ML082410444

From kanterella
Jump to navigation Jump to search
Site-specific Implementation of b.5.b Phase 2 and 3 Mitigating Strategies Temporary Instruction Inspection (NRC Inspection Report 05000382/2008006)
ML082410444
Person / Time
Site: Waterford Entergy icon.png
Issue date: 08/27/2008
From: Ryan Lantz
Operations Branch IV
To: Walsh K
Entergy Operations
References
Download: ML082410444 (4)


See also: IR 05000382/2008006

Text

OFFICIAL USE ONLY - SECURITY-RELATED INFORMATION

UNITED STATES

NU CLE AR RE GU LATOR Y C O M M I S S I O N

R EGI ON I V

611 R YAN PLAZA D R IV E, SU ITE 400

AR LI N GTON , TEXAS 76011-4005

August 27, 2008

Kevin Walsh, Vice President, Operations

Entergy Operations, Inc.

Waterford Steam Electric Station, Unit 3

17265 River Road

Killona, LA 70057-3093

SUBJECT: WATERFORD STEAM ELECTRIC STATION, UNIT 3 - SITE-SPECIFIC

IMPLEMENTATION OF B.5.B PHASE 2 AND 3 MITIGATING STRATEGIES

TEMPORARY INSTRUCTION INSPECTION (NRC INSPECTION

REPORT 05000382/2008006)

Dear Mr. Walsh:

In a telephone conversation on August 27, 2008, Messrs. Greg Scott and John Kirkland made

arrangements for the Nuclear Regulatory Commission to inspect the site-specific

implementation of B.5.b Phase 2 and 3 mitigating strategies at the Waterford Steam Electric

Station, Unit 3. The inspection is planned for the week of September 29, 2008.

In order for the NRC to adequately prepare for this inspection, please furnish the documents

listed in Enclosure 1 to Mr. John Kirkland in electronic format no later than September 17, 2008.

Please have available on site at the beginning of the inspection the arrangements and

documents listed in Enclosure 2. Mr. Greg Scott has been advised of this request and provided

with the name and address of the NRC lead inspector.

This letter contains information collections that are subject to the Paperwork Reduction Act of

1995 (44 U.S.C. 3501 et seq.). These information collections were approved by the Office of

Management and Budget, approval number 3150-0011.

The public reporting burden for this collection of information is estimated to average 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> per

response, including the time for reviewing instructions, gathering and maintaining the data

needed, and completing and reviewing the collection of information. Send comments on any

OFFICIAL USE ONLY - SECURITY-RELATED INFORMATION

OFFICIAL USE ONLY - SECURITY-RELATED INFORMATION

Entergy Operations, Inc. -2-

aspect of this collection of information, including suggestions for reducing the burden, to the

Records and FOIA/Privacy Services Branch (T-5 F53), U.S. Nuclear Regulatory Commission,

Washington, D.C. 20555-0001, or by Internet electronic mail to

INFOCOLLECTS.Resource@NRC.GOV; and to the Desk Officer, Office of Information and

Regulatory Affairs, NEOB-10202, (3150-0011), Office of Management and Budget, Washington,

D.C. 20503-0001.

In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter will be

available electronically for public inspection in the NRC Public Document Room or from the

Publicly Available Records System (PARS) component of NRC's Agencywide Documents

Access and Management System (ADAMS), accessible from the NRC Web site at

http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room). However,

because of the sensitive information contained in the enclosures, and in accordance with

10 CFR 2.390, a copy of this letters enclosures will not be available for public inspection.

Thank you for your cooperation in this matter. If you have any questions regarding this

inspection, please contact John Kirkland at 402-426-9611, or me at 817 860-8159.

Sincerely,

/RA/

Ryan E. Lantz, Chief

Operations Branch

Division of Reactor Safety

Docket: 50-382

License: NPF-38

Enclosures:

1. Documentation Requested

Prior to the Inspection

2. Arrangements/Documents Requested

To Be Available Onsite during the

Inspection Week

cc w/o enclosure:

Senior Vice President

Entergy Nuclear Operations

P.O. Box 31995

OFFICIAL USE ONLY - SECURITY-RELATED INFORMATION

OFFICIAL USE ONLY - SECURITY-RELATED INFORMATION

Entergy Operations, Inc. -3-

Jackson, MS 39286-1995

Senior Vice President and

Chief Operating Officer

Entergy Operations, Inc.

P.O. Box 31995

Jackson, MS 39286-1995

Vice President, Operations Support

Entergy Services, Inc.

P.O. Box 31995

Jackson, MS 39286-1995

Senior Manager, Nuclear Safety

and Licensing

Entergy Services, Inc.

P.O. Box 31995

Jackson, MS 39286-1995

Site Vice President

Waterford Steam Electric Station, Unit 3

Entergy Operations, Inc.

17265 River Road

Killona, LA 70057-0751

Director

Nuclear Safety Assurance

Entergy Operations, Inc.

17265 River Road

Killona, LA 70057-0751

General Manager, Plant Operations

Waterford 3 SES

Entergy Operations, Inc.

17265 River Road

Killona, LA 70057-0751

Manager, Licensing

Entergy Operations, Inc.

17265 River Road

Killona, LA 70057-3093

OFFICIAL USE ONLY - SECURITY-RELATED INFORMATION

OFFICIAL USE ONLY - SECURITY-RELATED INFORMATION

Entergy Operations, Inc. -4-

Director, Nuclear Safety & Licensing

Entergy, Operations, Inc.

440 Hamilton Avenue

White Plains, NY 10601

OFFICIAL USE ONLY - SECURITY-RELATED INFORMATION