Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- AECM-80-179, Status Rept Re Feedwater Pipe Bend Below Design Min Wall Thickness.Feedwater Pipe Supplier Will Perform Evaluation of Pipe & Bending Process.Unit 1 Pipe Will Be Ultrasonically Tested.Final Rept Will Be Submitted by 801211 + (Status Rept Re Feedwater Pipe Bend Below Design Min Wall Thickness.Feedwater Pipe Supplier Will Perform Evaluation of Pipe & Bending Process.Unit 1 Pipe Will Be Ultrasonically Tested.Final Rept Will Be Submitted by 801211)
- ML18030A206 + (Status Rept Re Loose Contact Modules on GE Type CR2940 Selector Switches Originally Reported 801028.Deficiency Under Investigation by Bechtel.Final Rept Will Be Provided by 810529)
- ML20134Q069 + (Status Rept Re NRC Responses & Objections to Intervenors Bl Rorem,Et Al 850702 First Set of QA Interrogatories & Requests to Produce.Certificate of Svc Encl.Related Correspondence)
- ML20211N772 + (Status Rept Re Offsite Emergency Planning Issues.Work W/ State of Nh on Emergency Plan Continuing.Util Addressing Question of When Full 10-mile Radius Plume Exposure Pathway Necessary.Certificate of Svc Encl)
- ML19208D165 + (Status Rept Re Potential Delamination of Carbozinc 11/Phenoline Coating Sys on Polar Cranes.Blasting of Prime Coat & Repriming Will Be Done When safety-related Work Resumes.Final Rept Will Be Filed Upon Work Completion)
- ML20023C193 + (Status Rept Re Preparation of Draft Emergency Plans. Certificate of Svc Encl)
- ML19296A167 + (Status Rept Re Responses to Interrogatories & Document Requests.Intervenors Have Copied More than 225,500 Pages; About 137,500 Pages Have Been Sent to NRC)
- ML19323C679 + (Status Rept Re Settlement Discussion Progress.Urges Delay of Procedural Dates for 30 Addl Days Allowing Continuation of Negotiations W/O Involvement in Active Litigation. Certificate of Svc Encl)
- ML19323G691 + (Status Rept Re Settlement Discussions Progress.Urges ASLB to Convene Pretrial Conference to Accommodate Outstanding Discovery,Final Trial Preparation & Resolution of Remaining Procedural Matters.Certificate of Svc Encl)
- ML19320C301 + (Status Rept Re Settlement Negotiation Progress.Expresses No Optimism for Agreement W/Doj But Agreement W/Nrc May Be Reached Re License Conditions Dealing W/Bulk Power Wheeling Rates.Certificate of Svc Encl)
- ML19317H433 + (Status Rept Re Settlement Negotiations Progress. Discussions Are Continuing.Urges ASLB to Hold Prehearing Conference by 800514 & Requests Deferral of Ruling on Extension.Certificate of Svc & Supporting Documents Encl)
- ML20024A095 + (Status Rept Requesting Addl Time to File Draft Emergency Planning Contentions.If Util Transition Plan Only Subj of Contentions,Extension Needed Until 830818 to Submit Draft Contentions.Certificate of Svc Encl)
- ML20148H339 + (Status Rept Submitted by Dmpl Re Constr Permit Appl for Subj Facils,In Response to Aslab Ltr of 780808.DMPL Will Seek to Amend Its Present Constr Permit Appl to Seek Early Decision on Issues of Site Suitability Per 10CFR2.600 Et Seq)
- ML19224A845 + (Status Rept as of 2:05 PM,790330,re Uncontrolled Releases of Radioactivity Into Atmosphere from Primary Coolant Sys)
- ML19263B671 + (Status Rept as of 781229 Re Puerto Rico Water Resources Authoritys Application.Internal Review of Generation Expansion Not Yet Completed.Westinghouse Contract Re Nuclear Steam Supply Sys Cancelled.W/Certificate of Svc)
- ML19209B836 + (Status Rept as of 790831.Natl Academy of Sciences Is Studying Overall Energy Situation in Pr.Portion of Study Is Being Prepared by Electric Power Sys Subcommittee. Certificate of Svc Encl)
- ML20076M304 + (Status Rept as of 830715.Util Has No Further Issuances.Nrc Has Two Issuances Expected by 830901.Author Expects to File Revised/Addl Contentions.Prehearing Conference Unnecessary. Certificate of Svc Encl.Related Correspondence)
- ML17250A321 + (Status Rept by Ny State Energy Ofc in Reponse to ASLB 800429 Order.Recommends That Parties Be Permitted to Identify Addl Contentions & That Prehearing Conference Be Held to Discuss Issues.W/Notice of Appearance & Certificate of Svc Encl)
