A Entergy Nuclear Operations, Inc.
Palisades Nuclear Plant
~Entergy 27780 Blue Star Memorial Highway Covert, Ml 49043 Tel269 764 2000 Anthony J. Vitale Site Vice President PNP 2014-101 December 18, 2014 Mr. Kenneth O'Brien U. S. Nuclear Regulatory Commission Director, Division of Reactor Safety 2443 Warrenville Road Lisle, IL 60532
Subject:
Entergy Nuclear Operations, Inc. Six-Month Status Notification in Response to Confirmatory Order, EA-14-013 Palisades Nuclear Plant Docket 50-255 License No. DPR-20
Reference:
Confirmatory Order Related to NRC Report No. 05000255/2014406 and Of Report 3-2013-018; Palisades Nuclear Plant, dated July 21, 2014 (ML14203A082)
Dear Mr. O'Brien:
On July 21, 2014, the Nuclear Regulatory Commission (NRC) issued the referenced Confirmatory Order, EA-14-013, to Entergy Nuclear Operations, Inc (ENO). The Confirmatory Order requires ENO to submit written notifications to the NRC on the status of each item in the Confirmatory Order at intervals of six months, one year and annually thereafter until the terms of the Confirmatory Order are completed.
The purpose of this letter is to provide the six-month status notification pursuant to Section V, Item F.1, of the Confirmatory Order. The attachment delineates progress made in implementing the requirements of the Confirmatory Order.
This letter contains no new commitments and no revisions to existing commitments.
Sincerely,
/
ajv/tad
Attachment:
Entergy Nuclear Operations, Inc. Six-Month Status Notification in Response to Confirmatory Order, EA-14-013 cc: Document Control Desk, USNRC Administrator, Region Ill, USNRC Project Manager, Palisades, USNRC Resident Inspector, Palisades, USNRC RECEIVED DEC 19 2014
Entergy Nuclear Operations, Inc. Six-Month Status Notification in Response to Confirmatory Order, EA-14-013
> : .. .*. :* ~opfirmatory Order Item
' :~status : ** *** , * > 'comment$~ >
A. Verification of Training Credentials for both Staff and Management:
A.1: Completed on Each Entergy site Security Conduct fleet-wide review of qualifications of each duty position in security to ensure various dates Manager validated the that the qualifications for each position are clear and verifiable by all parties (security prior to qualifications for each officers, security supervisors, and security manager). The initial review and applicable 11/30/2014 position are clear and procedure revisions shall be completed by November 30, 2014. verifiable by all parties A.2: Completed on Revised EN-NS-221, Verify and modify, if necessary, the applicable security procedure to ensure that both 11/06/2014 "Security Department assignor and assignee validate qualifications before the assignee performs a duty Standards and position. This shall be completed by November 30, 2014. Expectations" revision 6 A.3: In-progress Training material has been Following completion of A.1 and A.2, training will be conducted on the changes. This developed and approved shall be completed by June 30, 2015. for use.
B. Strengthen Safety Culture:
B.1: In-progress 3ra and 4tn quarter 2014 Through June 30, 2016, the Palisades Security Manager shall meet quarterly (during the quarterly meetings have calendar quarter, allowing for one month grace period) with each security team: (a) to been completed.
reinforce the importance of a healthy SCWE and management's intolerance for retaliation, and (b) to discuss security concerns and issue resolution.
B.2: In-progress Security Top 10 issues and Through June 30, 2016, Palisades' security management shall maintain and update a resolutions are maintained "Security Top 10 Issues" board to reflect, among other things, the expected issues and communicated on a resolution dates. routine basis.
B.3: Completed on The third and final monthly Discuss the safety culture aspects of the event with Palisades Nuclear Plant staff, 11/06/2014 tailgate meeting material including long-term contract staff, in three monthly tailgate meetings. The tailgate was distributed on meetings shall include employee rights, licensee expectations with respect to raising November 6, 2014.
issues, methods to raise issues, and the right to contact the NRC. The tailgate meetings will be completed by December 31, 2014.
Page 1 of 3
Entergy Nuclear Operations, Inc., Six-Month Status Notification in Response to Confirmatory Order, EA-14-013 Confit'I'Mtory Order Item
, Status ' ', c canunfiits * ?c,
B.4: In-progress EN-LI-102 Revision 24 Revise procedure EN-LI-102 to ensure that the Condition Review Group (CRG) chair completed. A "read and considers whether the person assigned is sufficiently independent. This applies to sign" document was condition reports that have challenges to a decision or a resolution that is highly developed and distributed dependent on a single individual. A "read and sign" will be provided to each Entergy for signatures.
(fleet-wide) CRG chair to inform them of the procedure revision. The procedure will be revised by November 30, 2014, and the "read and sign" training will be completed by January 31, 2015.
