ML12172A344
| ML12172A344 | |
| Person / Time | |
|---|---|
| Site: | Susquehanna |
| Issue date: | 06/05/2012 |
| From: | Susquehanna |
| To: | Gerlach R Document Control Desk, Office of Nuclear Reactor Regulation |
| References | |
| 2012-37961 | |
| Download: ML12172A344 (38) | |
Text
Jun.
05, 2012 Page 1
of 2
MANUAL HARD COPY DISTRIBUTION DOCUMENT TRANSMITTAL 2012-37961 USER INFORMATION:
GERLACH*ROSE M EMPL#:028401 CA#:
0363 Address: NUCSA2 Phone#:
254-3194 TRANSMITTAL INFORMATION:
TO:
GERLACH*ROSE M 06/05/2012 LOCATION:
USNRC FROM:
NUCLEAR RECORDS DOCUMENT CONTROL CENTER (NUCSA-2)
THE FOLLOWING CHANGES HAVE OCCURRED TO THE HARDCOPY OR ELECTRONIC MANUAL ASSIGNED TO YOU.
HARDCOPY USERS MUST ENSURE THE DOCUMENTS PROVIDED MATCH THE INFORMATION ON THIS TRANSMITTAL.
WHEN REPLACING THIS MATERIAL IN YOUR HARDCOPY MANUAL, ENSURE THE UPDATE DOCUMENT ID IS THE SAME DOCUMENT ID YOU'RE REMOVING FROM YOUR MANUAL.
TOOLS FROM THE HUMAN PERFORMANCE TOOL BAG SHOULD BE UTILIZED TO ELIMINATE THE CHANCE OF ERRORS.
ATTENTION:
"REPLACE" directions do not affect the Table of Contents, Therefore no TOC will be issued with the updated material.
TRM2 -
TECHNICAL REQUIREMENTS MANUAL UNIT 2 REMOVE MANUAL TABLE OF CONTENTS DATE: 02/27/2012 ADD MANUAL TABLE OF CONTENTS DATE: 06/04/2012 CATEGORY:
DOCUMENTS TYPE: TRM2 A4oo(
Jun.
05, 2012 Page 2
of 2
ID:
TEXT 3.7.6 ADD:
REV:
3 REMOVE:
REV:2 CATEGORY:
DOCUMENTS TYPE:
TRM2 ID:
TEXT B3.7.6 ADD:
REV:
3 REMOVE:
REV:2 CATEGORY:
DOCUMENTS TYPE:
TRM2 ID:
TEXT LOES ADD:
REV:
73 REMOVE:
REV:72 ANY DISCREPANCIES WITH THE MATERIAL PROVIDED, CONTACT DCS @ X3107 OR X3136 FOR ASSISTANCE.
UPDATES FOR HARDCOPY MANUALS WILL BE DISTRIBUTED WITHIN 3 DAYS IN ACCORDANCE WITH DEPARTMENT PROCEDURES.
PLEASE MAKE ALL CHANGES AND ACKNOWLEDGE COMPLETE IN YOUR NIMS INBOX UPON COMPLETION OF UPDATES.
FOR ELECTRONIC MANUAL
- USERS, ELECTRONICALLY REVIEW THE APPROPRIATE DOCUMENTS AND ACKNOWLEDGE COMPLETE IN YOUR NIMS INBOX.
SSES MANUAL Manual Name:
TRM2 Manual
Title:
TECHNICAL REQUIREMENTS MANUAL UNIT 2 Table Of Contents Issue Date:
0 Procedure Name TEXT LOES
Title:
LIST OF EF 6/04/2012 Rev Issue Date 73 06/04/2012 FECTIVE SECTIONS Change ID Change Number TEXT TOC
Title:
TEXT 1.1
Title:
TEXT 2.1
Title:
TEXT 2.2
Title:
TEXT 3.0
Title:
21 12/08/2011 TABLE OF CONTENTS 0
11/19/2002 USE AND APPLICATION DEFINITIONS 1
02/04/2005 PLANT PROGRAMS AND SETPOINTS PLAT PRGRAMS P0 P1N13/2011 PLANT PROGRAMS AND SETPOINTiS ISTUMENT TRIP SETPOINT TABLE 4
05/23/2008 APPLICABILITY TECHNICAL REQUIREMENT FOR OPERATION (TRO)
APPLICABILITY TEXT 3.1.1 1
11/09/2007
Title:
REACTIVITY CONTROL SYSTEMS ANTICIPATED TRANSIENT WITHOUT SCRAM ALTERNATE ROD INJECTION (ATWS-ARI)
INSTRUMENTATION TEXT 3.1.2 0
11/19/2002
Title:
REACTIVITY CONTROL SYSTEMS CONTROL ROD DRIVE (CRD)
HOUSING SUPPORT TEXT 3.1.3 4
05/14/2009
Title:
REACTIVITY CONTROL SYSTEMS CONTROL ROD BLOCK INSTRUMENTATION TEXT 3.1.4 0
11/19/2002
Title:
REACTIVITY CONTROL SYSTEMS CONTROL ROD SCRAM ACCUMULATORS INSTRUMENTATION AND CHECK VALVE TEXT 3.2.1 9
04/20/2011
Title:
CORE OPERATING LIMITS CORE OPERATING LIMITS REPORT (COLR)
LDCN 4712 Page 1 Of 15~
Report Date: 06/05/12 Page 1 of 15 Report Date: 06/05/12
SSES MANUJAL Manual Name:
TRM2 Manual
Title:
TECHNICAL REQUIREMENTS MANUAL UNIT 2 TEXT 3.3.1 0
11/19/2002
Title:
INSTRUMENTATION RADIATION MONITORING INSTRUMENTATION TEXT 3.3.2 3
03/31/2011
Title:
INSTRUMENTATION SEISMIC MONITORING INSTRUMENTATION TEXT 3.3.3 2
11/09/2007
Title:
INSTRUMENTATION METEOROLOGICAL MONITORING INSTRUMENTATION TEXT 3.3.4 6
07/09/2010
Title:
INSTRUMENTATION TRM POST-ACCIDENT MONITORING INSTRUMENTATION TEXT 3.3.5 0
11/19/2002
Title:
INSTRUMENTATION THIS PAGE INTENTIONALLY LEFT BLANK TEXT 3.3.6 3
01/13/2011
Title:
INSTRUMENTATION TRM ISOLATION ACTUATION INSTRUMENTATION TEXT 3.3.7 1
11/09/2007
Title:
INSTRUMENTATION MAIN TURBINE OVERSPEED PROTECTION SYSTEM TEXT 3.3.8 1
10/22/2003
Title:
INSTRUMENTATION TRM RPS INSTRUMENTATION TEXT 3.3.9 3
05/14/2009
Title:
INSTRUMENTATION LPRM UPSCALE ALARM INSTRUMENTATION TEXT 3.3.10 1
12/14/2004
Title:
INSTRUMENTATION REACTOR RECIRCULATION PUMP MG SET STOPS TEXT 3.3.11
Title:
INSTRUMENTATION TEXT 3.3.12 1
10/22/2003 MVP ISOLATION INSTRUMENTATION 0
04/16/2009
Title:
WATER MONITORING INSTRUMENTATION Page2 of i~
Report Dater 06/05/12 Page 2 of 15 Report I Date: 06105/12
SSES MANUAL Manual Name:
TRM2 Manual
Title:
TECHNICAL REQUIREMENTS MANUAL UNIT 2 TEXT 3.4.1
Title:
REACTOR TEXT 3.4.2
Title:
REACTOR TEXT 3.4.3
Title:
REACTOR TEXT 3.4.4
Title:
REACTOR TEXT 3.4.5
Title:
REACTOR TEXT 34.6
Title:
REACTOR TEXT 3.5.1 1
04/26/2006 COOLANT SYSTEM REACTOR COOLANT SYSTEM CHEMISTRY 1
04/16/2009 COOLANT SYSTEM STRUCTURAL INTEGRITY 1
11/09/2007 COOLANT SYSTEM REACTOR COOLANT SYSTEM (RCS) 2 05/14/2009 COOLANT SYSTEM REACTOR RECIRCULATION FLOW AND ROD LINE LIMIT 1
04/26/2006 COOLANT SYSTEM REACTOR VESSEL MATERIALS 0
07/20/2010 RECIRCULATION SINGLE LOOP OPERATION SLO FLOW RATE RESTRICTION 1
02/04/2005
Title:
ECCS AND RCIC ADS MANUAL INHIBIT TEXT 3.5.2 1
11/09/2007
Title:
ECCS AND RCIC ECCS AND RCIC SYSTEM MONITORING INSTRUMENTATION TEXT 3.5.3 0
11/19/2002
Title:
ECCS AND RCIC LONG TERM NITROGEN SUPPLY TO ADS TEXT 3.6.1 0
11/19/2002
Title:
CONTAINMENT VENTING OR PURGING TEXT 3.6.2 1
08/23/2011
Title:
SUPPRESSION CHAMBER TO DRYWELL VACUUM BREAKER POSITION INDICATION TEXT 3.6.3 0
11/19/2002
Title:
CONTAINMENT SUPPRESSION POOL ALARM INSTRUMENTATION Page ~
of 15 Report Date: 06/05/12 Page 3 of 15 Report Date: 06/05/12
SSES MANUAL Manual Name:
TRM2 Manual
Title:
TECHNICAL REQUIREMENTS MANUAL UNIT 2 TEXT 3.6.4 0
11/19/2002
Title:
CONTAINMENT PRIMARY CONTAINMENT CLOSED SYSTEM BOUNDARIES TEXT 3. 7.1
Title:
PLANT 0
11/19/2002 SYSTEMS EMERGENCY SERVICE WATER SYSTEM (ESW)
SHUTDOWN TEXT 3. 7.2
Title:
