Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20207P446 + (Site-Specific Offsite Radiological Emergency Preparedness Alert & Notification Sys QA Assurance Verification)
- ML20059K322 + (Site-Specific Offsite Radiological Emergency Preparedness Alert & Notification Sys QA Verification)
- ML19257A904 + (Site-Specific Response Spectra)
- ML20031B710 + (Site-Specific Response Spectra Midland Plants - Units 1 & 2.Part Ii:Response Spectra Applicable for Top of Fill Matl at Plant Site. Certificate of Svc Encl.Related Correspondence)
- ML20031B703 + (Site-Specific Response Spectra,Midland Plant-Units 1 & 2. Part I:Response Spectra-SSE Original Ground Surface. Related Correspondence)
- ML20031B706 + (Site-Specific Response Spectra,Midland Plant - Units 1 & 2. Addendum to Part I:Response Spectra - Original Ground Surface. Related Correspondence)
- ML20052G342 + (Site-Specific Response Spectrum. Related Correspondence)
- RS-09-114, Site-Specific Safstor Decommissioning Cost Estimate + (Site-Specific Safstor Decommissioning Cost Estimate)
- ML20067B912 + (Site-Specific Weather Evaluation)
- ML021080467 + (Site-Specific Worksheets for Use in the Nuclear Regulatory Commissions Significance Determination Process)
- ML020360320 + (Site-Specific Worksheets for Use in the Nuclear Regulatory Commissions Significance Determination Process)
- ML013120536 + (Site-Specific Worksheets for Use in the NRC SDP)
- ML021330725 + (Site-Specific Worksheets for Use in the Nuclear Regulatory Commissions Significant Determination Process, Millstone Nuclear Power Station, Unit No. 2)
- ML18254A190 + (Site-Wide Procedure SWP-EPP-01, Rev. 22, Emergency Response Organization and Training)
- ML082210782 + (Site-specific Implementation of B.5.b Phase 2 and 3 Mitigating Strategies Temporary Instruction Inspection.(Nrc Inspection Report 05000458/2008007))
- ML082410444 + (Site-specific Implementation of b.5.b Phase 2 and 3 Mitigating Strategies Temporary Instruction Inspection (NRC Inspection Report 05000382/2008006))
- ML19321B337 + (Site:Property Survey, Sheet 3)
- ML19253C150 + (Siting Board Proceeding Status Rept 2 in Response to Suffolk County 791017 Allegation That Util Withheld Pertinent Info in Status Rept 1.State of Ny Siting Board 791012 Dismissal of Case 80008 Occurred After Util Response)
- ML20127D492 + (Siting Industrial Facilities,Lessons from Social Science Literature)
- ML19209B079 + (Sitpulation to Protect Pink Muckett Pearly Mussel During Const of Discharge Diffuser,Per ALAB-554,signed by NRC for All Parties.Certificate of Svc Encl)
- 05000318/LER-1982-033-01, Six Accessible Snubbers in Main Feedwater & Auxiliary Steam Supply Sys Not Tested According to Surveillance Test Program.Caused by Discrepancy Between safety-related Item List & Piping Stress Analyses + (Six Accessible Snubbers in Main Feedwater & Auxiliary Steam Supply Sys Not Tested According to Surveillance Test Program.Caused by Discrepancy Between safety-related Item List & Piping Stress Analyses)
- ML20058J279 + (Six Channel Meter of Steam and Gas Content in Boiling Technological Media PAD-1M)
- ENS 40096 + (Six Chemical Agent Monitors Containing Ni-63 Reported Missing)
- ML20090A799 + (Six Exhibits from Transcript of L Heller 801009 Deposition in Bethesda,Md)
- ML20266J668 + (Six Filter Head)
- ML19338C477 + (Six Hundred seventy-four Citizen Ltrs Commenting on Krypton Venting at Tmi.Table of Contents Encl)
- ML20058K846 + (Six Month Operating Rept 3 for Jan-June 1972 for Monticello Nuclear Nuclear Generating Plant)
- NG-16-0168, Six Month Status Report in Response to 03/12/2012 Commission Order to Modify Licenses with Regard to Reliable Spent Fuel Pool Instrumentation + (Six Month Status Report in Response to 03/12/2012 Commission Order to Modify Licenses with Regard to Reliable Spent Fuel Pool Instrumentation)
- NG-15-0280, Six Month Status Report in Response to March 12, 2012 Commission Order to Modify Licenses with Regard to Reliable Spent Fuel Pool Instrumentation (Order Number EA-12-051) + (Six Month Status Report in Response to March 12, 2012 Commission Order to Modify Licenses with Regard to Reliable Spent Fuel Pool Instrumentation (Order Number EA-12-051))
