Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML13249A078 + (Six-Month Status Update of Overall Integrated Plan in Response to Order EA-12-051, Reliable Spent Fuel Pool Instrumentation)
- ML14069A009 + (Six-month Status Report in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Reliable Spent Fuel Pool Instrumentation)
- ML14245A400 + (Six-month Status Report in Response to March 12, 2012 Commission Order Modifying License with Regard to Reliable Spent Fuel Pool Instrumentation (Order No. EA-12-015))
- ML14245A401 + (Six-month Status Report in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Reliable Spent Fuel Pool Instrumentation (Order No. EA-12051))
- ML20003F702 + (Sixteen Citizen Ltrs Supporting Facility Restart)
- ML20137Y237 + (Sixteenth Final Response to FOIA Request for Documents. Forwards Documents Listed in App AA Being Made Available in PDR)
- ML20137Y241 + (Sixteenth Final Response to FOIA Request for Documents. Forwards Documents Listed in App AA Being Made Available in PDR)
- L-17-072, Sixteenth Inservice Inspection Summary Report + (Sixteenth Inservice Inspection Summary Report)
- NL-13-2036, Sixteenth Maintenance / Refueling Outage Steam Generator Tube Inspection Report + (Sixteenth Maintenance / Refueling Outage Steam Generator Tube Inspection Report)
- ML20064N727 + (Sixteenth Motion for Summary Disposition of New England Coalition on Nuclear Pollution Contention I.M.Evidentiary Hearings Unnecessary.Certificate of Svc Encl.Related Correspondence)
- ML20137B837 + (Sixteenth Partial Response to FOIA Request for Documents. Records Subj to Request Identified in App Z & Encl)
- ML20137B842 + (Sixteenth Partial Response to FOIA Request for Documents. Records Subj to Request Identified in App Z & Encl)
- ML19330A807 + (Sixteenth Progress Rept of Tx A&M Univ,Nuclear Science Ctr, 1979)
- ML20070G529 + (Sixteenth Quarterly Rept Cleveland Electric Illuminating Co Seismic Monitoring Network,Oct-Dec 1990)
- ML20062G264 + (Sixteenth Quarterly Update to Startup Rept,Catawba Unit 2, Cycle 1)
- CP-201301238, Sixteenth Refueling Outage (1RF16) Steam Generator 180 Day Report + (Sixteenth Refueling Outage (1RF16) Steam Generator 180 Day Report)
- CP-201700805, Sixteenth Refueling Outage (2RF16) Steam Generator 180 Day Report + (Sixteenth Refueling Outage (2RF16) Steam Generator 180 Day Report)
- L-05-030, Sixteenth Refueling Outage Inservice Inspection Report + (Sixteenth Refueling Outage Inservice Inspection Report)
- L-13-027, Sixteenth Refueling Outage Inservice Inspection Summary Report + (Sixteenth Refueling Outage Inservice Inspection Summary Report)
- PLA-6625, Sixteenth Refueling Outage Owners Activity Report + (Sixteenth Refueling Outage Owners Activity Report)
- ML20042A221 + (Sixteenth Set of Interrogatories)
- ML20080B503 + (Sixteenth Set of Interrogatories & Requests to Produce Listed Documents Re Cygna Rept.Certificate of Svc Encl)
- GNRO-2016/00003, Sixth (Final) Six-Month Status Report in Response to March 12, 2102 Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events (Order Number EA-12-049) + (Sixth (Final) Six-Month Status Report in Response to March 12, 2102 Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events (Order Number EA-12-049))
- L-2024-066, Sixth 10-Year Inservice Testing Interval Relief Request No. PR-02 + (Sixth 10-Year Inservice Testing Interval Relief Request No. PR-02)
- EPID:L-2024-LLR-0029 + (Sixth 10-Year Inservice Testing Interval Relief Request No. PR-02)
- NRC 2022-0032, Sixth 10-Year Interval Inservice Testing (1ST) Program Plan + (Sixth 10-Year Interval Inservice Testing (1ST) Program Plan)
- ML20247D259 + (Sixth Annual 10CFR50.59 Rept,Virgil C Summer Nuclear Station)
- PMNS20250993, Sixth Annual Artificial Intelligence Workshop - Ai on the Horizon: Aligning Progress with Purpose + (Sixth Annual Artificial Intelligence Workshop - Ai on the Horizon: Aligning Progress with Purpose)
- SBK-L-16146, Sixth Annual Update to the Renewal Application + (Sixth Annual Update to the Renewal Application)
- ML20091L227 + (Sixth Bimonthly Ltr Rept for 800921-1120 Re Interagency Agreement NRC-03-79-167 Re Soils Issues.Related Info Encl)
- ML080230371 + (Sixth Disclosure Statement by Pilgrim Watch)