PLANT SYSTEMS 0
11/19/2002 ULTIMATE HEAT SINK (UHS)
AND GROUND WATER LEVEL TEXT 3.7.3.1
Title:
PLANT TEXT 3.7.3.2
Title:
PLANT TEXT 3.7.3.3
Title:
PLANT TEXT 3.7.3.4
Title:
PLANT TEXT 3.7.3.5
Title:
PLANT TEXT 3.7.3.6
Title:
PLANT TEXT 3.7.3.7
Title:
PLANT TEXT 3.7.3.8
Title:
PLANT TEXT 3. 7..4
Title:
PLANT 2
04/16/2009 SYSTEMS FIRE SUPPRESSION WATER SUPPLY SYSTEM 3
04/16/2009 SYSTEMS SPRAY AND SPRINKLER SYSTEMS 3
04/16/2009 SYSTEMS C02 SYSTEMS 2
04/16/2009 SYSTEMS HALON SYSTEMS 2
04/16/2009 SYSTEMS FIRE HOSE STATIONS 2
04/16/2009 SYSTEMS YARD FIRE HYDRANTS AND HYDRANT HOSE HOUSES 1
04/26/2006 SYSTEMS FIRE RATED ASSEMBLIES 10 11/30/2011 SYSTEMS FIRE DETECTION INSTRUMENTATION 1
04/26/2006 SYSTEMS SOLID RADWASTE SYSTEM Pae4 of1 eor ae 0/51 Page 4 of
.15 Report Date: 06/05/12
SSES MANUAL Manual Name:
TRM2 Manual
Title:
TECHNICAL REQUIREMENTS MANUAL UNIT 2 TEXT 3.7.5.1
Title:
PLANT TEXT 3.7.5.2
Title:
PLANT TEXT 3.7.5.3
Title:
PLANT TEXT 3.7. 6
Title:
PLANT 0
11/19/2002 SYSTEMS MAIN CONDENSER OFFGAS HYDROGEN MONITOR 0
11/19/2002 SYSTEMS MAIN CONDENSER OFFGAS EXPLOSIVE GAS MIXTURE 1
04/26/2006 SYSTEMS LIQUID HOLDUP TANKS 3
06/04/2012 SYSTEMS ESSW PUMPHOUSE VENTILATION TEXT 3.7.7 2
09/05/2008
Title:
PLANT SYSTEMS MAIN CONDENSER OFFGAS PRETREATMENT LOGARITHMIC RADIATION MONITORING INSTRUMENTATION TEXT 3.7. 8
Title:
PLANT SYSTEMS SNUBBERS 7
12/03/2010 TEXT 3.7.9 1
08/28/2006
Title:
PLANT SYSTEMS CONTROL STRUCTURE HVAC TEXT 3.7.10 1
12/14/2004
Title:
PLANT SYSTEMS SPENT FUEL STORAGE POOLS (SFSPS)
TEXT 3.7.11
Title:
PLANT SYSTEMS 1
10/02/2009 TEXT 3.8.1 2
02/04/2005
Title:
ELECTRICAL POWER PRIMARY CONTAINMENT PENETRATION CONDUCTOR OVERCURRENT PROTECTIVE DEVICES LDCN 4775 TEXT 3.8.2.1 2
11/09/2007
Title:
ELECTRICAL POWER MOTOR OPERATED VALVES (MOV)
THERMAL OVERLOAD PROTECTION -
CONTINUOUS TEXT 3.8.2.2 2
12/14/2004
Title:
ELECTRICAL POWER MOTOR OPERATED VALVES (MOV)
THERMAL OVERLOAD PROTECTION -
AUTOMATIC Page 5 of 15 Report Date: 06/05/12
SSES MANUAL Manual Name:
TRM2 Manual
Title:
TECHNICAL REQUIREMENTS MANUAL UNIT 2 TEXT 3.8.3
Title:
ELECTRICAL TEXT 3.8.4
Title:
ELECTRICAL TEXT 3.8.5
Title:
ELECTRICAL TEXT 3.8.6
Title:
ELECTRICAL TEXT 3.8.7 1
04/05/2010 POWER DIESEL GENERATOR (DG)
MAINTENANCE ACTIVITIES 1
02/04/2005 POWER 24 VDC ELECTRICAL SUBSYSTEM 0
11/19/2002 POWER DEGRADED VOLTAGE PROTECTION 1
12/08/2011 POWER EMERGENCY SWITCHGEAR ROOM COOLING 2
10/22/2009
Title:
BATTERY MAINTENANCE AND MONITORING PROGRAM TEXT 3.9.1 0
11/19/2002
Title:
REFUELING OPERATIONS DECAY TIME TEXT 3.9.2 0
11/19/2002
Title:
REFUELING OPERATIONS COMMUNICATIONS TEXT 3.9.3 0
11/19/2002
Title:
REFUELING OPERATIONS REFUELING PLATFORM TEXT 3.10.1 1
04/26/2006
Title:
MISCELLANEOUS SEALED SOURCE CONTAMINATION TEXT 3.10.2 1
04/09/2007
Title:
MISCELLANEOUS SHUTDOWN MARGIN TEST RPS INSTRUMENTATION TEXT 3.10.3 2
06/15/2010
Title:
MISCELLANEOUS INDEPENDENT SPENT FUEL STORAGE INSTALLATION (ISFSI)
TEXT 3.11.1.1 1
04/26/2006
Title:
RADIOACTIVE EFFLUENTS LIQUID EFFLUENTS CONCENTRATION Page 6 of 15 Report Date: 06/05/12 Page 6 of 15 Report Date:' 06/05/12
SSES MANUAL Manual Name:
TRM2 Manual
Title:
TECHNICAL REQUIREMENTS MANUAL UNIT 2 TEXT 3.11.1.2
Title:
RADIOACTIVE TEXT 3.11.1.3
Title:
RADIOACTIVE TEXT 3.11.1.4
Title:
RADIOACTIVE TEXT 3.11.1.5
Title:
RADIOACTIVE TEXT 3.11.2.1
Title:
RADIOACTIVE TEXT 3.11.2.2
Title:
RADIOACTIVE TEXT 3.11.2.3
Title:
RADIOACTIVE FORM TEXT 3.11.2.4
Title:
RADIOACTIVE TEXT 3.11.2.5
Title:
RADIOACTIVE TEXT 3.11.2.6
Title:
RADIOACTIVE TEXT 3.11.3
Title:
RADIOACTIVE TEXT 3.11.4.1
Title:
RADIOACTIVE EFFLUENTS EFFLUENTS EFFLUENTS EFFLUENTS EFFLUENTS EFFLUENTS EFFLUENTS EFFLUENTS EFFLUENTS EFFLUENTS EFFLUENTS EFFLUENTS 1
04/26/2006 LIQUID EFFLUENTS DOSE 1
04/26/2006 LIQUID WASTE TREATMENT SYSTEM 1
12/14/2004 LIQUID RADWASTE EFFLUENT MONITORING INSTRUMENTATION 2
05/02/2007 RADIOACTIVE LIQUID PROCESS MONITORING INSTRUMENTATION 3
04/26/2006 DOSE RATE 1
04/26/2006 DOSE -
NOBLE GASES 1
04/26/2006 DOSE -
11/19/2002 GASEOUS RADWASTE TREATMENT SYSTEM 3
11/14/2006 VENTILATION EXHAUST TREATMENT SYSTEM 4
09/16/2009 RADIOACTIVE GASEOUS EFFLUENT MONITORING INSTRUMENTATION 1
04/26/2006 TOTAL DOSE 3
04/26/2006 MONITORING PROGRAM Page L of 15 Report Date: 06/05/12 Page 7 of 15 Report Date: 06/05/12
SSES MANUAL Manual Name:
TRM2 Manual
Title:
TECHNICAL REQUIREMENTS MANUAL UNIT 2 TEXT 3.11.4.2 2
04/26/2006
Title:
RADIOACTIVE EFFLUENTS LAND USE CENSUS TEXT 3.11.4.3 1
04/26/2006
Title:
RADIOACTIVE EFFLUENTS INTERLABORATORY COMPARISON PROGRAM TEXT 3.12.1 0
11/19/2002
Title:
LOADS CONTROL PROGRAM CRANE TRAVEL-SPENT FUEL STORAGE POOL TEXT 3.12.2 4
04/17/2008
Title:
LOADS CONTROL PROGRAM HEAVY LOADS REQUIREMENTS TEXT 3.12.3 0
11/19/2002
Title:
LOADS CONTROL PROGRAM LIGHT LOADS REQUIREMENTS TEXT 4.1
Title:
TEXT 4.2
Title:
TEXT 4.3
Title:
TEXT 4.4
Title:
TEXT 4.5
Title:
TEXT 4.6
Title:
TEXT 4.7
Title:
- 0 09/27/2003 CONTROLS ORGANIZATION ADMINISTRATIVE ADMINISTRATIVE CONTROLS 0
ADMINISTRATIVE CONTROLS 1
ADMINISTRATIVE CONTROLS 0
ADMINISTRATIVE CONTROLS 0
ADMINISTRATIVE CONTROLS 0
ADMINISTRATIVE CONTROLS 09/27/2003 REPORTABLE EVENT ACTION 09/27/2003 SAFETY LIMIT VIOLATION 12/18/2008 PROCEDURES & PROGRAMS 09/27/2003 REPORTING REQUIREMENTS 09/27/2003 RADIATION PROTECTION PROGRAM 09/27/2003 TRAINING Page8 of
~
Report Date: 06/05/12 Page 8 of 15 Report Date: 06/05/12
SSES MANUAL Manual Name:
TRM2 Manual
Title:
TECHNICAL REQUIREMENTS MANUAL UNIT 2 TEXT B3.0 4
05/23/2008
Title:
APPLICABILITY BASES TECHNICAL REQUIREMENT FOR OPERATION (TRO)
APPLICABILITY TEXT B3.1.1 1
11/09/2007
Title:
REACTIVITY CONTROL SYSTEM BASES ANTICIPATED TRANSIENT WITHOUT SCRAM ALTERNATE ROD INJECTION (ATWS-ARI)
INSTRUMENTATION TEXT B3.1.2 0
11/19/2002
Title:
REACTIVITY CONTROL SYSTEM BASES CONTROL ROD DRIVE (CRD)
HOUSING SUPPORT TEXT B3.1.3 3
