ML12172A343
| ML12172A343 | |
| Person / Time | |
|---|---|
| Site: | Susquehanna |
| Issue date: | 06/05/2012 |
| From: | Susquehanna |
| To: | Gerlach R Document Control Desk, Office of Nuclear Reactor Regulation |
| References | |
| Download: ML12172A343 (39) | |
Text
Jun.
05, 2012 Page 1
of 2
MANUAL HARD COPY DISTRIBUTION DOCUMENT TRANSMITTAL 2012-38045 USER INFORMATION:
.GERLACH*ROSE M EMPL#:028401 CA#:
0363 Address: NUCSA2 Phone#:
254-3194 TRANSMITTAL INFORMATION:
TO:
GERLACH*ROSE M 06/05/2012 LOCATION:
USNRC FROM:
NUCLEAR RECORDS DOCUMENT CONTROL CENTER (NUCSA-2)
THE FOLLOWING CHANGES HAVE OCCURRED TO THE HARDCOPY OR ELECTRONIC MANUAL ASSIGNED TO YOU.
HARDCOPY USERS MUST ENSURE THE DOCUMENTS PROVIDED MATCH THE INFORMATION ON THIS TRANSMITTAL.
WHEN REPLACING THIS MATERIAL IN YOUR HARDCOPY MANUAL, ENSURE THE UPDATE DOCUMENT ID IS THE SAME DOCUMENT ID YOU'RE REMOVING FROM YOUR MANUAL.
TOOLS FROM THE HUMAN PERFORMANCE TOOL BAG SHOULD BE UTILIZED TO ELIMINATE THE CHANCE OF ERRORS.
ATTENTION:
"REPLACE" directions do not affect the Table of Contents, Therefore no TOC will be issued with the updated material.
TRMI -
TECHNICAL REQUIREMENTS MANUAL UNIT 1 REMOVE MANUAL TABLE OF CONTENTS DATE: 05/30/2012 ADD MANUAL TABLE OF CONTENTS DATE: 06/04/2012 CATEGORY:
DOCUMENTS TYPE:
TRM1
Jun.
05, 2012 Page 2
of 2
ID:
TEXT 3.7.6 REMOVE:
REV:2 ADD:
REV:
3 CATEGORY:
DOCUMENTS TYPE:
TRM1 ID:
TEXT B3.7.6 REMOVE:
REV:2 ADD:
REV: 3 CATEGORY:
DOCUMENTS TYPE: TRMI ID:
TEXT LOES ADD:
REV:
72 REMOVE:
REV:71 ANY DISCREPANCIES WITH THE MATERIAL PROVIDED, CONTACT DCS @ X3107 OR X3136 FOR ASSISTANCE.
UPDATES FOR HARDCOPY MANUALS WILL BE DISTRIBUTED WITHIN 3 DAYS IN ACCORDANCE WITH DEPARTMENT PROCEDURES.
PLEASE MAKE ALL CHANGES AND ACKNOWLEDGE COMPLETE IN YOUR NIMS INBOX UPON COMPLETION OF UPDATES.
FOR ELECTRONIC MANUAL
- USERS, ELECTRONICALLY REVIEW THE APPROPRIATE DOCUMENTS AND ACKNOWLEDGE COMPLETE IN YOUR NIMS INBOX.
