Search by property

Jump to navigation Jump to search

This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.

Search by property

A list of all pages that have property "Title" with value "Sser 6". Since there have been only a few results, also nearby values are displayed.

Showing below up to 26 results starting with #1.

View (previous 50 | next 50) (20 | 50 | 100 | 250 | 500)


    

List of results

  • ML19221B037  + (Srp,Section 9.2.2, Reactor Auxiliary Cooling Water Sys)
  • ML19221B044  + (Srp,Section 9.3.1, Compressed Air Sys)
  • ML19221B136  + (Srp,Sections 15.1.1,15.1.2,15.1.3 & 15.1.4, Decrease in Feedwater Temp,Increase in Feedwater Flow,Increase in Steam Flow & Inadvertent Opening of a Steam Generator Relief or Safety Valve)
  • ML19221B142  + (Srp,Sections 15.2.1,15.2.2,15.2.3,15.2.4 & 15.2.5, Loss of External Load,Turbine Trip,Loss of Condenser Vacuum,Closure of MSIV (BWR) & Steam Pressure Regulator Failure (Closed))
  • ML19221B149  + (Srp,Sections 15.3.1 & 15.3.2, Loss of Forced Reactor Coolant Flow Including Trip of Pump & Flow Controller Malfunctions)
  • ML20302A273  + (Srr Construction, 2015-NCR-15-WHC-0008, Equipment Failure)
  • ML19094B125  + (Srr Cwda 2018 00092 Rev 0 Savannah River Site Liquid Waste Facilities Performance Assessment Maintenance Program FY2019 Implementation Plan)
  • ML19094A707  + (Srr Cwda 2019 00030 Rev 0 2018 GSA ML Particle Tracking Figure)
  • ML19281D350  + (Srr Cwda 2019-00102 Rev 0 Updated Photographs Information from Jan 2017 NRC Onsite Observation Visit)
  • ML15012A623  + (Ssd Case 14-49 Completion Letter)
  • ML25015A203  + (Ssd Standing Committee Final Charter)
  • ML043430448  + (Ssdpc Inspection Notification Letter - IR 05000327-05-006 & IR 05000328-05-006)
  • ML043420135  + (Ssdpc Inspection Notification Letter - IR 05000261-05-006)
  • ML22175A116  + (Ssdr Update Letter Transmitting Amended WA-1506-D-101-S)
  • ML20236D073  + (Sser 1)
  • ML20235A128  + (Sser 1 Re Gessar)
  • ML20154D192  + (Sser 1 Re Licensee 851204 Response to Generic Ltr 83-28, Item 3.2.2 Concerning Procedures & Programs to Review Info on safety-related Equipment.Response Acceptable & Meets Intent of Generic Ltr 83-28)
  • ML20058K465  + (Sser 1 Re Seismic Qualification Util Group Generic Implementation Procedure,Rev 1 for Implementation of USI A-46 Concerning Verification of Seismic Adequacy of Operating Nuclear Plant Equipment)
  • ML20236C881  + (Sser 2)
  • ML20235A078  + (Sser 2 Re Gesser)
  • ML20234F599  + (Sser 3 Accepting Use of ACI 318-71 Code w/one-third Increase in Allowable Stresses for Seismic Loads & Concluding That Licensee Should Adopt Simplified Seismic Analysis Procedure)
  • ML20236C367  + (Sser 3.Supporting Documentation Encl)
  • ML20209G162  + (Sser 31 Re Performance of Dcrdr Per Suppl 1 to NUREG-0737, Item 1.D.1.Satisfactory Implementation of of Control Room Improvements Required for Licensing,Per Util 850208 Commitment,Will Minimize Potential for Operator Error)
  • ML20236B708  + (Sser 4)
  • ML20236B420  + (Sser 5)
  • ML20248C073  + (Sser Accepting 880601,0909 & 890602 Changes to ATWS Mitigation Sys Actuation Circuitry for Plants)
  • ML20006E489  + (Sser Accepting Compliance W/Atws Rule 10CFR50.62.Staff Statements Contained in Conclusion of Original SER Re Completion of Noted Human Factors Engineering Reviews Still Valid)
  • ML15264A578  + (Sser Accepting Design for Variables on Pressurizer Level, Pressurizer Heater Status & Safety Relief Valve Position or Main Steam Flow Instrumentation,Per Reg Guide 1.97,Rev 2. SALP Input Encl)
