Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- LIC-07-0025, Revised Fort Calhoun Station, Unit 1, 2007 Biennial Decommissioning Funding Status Report + (Revised Fort Calhoun Station, Unit 1, 2007 Biennial Decommissioning Funding Status Report)
- ML20199B734 + (Revised Fort St Vrain Nuclear Generating Station Spill Prevention & Containment Plan)
- ML063280045 + (Revised Forthcoming Meeting with Amergen Energy Company, LLC (Licensee) Regarding Application of an Alternative Source Term for Oyster Creek Nuclear Generating Station)
- ML051740074 + (Revised Forthcoming Meeting with Entergy Nuclear Vermont Yankee, LLC and GE Nuclear Energy - Re Room Location Change)
- ML053120104 + (Revised Forthcoming Meeting with Firstenergy Nuclear Operating Company, Regarding Beaver Valley Units 1 and 2 Extended Power Uprate)
- ML13002A236 + (Revised Forthcoming Meeting with Petitioner Requesting Action Against Southern California Edison Company)
- ML19312B783 + (Revised Forwarding Amend 13 to Application for Licenses.Amend Incorporates Util Engineering Dept Design Rept File OS-27B,dtd 700605, & Revison 6 to Fsar,Including Suppl 3.W/o Encl)
- ML19262C685 + (Revised Forwarding Ltr for Revised LER 80-005/04T-0)
- LIC-14-0099, Revised Fourth Ten-Year Interval Inservice Inspection (ISI) Interval + (Revised Fourth Ten-Year Interval Inservice Inspection (ISI) Interval)
- ML19256D539 + (Revised Functional Budget 1979 for Unit 1 Operation & Maint Operations)
- ML073100985 + (Revised Fuse Comments on Scope of Environmental Impact Statement and Scoping Process Indian Point Energy Center Unit 2 and Unit 3)
- ML20117E037 + (Revised GE Relays & Accessories Seismic Capability)
- ML13109A052 + (Revised GNF Response to NRC RAI 44 for License Amendment Request for Use of Neutron Absorbing Spent Fuel Pool Rack Inserts, Attachment 3, Enclosures 2, 3 and 4)
- ML032390359 + (Revised General Electric Co. Report, GE-NE-A22-00100-08-01-R2, Pressure Temperature Curves for Duane Arnold Energy Center)
- GL-718231-24, Revised General Licensee Registration - Not in Possession - Pacific Steel + (Revised General Licensee Registration - Not in Possession - Pacific Steel)
- ML032461264 + (Revised General Office Operations Manager: Emergency Plan - Position Specific Procedure)
- LIC-04-0107, Revised Generic Letter 2003-01, Control Room Habitability Commitments + (Revised Generic Letter 2003-01, Control Room Habitability Commitments)
- ML042790399 + (Revised Generic Letter 2003-01, Control Room Habitability Commitments)
- ML17309A648 + (Revised Ginna Station Emergency Operating Procedures. with)
- GNRO-2017/00055, Revised Grand Gulf Nuclear Station (GGNS) Annual Radioactive Effluent Release Report (ARERR) for 2016 + (Revised Grand Gulf Nuclear Station (GGNS) Annual Radioactive Effluent Release Report (ARERR) for 2016)
- IR 05000416/2024002 + (Revised Grand Gulf Nuclear Station - Integrated Inspection Report 05000416/2024002)
- IR 05000416/2022013 + (Revised Grand Gulf Nuclear Station Design Basis Assurance Inspection Report 05000416/2022013)
- ML20205N800 + (Revised Ground Water Compliance Action Plan & Application for Alternate Concentration Limits for Canonsburg,Pa,Umtra Project Site)
- CY-07-052, Revised Groundwater Monitoring Plan to Support HNP License Termination + (Revised Groundwater Monitoring Plan to Support HNP License Termination)
- ML100960495 + (Revised Guidance Regarding Coatings Zone of Influence for Review of Final Licensee Responses to Generic Letter 2004-02, Potential Impact of Debris Blockage on Emergency Recirculation During Design Basis Accidents at Pressurized-Water Reacto)
