Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20260J105 + (Settlement Summary Turbine Building - Unit 2)
- ML20260B762 + (Settlement Summary Turbine Building - Unit 2)
- ML20261A555 + (Settlement Summary Turbine Building - Unit 2. Rev Date Illegible)
- ML20091L058 + (Settlement Update for Midland Units 1 & 2)
- ML20261A600 + (Settlement Vs Time:Reactor Buildings. No Rev Date)
- ML091200297 + (Settlement of Contention 2)
- ML20010C829 + (Settlement of Proceeding Modifying 810223 Order Imposing Civil Penalty.Decreases Penalty to $18,000.Util Will Withdraw 810319 Request for Hearing)
- ML20151E805 + (Settlement of SWS Piping - Intake Structure to Valve Pit. W/Four Oversize Encls)
- ML20102B512 + (Settlement of Uranium Mill Tailings Piles: a Comparison of Analysis Techniques)
- ML23258A055 + (Setup of Online Reference Portal and Audit Plan for the NRC Staffs Review of LAR to Use Framatome Small Break and Realistic Large Break LOCA Methodologies (08/31/2023 e-mail))
- ML19282A637 + (Seven Directions & Requests for Evidentiary Hearings on Remanded Issues)
- 05000285/FIN-2012301-01 + (Seven Examples of Inadequate Procedures for the Barrier Integrity Cornerstone)
- ML19256E388 + (Seven Telegrams Requesting That NRC Review Safety Requirements & Permit Startup of Facility as Soon as It Is Safe & Possible)
- ENS 46596 + (Seven Tritium Exit Signs Lost)
- ML020880618 + (Seven-Day Response to NRC Bulletin 2002-01, Reactor Pressure Vessel Head Degradation and Reactor Coolant Pressure Boundary Integrity)
- ML20260F348 + (Seventeen Illegible Geophysical Maps)
- L-19-119, Seventeenth Inservice Inspection Summary Report + (Seventeenth Inservice Inspection Summary Report)
- ML20235N282 + (Seventeenth Issue of U Mill Tailings Remedial Action (Umtra) Integrated Monthly Vicinity Property Progress Rept (Vppr),May 1987. Summary of Listed at Completion Variances (Acvs) & Milestone Schedule Variances Encl)
- NL-13-0631, Seventeenth Maintenance/Refueling Outage Steam Generator Tube Inspection Report + (Seventeenth Maintenance/Refueling Outage Steam Generator Tube Inspection Report)
- ML20129C975 + (Seventeenth Monthly Progress Rept for Apr 1985)
- ML20070W180 + (Seventeenth Motion for Summary Disposition of Contention Necnp I.U.No Genuine Issue of Matl Fact Exists & Applicant Entitled to Favorable Decision.Certificate of Svc Encl. Related Correspondence)
- ML20135F952 + (Seventeenth Partial Response to FOIA Request for Documents. App Bb Records Being Withheld in Part & App AA Being Withheld in Their Entirety (Ref FOIA Exemption 5))
- ML20135F953 + (Seventeenth Partial Response to FOIA Request for Documents. App Bb Records Being Withheld in Part & App AA Being Withheld in Their Entirety (Ref FOIA Exemption 5))
- ML20030D311 + (Seventeenth Progress Rept of Tx A&M Univ Nuclear Science Ctr,1980)
- ML20077E536 + (Seventeenth Quarterly Rept Cleveland Electric Illuminating Co Seismic Monitoring Network Jan-Mar 1991)
- L-06-104, Seventeenth Refueling Outage Inservice Inspection Report + (Seventeenth Refueling Outage Inservice Inspection Report)
- L-14-243, Seventeenth Refueling Outage Inservice Inspection Summary Report + (Seventeenth Refueling Outage Inservice Inspection Summary Report)
- ML20042C317 + (Seventeenth Set of Interrogatories & Request to Produce. Certificate of Svc Encl)
- ML20087F263 + (Seventeenth Set of Interrogatories & Requests to Produce to Applicants.Certificate of Svc Encl.Related Correspondence)
- ND-22-0040, Seventeenth Six-Month Status Report of the Implementation of the Requirements of the Commission Order with Regard to Mitigation Strategies for Beyond-Design-Basis External Events (EA-12-049 + (Seventeenth Six-Month Status Report of the Implementation of the Requirements of the Commission Order with Regard to Mitigation Strategies for Beyond-Design-Basis External Events (EA-12-049)
- ML111661798 + (Seventeenth Update to Disclosures Pursuant to 10 CFR 2.336; Tennessee Valley Authority (Watts Bar Nuclear Plant, Unit 2))