  • ML14191A572  + (Sser Accepting Licensee 910313 Response to Station Blackout Rule.Response Acceptable Contingent Upon Util Implementation of Control Room Heatup & Reactor Coolant Inventory Analysis)
  • ML20057C383  + (Sser Accepting Licensee 930707 Response to Station Blackout Rule,Per 10CFR50.63)
  • ML18153D355  + (Sser Accepting Revised Commitments for Future AFW Pump Insps at Facilities)
  • ML20214J852  + (Sser Accepting SPDS Contingent Upon Resolution of Concerns Re Maint & Improvement of Placement & Visual Access of Containment Isolation Panel & Minor Human Factors Engineering Concerns)
  • ML20126L911  + (Sser Accepting Seismic Analysis of Soil Structure Interaction for Deeply Embedded Standby Svc Water Cooling Tower Basin)
  • ML17250B058  + (Sser Accepting Sep/Structural Upgrade Program)
  • ML20202C572  + (Sser Accepting Util 860304 Response to Generic Ltr 83-28, Item 4.3, Seismic Qualification of Shunt Trip Components)
  • ML20246L651  + (Sser Accepting Util Efforts Re Action Items 1.a & 1.b of NRC Bulletin 88-011,per NRC Findings of Westinghouse & Plant Audit)
  • ML20140H006  + (Sser Authorizing Operation of SEFOR at Power Levels Up to 20 Mwt)
  • ML17306B228  + (Sser Concluding That Load Testing of Alternate Ac Sources on Approx Yearly Basis Will Not Provide Sufficient Data Base to Demonstrate Required 95% Reliability of Gas Turbine Generators Under Load.Response Required)
  • ML20059A708  + (Sser Concluding That Rochester Instrument Sys Model SC-1302 Isolation Device Acceptable for Use at Plant for Interfacing SPDS W/Class IE Circuits)
  • ML17328A215  + (Sser Determining That Inservice Testing Program Presented in 890829 Safety Evaluation & Modified & Clarified Will Provide Reasonable Assurance of Operational Readiness of Pumps & Valves to Perform safety-related Functions)
  • ML20024H374  + (Sser Granting Licensee Request for Deviation from Recommendations of Reg Guide 1.97 Re RCS Soluble Boron Concentration Instrumentation)
  • ML20005E895  + (Sser Granting one-time Partial Relief from post-maint Test of ASME Code,Section XI,IWV-3200 for Eight Recently Repaired Safety Injection Check Valves as Result of Sys Mods to RHR & Containment Bldg Spray Sys)
  • ML20128G592  + (Sser Input Re Potential Flooding of Cooling Tower Areas. Requirements of GDC 2 Met.Related Info Encl)
  • ML20209F911  + (Sser Re Adequacy of Shift Staffing & Need for Shift Advisors & License Conditions,Per Recent Concerns.Util Has Adequate Number of Qualified Operators & Need for Shift Advisors & License Conditions Not Evident)
  • ML20236B890  + (Sser Re Alternate Rod Insertion (ARI) Sys.Util Plans for Relocating ARI Position Indication Out of Control Room to Another Location in Control Bldg Acceptable)
  • ML20198H327  + (Sser Re Automatic Sys to Prevent Charging Pump Deadheading. Design Mod Acceptable.Ser Confirmatory Item 16 Considered Closed)
  • ML20246A232  + (Sser Re CESSAR Sys 80 Concerning Steam Generator Tube Vibration)
  • ML17263A159  + (Sser Re Conformance to Reg Guide 1.97 Concerning Emergency Response Capability)
  • ML17180B339  + (Sser Re Core Shroud Cracking.Nrc Determined That Amended Loads Acceptable & Consistent W/Previous Loading Methodology Accepted by Staff)
  • ML18092A564  + (Sser Re Detailed Control Room Design Review Per Suppl 1 to NUREG-0737.Util Should Meet All Requirements of Suppl 1 Following Submittal & Review of Satisfactory Supplemental Summary Rept Addressing Noted Concerns)