04/10/2007
Title:
REACTIVITY CONTROL SYSTEM BASES CONTROL ROD BLOCK INSTRUMENTATION TEXT B3.1.4 0
11/19/2002
Title:
REACTIVITY CONTROL SYSTEM BASES CONTROL ROD SCRAM ACCUMULATORS INSTRUMENTATION AND CHECK VALVE TEXT B3.2.1
Title:
CORE OPERATING L TEXT B3.3.1
Title:
INSTRUMENTATION TEXT B3.3.2
Title:
INSTRUMENTATION TEXT B3.3.3
Title:
INSTRUMENTATION TEXT B3.3.4
Title:
INSTRUMENTATION TEXT B3.3.5
Title:
INSTRUMENTATION TEXT B3.3.6
Title:
INSTRUMENTATION IMITS 0
11/19/2002 BASES CORE OPERATING LIMITS REPORT (COLR) 0 11/19/2002 BASES RADIATION MONITORING INSTRUMENTATION 2
03/31/2011 BASES SEISMIC MONITORING INSTRUMENTATION 2
11/09/2007 BASES METEOROLOGICAL MONITORING INSTRUMENTATION 4
07/09/2010 BASES TRM POST ACCIDENT MONITORING (PAM)
INSTRUMENTATION 2
11/09/2007 BASES THIS PAGE INTENTIONALLY LEFT BLANK 4
01/13/2011 BASES TRM ISOLATION ACTUATION INSTRUMENTATION Page ~
of 15 Report Date: 06/05/12 Page9 of 15 Report Date: 06/05/12
SSES MANTJTAIL Manual Name:
TRM2 Manual
Title:
TECHNICAL REQUIREMENTS MANUAL UNIT 2 TEXT B3.3.7
Title:
INSTRUMENTATION TEXT B3.3.8
Title:
INSTRUMENTATION TEXT B3.3.9
Title:
INSTRUMENTATION TEXT B3.3.10
Title:
INSTRUMENTATION TEXT B3.3.11
Title:
INSTRUMENTATION 1
11/09/2007 BASES MAIN TURBINE OVERSPEED PROTECTION SYSTEM 1
10/22/2003 BASES TRM RPS INSTRUMENTATION 3
05/14/2009 BASES LPRM UPSCALE ALARM INSTRUMENTATION 3
02/22/2012 BASES REACTOR RECIRCULATION PUMP MG SET STOPS 1
10/22/2003 BASES MVP ISOLATION INSTRUMENTATION 0
TEXT B3.3.12 0
04/16/2009
Title:
WATER MONITORING INSTRUMENTATION TEXT B3.4.1
Title:
REACTOR TEXT B3.4.2
Title:
REACTOR TEXT B3.4.3
Title:
REACTOR TEXT B3.4.4
Title:
REACTOR TEXT B3.4.5
Title:
REACTOR TEXT B3.4.6 0
11/19/2002 COOLANT SYSTEM BASES REACTOR COOLANT SYSTEM CHEMISTRY 1
04/16/2009 COOLANT SYSTEM BASES STRUCTURAL INTEGRITY 1
11/09/2007 COOLANT SYSTEM BASES HIGH/LOW PRESSURE INTERFACE LEAKAGE MONITOR 0
11/19/2002 COOLANT SYSTEM BASES REACTOR RECIRCULATION FLOW AND ROD LINE LIMIT 0
11/19/2002 COOLANT SYSTEM BASES REACTOR VESSEL MATERIALS 0
07/20/2010
Title:
REACTOR RECIRCULATION SINGLE LOOP OPERATION SLO FLOW RATE RESTRICTION Page 10 of 15 Report Date: 06/05/12 Page 10 of 15 Report Date'-' 06/05/12
SSES MANUAL Manual Name:
TRM2 Manual
Title:
TECHNICAL REQUIREMENTS MANUAL UNIT 2 TEXT B3.5.1 0
11/19/2002
Title:
ECCS AND RCIC BASES ADS MANUAL INHIBIT TEXT B3.5.2 1
11/09/2007
Title:
ECCS AND RCIC BASES ECCS AND RCIC SYSTEM MONITORING INSTRUMENTATION TEXT B3.5.3 1
11/09/2007
Title:
ECCS AND RCIC BASES LONG TERM NITROGEN SUPPLY TO ADS TEXT B3.6.1 0
11/19/2002
Title:
CONTAINMENT BASES VENTING OR PURGING TEXT B3.6.2 0
11/19/2002
Title:
CONTAINMENT BASES SUPPRESSION CHAMBER-TO-DRYWELL VACUUM BREAKER POSITION INDICATION TEXT B3.6.3 1
04/19/2007
Title:
CONTAINMENT BASES SUPPRESSION POOL ALARM INSTRUMENTATION TEXT B3.6.4 1
12/14/2004
Title:
CONTAINMENT BASES PRIMARY CONTAINMENT CLOSED SYSTEM BOUNDARIES TEXT B3.7.1
Title:
PLANT TEXT B3.7.2
Title:
PLANT TEXT B3.7.3.1
Title:
PLANT TEXT B3.7.3.2
Title:
PLANT TEXT B3.7.3.3
Title:
PLANT SYSTEMS BASES SYSTEMS BASES SYSTEMS BASES 0
11/19/2002 EMERGENCY SERVICE WATER SYSTEM (SHUTDOWN) 0 11/19/2002 ULTIMATE HEAT SINK (UHS)
GROUND WATER LEVEL 3
06/15/2010 FIRE SUPPRESSION WATER SUPPLY SYSTEM 2
04/26/2006 SYSTEMS BASES SPRAY AND SPRINKLER SYSTEMS 0
11/19/2002 SYSTEMS BASES C02 SYSTEMS Page ii of 15 Report Date: 06/05/12 Page I I of 15 Report Date: 06/05/12
SSES MANUAL Manual Name:
TRM2 Manual
Title:
TECHNICAL REQUIREMENTS MANUAL UNIT 2 TEXT B3.7.3.4
Title:
PLANT TEXT B3.7.3.5
Title:
PLANT TEXT B3.7.3.6
Title:
PLANT TEXT B3.7.3.7
Title:
PLANT TEXT B3.7.3.8
Title:
PLANT TEXT B3.7.4
Title:
PLANT TEXT B3.7.5.1
Title:
PLANT TEXT B3.7.5.2
Title:
PLANT TEXT B3.7.5.3
Title:
PLANT TEXT B3.7.6
Title:
PLANT TEXT B3.7.7
Title:
PLANT 1
04/26/2006 SYSTEMS BASES HALON SYSTEMS 1
04/26/2006 SYSTEMS BASES FIRE HOSE STATIONS 1
04/26/2006 SYSTEMS BASES YARD FIRE HYDRANTS AND HYDRANT HOSE HOUSES 0
11/19/2002 SYSTEMS BASES FIRE RATED ASSEMBLIES 2
11/30/2011 SYSTEMS BASES FIRE DETECTION INSTRUMENTATION 0
11/19/2002 SYSTEMS BASES SOLID RADWASTE SYSTEM SYSTEMS BASES SYSTEMS BASES SYSTEMS BASES SYSTEMS BASES SYSTEMS BASES 0
11/19/2002 MAIN CONDENSER OFFGAS HYDROGEN MONITOR 0
11/19/2002 MAIN CONDENSER OFFGAS EXPLOSIVE GAS MIXTURE 0
11/19/2002 LIQUID HOLDUP TANKS 3
06/04/2012 ESSW PUMPHOUSE VENTILATION 2
01/31/2008 MAIN CONDENSER OFFGAS PRETREATMENT LOGARITHMIC RADIATION MONITORING INSTRUMENTATION TEXT B3.7.8 3
06/21/2007
Title:
PLANT SYSTEMS BASES SNUBBERS Page 12 of 15 Report Date: 06/05/12 Page 12 of 15 Report Date: 06/05/12
SSES MANUAL Manual Name:
TRM2 Manual
Title:
TECHNICAL REQUIREMENTS MANUAL UNIT 2 TEXT B3.7.9 2
12/08/2011
Title:
PLANT SYSTEMS BASES CONTROL STRUCTURE HVAC TEXT B3.7.10 1
12/14/2004
Title:
PLANT SYSTEMS BASES SPENT FUEL STORAGE POOLS TEXT B3.7.11 2
04/14/2010
Title:
STRUCTURAL INTEGRITY TEXT B3.8.1 2
03/10/2010
Title:
ELECTRICAL POWER BASES PRIMARY CONTAINMENT PENETRATION CONDUCTOR OVERCURRENT PROTECTIVE DEVICES TEXT B3.8.2.1
Title:
ELECTRICAL CONTINUOUS TEXT B3.8.2.2
Title:
ELECTRICAL AUTOMATIC TEXT B3.8.3
Title:
ELECTRICAL TEXT B3.8.4
Title:
ELECTRICAL TEXT B3.8.5
Title:
ELECTRICAL TEXT B3.8.6
Title:
ELECTRICAL TEXT B3.8.7 0
11/19/2002 POWER BASES MOTOR OPERATED VALVES (MOV)
THERMAL OVERLOAD 1
09/17/2004 POWER BASES MOTOR OPERATED VALVES (MOV)
THERMAL OVERLOAD 0
11/19/2002 POWER BASES DIESEL GENERATOR (DG)
MAINTENANCE ACTIVITIES 0
11/19/2002 POWER BASES 24 VDC ELECTRICAL. POWER SUBSYSTEM 0
11/19/2002 POWER BASES DEGRADED VOLTAGE PROTECTION 2
12/08/2011 POWER BASES EMERGENCY SWITCHGEAR ROOM COOLING 1
06/15/2009 PROTECTION -
PROTECTION -
Title:
BATTERY MAINTENANCE AND MONITORING PROGRAM TEXT B3.9.1 0
11/19/2002
Title:
REFUELING OPERATIONS BASES DECAY TIME Page 13.
