MRPC 4R DSIs NDF 4H +0.00 BOBBIN DSI 0.79 4H +0.11 33 42 MRPC 4R DSIs NDF 3H +0.00 33 44 MRPC 4R DSIs NDF 2H +0.00 BOBBIN DSI 0.66 2H +0.03 0 33 33 34 34 60 MRPC 4R DSIs

'64 MRPC 4R DSIs 24 BOBBIN 35 MRPC 4R DSIs NDF NDF FSA NDF 1.97 3H 2H 2H 3H

+0.00

+0.00

+47.27

+0.00 MRPC 5R DSIs NDF 3H +0.00 BOBBIN DSI 1.46 3H +0.22 34 45 MRPC 4R DSIs- NDF 3H +0.00 34 '52 MRPC SR DSIs NDF 3H +0.05 MRPC SR DSIs NDF 3H +0.05 BOBBIN DSI 0.68 3H +0.05 34 ~55 BOBBIN FSA 2.83 6H +17.63 34 58 MRPC 5R DSIs NDF 5H +0.11 ,

MRPC SR DSIs NDF 5H +0.11 i BOBBIN DSI 0.52 5H +0.11 34 59 MRPC SR DSIs NDF 2H +0.10 BOBBIN DSI 0.98 2H +0.10 34- 74 BOBBIN FSI 0.29 3C +22.31 MRPC Special In NDF 3C +22.31 34 78 MRPC SR DSIs NDF 1H +8.07 BOBBIN 19 ODI 0.46 1H +0.07 MRPC Special In NDF 1H +8.07 35 30 MRPC SR DSIs NDF 3H +0.03 BOBBIN DSI 1.33 3H +0.03 35 31 BOBBIN FSA 2.72 6H +7.64 35 36 MRPC SR DSIs NDF 3H -0.13 BOBBIN DSI 0.96 3H' -0.13 35 46 MRPC SR DSIs NDF 3H +0.00 BOBBIN DSI 0.94 3H +0.05 35 48 MRPC 4R DSIs NDF 2H +0.00 MRPC 4R DSIs NDF 3H +0.00 MRPC 4R DSIs NDF 4H +0.00 BOBBIN DSI 0.93 2H +0.13 35 56 MRPC 4R DSIs NDF 3H +0.00 35 78 BOBBIN FSA 2.28 TSC +11.56 MRPC Special In VOL 3.48 TSC +11.52

. O~ .

36 19 BOBBIN MRPC Special In FSI NDF 0.19 3C 3C

+13.40

+13.40 36 26 MRPC 4R DSIs NDF 3H +0.00 36 35 MRPC 4R DSIs NDF 3H +0.00

BWNS TUBAN II (Varsion 2.0) 06/12/1995 14:11:22 Bravar Valley Unit 2 SG C 5R 03/95 BOBBIN, Loose Parts Testing,MRPC 4R DSIs,MRPC SR DSIs,MRPC Special Int.,MRPC TSH,MRPC U-Bend r^s Page 15 of 15 Steam Generator 2RCS-SG21C Location & Percent Through Wall Calls (%TW) For All Indications ROW COL TEST TYPE %TW IND VOLTS LOCATION 36 43 BOBBIN FSA 1.62 3C +18.22 36 56 MRPC SR DSIs NDF 3H +0.08 MRPC SR DSIs NDF 3H +0.16 BOBBIN DSI 0.55 3H +0.16 BOBBIN FSA 3.00 SC +28.54 MRPC Special In VOL 0.44 5C +28.54 37 29 MRPC SR DSIs NDF 3H +0.03 BOBBIN DSI 1.00 3H +0.03 37 46 BOBBIN FSA 3.31 6C +45.15 37 48 BOBBIN FSA 1.63 TSH +5.61 37 58 MRPC 4R DSIs NDF 6H +0.00 37 60 MRPC 4R DSIs NDF 4H +0.00 37 67 MRPC 4R DSIs NDF 4H +0.00 BOBBIN 17 ODI 1.00 AV3 +0.00 BOBBIN 18 ODI 1.06 AV2 +0.00 38 45 BOBBIN FSA 3.36 4C +27.82 MRPC Special In VOL 2.08 4C +27.95 38 52 MRPC 4R DSIs NDF 2H +0.00 BOBBIN DSI 0.45 2H +0.08 38 61 MRPC 4R DSIs NDF 4H +0.05 38 64 MRPC 4R DSIs NDF 6H +0.00 39 24 BOBBIN FSA 2.54 4C +44.C5 39 46 MRPC 4R DSIs NDF 4H +0.00 BOBBIN DSI 0.51 4H +0.00 39 47 MRPC 4R DSIs NDF 5H +0.00 39 51 MRPC 4R DSIs NDF 4H +0.00