B.S: In-progress The case study developed Conduct a case study for supervisors and above throughout the Entergy fleet that was approved for training highlights safety culture aspects of the event: questioning attitude, proceeding in the on 12/8/2014 I face of uncertainty, procedure compliance, and responsiveness to employee concerns. I The case study will be developed and conducted by June 30, 2015.
C. Recognition by the Reactor Community:
C.1: Complete on NRC reviewed presentation Entergy Fleet Director of Nuclear Security shall make a presentation to an industry 11/5/2014 prior to presentation at NEI security working group on this event. The licensee will provide the NRC an opportunity Security Working Group to review the presentation. The presentation shall be accomplished by December 31, meeting on November 5, 2014. 2014 C.2: On target Currently planned for a Entergy shall make a related presentation at a broad industry meeting aimed at an meeting of the National audience beyond the security organizations and covering all four NRC regions. It is Association of Employee acceptable to make the presentation at multiple meetings, if deemed necessary to reach Concerns Professionals the desired audience. The presentations shall be accomplished by June 30, 2015. Feb 2015 o~ Setting Standards for Security Senior Management:
Entergy shall revise procedure EN-FAP-HR-006 to include specific requirements for In-progress Security Manager selection and development. This shall be accomplished by December On target 31,2014.
Page 2 of 3
Entergy Nuclear Operations, Inc., Six-Month Status Notification in Response to Confirmatory Order, EA-14-013 tonfirmatorv order Item , Status. l* ,. comments'* . ,*
E. Effectiveness Review:
Entergy shall arrange for an independent effectiveness review of the actions discussed in On target sections A and B. The review will be conducted no earlier than one year, but less than two years, from the issuance date of the Confirmatory Order.
F. Notification of NRC When Actions Are Completed:
F.l: In-Progress 6-month status notification Unless otherwise specified, Entergy will submit written notification by letter to the NRC completed.
staff, specifically, the Director, Division of Reactor Safety, 2443 Warrenville Road, Lisle, IL, 60532, at intervals of six months, one year, and annually thereafter until the terms of the Confirmatory Order are completed, providing a status of each item in the Confirmatory Order.
F.2: On target Upon completion of all terms of the Confirmatory Order, Entergy will provide the NRC with a letter discussing its basis for concluding that the Order has been satisfied.
Page 3 of 3
A Entergy Nuclear Operations, Inc.
Palisades Nuclear Plant
~Entergy 27780 Blue Star Memorial Highway Covert, Ml 49043 Tel269 764 2000 Anthony J. Vitale Site Vice President PNP 2014-101 December 18, 2014 Mr. Kenneth O'Brien U. S. Nuclear Regulatory Commission Director, Division of Reactor Safety 2443 Warrenville Road Lisle, IL 60532
Subject:
Entergy Nuclear Operations, Inc. Six-Month Status Notification in Response to Confirmatory Order, EA-14-013 Palisades Nuclear Plant Docket 50-255 License No. DPR-20
Reference:
Confirmatory Order Related to NRC Report No. 05000255/2014406 and Of Report 3-2013-018; Palisades Nuclear Plant, dated July 21, 2014 (ML14203A082)
Dear Mr. O'Brien:
On July 21, 2014, the Nuclear Regulatory Commission (NRC) issued the referenced Confirmatory Order, EA-14-013, to Entergy Nuclear Operations, Inc (ENO). The Confirmatory Order requires ENO to submit written notifications to the NRC on the status of each item in the Confirmatory Order at intervals of six months, one year and annually thereafter until the terms of the Confirmatory Order are completed.
The purpose of this letter is to provide the six-month status notification pursuant to Section V, Item F.1, of the Confirmatory Order. The attachment delineates progress made in implementing the requirements of the Confirmatory Order.
This letter contains no new commitments and no revisions to existing commitments.
Sincerely,
/
ajv/tad
Attachment:
Entergy Nuclear Operations, Inc. Six-Month Status Notification in Response to Confirmatory Order, EA-14-013 cc: Document Control Desk, USNRC Administrator, Region Ill, USNRC Project Manager, Palisades, USNRC Resident Inspector, Palisades, USNRC RECEIVED DEC 19 2014
Entergy Nuclear Operations, Inc. Six-Month Status Notification in Response to Confirmatory Order, EA-14-013
> : .. .*. :* ~opfirmatory Order Item
' :~status : ** *** , * > 'comment$~ >
A. Verification of Training Credentials for both Staff and Management:
A.1: Completed on Each Entergy site Security Conduct fleet-wide review of qualifications of each duty position in security to ensure various dates Manager validated the that the qualifications for each position are clear and verifiable by all parties (security prior to qualifications for each officers, security supervisors, and security manager). The initial review and applicable 11/30/2014 position are clear and procedure revisions shall be completed by November 30, 2014. verifiable by all parties A.2: Completed on Revised EN-NS-221, Verify and modify, if necessary, the applicable security procedure to ensure that both 11/06/2014 "Security Department assignor and assignee validate qualifications before the assignee performs a duty Standards and position. This shall be completed by November 30, 2014. Expectations" revision 6 A.3: In-progress Training material has been Following completion of A.1 and A.2, training will be conducted on the changes. This developed and approved shall be completed by June 30, 2015. for use.