of 15 Report Date: 06/05/12 Page 13 of 15 Report Date: 06/05/12
SSES MANUAL Manual Name:
TRM2 Manual
Title:
TECHNICAL REQUIREMENTS MANUAL UNIT 2 TEXT B3.9.2 0
11/19/2002
Title:
REFUELING OPERATIONS BASES COMMUNICATIONS TEXT B3.9.3 0
11/19/2002
Title:
REFUELING OPERATIONS BASES REFUELING PLATFORM TEXT B3.10.1 0
11/19/2002
Title:
MISCELLANEOUS BASES SEALED SOURCE CONTAMINATION TEXT B3.10.2 1
04/10/2007
Title:
MISCELLANEOUS BASES SHUTDOWN MARGIN TEST RPS INSTRUMENTATION TEXT B3.10.3 0
11/19/2002
Title:
MISCELLANEOUS BASES INDEPENDENT SPENT FUEL STORAGE INSTALLATION (ISFSI)
TEXT B3.11.1.1
Title:
RADIOACTIVE TEXT B3.11.1.2
Title:
RADIOACTIVE TEXT B3.11.1.3
Title:
RADIOACTIVE TEXT B3.11.1.4
Title:
RADIOACTIVE 0
BASES 11/19/2002 LIQUID EFFLUENTS CONCENTRATION EFFLUENTS EFFLUENTS EFFLUENTS EFFLUENTS 0
11/19/2002 BASES LIQUID EFFLUENTS DOSE 0
11/19/2002 BASES LIQUID WASTE TREATMENT SYSTEM 0
11/19/2002 BASES LIQUID RADWASTE EFFLUENT MONITORING INSTRUMENTATION TEXT B3.11.1.5
Title:
RADIOACTIVE EFFLUENTS 0
11/19/2002 BASES RADIOACTIVE LIQUID PROCESS MONITORING INSTRUMENTATION TEXT B3.11.2.1 1
12/14/2004
Title:
RADIOACTIVE EFFLUENTS BASES DOSE RATE TEXT B3.11.2.2 0
11/19/2002
Title:
RADIOACTIVE EFFLUENTS BASES DOSE -
NOBLE GASES Page 14 of 15 R~port Date: 06/05/12 Page 14 of 15 Report Date: 06/05/12
SS~E M.ANUTA-L Manual Name:
TRM2 Manual
Title:
TECHNICAL REQUIREMENTS MANUAL UNIT 2 TEXT B3.11.2.3
Title:
RADIOACTIVE EFFLUENTS PARTICULATES FORM TEXT B3.11.2.4
Title:
RADIOACTIVE EFFLUENTS TEXT B3.11.2.5
Title:
RADIOACTIVE EFFLUENTS TEXT B3.11.2.6
Title:
RADIOACTIVE EFFLUENTS INSTRUMENTATION TEXT B3.11.3
Title:
RADIOACTIVE EFFLUENTS TEXT B3.11.4.1
Title:
RADIOACTIVE EFFLUENTS TEXT B3.11.4.2
Title:
RADIOACTIVE EFFLUENTS TEXT B3.11.4.3
Title:
RADIOACTIVE EFFLUENTS 0
11/19/2002 BASES DOSE -
11/19/2002 BASES GASEOUS RADWASTE TREATMENT SYSTEM 4
11/14/2006 BASES VENTILATION EXHAUST 1
01/27/2004 BASES RADIOACTIVE GASEOUS TREATMENT SYSTEM EFFLUENT MONITORING 0
11/19/2002 BASES TOTAL DOSE 3
07/09/2010 BASES MONITORING PROGRAM 0
11/19/2002 BASES LAND USE CENSUS 0
11/19/2002 BASES INTERLABORATORY COMPARISON PROGRAM TEXT B3.12.1 1
10/04/2007
Title:
LOADS CONTROL PROGRAM BASES CRANE TRAVEL-SPENT FUEL STORAGE POOL TEXT B3.12.2
Title:
LOADS CONTROL PROGRAM 1
BASES 12/03/2010 HEAVY LOADS REQUIREMENTS TEXT B3.12.3 0
11/19/2002
Title:
LOADS CONTROL PROGRAM BASES LIGHT LOADS REQUIREMENTS Page 15.
of 15 Report Date: 06/05/12 Page 15 of 15 Report Date: 06/05/12
SUSQUEHANNA STEAM ELECTRIC STATION PPL Rev. 73 LIST OF EFFECTIVE SECTIONS (TECHNICAL REQUIREMENTS MANUAL)
Section Title Effective Date TOC 1.0 TABLE OF CONTENTS USE AND APPLICATION Page TRM / 1.0-1 Page TRM / 1.0-2 Page TRM / 1.0-3 2.0 3.0 PLANT PROGRAMS Page 2.0-1 Pages TRM / 2.0-2 and TRM 2.0-3 Page TRM / 2.0-4 Page TRM /2.0-5 Page TRM / 2.0-6 Page TRM / 2.0-7 Pages TRM / 2.0-8 and TRM / 2.0-9 Page TRM / 2.0-10 Page TRM / 2.0-11 Page TRM / 2.0-12 Pages TRM / 2.0-13 and TRM / 2.0-14 Page TRM / 2.0-15 APPLICABILITY Pages TRM / 3.0-1 and TRM / 3.0-2 Page TRM / 3.0-3 Page TRM / 3.0-4 REACTIVITY CONTROL SYSTEMS Page TRM /.3.1-1 Pages TRM / 3.1-2 through TRM / 3.1-5 Page TRM / 3.1-6 Page TRM / 3.1-7 Page TRM / 3.1-8 Pages TRM / 3.1-9 and TRM / 3.1-9a Page TRM / 3.1-10 CORE OPERATING LIMITS REPORT Page TRM / 3.2-1 Pages TRM / 3.2-2 through TRM / 3.2-54 INSTRUMENTATION Pages TRM / 3.3-1 through TRM / 3.3-3 Pages TRM / 3.3-4 and TRM / 3.3-5 Page TRM / 3.3-6 Page TRM 3.3-7 Page 3.3-8 11/30/2011 08/31/1998 10/04/2002 08/31/1998 08/31/1998 01/28/2005 06/25/2002 04/12/1999 04/15/2009 05/15/2008 01/07/2011 02/02/2010 11/15/2004 04/15/2009 11/15/2004 11/15/2005 04/14/2008 03/15/2002 11/30/2005 10/31/2007 08/31/1998 03/27/2007 04/15/2009 03/27/2007 02/18/1999 02/18/1999 08/31/1998 04/12/2011 07/16/1999 10/31/2007 03/10/2011 10/31/2007 08/31/1998 3.1 3.2 3.3 SUSQUEHANNA
- UNIT 2 TRM / LOES-1 EFFECTIVE DATE 05/24/2012
.SUSQUEHANNA - UNIT 2 TRM / LOES-1 EFFECTIVE DATE 05/24/2012
SUSQUEHANNA STEAM ELECTRIC STATION PPL Rev. 73 LIST OF EFFECTIVE SECTIONS (TECHNICAL REQUIREMENTS MANUAL)
Section Title Effective Date 3.4 Pages TRM / 3.3-9 and TRM / 3.3-9a Page TRM / 3.3-10 Pages TRM / 3.3-11 and TRM / 3.3-1 la Page TRM / 3.3-12 Page TRM / 3.3-13 Page TRM / 3.3-14 Pages TRM / 3.3-15 and TRM /3.3-16 Page TRM / 3.3-17 Page TRM / 3.3-18 Pages TRM / 3.3-19 and TRM / 3.3-20 Page TRM / 3.3-21 Page TRM / 3.3-21a Pages TRM /3.3-21b through TRM / 3.3-21d Page TRM / 3.3-22 Pages TRM / 3.3-23 and TRM / 3.3-24 Page TRM / 3.3-25 Pages TRM / 3.3-26 and TRM / 3.3-27 REACTOR COOLANT SYSTEM Page TRM / 3.4-1 Pages 3.4-2 through 3.4-5 Pages TRM / 3.4-6 through TRM / 3.4-8 Page 3.4-9 Page 3.4-10 Page 3.4-11 Page TRM / 3.4-12 Page TRM / 3.4-13 Page TRM / 3.4-14 EMERGENCY CORE COOLING AND RCIC Page TRM / 3.5-1 Pages 3.5-2 and 3.5-3 Page TRM / 3.5-4 Pages 3.5-5 through 3.5-7 CONTAINMENT Pages 3.6-1 and 3.6-2 Pages TRM / 3.6-3 and TRM I 3.6-3a Page 3.6-4 Page TRM / 3.6-5 Page 3.6-6 Pages TRM / 3.6-7 through TRM / 3.6-9 06/30/2010 10/31/2007 06/30/2010 03/30/2001 01/07/2011 12/14/1998 01/07/2011 06/14/2002 10/31/2007 10/22/2003 04/15/2009 11/15/2004 03/27/2007 12/03/2004 05/16/2003 10/22/2003 04/07/2009 03/31/2006 10/23/1998 04/01/2009 08/31/1998 10/31/2007 08/31/1998 04/17/2009 03/31/2006 07/15/2010 01/28/2005 08/31/1998 10/31/2007 08/31/1998 08/31/1998 08/11/2011 08/31/1998 01/07/2002 08/31/1998 12/31/2002 3.5 3.6 SUSQUEHANNA - UNIT 2 TRM / LOES-2 EFFECTIVE DATE 05/24/2012
SUSQUEHANNA STEAM ELECTRIC STATION PPL Rev. 73 LIST OF EFFECTIVE SECTIONS (TECHNICAL REQUIREMENTS MANUAL)