'N 39 55 MRPC 5R DSIs NDF 3H +0.08 s MRPC SR DSIs NDF 3H +0.08 BOBBIN DSI 1.09 3H +0.08 39 57 MRPC SR DSIs NDF 4H +0.00 BOBBIN DSI 0.71 4H +0.00 39 58 BOBBIN FSA 1.29 3C +32.02 40 43 BOBBIN FSA 1.51 SC +41.54 BOBBIN FSA 2.47 2C +29.21 BOBBIN FSA 0.84 5H +37.99 40 49 MRPC 4R DSIs NDF 4H +0.00 40 53 MRPC 4R DSIs NDF 4H +0.05 BOBBIN DSI 0.95 4H +0.16 40 57 MRPC 4R DSIs NDF 3H +0.00 40 64 BOBBIN FSA 1.35 SC +28.35 BOBBIN FSA 1.49 7C +40.92 BOBBIN FSA 2.60 AV1 +29.46 41 35 BOBBIN FSA 3.58 TSC +12.46 41 51 MRPC 4R DSIs NDF 5H +0.00 41 60 MRPC 4R DSIs NDF 4H +0.00 42 30 BOBBIN FSA 2.55 4H +12.14 42 48 BOBBIN FSA 2.27 2C +43.45 BOBBIN FSA 1.97 6C +10.17 45 59 MRPC SR DSIs NDF 2H +0.05 BOBBIN DSI 0.73 2H +0.05 46 42 BOBBIN FSA 1.53 8H +11.06 46 43 BOBBIN FSA 0.97 6H +30.15 BOBBIN FSA 1.29 3H +40.90 46 46 BOBBIN FSA 1.16 6C +46.10 MRPC Special In NDF 7C -4.40 46 48 BOBBIN FSA 1.50 2C +32.95 BOBBIN FSA 2.81 AV2 +29.96 Total Indications Found = 967 Total Tubes Found = 506

/~N Total Tubes in Input File = 3312 U

i 1

s I

O ATTACHMENT 6A -

i j:  :

j' .

J

TUBE PLUGGING RESULTS i
FROM THE UNIT #2 STH REFUELING OUTAGE (5R) .  ;

i i FOR 1

L STEAM GENERATOR ,

t 2RCS-SG21C .

i h

i-  !

i i'  ;

O  :

r ,

! e i-  !

k-t ,

i 4

1 i i

n i

4 i

i d

i i

a i

s O

k i

5 4

J

~.,e --w -

-- r ne , , ,- . . - . , - - . - . . , - - , , . + , - ~ - ~ , - - , . . - . . . , - - . - - - , - - - - - - -. - - - - - - -

v v v

2RCS-SG21C TUBES PLUGGED 5R Beaver Vagoy LHt 2 S3 C Total Times  : 3376 Tubes Selected : 64 Out Of Service ( ) : N/A

....e......e............

.......e......................

............e.e.......................

.........e 40 ................................................

....................o..o............................

e........................................................e

....e..................o....................................

35 - - - e - - - - - e . =*

.............................e. ... .......................... ...

e..............................................o................

t o...............................................................

..ee.............................e.................................... - - - - -

R 30 - -

O .......................o..............o....ee ee............................

g ...o..........................................e.............................

S. 25 . . . . . ... . . . ..- . - . . .... . ..... .-. * . . .. . . .. .. .. ... .. . . .... . ....

4 ........................o............... . ......e.....................,..........