B. Strengthen Safety Culture:
B.1: In-progress 3ra and 4tn quarter 2014 Through June 30, 2016, the Palisades Security Manager shall meet quarterly (during the quarterly meetings have calendar quarter, allowing for one month grace period) with each security team: (a) to been completed.
reinforce the importance of a healthy SCWE and management's intolerance for retaliation, and (b) to discuss security concerns and issue resolution.
B.2: In-progress Security Top 10 issues and Through June 30, 2016, Palisades' security management shall maintain and update a resolutions are maintained "Security Top 10 Issues" board to reflect, among other things, the expected issues and communicated on a resolution dates. routine basis.
B.3: Completed on The third and final monthly Discuss the safety culture aspects of the event with Palisades Nuclear Plant staff, 11/06/2014 tailgate meeting material including long-term contract staff, in three monthly tailgate meetings. The tailgate was distributed on meetings shall include employee rights, licensee expectations with respect to raising November 6, 2014.
issues, methods to raise issues, and the right to contact the NRC. The tailgate meetings will be completed by December 31, 2014.
Page 1 of 3
Entergy Nuclear Operations, Inc., Six-Month Status Notification in Response to Confirmatory Order, EA-14-013 Confit'I'Mtory Order Item
, Status ' ', c canunfiits * ?c,
B.4: In-progress EN-LI-102 Revision 24 Revise procedure EN-LI-102 to ensure that the Condition Review Group (CRG) chair completed. A "read and considers whether the person assigned is sufficiently independent. This applies to sign" document was condition reports that have challenges to a decision or a resolution that is highly developed and distributed dependent on a single individual. A "read and sign" will be provided to each Entergy for signatures.
(fleet-wide) CRG chair to inform them of the procedure revision. The procedure will be revised by November 30, 2014, and the "read and sign" training will be completed by January 31, 2015.
B.S: In-progress The case study developed Conduct a case study for supervisors and above throughout the Entergy fleet that was approved for training highlights safety culture aspects of the event: questioning attitude, proceeding in the on 12/8/2014 I face of uncertainty, procedure compliance, and responsiveness to employee concerns. I The case study will be developed and conducted by June 30, 2015.
C. Recognition by the Reactor Community:
C.1: Complete on NRC reviewed presentation Entergy Fleet Director of Nuclear Security shall make a presentation to an industry 11/5/2014 prior to presentation at NEI security working group on this event. The licensee will provide the NRC an opportunity Security Working Group to review the presentation. The presentation shall be accomplished by December 31, meeting on November 5, 2014. 2014 C.2: On target Currently planned for a Entergy shall make a related presentation at a broad industry meeting aimed at an meeting of the National audience beyond the security organizations and covering all four NRC regions. It is Association of Employee acceptable to make the presentation at multiple meetings, if deemed necessary to reach Concerns Professionals the desired audience. The presentations shall be accomplished by June 30, 2015. Feb 2015 o~ Setting Standards for Security Senior Management:
Entergy shall revise procedure EN-FAP-HR-006 to include specific requirements for In-progress Security Manager selection and development. This shall be accomplished by December On target 31,2014.
Page 2 of 3
Entergy Nuclear Operations, Inc., Six-Month Status Notification in Response to Confirmatory Order, EA-14-013 tonfirmatorv order Item , Status. l* ,. comments'* . ,*
E. Effectiveness Review:
Entergy shall arrange for an independent effectiveness review of the actions discussed in On target sections A and B. The review will be conducted no earlier than one year, but less than two years, from the issuance date of the Confirmatory Order.
F. Notification of NRC When Actions Are Completed:
F.l: In-Progress 6-month status notification Unless otherwise specified, Entergy will submit written notification by letter to the NRC completed.
staff, specifically, the Director, Division of Reactor Safety, 2443 Warrenville Road, Lisle, IL, 60532, at intervals of six months, one year, and annually thereafter until the terms of the Confirmatory Order are completed, providing a status of each item in the Confirmatory Order.
F.2: On target Upon completion of all terms of the Confirmatory Order, Entergy will provide the NRC with a letter discussing its basis for concluding that the Order has been satisfied.
Page 3 of 3