Section Title Effective Date 3.7 PLANT SYSTEMS Pages TRM / 3.7-1 and TRM / 3.7-2 Page 3.7-3 Page TRM / 3.7-4 Page TRM / 3.7-5 Pages TRM / 3.7-6 through TRM / 3.7-8 Pages TRM / 3.7-9 and TRM / 3.7-10 Page TRM / 3.7-11 Page TRM / 3.7-12 Page TRM / 3.7-13 Page TRM / 3.7-14 Pages TRM / 3.7-15 and TRM / 3.7-16 Page TRM / 3.7-17 Page TRM / 3.7-18 Page TRM / 3.7-19 Pages TRM / 3.7-20 through TRM / 3.7-22 Page TRM / 3.7-23 Page TRM / 3.7-24 Pages TRM / 3.7-25 and TRM / 3.7-26 Page TRM / 3.7-27 Page TRM / 3.7-28 Page TRM / 3.7-29 Page TRM / 3.7-30 Page TRM / 3.7-31 Page TRM / 3.7-32 Page TRM / 3.7-33 Page TRM / 3.7-34 Pages TRM / 3.7-35 and TRM / 3.7-36 Pages 3.7-37 through 3.7-38 Page TRM / 3.7-39 Page TRM / 3.7-40 Pages TRM / 3.7-40a through TRM / 3.7-40c Page TRM / 3.7-41 Page TRM / 3.7-42 Pages TRM / 3.7-43 through TRM / 3.7-45 Page TRM / 3.7-46 Page TRM / 3.7-47 Page TRM / 3.7-48 Page TRM / 3.7-49 Page TRM / 3.7-50 Page TRM / 3.7-51 Page TRM / 3.7-52 Page TRM / 3.7-53 Page TRM / 3.7-54 Page TRM / 3.7-55 Page TRM / 3.7-56 07/29/1999 08/31/1998 03/31/2006 04/07/2009 08/02/1999 04/07/2009 01/21/2000 08/02/1999 04/07/2009 08/09/2005 08/02/1999 04/07/2009 08/02/1999 04/07/2009 08/02/1999 04/07/2009 03/31/2006 08/02/1999 11/24/2011 11/29/2006 01/13/2010 11/30/2005 11/16/2001 09/16/2010 10/05/2002 03/31/2006 02/01/1999 08/31/1998 03/31/2@06 05/24/2012 05/24/2012 09/04/2008 08/31/1998 10/05/2006 06/07/2007 11/29/2010 06/07/2007 03/09/2001 08/16/2006 12/03/2004 04/15/2003 07/29/1999 04/01/2009 09/25/2009 04/01/2009 SUSQUEHANNA - UNIT 2 TRM / LOES-3 EFFECTIVE DATE 05/24/2012 SUSQUEHANNA - UNIT 2 TRM / LOES-3 EFFECTIVE DATE 05/24/2012
SUSQUEHANNA STEAM ELECTRIC STATION PPL Rev. 73 LIST OF EFFECTIVE SECTIONS (TECHNICAL REQUIREMENTS MANUAL)
Section Title Effective Date 3.8 ELECTRICAL POWER Page TRM / 3.8-1 Pages TRM / 3.8-2 and TRM / 3.8-3 Page TRM / 3.8-4 Pages TRM / 3.8-5 and TRM / 3.8-6 Pages TRM / 3.8-7 through TRM / 3.8-10 Page TRM / 3.8-11 Page TRM / 3.8-12 Page TRM / 3.8-13 Page TRM / 3.8-14 Page TRM / 3.8-15 Pages TRM / 3.8-16 and TRM / 3.8-17 Page 3.8-18 Page TRM / 3.8-19 Page TRM / 3.8-20 Pages TRM / 3.8-21 through TRM / 3.8-23 Pages TRM / 3.8-24 and TRM / 3.8-25 Pages TRM / 3.8-25a and TRM / 3.8-25b Page TRM / 3.8-26 Page TRM / 3.8-27 Page TRM / 3.8-28 Page TRM / 3.8-29 04/02/2002 01/28/2005 01/31/2005 04/02/2002 10/31/2007 08/10/2004 12/03/2004 03/25/2010 08/31/1998 01/28/2005 04/02/2002 02/01/1999 04/02/2002 02/01/1999 06/06/1999 11/30/2011 11/30/2011 05/28/2009 11/29/2006 05/28/2009 10/20/2009 08/31/1998 03/31/2006 08/30/1998 03/27/2007 06/10/2010 3.9 REFUELING OPERATIONS Pages 3.9-1 through 3.9-3 3.10 MISCELLANEOUS Page TRM / 3.10-1 Pages 3.10-2 through 3.10-4 Pages TRM / 3.10-5 and TRM / 3.10-6 Page TRM / 3.10-7 3.11 RADIOACTIVE EFFLUENTS Page TRM / 3.11-1 Pages 3.11-2 through 3.11-3 Page TRM / 3.11-4 Page 3.11-5 Page TRM / 3.11-6 Pages 3.11-7 through 3.11-9 Page TRM / 3.11-10 Pages 3.11-11 and 3.11-12 Page TRM / 3.11-13 Page TRM / 3.11-14 Pages 3.11-15 and 3.11-16 Page TRM / 3.11-17 03/31/2006 08/31/1998 03/31/2006 08/31/1998 03/31/2006 08/31/1998 12/03/2004 08/31/1998 04/12/2007 12/03/1004 09/01/1998 03/31/2006 SUSQUEHANNA - UNIT 2 TRM / LOES-4 EFFECTIVE DATE 05/24/2012 SUSQUEHANNA - UNIT 2 TRM / LOES-4 EFFECTIVE DATE 05/24/2012
SUSQUEHANNA STEAM ELECTRIC STATION PPL Rev. 73 LIST OF EFFECTIVE SECTIONS (TECHNICAL REQUIREMENTS MANUAL)
Section Title Effective Date Page 3.11-18 Page TRM / 3.11-19 Pages TRM / 3.11-20 and TRM / 3.11-21 Page TRM / 3.11-22 Page TRM / 3.11-23 Page TRM / 3.11-24 Page TRM / 3.11-25 Pages TRM / 3.11-26 and TRM / 3.11-27 Page TRM / 3.11-28 Page TRM / 3.11-29 Pages TRM 3.11-30 through TRM / 3.11-32 Page TRM / 3.11-33 Page 3.11-34 Page TRM / 3.11-35 Pages TRM / 3.11-36 through TRM / 3.11-39 Pages 3.11-40 through 3.11-44 Page TRM / 3.11-45 Page 3.11-46 Page TRM / 3.11-47 LOADS CONTROL PROGRAM Pages TRM / 3.12-1 through TRM / 3.12-3 Page TRM / 3.12-4 Page TRM / 3.12-5 ADMINISTRATIVE CONTROLS Pages TRM / 4.0-1 through TRM / 4.0-3 Page TRM / 4.0-4 Pages TRM / 4.0-5 through TRM / 4.0-8 08/31/1998 08/15/2005 03/31/2006 04/02/2002 11/14/2006 05/13/2005 04/12/2007 01/21/2004 09/08/2009 12/03/2004 01/21/2004 03/31/2006 08/31/1998 03/31/2006 11/30/2005 08/31/1998 03/31/2006 08/31/1998 03/31/2006 02/05/1999 03/14/2008 02/05/1999 08/31/1998 12/11/2008 08/31/1998 3.12 4.0 SUSQUEHANNA - UNIT 2 TRM / LOES-5 EFFECTIVE DATE 05/24/2012
SUSQUEHANNA STEAM ELECTRIC STATION PPL Rev. 73 LIST OF EFFECTIVE SECTIONS (TECHNICAL REQUIREMENTS MANUAL)
Section Title Effective Date B 3.0 APPLICABILITY BASES Pages TRM / B 3.0-1 through TRM / B 3.0-3 Page TRM / B 3.0-4 Page TRM / B 3.0-5 Page TRM / B 3.0-6 Page TRM / B 3.0-7 Pages TRM / B 3.0-8 through TRM / B 3.0-10 Pages TRM / B 3.0-11 and TRM / B 3.0-12 Pages TRM / B 3.0-13 and TRM / B 3.0-14 Page TRM / B 3.0-15 B 3.1 B 3.2 B 3.3 REACTIVITY CONTROL SYSTEMS BASES Page TRM / B 3.1-1 Pages TRM / B 3.1-2 and TRM / B 3.1-3 Page B 3.1-4 Pages TRM / B 3.1-5 through TRM / B 3.1-7 Page TRM / B 3.1-8 CORE OPERATING LIMITS BASES Page B 3.2-1 INSTRUMENTATION BASES Page TRM / B 3.3-1 Page TRM / B 3.3-2 Page TRM / B-3.3-2a Pages TRM / B 3.3-3 and TRM / B 3.3-3a Page TRM / B 3.3-4 Page TRM / B 3.3-5 Page TRM / B 3.3-6 Page TRM / B 3.3-7 Page TRM / B 3.3-8 Page TRM / B 3.3-9 Pages TRM / B 3.3-10 through TRM / B 3.3-13 Page TRM / B 3.3-14 Page TRM / B 3.3-14a Page TRM / B 3.3-14b Pages TRM / B 3.3-15 through TRM / B 3.3-17 Pages TRM / B 3.3-18 and TRM / B 3.3-19 Pages TRM / B 3.3-19a and TRM / B 3.3-19b Page TRM / B 3.3-19c Pages TRM / B 3.3-19d and TRM / B 3.3-19e Page TRM / B 3.3-20 Page TRM / B 3.3-21 Page TRM / B 3.3-22 Page TRM / B 3.3-23 Pages TRM / B 3.3-24 and TRM / B 3.3-25 08/31/1998 01/10/2007 04/14/2008 08/31/1998 04/12/2007 08/31/1998 03/15/2002 11/30/2005 03/15/2002 07/13/1999 10/31/2007 08/31/1998 03/27/2007 02/18/1999 08/31/1998 04/07/2000 03/10/2011 10/31/2007 10/31/2007 06/30/2010 05/30/2006 06/30/2010 10/31/2007 06/30/2010 10/31/2007 01/07/2011 06/25/2002 10/31/2007 06/14/2002 10/22/2003 03/27/2007 03/27/2007 04/17/2009 03/27/2007 02/16/2012 08/03/2010 10/22/2003 05/16/2003 04/07/2009 SUSQUEHANNA - UNIT 2 TRM / LOES-6 EFFECTIVE DATE 05/24/2012