SSES MANUAL Manual Name:
TRM1 Manual
Title:
TECHNICAL REQUIREMENTS MANUAL UNIT 1 Table Of Contents Issue Date:
0 Procedure Name TEXT LOES
Title:
LIST OF EF:
6/04/2012 Rev Issue Date 72 06/04/2012 FECTIVE SECTIONS Change ID Change Number TEXT TOC
Title:
TEXT 1.1
Title:
TEXT 2.1
Title:
TEXT 2.2
Title:
TEXT 3.0
Title:
21 12/08/2011 TABLE OF CONTENTS 0
11/18/2002 USE AND APPLICATION DEFINITIONS 1
PO/SA/EO5 PLANT PROGRAMS AND SETPOINTS PAN PORAMKS 9
01/13/2011 PLANT PROGRAMS AND SETPOI UMENT TRIP SETPOINT TABLE LDCN 4414 4
05/23/2008 TECHNICAL REQU FOR OPERATION (TRO)
APPLICABILITY & SURVEILLANCE (TRS)
APPLICABILITY TEXT 3.1.1 1
11/09/2007
Title:
REACTIVIT CNTRL SYSTEMS ANTICIPATED TRANSIENT WITHOUT SCRAM ALTERNATE ROD INJECTION (A T-ARI) INSTRUMENTATION TEXT 3.1.2 0
11/18/2002
Title:
REACTIVITY CONTROL SYSTEMS CONTROL ROD DRIVE TEXT 3.1.3 5
04/16/2009
Title:
REACTIVITY CONTROL SYSTEMS CONTROL ROD BLOCK TEXT 3.1.4 0
11/18/2002
Title:
REACTIVITY CONTROL SYSTEMS CONTROL ROD SCRAM CHECK VALVE TEXT 3.2.1 13 04/10/2012
Title:
CORE OPERATING LIMITS REPORT (COLR)
(CRD)
HOUSING SUPPORT INSTRUMENTATION ACCUMULATORS INSTRUMENTATION &
Pagel of ~
Report Date: 06/05/12 Page.1 of 16 Report Date: 06/05/12
SSES MANUAL Manual Name:
TRMI Manual
Title:
TECHNICAL REQUIREMENTS MANUAL UNIT 1 TEXT 3.3.1
Title:
INSTRUMENTATION TEXT 3.3.2
Title:
INSTRUMENTATION TEXT 3.3.3
Title:
INSTRUMENTATION TEXT 3.3.4
Title:
INSTRUMENTATION TEXT 3.3.5
Title:
INSTRUMENTATION 0
11/18/2002 RADIATION MONITORING INSTRUMENTATION 3
03/31/2011 SEISMIC MONITORING INSTRUMENTATION 2
11/09/2007 METEOROLOGICAL MONITORING INSTRUMENTATION 6
07/09/2010 TRM POST-ACCIDENT MONITORING INSTRUMENTATION 0
11/18/2002 THIS PAGE INTENTIONALLY LEFT BLANK TEXT 3.3.6 3
01/13/2011
Title:
INSTRUMENTATION TRM ISOLATION ACTUATION INSTRUMENTATION TEXT 3.3.7 1
11/09/2007
Title:
INSTRUMENTATION MAIN TURBINE OVERSPEED PROTECTION SYSTEM TEXT 3.3.8 1
10/22/2003
Title:
INSTRUMENTATION TRM RPS INSTRUMENTATION TEXT 3.3.9 3
04/17/2008
Title:
OPRM INSTRUMENTATION CONFIGURATION TEXT 3.3.10 1
12/14/2004
Title:
INSTRUMENTATION REACTOR RECIRCULATION PUMP MG SET STOPS TEXT 3.3.11 1
10/22/2003
Title:
INSTRUMENTATION MVP ISOLATION INSTRUMENTATION TEXT 3.3.12 0
04/16/2009
Title:
WATER MONITORING INSTRUMENTATION Page2 of
~,j Report Date: 06/05/12 Page 2 of
.16 Report Date: 06/05/12
SSES MAN~UAL Manual Name:
TRM1 Manual
Title:
TECHNICAL REQUIREMENTS MANUAL UNIT 1 TEXT 3.4.1
Title:
REACTOR TEXT 3.4.2
Title:
REACTOR TEXT 3.4.3
Title:
REACTOR TEXT 3.4.4
Title:
REACTOR TEXT 3.4.5
Title:
REACTOR TEXT 3.4.6
Title:
REACTOR TEXT 3.5.1 1
04/26/2006 COOLANT SYSTEM REACTOR COOLANT SYSTEM CHEMISTRY 1
04/16/2009 COOLANT SYSTEM STRUCTURAL INTEGRITY 1
11/09/2007 COOLANT SYSTEM HIGH/LOW PRESSURE INTERFACE LEAKAGE MONITORS 2
04/17/2008 COOLANT SYSTEM REACTOR RECIRCULATION FLOW AND ROD LINE LIMIT 1
04/26/2006 COOLANT SYSTEM REACTOR VESSEL MATERIALS 1
06/15/2010 RECIRCULATION SINGLE LOOP OPERATION SLO FLOW RATE RESTRICTION 1
02/04/2005
Title:
EMERGENCY CORE COOLING AND RCIC ADS MANUAL INHIBIT TEXT 3.5.2 1
11/09/2007
Title:
EMERGENCY CORE COOLING AND RCIC ECCS AND RCIC SYSTEM MONITORING INSTRUMENTATION TEXT 3.5.3 0
11/18/2002
Title:
EMERGENCY CORE COOLING AND RCIC LONG TERM NITROGEN SUPPLY TO ADS TEXT 3.6.1 0
11/18/2002
Title:
CONTAINMENT VENTING OR PURGING TEXT 3.6.2 1
08/23/2011
Title:
SUPPRESSION CHAMBER TO DRYWELL VACUUM BREAKER POSITION INDICATION TEXT 3.6.3 0
11/18/2002
Title:
CONTAINMENT SUPPRESSION POOL ALARM INSTRUMENTATION Page 3 of 16 Report Date: 06/05/12
"SSES MANUAL Manual Name:
TRMI1 Manual
Title:
TECHNICAL REQUIREMENTS MANUAL UNIT 1 TEXT 3.6.4 0
11/18/2002
Title:
CONTAINMENT PRIMARY CONTAINMENT CLOSED SYSTEM BOUNDARIES TEXT 3.7.1
Title:
PLANT TEXT 3.7.2
Title:
PLANT TEXT 3.7.3.1
Title:
PLANT TEXT 3.7.3.2
Title:
PLANT TEXT 3.7.3.3
Title:
PLANT TEXT 3.7.3.4
Title:
PLANT TEXT 3.7.3.5
Title:
PLANT TEXT 3.7.3.6
Title:
PLANT TEXT 3.7.3.7
Title:
PLANT TEXT 3.7.3.8
Title:
PLANT TEXT 3.7.4
Title:
PLANT 0
11/18/2002 SYSTEMS EMERGENCY SERVICE WATER SYSTEM (ESW)
SHUTDOWN 0
11/18/2002 SYSTEMS ULTIMATE HEAT SINK (UHS)
AND GROUND WATER LEVEL 2
04/16/2009 SYSTEMS FIRE SUPPRESSION WATER SUPPLY SYSTEM 3
04/16/2009 SYSTEMS SPRAY AND SPRINKLER SYSTEMS 3
04/16/2009 SYSTEMS C02 SYSTEMS 2
04/16/2009 SYSTEMS HALON SYSTEMS 2
04/16/2009 SYSTEMS FIRE HOSE STATIONS 2
04/16/2009 SYSTEMS YARD FIRE HYDRANTS AND HYDRANT HOSE HOUSES 1
04/26/2006 SYSTEMS FIRE RATED ASSEMBLIES 9
11/30/2011 SYSTEMS FIRE DETECTION INSTRUMENTATION LDCN 1
04/26/2006 SYSTEMS SOLID RADWASTE SYSTEM 3503 Page 4 of 16 Report Date: 06/05/12 Page 4 of 16 Report Date: 06/05/12
,SSES: MANUJAL Manual Name:
TRM1 Manual
Title:
TECHNICAL REQUIREMENTS MANUAL UNIT 1 TEXT 3.7.5.1
Title:
PLANT SYSTEMS TEXT 3.7.5.2
Title:
PLANT SYSTEMS TEXT 3.7.5.3
Title:
PLANT SYSTEMS TEXT 3.7.6
Title:
PLANT SYSTEMS TEXT 3.7.7
Title:
PLANT SYSTEMS MONITORING TEXT 3.7.8
Title:
PLANT SYSTEMS TEXT 3.7.9
Title:
PLANT SYSTEMS 0
11/18/2002 MAIN CONDENSER OFFGAS HYDROGEN MONITOR 0