- NL-15-0596, Seventeeth Maintenance/Refueling Outage Steam Generator Tube Inspection Report + (Seventeeth Maintenance/Refueling Outage Steam Generator Tube Inspection Report)
- ML20043A170 + (Seventh Annual 10CFR50.59 Rept,Virgil C Summer Nuclear Station)
- SBK-L-17172, Seventh Annual Update to the License Renewal Application + (Seventh Annual Update to the License Renewal Application)
- ML20065M694 + (Seventh Discovery Progress Rept,Pursuant to ASLB 810909 Memorandum & order,LBP-81-35.Interrogatories Submitted to Applicant & NRC Re Issues 4,5,6,7,8 & 9.Discovery Re Issue 9 Forthcoming)
- ML20065N777 + (Seventh Discovery Progress Rept.Certificate of Svc Encl)
- ML20210N301 + (Seventh Final Response to FOIA Request for Documents.Records in App H Encl & Will Be Available in PDR)
- ML20211M297 + (Seventh Final Response to FOIA Request for Documents. Documents Identified in App K Being Withheld in Entirety (Ref FOIA Exemption 4))
- IA-97-325, Seventh Final Response to FOIA Request for Documents. Documents Listed in App I Being Released in Entirety. Documents Listed in App J Being Withheld in Entirety (Ref FOIA Exemption 4,6 & 7C) + (Seventh Final Response to FOIA Request for Documents. Documents Listed in App I Being Released in Entirety. Documents Listed in App J Being Withheld in Entirety (Ref FOIA Exemption 4,6 & 7C))
- ML20203G561 + (Seventh Final Response to FOIA Request for Documents. Documents Listed in App I Being Released in Entirety. Documents Listed in App J Being Withheld in Entirety (Ref FOIA Exemption 4,6 & 7C))
- ML20134N731 + (Seventh Final Response to FOIA Request for Documents.Records in App G Encl & Will Be Available in PDR)
- ML20134N734 + (Seventh Final Response to FOIA Request for Documents.Records in App G Encl & Will Be Available in PDR)
- IA-96-246, Seventh Final Response to FOIA Request for Documents.Records in App G Encl & Will Be Available in PDR + (Seventh Final Response to FOIA Request for Documents.Records in App G Encl & Will Be Available in PDR)
- ML032671083 + (Seventh Interim Application of FTI Consulting, Inc., for Allowance and Payment of Compensation and Reimbursement of Expenses (04/01 - 07/31/03) Declaration of Thomas E. Lumsden in Support Thereof)
- ML20080G986 + (Seventh Interim Deficiency Rept 32 Re Stress Analysis for Welded Supports Not Performed Prior to Fabrication.Final Rept Will Be Submitted by 840309)
- AECM-83-0215, Seventh Interim Deficiency Rept PRD-81/44 Re Valves & Actuators Not Mfg Under QA Program.Initially Reported on 811029.Actuators & Appurtenances Not Mfg Under QA Program Qualified by Tests.Final Rept Expected by 830708 + (Seventh Interim Deficiency Rept PRD-81/44 Re Valves & Actuators Not Mfg Under QA Program.Initially Reported on 811029.Actuators & Appurtenances Not Mfg Under QA Program Qualified by Tests.Final Rept Expected by 830708)
- ML20066H588 + (Seventh Interim Deficiency Rept Re B&W Nonconsecutive Analysis of Neutron Flux.Initially Reported on 801105.Vendor Submitted by 830523.Also Reported Per Part 21)
- ML20063M789 + (Seventh Interim Deficiency Rept Re Base Metal Defects in Main Steam & Feedwater Containment Penetration Anchors.Top Crosspiece of East Main Steam Anchor Will Be Welded as Last Corrective Action.Final Rept Expected by 821029)
- ML20063D671 + (Seventh Interim Deficiency Rept Re Breakdown in Quality Program Procurement Cycle of Purchased Matl,Initially Reported 800613.Bechtel Has Undertaken Assessment of Each Document Package.Next Rept by 821119)
- ML20062J881 + (Seventh Interim Deficiency Rept Re Corrosion of Carbon Steel Piping.Initially Reported on 801230.Statistical Analysis of Meteorological & River Temp Data Demonstrated Validity of Lowering Max Emergency Raw Cooling Water Temp)
- ML20065K090 + (Seventh Interim Deficiency Rept Re Discrepancies in Itt Grinnel Weld Depositions.Initially Reported on 800905.ITT Grinnel Revision of Affected Hanger Detail Sheets Near Completion.Also Reported Per Part 21.Next Rept by 830315)