ML18030A206
| ML18030A206 | |
| Person / Time | |
|---|---|
| Site: | Susquehanna |
| Issue date: | 02/04/1981 |
| From: | Curtis N PENNSYLVANIA POWER & LIGHT CO. |
| To: | Grier B NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I) |
| References | |
| PLA-624, NUDOCS 8102100338 | |
| Download: ML18030A206 (5) | |
Text
REGUI ATORY FORMATION DISTRIBUTION S M (RIDS)
ACCESSION NBR:8102100338 DOC ~ DATE: 81/02/04 NOTARIZED:
NO DOCKET ¹ FACILs50 387 Susquehanna Steam Electr ic Stationi Uni t ls Pennsyl va 0
50-388 Susquehanna Steam Electric StationP Unit 2E Pennsylva 0003 8
AUTH ~ NAHE AUTHuR AFFILIATION CURTIS'
~ 'h, Pennsylvania Power A Light Co ~
REC IP ~ NAHE RECIPIENT AFFILIATION GRIER,8,n, Region lr Philadelphfar Office of the Director'UBJECT:
Status rept re loose contact mooules on GE Type CR29a0 I
....,selector switches originally reported 801028 'eficiency under investigation by Bechtel,Final rept will be proviaed by 810529
'ISTRISUTION COOE:
00100 COPIES RECEIVES:LTR J ENCL IP SIZE:
TITLE; Construction Deficiency Rector t (10CFR50
~ 55E)
NOTES:Send IS,E 3 copies FSAR 5 all
- amends, Send ISE 3 copies FSAR 8 all amends'5000387 05000388 REC IP IENT ID CODE/NAME ACTION; A/D LICENSNG ou RUSHBROOKEM ~
06 INTERNAL: AD/RCI/IE 11 D/0 IR HUM F AC 15 EDO 8
STAFF 19 HYD/GEO BR 22 LIC QUAL BR 12 hRC PDR 02 PROQJ REV 13 E
F ILE 01
%MD S
OEV 21 COPIES LTTR ENCL REC IP IENT ID CODE/11IA~~E YOUAGBLOODpB 05 STARKERS 07 ASLBP/J ~ HARD DIRE DIV OF LIC EQUIP QUAL BR 1 1
IEE 09 MPA 20 OELD
~
21 AA BR 14 RUTHERFORDrh ~ IE COPIFS LTTR ENCL E)(TERNAL'CRS
'SIC 16 08 16 1
1 LPDR 03 FgB 13 i88l 0
TOTAL NUBBER OF< CQPIF'S sREQUIRED LTTRr~ I39I~'blCL
t
~ \\
yf
~
TWO NORTH NINTH STREET, ALLENTOWN, PA. 18101 PHONEr (215) 7'70-5151 NORMAN W. CURTIS Vice President. Engineering S Construction-Nuclear 770 5381 February 4, 1981 Mr. Boyce H. Grier Director, Region I U. S. Nuclear Regulatory Commission 631 Park Avenue King of Prussia, PA 19406 SUSQUEHANNA, STEAM ELECTRIC STATZON STATUS UPDATE ON A DEFICIENCY RELATING TO GE TYPE CR2940 SWITCHES ERs 100450/100508 FILE 840-4/900-10 PLA-624
Reference:
PLA-565 dated October 28, 1980
Dear Mr. Grier:
This letter serves to supplement the above referenced correspondence which advised the Commission of a deficiency involving loose contact modules on GE type CR2940 selector switches.
Bechtel Corporation is still in the process of accumulating information on the problem and has advised PP&L that their analysis of the condition" will be. delayed.
Conseguentlyr we now expect to provide a final report on the deficiency by May 29, 1981.
Very truly yours, N.
W. Curtis Vice President-Engineering
& Construction-Nuclrear>
FLW:sab =".W cc:
Mr; LVi.ctor Stello (15)'irectorWf fice o'f"Inspection
-'-'Ac::e r:-'.
Enforcement..
U. S. Nu'clear Regulatory Commission Washington; D.C. 20555
~.m gk'N N S,Y O'Y'A'lN'f'A,I 0 W E R a L I G H T C 0 AI"P'AN Y r r~,"4 y(N'x 8
I:.hara l':0'03:
r'
~"*'
Mr. Boyce H. Grier February 4( 1981 ccrc Mr. G. McDonald, Director (1)
Office of Management Information, & Program Control U. S. Nuclear Regulatory Commission Washington, D.C. 20555 Mr. Robert M. Gallo U. S. Nuclear Regulatory Commission P.
O. Box 52 Shickshinny(
PA 18655
0