11/18/2002 MAIN CONDENSER OFFGAS EXPLOSIVE GAS MIXTURE 1
04/26/2006 LIQUID HOLDUP TANKS 3
06/04/2012 ESSW PUMPHOUSE VENTILATION 2
09/05/2008 MAIN CONDENSER OFFGAS PRETREATMENT LOGARITHMIC RADIATION 4
06/21/2007 SNUBBERS 1
08/28/2006 CONTROL STRUCTURE HVAC 1
12/14/2004 SPENT FUEL STORAGE POOLS (SFSPS)
TEXT 3.7.10
Title:
PLANT SYSTEMS TEXT 3.7.11 0
04/16/2009
Title:
STRUCTURAL INTEGRITY TEXT 3.8.1 2
04/05/2010
Title:
ELECTRICAL POWER PRIMARY CONTAINMENT PENETRATION CONDUCTOR OVERCURRENT PROTECTIVE DEVICES TEXT 3.8.2.1 2
.11/09/2007
Title:
ELECTRICAL POWER MOTOR OPERATED VALVES (MOV)
THERMAL OVERLOAD PROTECTION -
CONTINUOUS TEXT 3.8.2.2 2
12/14/2004
Title:
ELECTRICAL POWER MOTOR OPERATED VALVES (MOV)
THERMAL OVERLOAD PROTECTION -
AUTOMATIC Page a
. of 16 Report Date: 06/05/12
SSES MANUAL Manual Name:
TRMI Manual
Title:
TECHNICAL REQUIREMENTS MANUAL UNIT 1 TEXT 3.8.3
Title:
ELECTRICAL TEXT 3.8.4
Title:
ELECTRICAL TEXT 3.8.5
Title:
ELECTRICAL TEXT 3.8.6
Title:
ELECTRICAL TEXT 3.8.7 1
04/05/2010 POWER DIESEL GENERATOR (DG)
MAINTENANCE ACTIVITIES 0
11/18/2002 POWER 24 VDC ELECTRICAL POWER SUBSYSTEM 0
11/18/2002 POWER DEGRADED VOLTAGE PROTECTION 1
12/08/2011 POWER EMERGENCY SWITCHGEAR ROOM COOLING 1
06/15/2009
Title:
BATTERY MAINTENANCE AND MONITORING PROGRAM TEXT 3.9.1 0
11/18/2002
Title:
REFUELING OPERATIONS DECAY TIME TEXT 3.9.2 0
11/18/2002
Title:
REFUELING OPERATIONS COMMUNICATIONS TEXT 3.9.3 0
11/18/2002
Title:
REFUELING OPERATIONS REFUELING PLATFORM TEXT 3.10.1 1
04/26/2006
Title:
MISCELLANEOUS SEAL SOURCE CONTAMINATION TEXT 3.10.2
Title:
MISCELLANEOUS TEXT 3.10.3
Title:
MISCELLANEOUS 2
08/08/2006 SHUTDOWN MARGIN TEST RPS INSTRUMENTATION 2
06/15/2010 INDEPENDENT SPENT FUEL STORAGE INSTALLATION (ISFSI)
TEXT 3.10.4 2
04/17/2008
Title:
MISCELLANEOUS LEADING EDGE FLOW METER (LEFM)
Page 6 of 16 Report Date: 06/05/12 Page 6 of 16 Report Date: 06/05/12
S.SES MANUAL Manual Name:
TRMI Manual
Title:
TECHNICAL REQUIREMENTS MANUAL UNIT 1 TEXT 3.11.1.1
Title:
RADIOACTIVE TEXT 3.11.1.2
Title:
RADIOACTIVE TEXT 3.11.1.3
Title:
RADIOACTIVE TEXT 3.11.1.4
Title:
RADIOACTIVE TEXT 3.11.1.5
Title:
RADIOACTIVE TEXT 3.11.2.1
Title:
RADIOACTIVE TEXT 3.11.2.2
Title:
RADIOACTIVE TEXT 3.11.2.3
Title:
RADIOACTIVE FORM TEXT 3.11.2.4
Title:
RADIOACTIVE TEXT 3.11.2.5
Title:
RADIOACTIVE TEXT 3.11.2.6
Title:
RADIOACTIVE TEXT 3.11.3
Title:
RADIOACTIVE EFFLUENTS EFFLUENTS EFFLUENTS EFFLUENTS EFFLUENTS EFFLUENTS EFFLUENTS EFFLUENTS EFFLUENTS EFFLUENTS EFFLUENTS EFFLUENTS 1