SUSQUEHANNA STEAM ELECTRIC STATION PPL Rev. 73 LIST OF EFFECTIVE SECTIONS (TECHNICAL REQUIREMENTS MANUAL)
Section Title B 3.4 B 3.5 B 3.6 REACTOR COOLANT SYSTEM BASES Page TRM / B 3.4-1 Pages TRM / B 3.4-2 and TRM / B3.4-3 Pages TRM / B 3.4-4 and TRM / B 3.4-4a Page TRM / B 3.4-5 Page B 3.4-6 Page TRM / B 3.4-7 ECCS AND RCIC BASES Pages B 3.5-1 and B 3.5-2 Pages TRM / B 3.5-3 and TRM / B 3.5-3a Page B 3.5-4 Page TRM / B 3.5-5 CONTAINMENT BASES Page TRM / B 3.6-1 Page TRM / B 3.6-2 Page B 3.6-3 Page TRM / B 3.6-4 Page TRM / B 3.6-5 Page TRM / B 3.6-6 Pages TRM / B 3.6-7 through TRM / B 3.6-11 PLANT SYSTEMS BASES Pages B 3.7-1 and B 3.7-2 Page TRM / B 3.7-3 Page TRM / B 3.7-3a Page TRM / B 3.7-4 Page TRM / B 3.7-5 Pages TRM / B 3.7-6 and TRM / B 3.7-6a Pages TRM / B 3.7-7 and TRM / B 3.7-7a Page TRM / B 3.7-8 Page TRM / B 3.7-9 Page TRM / B 3.7-10 Pages TRM /B 3.7-10a through TRM / B 3.7-11a Pages TRM / B 3.7-12 through TRM / B 3.7-14 Page TRM / B 3.7-14a Page TRM / B 3.7-14b Pages TRM / B 3.7-15 and TRM / B 3.7-16 Pages B 3.7-17 through B 3.7-20 Page TRM / B 3.7-21 Pages TRM / B 3.7-21a through TRM / 3.7-21g Pages TRM / B 3.7-22 and TRM / B 3.7-23 Pages TRM/ B 3.7-24 through TRM / B 3.7-29 Effective Date 08/31/1998 04/01/2009 10/31/2007 10/15/1999 08/31/1998 07/15/2010 08/31/1998 10/31/2007 08/31/1998 10/31/2007 07/26/2001 02/01/1999 08/31/1998 03/29/2007 04/04/2007 12/03/2004 12/31/2002 08/31/1998 06/10/2010 12/27/2007 03/31/2006 08/02/1999 03/31/2006 08/02/1999 08/02/1999 03/31/2006 08/02/1999 03/31/2006 08/02/1999 01/09/2004 11/24/2011 02/01/1999 08/31/1998 05/24/2012 05/24/2012 01/30/2008 10/05/2006 B 3.7 SUSQUEHANNA - UNIT 2 TRM / LOES-7 EFFECTIVE DATE 05/24/2012
SUSQUEHANNA STEAM ELECTRIC STATION PPL Rev. 73 LIST OF EFFECTIVE SECTIONS (TECHNICAL REQUIREMENTS MANUAL)
Section Title Effective Date B 3.8 B.3.9 Page TRM / B 3.7-30 Pages TRM / B 3.7-30a and TRM / B 3.7-30b Page TRM / B 3.7-31 Page TRM / B 3.7-32 Page TRM / B 3.7-33 Page TRM / B 3.7-34 Page TRM / B 3.7-35 Pages TRM / B 3.7-36 and TRM / B 3.7-37 Page TRM / B 3.7-38 Page TRM / B 3.7-39 Page TRM / B 3.7-40 ELECTRICAL POWER BASES Page TRM / B 3.8-1 Pages TRM / B 3.8-2 and TRM / B 3.8-2 Page TRM / B 3.8-2a Pages TRM / B 3.8-3 and TRM / B 3.8-3a Page TRM / B 3.8-4 Page TRM / B 3.8-4a Page TRM / B 3.8-5 Pages TRM / B 3.8-6 through TRM / B 3.8-16 Page TRM / B 3.8-17 Pages TRM / B 3.8-17a and TRM / B 3.8-17b Pages TRM / B 3.8-18 through TRM / B 3.8-20 Pages TRM / B 3.8-21 through TRM / B 3.8-24 REFUELING OPERATIONS BASES Pages B 3.9-1 and B 3.9-2 Pages B 3.9-3 through B 3.9-7 06/07/2007 10/05/2006 11/30/2011 03/09/2001 04/15/2003 12/03/2004 07/05/2000 04/01/2009 09/25/2009 04/01/2009 04/08/2010 04/02/2002 01/28/2005 03/01/2010 04/02/2002 04/02/2002 08/10/2004 08/31/1998 04/02/2002 11/30/2011 11/30/2011 11/29/2006 05/28/2009 08/31/1998 10/23/1998 08/31/1998 03/27/2007 08/23/1999 08/31/1998 02/01/1999 04/07/2000 02/01/1999 12/03/2004 02/01/1999 08/31/1998 04/02/2002 B 3.10 MISCELLANEOUS BASES Page B 3.10-1 Pages TRM / B 3.10-2 and TRM / B 3.10-3 Pages TRM / B 3.10-4 and TRM / B 3.10-5 B 3.11 RADIOACTIVE EFFLUENTS BASES Pages B 3.11-1 through B 3.11-9 Page TRM / B 3.11-10 Pages TRM/B 3.11-11 and TRM/B 3.11-1 la Pages TRM/B 3.11-12 and TRM/B 3.11-13 Page TRM / B 3.11-14 Page TRM / B 3.11-15 Pages B 3.11-16 through B 3.11-19 Pages TRM / B 3.11-20 and TRM / B 3.11-20a SUSQUEHANNA - UNIT 2 TRM / LOES-8 EFFECTIVE DATE 05/24/2012
SUSQUEHANNA STEAM ELECTRIC STATION PPL Rev. 73 LIST OF EFFECTIVE SECTIONS (TECHNICAL REQUIREMENTS MANUAL)
Section Title Effective Date Page TRM / B 3.11-21 Pages TRM / B 3.11-22 and TRM / B 3.11-23 Page TRM / B 3.11-23a Pages TRM / B 3.11-24 and TRM / B 3.11-25 Pages B 3.11-26 through B 3.11-27 Pages TRM / B 3.11-28 and TRM / B 3.11-29 Page TRM / B 3.11-30 Pages TRM / B 3.11-31 and TRM / B 3.11-32 Page TRM / B 3.11-33 Pages TRM / B 3.11-34 and TRM / B 3.11-35 Page TRM / B 3.11-36
,B.3.12 LOADS CONTROL PROGRAM BASES Page TRM / B 3.12-1 Page TRM / B 3.12-2 Page TRM / B 3.12-3 05/13/2005 11/14/2006 05/13/2005 01/21/2004 08/31/1998 11/30/2005 06/30/2010 08/31/1998 06/30/2010 08/31/1998 02/12/1999 09/19/2007 11/29/2010 02/05/1999 TRM2 text LOES.doc 5/25/2012 SUSQUEHANNA
- UNIT 2 TRM / LOES-9 EFFECTIVE DATE 05/24/2012 SUSQUEHANNA - UNIT 2 TRM / LOES-9 EFFECTIVE DATE 05/24/2012
ESSW Pumphouse Ventilation 3.7.6 PPL Rev. 3 3.7 Plant Systems 3.7.6 ESSW Pumphouse Ventilation TRO 3.7.6 Two ESSW Pumphouse Ventilation Subsystems shall be OPERABLE.
APPLICABILITY:
Whenever associated RHRSW and ESW Pumps are required to be OPERABLE.
ACTIONS NOTES-----------
- 1.
If two or more fans and one or more dampers render ESSW Pumphouse Ventilation Subsystem fan train(s) inoperable, enter both the appropriate Condition for inoperable fan(s) and Condition D, E, F or G.
- 2.
Dampers gagged in the appropriate position may be un-gagged intermittently under administrative controls to allow for work and/or operability testing.
CONDITION REQUIRED ACTION COMPLETION TIME A.
Two ESSW Pumphouse A.1 Restore inoperable 30 days Ventilation Subsystem equipment so at least fan trains in one or both three fans in each subsystems inoperable subsystem are in due to inoperable fans.
OPERABLE status.
B.
Three ESSW B.1 Restore inoperable 36 hours4.166667e-4 days <br />0.01 hours <br />5.952381e-5 weeks <br />1.3698e-5 months <br /> Pumphouse Ventilation equipment so at least Subsystem fan trains in two fans in each one or both subsystems subsystem are in inoperable due to OPERABLE status.
inoperable fans.