- ML20063D253 + (Sixth Discovery Progress Rept Per ASLB 810909 Memorandum & Order LBP-81-35.Certificate of Svc Encl.Related Correspondence)
- ML20063A098 + (Sixth Discovery Progress Rept.Certificate of Svc Encl)
- ML20207D631 + (Sixth Draft Supplementary Rept, Comanche Peak Steam Electric Station:Alleged Climate of Intimidation)
- ML20151P091 + (Sixth Final Response to FOIA Request for Documents.Documents Listed in App F Being Released in Entirety.Pages B-11 & C-2 of Incoming Submittal Not Included)
- ML20137X094 + (Sixth Final Response to FOIA Request for Documents.App K Records Being Withheld in Entirety (Ref FOIA Exemption 5))
- ML031480618 + (Sixth Interim Application of FTI Consulting Inc. for Allowance and Payment of Compensation and Reimbursement of Expenses (December 1, 2002 Through March 31, 2003); Declaration of Thomas E. Lumsden in Support Thereof)
- ML20023C635 + (Sixth Interim Const Deficiency Rept 33 Re Chilled Water Piping Supports.Initially Reported on 830307.Hardware Mods Complete.Review of Supporting Documentation Underway.Final Rept Will Be Submitted by 830630)
- ML20064M583 + (Sixth Interim Deficiency Rept 50-438/81-61 Re Reactor Coolant impeller-to-shaft Mismatch.Initially Reported on 810917.Pump 1P1AZ Shaft & Impeller Returned to Vendor for Remachining.Next Rept to Be Submitted by 830819)
- AECM-83-0321, Sixth Interim Deficiency Rept PRD-82/14 Re Sheared Bolts on Diesel Generator Rear Crankcase Cover.Initially Reported on 820322.Deficiency Reportable Under 10CFR50.55(e) & Part 21 for Unit 1,Div II Diesel Generator Only + (Sixth Interim Deficiency Rept PRD-82/14 Re Sheared Bolts on Diesel Generator Rear Crankcase Cover.Initially Reported on 820322.Deficiency Reportable Under 10CFR50.55(e) & Part 21 for Unit 1,Div II Diesel Generator Only)
- ML20062J260 + (Sixth Interim Deficiency Rept Re B&W Nonconservative Analysis of Neutron Flux in Reactor Protection Sys.Initially Reported on 801105.Analytical Software Fix Will Be Used to Correct Problem.Next Rept Due by 821119)
- ML20064H515 + (Sixth Interim Deficiency Rept Re Bolted Bonnet Gate Valve Studs Torqued to Values Less than Required by Applicable Vendor Drawing.Initially Reported on 811222.No Notification Received from Borg-Warner.Also Reportable Per Part 21)
- ML20011A584 + (Sixth Interim Deficiency Rept Re Breakdown in Quality Program for Procurement Cycle of Purchased Matls,Initially Reported 800613.Brown & Root Will Perform Closure Actions for All Dispositions.Next Rept by 820630)
- ML20064H400 + (Sixth Interim Deficiency Rept Re Chattanooga Bolt & Screw Stainless Steel Nuts & Bolts Failing to Meet ASTM Specs. Initially Reported on 810924.Evaluation Continuing.Next Rept Expected by 830426.Also Reportable Under Part 21)
- ML20071Q047 + (Sixth Interim Deficiency Rept Re Computer Verification Program.Initially Reported on 810508.Bechtel Method for Reviewing Brown & Root,Inc Computer Calculations Established & Results Discussed.Next Rept Expected by 830512)
- ML20049J430 + (Sixth Interim Deficiency Rept Re Corrosion of Carbon Steel Piping,Initially Reported 801230.Twenty-one Essential Raw Cooling Water Piping Loops Identified for Reanalysis.Work Complete on 19 Loops.Next Rept Expected by 820811)
- ML20106H604 + (Sixth Interim Deficiency Rept Re Defect in Undervoltage Protection During Accident.Initially Reported on 820727. Initial Analysis to Determine Voltage & time-delay Relay Setpoints Completed.Next Rept Will Be Submitted on 850719)
- ML20128L325 + (Sixth Interim Deficiency Rept Re Environ Qualification of safety-related Electrical Components.Initially Reported on 811021.Transmitters Being Relocated Per Engineering Change Notice 3022.Next Rept Will Be Submitted by 861031)
- ML20030C149 + (Sixth Interim Deficiency Rept Re Excessive Output Fluctuations of Foxboro Instrumentation,Initially Reported 790828.Field Mod Kit Instruments That Function as Current/ Current Repeaters Tested.Also Reported Per Part 21)
- ML20054B140 + (Sixth Interim Deficiency Rept Re Failure of Main Steam Lines Because of Main Feedwater Overfill,Initially Reported on 800319.Preliminary Reviews of B&W Rept Indicate That Data Appear Favorable.Also Reportable Per Part 21)
- ML20071H726 + (Sixth Interim Deficiency Rept Re Fillet Welds Misspec. Destructive Test on Mockups Performed.Review of Test Results Continuing.Next Rept Expected by 820623)