- ML20198C178 + (Revised Guide for Processing License Amends)
- ML16246A210 + (Revised Guidelines for Prioritization of Generic Safety Issues)
- ML25350C318 + (Revised HI-STORM Umax Amd 6 Pre-Submittal-Public Session)
- ML070820522 + (Revised Handout from 03/20/2007 Meeting)
- HNP-02-129, Revised Harris Nuclear Plant Emergency Plan Implementing Procedure, PEP-110, Revision 10, Emergency Classification & Protective Action Recommendations + (Revised Harris Nuclear Plant Emergency Plan Implementing Procedure, PEP-110, Revision 10, Emergency Classification & Protective Action Recommendations)
- ML20030A512 + (Revised Hazards Summary Rept for Facility)
- ML20236E487 + (Revised Health & Safety Sections for Renewal Application of Special Nuclear Matls License SNM-21)
- ML20237H327 + (Revised Health Physics Procedure Hpp 6-2, Lab Radwaste Collection)
- ML20126K026 + (Revised Health Physics Procedures,For Frank H Neely Nuclear Research Ctr)
- ML20141N649 + (Revised Health Physics Procedures,Including Rev 1 to RAC-001, Radiological Instruments..., Rev 1 to RAC-003, Source Accountability & Leak Testing & Rev 1 to RAC-004, Particulate Radiation/Contamination Control)
- L-PI-13-086, Revised Heat Transfer Multiplier Distributions - Error Identified in ECCS Evaluation Model, 10 CFR 50.46 + (Revised Heat Transfer Multiplier Distributions - Error Identified in ECCS Evaluation Model, 10 CFR 50.46)
- ML20030A569 + (Revised Heatup Analysis for Exxon Nuclear Co Mixed Oxide G Fuel in Big Rock Point Plant Using Reduced Fuel Thermal Conductivity)
- ML20205D888 + (Revised Heavy Load Analysis Rept,Phase I)
- ML040930190 + (Revised Heller Ehrman White & Mcauliffe Llps Cover Sheet Application for Allowance and Payment of Interim Compensation and Reimbursement of Expenses for the Period February 1, 2004, Through February 29, 2004)
- ML23317A422 + (Revised Hermes Construction Permit)
- ML20071J980 + (Revised Hope Creek Event Classification Guide)
- ML20094P115 + (Revised Hope Creek Event Classification Guide, Including Rev 44 to Table of Contents,Rev 38 to Attachments Signature Page & Rev 25 to Attachments 6,7 & 9)
- ML20069N207 + (Revised Hope Creek Generating Station Event Classification Guide,Including Rev 33 to Table of Contents,Rev 12 to Attachment 1,Page 5 & Rev 7 to Attachment 2,Page 4)
- ML20096F474 + (Revised Hope Creek Generating Station Event Classification Guide, Including Rev 45 to Table of Contents,Rev 39 to Attachments Signature Page,Rev 26 to Attachment 6,Rev 26 to Attachment 7 & Rev 26 to Attachment 9)
- ML18018A436 + (Revised Human Factors Design Evaluation Rept for Shearon Harris Unit 1 Control Room)
- ML20199F515 + (Revised Human Factors Engineering Dcrdr Technical Evaluation Rept for Beaver Valley Power Station Unit 2)
- ML19319C504 + (Revised Hydrologic Engineering Summary Input for SER)
- IR 05000003/1982001 + (Revised IE Insp Repts 50-003/82-01 & 50-247/82-02 on 820208- 11.No Noncompliance Noted.Major Areas Inspected:Followup of Emergency Preparedness Items from 810511-20 Appraisal.Rept Includes Revised Page 22)
- ML21106A282 + (Revised IMC 1245 App C15, Construction Inspector Technical Proficiency Training and Qualification Journal)
- ML13247A349 + (Revised ISFSI Bases, Includes Revised Record of Revision, Revised Current Page List, and Revision 9 to Page B 3.1.5-1)
- ML17263A523 + (Revised ISI Program for 1990-1999 Interval)