ML20023C635

From kanterella
Jump to navigation Jump to search
Sixth Interim Const Deficiency Rept 33 Re Chilled Water Piping Supports.Initially Reported on 830307.Hardware Mods Complete.Review of Supporting Documentation Underway.Final Rept Will Be Submitted by 830630
ML20023C635
Person / Time
Site: Waterford Entergy icon.png
Issue date: 05/11/1983
From: Maurin L
LOUISIANA POWER & LIGHT CO.
To: Jay Collins
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
References
32, 33, W3I83-0163, W3I83-163, NUDOCS 8305170500
Download: ML20023C635 (1)


Text

l OUISIANA P O W E R & L i G H T! e O. box 6008. NEW ORLEANS. LOUISIANA 70174 142 DRARONDE STRUT

. (504) 366-2345

$ sis $ EsYEb L V M/ URIN Vtce PresKlent Nuclear Operations May 11, 1983 W3I83-0163 Q-3-A35.07.33 Mr. John T. Collins, Regional Administrator, Region IV E

U. S. Nuclear Regulatory Commission js MAY I 31983 {!

l.

611 Ryan Plaza Drive, Suite 1000 I

' 'i!

Arlington, Texas 76012 l

L

1..

SUBJECT:

Waterford SES Unit No. 3 Docket No. 50-382 Significant Construction Deficiency Report No. 33

" Chilled Water Piping Supports" Sixth Interim Report

REFERENCE:

LP&L letter W3I83-0071 dated March 7, 1983

Dear Mr. Collins:

At the present time, all required hardware modifications have been completed.

A review cf the supporting documentation is currently under way and it is anticipated that it will be complete by June 15, 1983. A final report will therefore be subicitted by June 30, 1983.

Very truly yours,

/

(a w d-L. V. Maurin LVM/ MAL /cmk cc:

1) Director 3)

Mr. E. L. Blake Office of Inspection & Enforcement U. S. Nuclear Regulatory Commission Washington, D. C.

20555

2) Director 4)

Mr. W. M. Stevenson Office of Management Information and Program Control U. S. Nuclear Regulatory Commission Washington, D. C.

20555

/

8305170500 830511

[V V

PDR ADOCK 05000382 S

PDR

/