SUSQUEHANNA - UNIT 2 TRM / 3.7-40 EFFECTIVE DATE 05/24/2012
ESSW Pumphouse Ventilation PPL Rev. 3 3.7.6 ACTIONS (continued)
CONDITION REQUIRED ACTION COMPLETION TIME C.
Fourfan trains in one or C.1 Establish acceptance 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br /> both subsystems ventilation flow path.
inoperable due to inoperable fans.
AND C.2 Restore inoperable 36 hours4.166667e-4 days <br />0.01 hours <br />5.952381e-5 weeks <br />1.3698e-5 months <br /> equipment so at least two fans in each subsystem are in OPERABLE status.
D.
NOTE ------------
D. 1 Track failed dampers.
Immediately Separate Condition entry is allowed for each damper.
AND One ESSW Pumphouse Ventilation Subsystem fan train in one or both D.2 Gag damper or secure 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> subsystems inoperable due and deactivate damper to one or more dampers actuator on the affected inoperable (includes fans' dampers in the previously failed dampers appropriate position.
that are not repaired).
E. ------- NOTE ------------
E. 1 Gag damper or secure 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> Separate Condition entry is and deactivate damper allowed for each damper.
actuator on the affected fans' dampers in the appropriate position.
Two ESSW Pumphouse Ventilation Subsystem fan AND 30 days trains in one or both subsystems inoperable due E.2 Restore all dampers in at to one or more dampers least three fan trains in inoperable (includes both subsystems to previously failed dampers original design/functional that are not repaired).
status.
SUSQUEHANNA - UNIT 2 TRM / 3.7-40a EFFECTIVE DATE 05/24/2012
ESSW Pumphouse Ventilation PPL Rev. 3 3.7.6 ACTIONS (continued)
CONDITION REQUIRED ACTION COMPLETION TIME F.
NOTE ------------
F.1 Gag damper or secure and 36 hours4.166667e-4 days <br />0.01 hours <br />5.952381e-5 weeks <br />1.3698e-5 months <br /> Separate Condition entry is deactivate damper actuator allowed for each damper.
on the affected fans' dampers in the appropriate position.
Three ESSW Pumphouse Ventilation Subsystem fan AND 30 days trains in one or both subsystems inoperable due F.2 Restore all dampers in at to one or more dampers least three fan trains in both inoperable (includes subsystems to original previously failed dampers design/functional status that are not repaired).
G.
NOTE ----------
G.1 Establish acceptable 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br /> Separate Condition entry is ventilation flow path allowed for each damper.
AND Four ESSW Pumphouse G.2 Gag damper or secure and 36 hours4.166667e-4 days <br />0.01 hours <br />5.952381e-5 weeks <br />1.3698e-5 months <br /> Ventilation Subsystem fan deactivate damper actuator trains in one or both on the affected fans' subsystems inoperable due dampers in the appropriate to one or more dampers position.
inoperable (includes previously failed dampers AND that are not repaired).
G.3 Restore all dampers in at 30 days least three fan trains in both subsystems to original design/functional status H. Required Action and H.1 Declare the associated Immediately associated Completion ESW/RHRSW pumps Time of Conditions A, B, C, inoperable.
E, F or G not met.
SUSQUEHANNA - UNIT 2 TRM / 3.7-40b EFFECTIVE DATE 05/24/2012
ESSW Pumphouse Ventilation 3.7.6 PPL Rev. 3 TECHNICAL REQUIREMENT SURVEILLANCE SURVEILLANCE FREQUENCY TRS 3.7.6.1 Verify that the ESSW Pumphouse Ventilation 92 days Subsystems fans start and associated dampers automatically position when their associated pump starts.
SUSQUEHANNA - UNIT 2 TRM / 3.:7-40c EFFECTIVE DATE 05/24/2012
ESSW Pumphouse Ventilation PPL Rev. 3 B 3.7.6 B 3.7.6 ESSW Pumphouse Ventilation BASES TRO The ESSW Pumphouse Ventilation System provides heat removal capability to ensure equipment temperature limits are maintained for the ESW pumps and the Unit I and Unit 2 RHRSW pumps. These pumps are required to operate to mitigate a design basis event. The ESSW Pumphouse ventilation system consists of two subsystems that provide the primary means to remove heat from the pumphouse. Each subsystem consists of four trains.
A train consists of a fan and associated dampers. The associated dampers for a fan train are an outside supply damper, two recirculation dampers and an exhaust damper. The fail safe position of the outside supply and exhaust dampers is closed and the recirculation damper fail safe position is open.
Note that when the outside supply damper is placed in the fail safe position (closed), one of the recirculation dampers should be gagged in the open position to prevent potential fan damage. Placing the outside supply damper in the fail safe position assures that a single failure of an outside supply damper will not cause freezing temperatures in the subsystem during winter. Analysis has shown that two fan trains in a subsystem (fan, duct, dampers and associated controls) will maintain temperatures within operability limits. Analysis has also shown that one fan train assures adequate cooling (36 hours4.166667e-4 days <br />0.01 hours <br />5.952381e-5 weeks <br />1.3698e-5 months <br />) during summer months.
If only one damper or multiple dampers in one fan train are failed, the appropriate damper positions are closed for the supply and exhaust dampers and open for the recirculation dampers regardless of the time of year (see Table B3.7.6-1). If the supply damper is failed or gagged closed, one of the recirculation dampers must be opened to prevent potential fan damage. The above actions allow the dampers to remain in the above configuration through any season since the remaining fan systems can maintain temperatures in the pumphouse. With the exception of the supply damper failure requiring one recirculation damper to be gagged open, only the damper or dampers that are failed need to be placed in the position dictated by Table B3.7.6-1 or as directed by Engineering. The affected fan train is considered not operable.
If one damper or multiple dampers in two or three fan trains are failed during June, July or August, the appropriate damper positions is open for the supply and exhaust dampers and closed for the recirculation dampers (see Table B3.7.6-2). Note that the time frames are for when the damper failure initially occurred and changes to damper positions are not required even if the TRO carries into an adjacent month. If one damper or multiple dampers (continued)
SUSQUEHANNA - UNIT 2 TRM / B 3.7-21 EFFECTIVE DATE 05/24/2012
ESSW Pumphouse Ventilation B 3.7.6 PPL Rev. 3 B 3.7.6 ESSW Pumphouse Ventilation BASES TRO (continued) in two or three fan trains are failed during any month except June, July or August, the appropriate damper positions is closed for the supply and exhaust dampers and open for the recirculation dampers (see Table B3.7.6-3). All dampers in the affected train must be placed in the position specified in Table B3.7.6-2 or Table B3.7.6-3 or as directed by Engineering. If the supply damper is failed closed, one of the recirculation dampers must be opened to prevent potential fan damage. The damper configuration in Table 3.7.6-2 maintains the fan train operable if the fan is operable.
If all 4 Division I fan trains (0V521A, 0V521C, 1V506A and 2V506A) are failed and three Division II fan trains (0V521B, 0V521D, 1V506B and 2V506B) are operable an acceptable ventilation alignment is blocking open Door 1702-0, Door 1703-0, Door 1701-0 and Door 1706-0 and confirming Door 1704-0 and 1705-0 are closed. If all 4 Division II fan trains (0V521B, 0V521 D, 1V506B and 2V506B) are failed and three Division I fan trains (0V521A, 0V521C, 1V506A and 2V506A) are operable an acceptable ventilation alignment is blocking open Door 1702-0, Door 1703-0, confirming Door 1704-0 and 1705-0 are closed and gagging open two exhaust dampers in Division II. Note that during winter months this will require additional heater installation. Other appropriate ventilation alignment will be determined by engineering.
Each ventilation subsystem provides cooling for separate divisions of equipment. Each division consists of two ESW pumps, one Unit 1 RHRSW pump and one Unit 2 RHRSW pump. The two ESSW Pumphouse Ventilation Subsystems provide the normal and emergency ventilation for the ESSW pumphouse. (Reference 1)
ACTIONS The ACTIONS are modified by two Notes. Note 1 directs the entry into both a Condition for an inoperable fan(s) and Condition D, E, F or G for inoperable dampers when both one or more fans and one or more dampers are inoperable. Should the fan(s) and one or more dampers in an ESSW Pumphouse Ventilation Subsystem fan train(s) be inoperable, entry into two Conditions is required.
(continued)
SUSQUEHANNA - UNIT 2 TRM / B 3.7-21 a EFFECTIVE DATE 05/24/2012
ESSW Pumphouse Ventilation B 3.7.6 PPL Rev. 3 B 3.7.6 ESSW Pumphouse Ventilation BASES ACTIONS (continued)
Note 2 allows a gagged damper to be un-gagged intermittently under administrative controls to allow for work and/or operability testing. These controls consist of stationing a dedicated person capable of installing a gag, who is in communication with the control room, at the damper. In this way, the damper can be re-gagged if the associated ESW/RHRSW pump starts.
An exception to the administrative control requirement to have a dedicated person stationed at the damper is when a damper has been repaired and successfully tested for operability but all of the required documentation has not been completed (i.e., functional but not administratively operable). If an inoperable damper remains un-gagged under administrative controls for a period of time greater than allowed by the action statements (i.e., 72 hrs.),
the associated ESW\\RHRSW pump must be declared inoperable.
The Actions are defined to ensure proper corrective measures are taken in response to inoperable components. The completion times are similar to completion times for the ESW system and are also based on engineering judgement that accounts for the fact that the system is a support system whose function is to maintain the ESSW Pumphouse temperature within limits.
Each subsystem of ESSW pumphouse equipment can maintain acceptable temperatures to meet design basis limits when all ventilation subsystem fan trains are operable. If a fan's associated damper(s) are inoperable, the associated fan subsystem can perform its intended safety function provided the inoperable fan(s) damper(s) are gagged in the appropriate position as determined by Tables B3.7.6-1, B3.7.6-2 and B3.7.6-3 or by Engineering.