- ML19320B890 + (Status Rept by Public Utils Board of City of Brownsville,Tx Re Settlement Progress.City Would Not Object to Further Extension Limited to 30 Days Although Negotiations Do Not Appear to Be Fruitful.Certificate of Svc Encl)
- ML20076B155 + (Status Rept by Puerto Rico Water Resources Authority Re Facility Application,As of 790430.Electric Power Sys Will Issue Rept by Late May.Certificate of Svc Encl)
- ML19221A194 + (Status Rept by Special Instrument Group Re Diagnostic Instrumentation.Rept to Be Updated Daily)
- ML19338E506 + (Status Rept by Tx Border Cooperatives Opposing Settlement Negotiations.Differences W/Central & South West Corp Re Dc Interconnection Are Not Insurmountable,But Accord Not Yet Reached.W/Supporting Documentation & Certificate of Svc)
- ML19221A163 + (Status Rept for 11:30 Am & 4:30 Pm on 790401 Re Reactor Coolant Sys,Steam Generators,Containment,Auxiliary Sys & Latest Estimate on Bubble Size)
- ML19221A160 + (Status Rept for 790401 Re Reactor Coolant Sys Steam Generators & Containment)
- ML19221A171 + (Status Rept for 790401 on Reactor Coolant Sys,Steam Generators,& Containment)
- ML19224B897 + (Status Rept for 790507)
- ML20005H219 + (Status Rept for Apr 1980 for FINs A-2010,A-2150,A-2143 & A-2157)
- ML20005H212 + (Status Rept for Aug 1980 for FINs A-2010,A-2150,A-2143 & A-2157)
- ML20005H223 + (Status Rept for Dec 1979 for FINs A-2010,A-2150,A-2143 & A-2157)
- ML20005H221 + (Status Rept for Feb 1980 for FINs A-2010,A-2150,A-2143 & A-2157)
- ML20005H222 + (Status Rept for Jan 1980 for FINs A-2010,A-2150,A-2143 & A-2157)
- ML20005H214 + (Status Rept for Jul 1980 for FINs A-2010,A-2150,A-2143 & A-2157)
- ML20005H216 + (Status Rept for June 1980 for FINs A-2010,A-2150,A-2143 & A-2157)
- ML20005H220 + (Status Rept for Mar 1980 for FINs A-2010,A-2150,A-2143 & A-2157)
- ML20005H218 + (Status Rept for May 1980 for FINs A-2010,A-2150,A-2143 & A-2157)
- ML19256F931 + (Status Rept for Nov 1979.South Tx Electric Cooperative,Inc & Medina Electric Cooperative,Inc Neither Initiated Nor Received Discovery Requests)
- ML20005H207 + (Status Rept for Nov 1980 for FINs A-2010,A-2150 & A-2157)
- ML20005H208 + (Status Rept for Oct 1980 for FINs A-2010,A-2150,A-2143 & A-2157)
- ML20003B635 + (Status Rept for PDR-81/01 Re Lubrication of Thrust Bearings on Turbocharger.Engine Availability Could Be Affected If Defect Found by Transamerica Delaval Not Corrected)
- ML20005H209 + (Status Rept for Sept 1980 for FINs A-2010,A-2150,A-2143 & A-2157)
- ML20010F412 + (Status Rept for Shoreham Opponents Coalition,Util & NRC Discussion Re Discovery,Motions for Summary Disposition, Contentions 19 & 7(a)(ii) & CP Extension Request.Related Correspondence)
- ML20136D630 + (Status Rept for St Lucie,Units 1 & 2)
- ML19323G655 + (Status Rept in Response to ASLB 800421 Memorandum & Order on Sholly Motion to Compel Licensee Answers to Contention 16 Interrogatories.Submits Areas of Agreement Between Licensee & Sholly.W/Certificate of Svc.Related Correspondence)
- ML17250A328 + (Status Rept in Response to ASLB 800429 Order.Recommends Schedule for Findings,Safety Evaluation Suppl,Discovery & Further Prehearing Conferences.Recommends Determination of SEP Progress in One Yr)
- ML19338C454 + (Status Rept in Response to ASLB 800721 Order.Nrc Has Initiated Discussions Re Identification of Environ Site Suitablility Issues for Partial Initial Decision.Prehearing Conference in Near Future Would Not Be Fruitful)
- ML20054L761 + (Status Rept of Counsel Pursuant to ASLB OL Hearing Instructions.Certificate of Svc Encl)
- ML19338C217 + (Status Rept of Midland Plant Units 1 & 2)
- ML20234C008 + (Status Rept of Potential Safety Issues Discussed in 1975 Nuclear Reactor Study (Reed Rept))
- ML19210C725 + (Status Rept of Remanded Proceeding.No Further Hearings Held. Briefs Filed on 790716 & Replies on 790816.LILCO Et Al Supported Station as Proposed.Believes Proposal Will Be Approved by Weight of Evidence.W/Certificate of Svc)
- ML20004C296 + (Status Rept on Adequacy of Category I Structural Backfill, South Texas Project Electric Generating Station)
- ML20079F719 + (Status Rept on Automatic Depressurization Sys Logic Mod. Engineering & Matl Procurement on Schedule & Mod Implementation Will Be Completed Prior to Fuel Load. Certificate of Svc Encl)