04/26/2006 LIQUID EFFLUENTS CONCENTRATION 1
04/26/2006 LIQUID EFFLUENTS DOSE 1
04/26/2006 LIQUID WASTE TREATMENT SYSTEM 1
12/14/2004 LIQUID RADWASTE EFFLUENT MONITORING INSTRUMENTATION 2
05/02/2007 RADIOACTIVE LIQUID PROCESS MONITORING INSTRUMENTATION 3
04/26/2006 DOSE RATE 1
04/26/2006 DOSE -
NOBLE GASES 1
04/26/2006 DOSE
11/18/2002 GASEOUS RADWASTE TREATMENT SYSTEM 3
11/14/2006 VENTILATION EXHAUST TREATMENT SYSTEM 4
09/16/2009 RADIOACTIVE GASEOUS EFFLUENT MONITORING INSTRUMENTATION 1
04/26/2006 TOTAL DOSE Page 2 of 16 Report Date: 06/05/12 Page 7 of 16 Report Date: 06/05/12
S SES A.'MANUAL Manual Name:
TRMI Manual
Title:
TECHNICAL REQUIREMENTS MANUAL UNIT.1 TEXT 3.11.4.1
Title:
RADIOACTIVE EFFLUENTS 4
08/08/2006 MONITORING PROGRAM TEXT 3.11.4.2 2
04/26/2006
Title:
RADIOACTIVE EFFLUENTS LAND USE CENSUS TEXT 3.11.4.3 1
04/26/2006
Title:
RADIOACTIVE EFFLUENTS INTERLABORATORY COMPARISON PROGRAM TEXT 3.12.1 0
11/19/2002
Title:
LOADS CONTROL PROGRAM CRANE TRAVEL-SPENT FUEL POOL STORAGE POOL TEXT 3.12.2
Title:
LOADS CONTROL PROGRAM 4
04/17/2008 HEAVY LOADS REQUIREMENTS TEXT 3.12.3 0
11/19/2002
Title:
LOADS CONTROL PROGRAM LIGHT LOADS REQUIREMENT TEXT 4.1
Title:
TEXT 4.2
Title:
TEXT 4.3
Title:
TEXT 4.4
Title:
TEXT 4.5
Title:
TEXT 4.6
Title:
0 08/31/1998 ADMINISTRATIVE CONTROLS ORGANIZATION ADMINISTRATIVE ADMINISTRATIVE ADMINISTRATIVE ADMINISTRATIVE ADMINISTRATIVE 0
08/31/1998 CONTROLS REPORTABLE EVENT ACTION 0
08/31/1998 CONTROLS SAFETY LIMIT VIOLATION 1
12/18/2008 CONTROLS PROCEDURES & PROGRAMS 0
08/31/1998 CONTROLS REPORTING REQUIREMENTS 0
08/31/1998 CONTROLS RADIATION PROTECTION PROGRAM Page 8
- of
~
Report Date: 06/05/12 Page 8 of 16 Report Date: 06/05/12
SSES-MANTAL Manual Name:
TRI Manual
Title:
TECHNICAL REQUIREMENTS MANUAL UNIT 1 TEXT 4.7 0
08/31/1998
Title:
ADMINISTRATIVE CONTROLS TRAINING TEXT B3.0 4
05/23/2008
Title:
APPLICABILITY BASES TECHNICAL REQUIREMENT FOR OPERATION (TRO)
APPLICABILITY TEXT B3.1.1 1
11/09/2007
Title:
REACTIVITY CONTROL SYSTEMS BASES ANTICIPATED TRANSIENT WITHOUT SCRAM ALTERNATE ROD INJECTION (ATWS-ARI)
INSTRUMENTATION TEXT B3.1.2 0
11/19/2002
Title:
REACTIVITY CONTROL SYSTEMS BASES CONTROL ROD DRIVE (CRD)
HOUSING SUPPORT TEXT B3.1.3 3
03/31/2006
Title:
REACTIVITY CONTROL SYSTEMS BASES CONTROL ROD BLOCK INSTRUMENTATION TEXT B3.1.4 0
11/19/2002
Title:
REACTIVITY CONTROL SYSTEMS BASES CONTROL ROD SCRAM ACCUMULATORS INSTRUMENTATION AND CHECK VALVE TEXT B3.2.1
Title:
CORE OPERATING LIMITS TEXT B3.3.1.
