Search by property

Jump to navigation Jump to search

This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.

Search by property

A list of all pages that have property "Title" with value "SONGS 1 ECCS Single Failure Analysis Follow-up Rept". Since there have been only a few results, also nearby values are displayed.

â§Ľshowingresultsâ§˝

View (previous 50 | next 50) (20 | 50 | 100 | 250 | 500)


    

List of results

  • ML19326E120  + (SOLA-LOOP:Nonequilibrium,Drift-Flux Code for Two-Phase Flow in Networks)
  • ML20096G642  + (SOLA-PTS: a Transient,Three-Dimensional Algorithm for Fluid-Thermal Mixing and Wall Heat Transfer in Complex Geometrics)
  • ML25159A013  + (SOLO-TR-2025-1-NP, Revision 0, Solo Tm Micro Modular Nuclear Reactor Principal Design Criteria)
  • ML25361A006  + (SOLO-TR-2025-10, Rev. 0, Emergency Planning and EPZ Sizing)
  • ML26047A006  + (SOLO-TR-2025-11, Revision 0, External and Internal Hazards Analysis and Safety Basis Event Identification for Solo Non-Power Reactor (Non-Proprietary))
  • ML25257A014  + (SOLO-TR-2025-6-NP, Rev. 0, Solo Safeguards Methodology and Implementation of the Material Control & Accountancy (Mc&A))
  • ML25361A004  + (SOLO-TR-2025-7, Rev. 0, Solo Tm Pre-FOAK Test Plan)
  • ML25257A012  + (SOLO-TR-2025-9-NP, Rev. 0, Solo Project Quality Plan)
  • ML051710641  + (SONGS (SCE) Meeting Notice Plans for Managing Inconel 600 Materials Inspections During Its Next Refueling Outage)
  • ML060820610  + (SONGS - 10-2005 - Draft Outline)
  • ML060820633  + (SONGS - 10-2005 - Final Outline)
  • ML060830508  + (SONGS - 10-2005 - Final Reference Operating Exam)
  • ML060830444  + (SONGS - 10-2005 - Final Reference Written Exam)
  • ML050480154  + (SONGS - 12-2003 - Final Outline)
  • ML13127A274  + (SONGS - 2012-11-Public Forms)
  • ML040780574  + (SONGS - Conference Call Summary Regenerative Heat Exchanger Weld Failure)
  • ML090980515  + (SONGS - GSI-191 Chemical Effects)
  • ML071520364  + (SONGS - Initial Exam - 06/2007 - NRC Initial Operator Examination Approval)
  • ML051050007  + (SONGS - Initial Examination 05000361/05-301 & 05000362/05-301 - Operator Licensing Examination Approval)
  • ML051020134  + (SONGS - Intial Exam - 04/2005 - Corporate Notification Letter)
  • ML051100213  + (SONGS - Meeting with Southern California Edison (SCE) 218kV Grid Voltage, Etc)
  • ML20034E605  + (SONGS - Mesa Navy All Parcels Fig1_v9)
  • ML14093A677  + (SONGS - Request for Additional Information Concerning Pre-Emption Authority)
  • ML042510487  + (SONGS - Units 2 & 3, NRC Bulletin 2003-01 Potential Impact of Debris Blockage on Emergency Sump Recirculation at Pressurized-Water Reactors)
  • ML13329A742  + (SONGS 1 Cost-Effectiveness Analysis)
  • ML13311A426  + (SONGS 1 ECCS Single Failure Analysis Follow-up Rept)
  • ML060820618  + (SONGS 10-2005 - Draft Outline Comments)
  • ML072400451  + (SONGS 2 & 3 - 4/18/07 E-mail to D. Mercurio RAI Criticality Analysis & Ts/Lcs/Bases Changes - (Tacs. MD1405 and 1406))
  • ML072400505  + (SONGS 2 & 3 - 4/20/07 E-mail to L. Conklin, RAI Acceptability to CEAs & Gt Inserts, Etc. (Tacs. MD1405 and 1406))
  • ML030580398  + (SONGS 2 & 3 - Change in Project Director)
  • ML070090384  + (SONGS 2 & 3 - Corr. Ltr for Issuance of Amd 209/201 Transfer of Licenses Permitting Transfer of Undivided Ownership Interest Held by City of Anaheim to Scec, Excl Interest in Spent Fuel & Independent Spent Fuel Storage Installation (TAC MD0)
  • ML033010612  + (SONGS 2 & 3 - Issuance of Amds. 190/181 on Emergency Core Cooling System (ECCS) Surveillance Requirement. (Tac. MB8123/8124))
  • ML040300561  + (SONGS 2 & 3 - Meeting with Southern California Edison (SCE) to Discuss Proposed License Amendment for Battery Alteration)
  • ML021440234  + (SONGS 2 & 3 - Notice of Consideration of Issuance of Amendment to Revise TS 5.5.2.11.f.1.h to More Clearly Delineate Scope of SG Tube Inspection Required in Tubesheet Region)
  • ML030870926  + (SONGS 2 & 3 - Request for Relief from the Requirements of the American Society of Mechanical Engineers Boiler and Pressure Vessel Code Concerning Use of Temperbead and Embedded Flaw Repair Techniques. Tac. MB5186/5187)
  • ML032950245  + (SONGS 2 & 3 -Meeting with Southern California Edison (SCE))
  • ML052420079  + (SONGS 2 & 3, Cancellation of TAC Nos. for Physical Security Plan Change Submitted 5/27/05 TAC MB7214, MB7215)
  • ML070100401  + (SONGS 2 & 3, Corrected Technical Specifications, Transfer of Licenses Permitting Transfer of Undivided Ownership Interest Held by City of Anaheim to Scec, Excluding Interest in Spent Fuel & Independent Spent Fuel Storage Installation)
  • ML021210552  + (SONGS 2 & 3, Corrections to Amendments 185 & 186, New Amendment Numbers Noted in Each Deleted License Condition & Typographical Errors Corrected (Tacs. MB1552/MB1553))
  • ML043350123  + (SONGS 2 - Evaluation of Steam Generator Tube Inspection Report from 2004 Outage)
  • ML20100Q612  + (SONGS 2 Primary Plant Make-Up Storage Tank Upgrade)
  • ML040420634  + (SONGS 2 and 3 - Conference Call Summary Pressurizer Inspection)
  • ML060690154  + (SONGS 2 and 3 Summary of Meeting Dated 03/02/06)
  • ML032950305  + (SONGS 2&3 Rai Letter - Steam Generator Pressure-Low Allowable Value (Tacs. MC0200, MC0201))
  • ML061100371  + (SONGS 2, E-mail, N. Kalyanam to Jack Rainsberry, Draft RAI to Licensee with a follow-up Question)
  • ML061100366  + (SONGS 2, Email, N. Kalyanam to Jack Rainsberry, Draft RAI from Dci/Cfeb on ISI-3-18)
  • ML060960198  + (SONGS 2, Handouts, Information Supplied by SCE in Support of Discussion)
  • ML060950286  + (SONGS 2, Summary of Jan 2006 Discussions of Steam Generator Tube Inspections)
  • ML26055A101  + (SONGS 2.206 Inspector General)
  • ML13065A031  + (SONGS 2012 IP 71111.11Q Control Room Observation Samples)
  • ML13115A926  + (SONGS 2013403-Errata letter-Nonsgi-jlb)