Search by property

Jump to navigation Jump to search

This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.

Search by property

A list of all pages that have property "Title" with value "Rev. 36 to Technical Specification Bases". Since there have been only a few results, also nearby values are displayed.

â§Ľshowingresultsâ§˝

View (previous 50 | next 50) (20 | 50 | 100 | 250 | 500)


    

List of results

  • ML19137A125  + (Rev. 29 to Updated Safety Analysis Report, Section I, List of Tables)
  • ML19137A123  + (Rev. 29 to Updated Safety Analysis Report, Section I, Table of Contents)
  • ML19137A130  + (Rev. 29 to Updated Safety Analysis Report, Section III, Reactor)
  • ML19137A134  + (Rev. 29 to Updated Safety Analysis Report, Section V, Containment)
  • ML19137A135  + (Rev. 29 to Updated Safety Analysis Report, Section V, Figures)
  • ML19137A137  + (Rev. 29 to Updated Safety Analysis Report, Section VI, Figures)
  • ML19137A139  + (Rev. 29 to Updated Safety Analysis Report, Section VII, Figures)
  • ML19137A141  + (Rev. 29 to Updated Safety Analysis Report, Section Viii, Figures)
  • ML19137A143  + (Rev. 29 to Updated Safety Analysis Report, Section X, Auxiliary Systems)
  • ML19137A144  + (Rev. 29 to Updated Safety Analysis Report, Section X, Figures)
  • ML19137A148  + (Rev. 29 to Updated Safety Analysis Report, Section XIII, Figures)
  • ML19137A150  + (Rev. 29 to Updated Safety Analysis Report, Section Xiv, Figures)
  • ML052430335  + (Rev. 3 to Calculation DRE02-0035, Re-analysis of Main Steam Line Break (MSLB) Accident Using Alternative Source Terms)
  • ML052430392  + (Rev. 3 to Calculation QDC-0000-N-1266, Re-analysis of Main Steam Line Break (MSLB) Accident Using Alternative Source Terms)
  • ML040230494  + (Rev. 3 to Emergency Plan, Implementing Procedure, EM-401, Setup of the Emergency Operations Facility)
  • ML12172A343  + (Rev. 3 to Table of Contents to Technical Requirements Manual)
  • ML12172A344  + (Rev. 3 to Technical Requirements Manual Table of Contents)
  • ML21109A002  + (Rev. 3, Guidance for Implementation of 10 CFR 50.59, Changes, Tests, and Experiments)
  • ML17031A288  + (Rev. 3, Service Level I, II, III, and In-Scope License Renewal Protective Coatings Applied to Nuclear Power Plants)
  • WBL-24-018, Rev. 30 to Radiological Emergency Plan EPIP 14, Radiological Control Response  + (Rev. 30 to Radiological Emergency Plan EPIP 14, Radiological Control Response)
  • ML083500548  + (Rev. 31 to Emergency Plan Implementing Procedures Manual 13.10.2, TSC Manager Duties, and Rev. 23 to 13.10.7, Plant Administration Manager Duties, Volume 13 Package No. 2008-0968)
  • ML040990085  + (Rev. 32 to Emergency Plan Implementing Procedure A.2-101, Classification of Emergencies)
  • ML20087H047  + (Rev. 32 to Emergency Preparedness Procedure 13.11.12)
  • WO 20-0041, Rev. 32 to Equipment Qualification Summary Document-II (EQSD-II)  + (Rev. 32 to Equipment Qualification Summary Document-II (EQSD-II))
  • ML21008A317  + (Rev. 33 to Emergency Plan Implementing Procedure EPIP 10, Medical Emergency Response)
  • ML19151A213  + (Rev. 36 to Technical Specification Bases)
  • ML071200068  + (Rev. 37 to Technical Requirements Manual)
  • ML21048A441  + (Rev. 4)
  • ML21092A151  + (Rev. 4 ACRS Version)
  • ML20188A229  + (Rev. 4 to Emergency Plan Implementing Procedure IP-EP-350)
  • ML21125A540  + (Rev. 4 to NFPA 805 Fire Protection Program Manual)
  • ML062780181  + (Rev. 4 to TSB2, Technical Specifications Bases Unit 2 Manual and Rev. 75 to Manual Table of Contents)
  • ML051160049  + (Rev. 4 to Technical Requirements Manual, Unit 2)
  • ML16056A338  + (Rev. 4, Comprehensive Vibration Assessment Program for Reactor Internals During Preoperational and Startup Testing)
  • ML11326A158  + (Rev. 4, Technical Specifications Based Unit 2 Manual)
  • ML072890348  + (Rev. 41 to Technical Requirements Manual)
  • ML25107A230  + (Rev. 42 to the Updated Final Safety Analysis Report, Chapter 9, Plant Radioactive Waste Control Systems)
  • ML25105A257  + (Rev. 42 to the Updated Final Safety Analysis Report, Chapter 9, Plant Radioactive Waste Control Systems)
  • ML25107A231  + (Rev. 42 to the Updated Final Safety Analysis Report, Chapter 10, Plant Auxiliary Systems)
  • ML25105A258  + (Rev. 42 to the Updated Final Safety Analysis Report, Chapter 10, Plant Auxiliary Systems)
  • ML25107A243  + (Rev. 42 to the Updated Final Safety Analysis Report, Appendix F, Containment Vessel Design Summary Design)
  • ML25105A269  + (Rev. 42 to the Updated Final Safety Analysis Report, Appendix F, Containment Vessel Design Summary Design)
  • ML25107A228  + (Rev. 42 to the Updated Final Safety Analysis Report, Chapter 7, Plant Instrumentation and Control Systems)
  • ML25105A255  + (Rev. 42 to the Updated Final Safety Analysis Report, Chapter 7, Plant Instrumentation and Control Systems)
  • ML25107A242  + (Rev. 42 to the Updated Final Safety Analysis Report, Appendix E, Plant Comparative Evaluation with the Proposed AEC 70 Design Criteria)
  • ML25105A268  + (Rev. 42 to the Updated Final Safety Analysis Report, Appendix E, Plant Comparative Evaluation with the Proposed AEC 70 Design Criteria)
  • ML25107A223  + (Rev. 42 to the Updated Final Safety Analysis Report, Chapter 2, Site and Environs)
  • ML25105A250  + (Rev. 42 to the Updated Final Safety Analysis Report, Chapter 2, Site and Environs)
  • ML25107A229  + (Rev. 42 to the Updated Final Safety Analysis Report, Chapter 8, Plant Electrical Systems)
  • ML25105A256  + (Rev. 42 to the Updated Final Safety Analysis Report, Chapter 8, Plant Electrical Systems)
  • ML25107A232  + (Rev. 42 to the Updated Final Safety Analysis Report, Chapter 11, Plant Power Conversion Systems)