Title:
INSTRUMENTATION BASES TEXT B3.3.2
Title:
INSTRUMENTATION BASES TEXT B3.3.3
Title:
INSTRUMENTATION BASES TEXT B3.3.4
Title:
INSTRUMENTATION BASES TEXT B3.3.5
Title:
INSTRUMENTATION BASES 0
11/19/2002 BASES CORE OPERATING LIMITS REPORT (COLR) 0 11/19/2002 RADIATION MONITORING INSTRUMENTATION 2
03/31/2011 SEISMIC MONITORING INSTRUMENTATION 3
12/18/2008 METEOROLOGICAL MONITORING INSTRUMENTATION 4
07/09/2010 TRM POST ACCIDENT MONITORING (PAM)
INSTRUMENTATION 2
11/09/2007 THIS PAGE INTENTIONALLY LEFT BLANK Page 9 of ~1i Report Date: 06/05/12 Page 9 of 16 Report Date: 06/05/12
MSS1ANUAL Manual Name:
TRM1 Manual
Title:
TECHNICAL REQUIREMENTS MANUAL UNIT 1 TEXT B3.3.6
Title:
INSTRUMENTATION BASES 4
01/13/2011 TRM ISOLATION ACTUATION INSTRUMENTATION TEXT B3.3.7 1
11/09/2007
Title:
INSTRUMENTATION BASES MAIN TURBINE OVERSPEED PROTECTION SYSTEM TEXT B3.3.8 1
10/22/2003
Title:
INSTRUMENTATION BASES TRM REACTOR PROTECTION SYSTEM (RPS)
INSTRUMENTATION TEXT B3.3.9
Title:
OPRE INSTRUMENTATION 3
04/17/2008 TEXT B3.3.10 3
08/09/2010
Title:
INSTRUMENTATION BASES REACTOR RECIRCULATION PUMP MG SET STOPS TEXT B3.3.11 1
10/22/2003
Title:
INSTRUMENTATION BASES MVP ISOLATION INSTRUMENTATION TEXT B3.3.12 0
04/16/2009
Title:
WATER MONITORING INSTRUMENTATION TEXT B3.4.1
Title:
11/19/2002 SYSTEM BASES REACTOR COOLANT SYSTEM CHEMISTRY TEXT B3.4.2 1
04/16/2009
Title:
REACTOR COOLANT SYSTEM BASES STRUCTURAL INTEGRITY TEXT B3.4.3 1
11/09/2007
Title:
REACTOR COOLANT SYSTEM BASES HIGH/LOW PRESSURE INTERFACE LEAKAGE MONITOR TEXT B3.4.4 0
11/19/2002
Title:
REACTOR COOLANT SYSTEM BASES REACTOR RECIRCULATION FLOW AND ROD LINE LIMIT TEXT B3.4.5
Title:
11/19/2002 SYSTEM BASES REACTOR VESSEL MATERIALS Page 10 of 16 Report Date: 06/05/12 Page 10 of
.16 Repo"rt D.at.e: 06[05/12
- S MANTJAI Manual Name
TRMI Manual
Title:
TECHNICAL REQUIREMENTS MANUAL UNIT 1 TEXT B3.4.6 1
06/15/2010
Title:
REACTOR RECIRCULATION SINGLE LOOP OPERATION SLO FLOW RATE RESTRICTION TEXT B3.5.1 0
11/19/2002
Title:
ECCS AND RCIC BASES ADS MANUAL INHIBIT TEXT B3.5.2 1
11/09/2007
Title:
ECCS AND RCIC BASES ECCS AND RCIC SYSTEM MONITORING INSTRUMENTATION TEXT B3.5.3 1
11/09/2007
Title:
ECCS AND RCIC BASES LONG TERM NITROGEN SUPPLY TO ADS TEXT B3.6.1 0
11/19/2002
Title:
CONTAINMENT BASES VENTING OR PURGING TEXT B3.6.2 0
11/19/2002
Title:
CONTAINMENT BASES SUPPRESSION CHAMBER-TO-DRYWELL VACUUM BREAKER POSITION INDICATION TEXT B3.6.3 2
04/17/2008
Title:
CONTAINMENT BASES SUPPRESSION POOL ALARM INSTRUMENTATION LDCN 3933 TEXT B3.6.4 1
12/14/2004