The gagged damper position ensures that the ambient temperatures will remain within limits thus assuring operability of ESSW pumphouse equipment. An inoperable fan reduces the cooling capability of the subsystem thus compromising the subsystem ability to maintain temperatures within design limits.
Conditions D, E, F and G relate to inoperable dampers in a subsystem.
Condition D is specific to the failure of one or more dampers on one fan train in a subsystem. Condition D requires the dampers to be gagged in the fail safe position. Adequate cooling to the division will be provided by the remaining fans.
(continued)
SUSQUEHANNA - UNIT 2 TRM / B 3.7-21b EFFECTIVE DATE 05/24/2012
ESSW Pumphouse Ventilation B 3.7.6 PPL Rev. 3 B 3.7.6 ESSW Pumphouse Ventilation BASES ACTIONS (continued)
An example of a hypothetical Condition D entry would be the failure of the
'D' ESW Fan supply damper (TD-08206D1). This condition would require gagging the damper or securing and deactivating the damper actuator in the fail safe position (closed for this damper) within 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> due to Condition D entry assuming all other dampers in the division are operable.
If the 'D' ESW fan exhaust damper (TD-08206D4) were to fail at a later date (but before the 'D' ESW supply damper was repaired), entry into Condition D would be required for the 'D' ESW exhaust damper since it is associated with the same fan train as the 'D' ESW supply damper.
A second example is provided for the hypothetical entry into Condition E. If the 'D' ESW supply damper (TD08206D1) failed, entry into Condition D would be required and the damper would be gagged in the fail safe position (closed for this damper) assuming all other dampers in the division are operable. If the 'B' ESW supply damper (TD08206B1) failed at a later date (but before the 'D' ESW supply damper was repaired), separate entry into Condition E would be required since it is associated with a different fan train. Additional damper failures would require entry into either Condition F orG.
Conditions D, E, F and G are modified by a separate note to allow separate Condition entry for each damper. The purpose of this note is to allow adequate time to gag or secure and deactivate the damper actuator of the damper that has failed. This is acceptable since the Required Action for this condition provides appropriate compensatory actions.
Condition G contains an action to establish an appropriate flow path within 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br />. If all 4 Division I fan trains (0V521A, 0V521C, 1V506A and 2V506A) are failed and three Division II fan trains (0V521B, 0V521 D, 1V506B and 2V506B) are operable an acceptable ventilation alignment is blocking open Door 1702-0, Door 1703-0, Door 1701-0 and Door 1706-0 and confirming Door 1704-0 and 1705-0 are closed. If all 4 Division II fan trains (0V521B, 0V521 D, 1V506B and 2V506B) are failed and three Division I fan trains (0V521A, 0V521C, 1V506A and 2V506A) are operable an acceptable ventilation alignment is blocking open Door 1702-0, Door 1703-0, confirming Door 1704-0 and 1705-0 are closed and gagging open two exhaust dampers in Division II. Note that during winter months this will require additional heater installation. Other appropriate ventilation alignment will be determined by engineering.
(continued)
SUSQUEHANNA - UNIT 2 TRM / B 3.7-21 c EFFECTIVE DATE 05/24/2012
ESSW Pumphouse Ventilation B 3.7.6 PPL Rev. 3 B 3.7.6 ESSW Pumphouse Ventilation BASES TRS The TRSs are defined to be performed at the specified Frequency to ensure that the ESSW Pumphouse Ventilation Systems are maintained OPERABLE.
Verifying the fans are OPERABLE includes ensuring fans and associated dampers have properly functioned when operated to support normal pump operation. This ensures adequate pump heat removal capability.
REFERENCES
- 1.
FSAR Section 9.4.8
- 2.
Safety Evaluation NL-99-057
- 3.
50.59 SD 00756 SUSQUEHANNA - UNIT 2 TRM / B 3.7-21d EFFECTIVE DATE 05/24/2012
PPL Rev. 3 ESSW Pumphouse Ventilation B 3.7.6 Table B3.7.6-1: Damper Position for One (1) Fan Train Inoperable Due to Inoperable Damper(s)
Affected Fan Failed Damper Gagged or Secured Position Train 0V521A Closed: TD-08206A1 "Supply" and TD-08206A4 "Exhaust" Open: TD-08206A2 and TD-08206A3 "Recirculation Dampers" 0V521 C Closed: TD-08206C1 "Supply" and TD-08206C4 "Exhaust" Open: TD-08206C2 and TD-08206C3 "Recirculation Dampers" 1V506A Closed: TD-18201A1 "Supply" and TD-18201A4 "Exhaust" Open: TD-18201A2 and TD-18201A3 "Recirculation Dampers" 2V506A Closed: TD-28201A1 "Supply" and TD-28201A4 "Exhaust" Open: TD-28201A2 and TD-28201A3 "Recirculation Dampers" 0V521B Closed: TD-08206B1 "Supply" and TD-08206B4 "Exhaust" Open: TD-08206B2 and TD-08206B3 "Recirculation Dampers" 0V521D Closed: TD-08206D1 "Supply" and TD-08206D4 "Exhaust" Open: TD-08206D2 and TD-08206D3 "Recirculation Dampers" 1V506B Closed: TD-182011B1 "Supply" and TD-182011B4 "Exhaust" Open: TD-18201 B2 and TD-182011B3 "Recirculation Dampers" 2V506B Closed: TD-28201B1 "Supply" and TD-28201B4 "Exhaust" Open: TD-28201 B2 and TD-28201 B3 "Recirculation Dampers" Note: With the exception of the supply damper failure requiring one recirculation damper to be gagged open, only the damper or dampers that are failed need to be placed in the position dictated by this table or as directed by Engineering.
SUSQUEHANNA - UNIT 2 TRM / B 3.7-21e EFFECTIVE DATE 05/24/2012
ESSW Pumphouse Ventilation B 3.7.6 PPL Rev. 3 Table B3.7.6-2: Damper Position for Two (2) or Three (3) Fan Trains.
Inoperable Due to Inoperable Damper(s) During June, July or August Affected Fan Failed Damper Gagged or Secured Position Train 0V521A Closed: TD-08206A2 and TD-08206A3 "Recirculation Dampers" Open: TD-08206A1 "Supply" and TD-08206A4 "Exhaust" 0V521C Closed: TD-08206C2 and TD-08206C3 "Recirculation Dampers" Open: TD-08206C1 "Supply" and TD-08206C4 "Exhaust" 1V506A Closed: TD-18201A2 and TD-18201A3 "Recirculation Dampers" Open: TD-18201A1 "Supply" and TD-18201A4 "Exhaust" 2V506A Closed: TD-28201A2 and TD-28201A3 "Recirculation Dampers" Open: TD-28201A1 "Supply" and TD-28201A4 "Exhaust" 0V521B Closed: TD-08206B2 and TD-08206B3 "Recirculation Dampers" Open: TD-08206B1 "Supply" and TD-08206B4 "Exhaust" 0V521 D Closed: TD-08206D2 and TD-08206D3 "Recirculation Dampers" Open: TD-08206D1 "Supply" and TD-08206D4 "Exhaust' 1V506B Closed: TD-18201B2 and TD-182011B3 'Recirculation Dampers" Open: TD-18201 B1 "Supply" and TD-18201 B4 "Exhaust' 2V506B Closed: TD-28201 B2 and TD-28201 B3 "Recirculation Dampers" Open: TD-28201 B1 "Supply" and TD-28201 B4 "Exhaust" Note: All dampers in the affected train must be placed in the position specified in this table or as directed by Engineering. The damper configuration in this table maintains the fan train operable if the fan is operable.
SUSQUEHANNA - UNIT 2 TRM / B 3.7-21f EFFECTIVE DATE 05/24/2012
ESSW Pumphouse Ventilation B 3.7.6 PPL Rev. 3 Table B3.7.6-3: Damper Position for Two (2) or Three (3) Fan Trains Inoperable Due to Inoperable Damper(s) During September through May Affected Fan Failed Damper Gagged or Secured Position Train 0V521A Closed: TD-08206A1 "Supply" and TD-08206A4 "Exhaust" Open: TD-08206A2 and TD-08206A3 "Recirculation Dampers" 0V521C Closed: TD-08206C1 "Supply" and TD-08206C4 "Exhaust" Open: TD-08206C2 and TD-08206C3 "Recirculation Dampers" 1V506A Closed: TD-18201A1 "Supply" and TD-18201A4 "Exhaust" Open: TD-18201A2 and TD-18201A3 "Recirculation Dampers" 2V506A Closed: TD-28201A1 "Supply" and TD-28201A4 "Exhaust" Open: TD-28201A2 and TD-28201A3 "Recirculation Dampers" 0V521B Closed: TD-08206B1 "Supply" and TD-08206B4 "Exhaust" Open: TD-082061B2 and TD-08206B3 "Recirculation Dampers" 0V521D Closed: TD-08206D1 "Supply" and TD-08206D4 "Exhaust" Open: TD-08206D2 and TD-08206D3 "Recirculation Dampers" 1V506B Closed: TD-18201 B1 "Supply" and TD-18201 B4 "Exhaust" Open: TD-18201 B2 and TD-18201 B3 "Recirculation Dampers" 2V506B Closed: TD-28201B1 "Supply" and TD-28201B4 "Exhaust" Open: TD-28201 B2 and TD-28201 B3 "Recirculation Dampers" Note: All dampers in the affected train must be placed in the position specified in this table or as directed by Engineering. If the supply damper is failed closed, one of the recirculation dampers must be opened to prevent potential fan damage.
SUSQUEHANNA - UNIT-2 TRM / B 3.7-21g EFFECTIVE DATE 05/24/2012