........................................ .. ..............e...............e.......

...............o . - . = .=... .= -* - --* ** -- * * -

20 . ....

.................o..o.................................................................

.....o.0..............................................................e.................

15

..........o....... ..-. .. .-

.- . - - o o.- . . .- . -

..o.......................................e.................................................

o o ==*=o......**...... ...........e .........**.**........... ....**... ..... = ...-

10 . ..-.... - .... ........- - . .

.. ... .. o .- .-- . =... - . - .-.....--. - .

... ... .. ... . ......e.........

.................................................................................o............

-- - - - --- o-5 e.............................................................................................. -- - *- -- - --- - =- -e- - - --

.....................................e.......e................o...............................

5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 94 NOZZLE M.ET (Hot Leg) - Prknary Face <- COLLNHS -> MANWAY m

3 m

O REES PWGGG SR - 20 0 REES Punnm PIE SR - 44 $

m Z

m O

m Na DJ

\a N

a O

a

.. . ~ _ . - - . ~ _ . ~ _- - . ~ . - - . . _ . . . . - . . . .. . . - . . .

, BWNS TUBAN II (Version 2.0) 06/12/1995 15:40:55

Bravar Valley Unit 2 i SG C l SR 03/95, BOBBIN, Loose Parts Testing,MRPC 4R DSIs,MRPC SR DSIs,MRPC Special Int.,MRPC TSH,MRPC U-Bend D( T Page 1 of 1 l Steam Generator 2RCS-SG21C Tubes Plugged SR ROW. COL TEST TYPE %TW IND VOLTS LOCATION l
L 63 MRPC U-Bend SAI 1.53 8H +13.31 5 40 BOBBIN DSI 10 . 3 8 5H -+0.12 MRPC 4R DSIs VOL 0.46 SH +0.05 10 42 BOBBIN DSI 0.58 4H +0.00 MRPC 4R DSIs VOL 0.38 2H -1.91 MRPC 4R DSIs VOL 0.20 2H -0.38 11 6 BOBBIN FSI 0.38 2C +4.12 MRPC Special In VOL 0.59 2C +4.40 11 12 BOBBIN DSI 0.84 3H +0.03 MRPC 5R DSIs VOL 0.64 3H -0.16-14 13 MRPC TSH VOL 0.28 TSH +1.38 15 76 BOBBIN FSI 0.29 7C +35.86 MRPC Special In VOL 0.52 7C +35.86 16 9 BOBBIN DSI 0.85 2H +0.06 MRPC SR DSIs VOL 0.45 2H -0.14 16 11 MRPC TSH VOL 0.37 TSH +0.74 18 22 BOBBIN DSI 0.87 4H +0.06 MRPC 5R DSIs VOL 0.47 4H -0.08 18 25 MRPC TSH VOL 0.34 TSH . +3.43 21 21 MRPC TSH VOL 0.28 TSH -0.14 23 31 MRPC 4R DSIs VOL 0.36 2H +0.00 27 13 MRPC TSH VOL 0.66 TSH +0.84 MRPC TSH VOL 0.43 TSH +2.55 28 33 MRPC 4R DSIs' VOL 0.41 2H -0.12 28 48 MRPC SR DSIs VOL 0.52 2H +40.02 MRPC Special In VOL 0.52. 2H +40.02

[ 's 33 ~63 MRPC SR DSIs MRPC Special In VOL 0.38 7H +14.17 VOL 0.38 7H +14.17 36 41 BOBBIN DSI 0.46 2H +0.03 MRPC 5R DSIs VOL 0.38 2H +0.15 39 42 MRPC TSH VOL 5.27 TSH +1.44 MRPC TSH VOL 0.30 TSH -0.40 39 45 BOBBIN FSI 1.44 3H +43.73 MRPC SR DSIs VOL 0.71 3H +43.93 MRPC Special In VOL 0.71 3H +43.93 Total Indications Found = 35 Total Tubes Found = 20 Total Tubes in Input File = 20