Title:
CONTAINMENT BASES PRIMARY CONTAINMENT CLOSED SYSTEM BOUNDARIES TEXT B3.7.1 0
11/19/2002
Title:
PLANT SYSTEMS BASES EMERGENCY SERVICE WATER SYSTEM (SHUTDOWN)
TEXT B3.7.2 0
11/19/2002
Title:
PLANT SYSTEMS BASES ULTIMATE HEAT SINK (UHS)
GROUND WATER LEVEL TEXT B3.7.3.1 3
06/15/2010
Title:
PLANT SYSTEMS BASES FIRE SUPPRESSION WATER SUPPLY SYSTEM TEXT B3.7.3.2 2
04/26/2006
Title:
PLANT SYSTEMS BASES SPRAY AND SPRINKLER SYSTEMS Page 11 of 16 Report Date: 06/05/12
SSES MANUAL Manual Name:
TRMI Manual
Title:
TECHNICAL REQUIREMENTS MANUAL UNIT 1 TEXT B3.7.3.3
Title:
PLANT TEXT B3.7.3.4
Title:
PLANT TEXT B3.7.3.5
Title:
PLANT TEXT B3.7.3.6
Title:
PLANT TEXT B3.7.3.7
Title:
PLANT TEXT B3.7.3.8
Title:
PLANT TEXT B3.7.4
Title:
PLANT TEXT B3.7.5.1
Title:
PLANT TEXT B3.7.5.2
Title:
PLANT TEXT B3.7.5.3
Title:
PLANT TEXT B3.7.6
Title:
PLANT SYSTEMS BASES SYSTEMS BASES SYSTEMS BASES 0
11/19/2002 C02 SYSTEMS 1
04/26/2006 HALON SYSTEMS 1
04/26/2006 FIRE HOSE STATIONS 1
04/26/2006 YARD FIRE HYDRANTS AND SYSTEMS BASES HYDRANT HOSE HOUSES SYSTEMS BASES SYSTEMS BASES SYSTEMS BASES SYSTEMS BASES SYSTEMS BASES SYSTEMS BASES SYSTEMS BASES 0
11/19/2002 FIRE RATED ASSEMBLIES 2
11/30/2011 FIRE DETECTION INSTRUMENTATION 0
11/19/2002 SOLID RADWASTE SYSTEM 0
11/19/2002 MAIN CONDENSER OFFGAS HYDROGEN MONITOR 0
11/19/2002 MAIN CONDENSER OFFGAS EXPLOSIVE GAS MIXTURE 0
11/19/2002 LIQUID HOLDUP TANKS 3
06/04/2012 ESSW PUMPHOUSE VENTILATION TEXT B3.7.7
Title:
PLANT SYSTEMS BASES 2
01/31/2008 MAIN CONDENSER OFFGAS PRETREATMENT LOGARITHMIC RADIATION*
MONITORING INSTRUMENTATION Page 12 of 16 Report Date: 06/05/12 Page 12 of 16 Report Date: 06/05/12
SSES: MANUAL "F --
Manual Name:
TRMI Manual
Title:
TECHNICAL REQUIREMENTS MANUAL UNIT 1 TEXT B3.7.8
Title:
PLANT TEXT B3.7.9
Title:
PLANT TEXT B3.7.10
Title:
PLANT 3
06/21/2007 SYSTEMS BASES SNUBBERS 2
12/08/2011 SYSTEMS BASES CONTROL STRUCTURE HVAC 1
12/14/2004 SPENT FUEL STORAGE POOLS SYSTEMS BASES TEXT B3.7.11
Title:
STRUCTURAL INTEGRITY 1
04/14/2010 TEXT B3.8.1
Title:
ELECTRICAL PROTECTIVE TEXT B3.8.2.1
Title:
ELECTRICAL CONTINUOUS TEXT B3.8.2.2
Title:
ELECTRICAL AUTOMATIC TEXT B3.8.3
Title:
ELECTRICAL TEXT B3.8.4
Title:
ELECTRICAL TEXT B3.8.5
Title:
ELECTRICAL TEXT B3.8.6
Title:
ELECTRICAL TEXT B3.8.7 2
03/10/2010 POWER BASES PRIMARY CONTAINMENT PENETRATION CONDUCTOR OVERCURRENT DEVICES 0
11/19/2002 POWER BASES MOTOR OPERATED VALVES (MOV)
THERMAL OVERLOAD 1
09/17/2004 POWER BASES MOTOR OPERATED VALVES (MOV)
THERMAL OVERLOAD 0
11/19/2002 POWER BASES DIESEL GENERATOR (DG)
