Search by property

Jump to navigation Jump to search

This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.

Search by property

A list of all pages that have property "Title" with value "Sixth 10-Year Interval Inservice Testing (1ST) Program Plan". Since there have been only a few results, also nearby values are displayed.

Showing below up to 26 results starting with #1.

View (previous 50 | next 50) (20 | 50 | 100 | 250 | 500)


    

List of results

  • ML20247D259  + (Sixth Annual 10CFR50.59 Rept,Virgil C Summer Nuclear Station)
  • PMNS20250993, Sixth Annual Artificial Intelligence Workshop - Ai on the Horizon: Aligning Progress with Purpose  + (Sixth Annual Artificial Intelligence Workshop - Ai on the Horizon: Aligning Progress with Purpose)
  • SBK-L-16146, Sixth Annual Update to the Renewal Application  + (Sixth Annual Update to the Renewal Application)
  • ML20091L227  + (Sixth Bimonthly Ltr Rept for 800921-1120 Re Interagency Agreement NRC-03-79-167 Re Soils Issues.Related Info Encl)
  • ML080230371  + (Sixth Disclosure Statement by Pilgrim Watch)
  • ML20063D253  + (Sixth Discovery Progress Rept Per ASLB 810909 Memorandum & Order LBP-81-35.Certificate of Svc Encl.Related Correspondence)
  • ML20063A098  + (Sixth Discovery Progress Rept.Certificate of Svc Encl)
  • ML20207D631  + (Sixth Draft Supplementary Rept, Comanche Peak Steam Electric Station:Alleged Climate of Intimidation)
  • ML20151P091  + (Sixth Final Response to FOIA Request for Documents.Documents Listed in App F Being Released in Entirety.Pages B-11 & C-2 of Incoming Submittal Not Included)
  • ML20137X094  + (Sixth Final Response to FOIA Request for Documents.App K Records Being Withheld in Entirety (Ref FOIA Exemption 5))
  • ML031480618  + (Sixth Interim Application of FTI Consulting Inc. for Allowance and Payment of Compensation and Reimbursement of Expenses (December 1, 2002 Through March 31, 2003); Declaration of Thomas E. Lumsden in Support Thereof)
  • ML20023C635  + (Sixth Interim Const Deficiency Rept 33 Re Chilled Water Piping Supports.Initially Reported on 830307.Hardware Mods Complete.Review of Supporting Documentation Underway.Final Rept Will Be Submitted by 830630)
  • ML20064M583  + (Sixth Interim Deficiency Rept 50-438/81-61 Re Reactor Coolant impeller-to-shaft Mismatch.Initially Reported on 810917.Pump 1P1AZ Shaft & Impeller Returned to Vendor for Remachining.Next Rept to Be Submitted by 830819)
  • AECM-83-0321, Sixth Interim Deficiency Rept PRD-82/14 Re Sheared Bolts on Diesel Generator Rear Crankcase Cover.Initially Reported on 820322.Deficiency Reportable Under 10CFR50.55(e) & Part 21 for Unit 1,Div II Diesel Generator Only  + (Sixth Interim Deficiency Rept PRD-82/14 Re Sheared Bolts on Diesel Generator Rear Crankcase Cover.Initially Reported on 820322.Deficiency Reportable Under 10CFR50.55(e) & Part 21 for Unit 1,Div II Diesel Generator Only)
  • ML20062J260  + (Sixth Interim Deficiency Rept Re B&W Nonconservative Analysis of Neutron Flux in Reactor Protection Sys.Initially Reported on 801105.Analytical Software Fix Will Be Used to Correct Problem.Next Rept Due by 821119)
  • ML20064H515  + (Sixth Interim Deficiency Rept Re Bolted Bonnet Gate Valve Studs Torqued to Values Less than Required by Applicable Vendor Drawing.Initially Reported on 811222.No Notification Received from Borg-Warner.Also Reportable Per Part 21)
  • ML20011A584  + (Sixth Interim Deficiency Rept Re Breakdown in Quality Program for Procurement Cycle of Purchased Matls,Initially Reported 800613.Brown & Root Will Perform Closure Actions for All Dispositions.Next Rept by 820630)
  • ML20064H400  + (Sixth Interim Deficiency Rept Re Chattanooga Bolt & Screw Stainless Steel Nuts & Bolts Failing to Meet ASTM Specs. Initially Reported on 810924.Evaluation Continuing.Next Rept Expected by 830426.Also Reportable Under Part 21)
  • ML20071Q047  + (Sixth Interim Deficiency Rept Re Computer Verification Program.Initially Reported on 810508.Bechtel Method for Reviewing Brown & Root,Inc Computer Calculations Established & Results Discussed.Next Rept Expected by 830512)
  • ML20049J430  + (Sixth Interim Deficiency Rept Re Corrosion of Carbon Steel Piping,Initially Reported 801230.Twenty-one Essential Raw Cooling Water Piping Loops Identified for Reanalysis.Work Complete on 19 Loops.Next Rept Expected by 820811)
  • ML20106H604  + (Sixth Interim Deficiency Rept Re Defect in Undervoltage Protection During Accident.Initially Reported on 820727. Initial Analysis to Determine Voltage & time-delay Relay Setpoints Completed.Next Rept Will Be Submitted on 850719)
  • ML20128L325  + (Sixth Interim Deficiency Rept Re Environ Qualification of safety-related Electrical Components.Initially Reported on 811021.Transmitters Being Relocated Per Engineering Change Notice 3022.Next Rept Will Be Submitted by 861031)
  • ML20030C149  + (Sixth Interim Deficiency Rept Re Excessive Output Fluctuations of Foxboro Instrumentation,Initially Reported 790828.Field Mod Kit Instruments That Function as Current/ Current Repeaters Tested.Also Reported Per Part 21)
  • ML20054B140  + (Sixth Interim Deficiency Rept Re Failure of Main Steam Lines Because of Main Feedwater Overfill,Initially Reported on 800319.Preliminary Reviews of B&W Rept Indicate That Data Appear Favorable.Also Reportable Per Part 21)
  • ML20071H726  + (Sixth Interim Deficiency Rept Re Fillet Welds Misspec. Destructive Test on Mockups Performed.Review of Test Results Continuing.Next Rept Expected by 820623)