- NG-15-0027, Six Month Status Report in Response to March 12, 2012 Commission Order to Modify Licenses with Regard to Reliable Spent Fuel Pool Instrumentation (Order Number EA-12-051) + (Six Month Status Report in Response to March 12, 2012 Commission Order to Modify Licenses with Regard to Reliable Spent Fuel Pool Instrumentation (Order Number EA-12-051))
- AEP-NRC-2013-72, Six Month Status Report in Response to March 12, 2012, Commission Order Modifying Licenses with Regard to Reliable Spent Fuel Pool Instrumentation (Order Number EA-12-051) + (Six Month Status Report in Response to March 12, 2012, Commission Order Modifying Licenses with Regard to Reliable Spent Fuel Pool Instrumentation (Order Number EA-12-051))
- AEP-NRC-2014-16, Six Month Status Report in Response to March 12, 2012, Commission Order Modifying Licensees with Regard to Reliable Spent Fuel Pool Instrumentation (Order Number EA-12-051) + (Six Month Status Report in Response to March 12, 2012, Commission Order Modifying Licensees with Regard to Reliable Spent Fuel Pool Instrumentation (Order Number EA-12-051))
- ML13242A013 + (Six Month Status Report in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events (Order No. EA-12-049))
- ML19208B404 + (Six Reels of Chart recorders.OPCP-802:reactor Coolant Wide Range press,OPCP-2-803:feedwater Flow for 790309-29, OPCP-2-807:HD-T-1 Pressure for 790328-0430,OPCP-804:turbine Vibrations/Eccentricities.Available in NRC Region 1 Only)
- ENS 47822 + (Six Tritium Exit Signs Unaccounted for After Shipping to Manufacturer)
- ENS 50597 + (Six Unit 2 Control Rod Drive Hydraulic Control Units Inoperable)
- ML19254E009 + (Six-Beam Test for Gamma Densitometer. Loft Technical Rept for Aug 1979)
- ML19250B843 + (Six-Inch Butterfly Valve Air Tests)
- ML20127M981 + (Six-Month Operating Rept 2 Jul-Dec 1971)
- ML20126F069 + (Six-Month Operating Rept 2 for Jul-Dec 1971)
- ML20125B243 + (Six-Month Operating Rept 6,Jul - Dec,1973)
- ML18086B328 + (Six-Month Response for Control of Heavy Loads, Revision 1)
- ML102450207 + (Six-Month Response to NRC Letter Re Work Environment Issues at Plant)
- ML18139B674 + (Six-Month Response to NRC Re NUREG-0612, Control of Heavy Loads)
- PNP 2014-101, Six-Month Status Notification in Response to Confirmatory Order, EA-14-013 + (Six-Month Status Notification in Response to Confirmatory Order, EA-14-013)
- NG-15-0361, Six-Month Status Report and Phase 1 and 2 Overall Integrated Plan in Response to June 6, 2013 Commission Order Modifying Licenses with Regard to Reliable Hardened Containment Vents Capable of Operation Under Severe Accident Conditions + (Six-Month Status Report and Phase 1 and 2 Overall Integrated Plan in Response to June 6, 2013 Commission Order Modifying Licenses with Regard to Reliable Hardened Containment Vents Capable of Operation Under Severe Accident Conditions)
- LIC-16-0062, Six-Month Status Report for the Implementation of Order EA-12-051, Order Modifying Licenses with Regard to Reliable Spent Fuel Pool Instrumentation + (Six-Month Status Report for the Implementation of Order EA-12-051, Order Modifying Licenses with Regard to Reliable Spent Fuel Pool Instrumentation)
- LIC-16-0009, Six-Month Status Report for the Implementation of Order EA-12-051, Order Modifying Licenses with Regard to Reliable Spent Fuel Pool Instrumentation + (Six-Month Status Report for the Implementation of Order EA-12-051, Order Modifying Licenses with Regard to Reliable Spent Fuel Pool Instrumentation)
- ET 14-0025, Six-Month Status Report for the Implementation of Order EA-12-051, Order Modifying Licenses with Regard to Reliable Spent Fuel Pool Instrumentation + (Six-Month Status Report for the Implementation of Order EA-12-051, Order Modifying Licenses with Regard to Reliable Spent Fuel Pool Instrumentation)
- LIC-17-0018, Six-Month Status Report for the Implementation of Order EA-12-049, Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events + (Six-Month Status Report for the Implementation of Order EA-12-049, Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events)