MAINTENANCE ACTIVITIES 0
11/19/2002 POWER BASES 24 VDC ELECTRICAL POWER SUBSYSTEM 0
11/19/2002 POWER BASES DEGRADED VOLTAGE PROTECTION 2
12/08/2011 POWER BASES EMERGENCY SWITCHGEAR ROOM COOLING 1
06/15/2009 PROTECTION PROTECTION
Title:
BATTERY MAINTENANCE AND MONITORING PROGRAM Page fl of 16 Repott Tate: ~6/05/12 Page 13 of 16
. Repokt -Date: -06/05/12
SSES MANUAL Manual Name:
TRMI Manual
Title:
TECHNICAL REQUIREMENTS MANUAL UNIT 1 TEXT B3.9.1 0
11/19/2002
Title:
REFUELING OPERATIONS BASES DECAY TIME TEXT B3.9.2 0
11/19/2002
Title:
REFUELING OPERATIONS BASES COMMUNICATIONS TEXT B3.9.3 0
11/19/2002
Title:
REFUELING OPERATIONS BASES REFUELING PLATFORM TEXT B3.10.1 0
11/19/2002
Title:
MISCELLANEOUS BASES SEALED SOURCE CONTAMINATION TEXT B3.10.2 1
03/31/2006
Title:
MISCELLANEOUS BASES SHUTDOWN MARGIN TEST RPS INSTRUMENTATION TEXT B3.10.3 0
11/19/2002
Title:
MISCELLANEOUS BASES INDEPENDENT SPENT FUEL STORAGE INSTALLATION (ISFSI)
TEXT B3.10.4 1
Title:
MISCELLANEOUS BASES LEADING 04/17/2008 EDGE FLOW METER (LEFM)
TEXT B3.11.1.1
Title:
RADIOACTIVE TEXT B3.11.1.2
Title:
RADIOACTIVE TEXT B3.11.1.3
Title:
RADIOACTIVE TEXT B3.11.1.4
Title:
RADIOACTIVE EFFLUENTS EFFLUENTS EFFLUENTS EFFLUENTS 0
BASES 0
BASES 0
BASES 0
BASES 11/19/2002 LIQUID EFFLUENTS CONCENTRATION 11/19/2002 LIQUID EFFLUENTS DOSE 11/19/2002 LIQUID WASTE TREATMENT SYSTEM 11/19/2002 LIQUID RADWASTE EFFLUENT MONITORING INSTRUMENTATION TEXT B3.11.1.5
Title:
RADIOACTIVE EFFLUENTS INSTRUMENTATION 0
11/19/2002 BASES RADIOACTIVE LIQUID PROCESS MONITORING Page~A of 16 Report Date: 06/05/12 Page 14 of 16 Report Date: 06/05/12
SSES MANUAL
- ?
Manual Name:
TRM1 Manual
Title:
TECHNICAL REQUIREMENTS MANUAL UNIT 1 TEXT B3.11.2.1
Title:
RADIOACTIVE EFFLUENTS TEXT B3.11.2.2
Title:
RADIOACTIVE EFFLUENTS TEXT B3.11.2.3
Title:
RADIOACTIVE EFFLUENTS PARTICULATES FORM TEXT B3.11.2.4
Title:
RADIOACTIVE EFFLUENTS TEXT B3.11.2.5
Title:
RADIOACTIVE EFFLUENTS TEXT B3.11.2.6
Title:
RADIOACTIVE EFFLUENTS INSTRUMENTATION TEXT B3.11.3
Title:
RADIOACTIVE EFFLUENTS TEXT B3.11.4.1
Title:
RADIOACTIVE EFFLUENTS TEXT B3.11.4.2
Title:
RADIOACTIVE EFFLUENTS TEXT B3.11.4.3
Title:
RADIOACTIVE EFFLUENTS 1
12/14/2004 BASES DOSE RATE 0
11/19/2002 BASES DOSE -
NOBLE GASES 0
11/19/2002 BASES DOSE -
11/19/2002 BASES GASEOUS RADWASTE TREATMENT SYSTEM 4
11/14/2006 BASES VENTILATION EXHAUST TREATMENT SYSTEM 1
01/27/2004 BASES RADIOACTIVE GASEOUS EFFLUENT MONITORING 0
11/19/2002 BASES TOTAL DOSE 3
07/09/2010 BASES MONITORING PROGRAM 0
11/19/2002 BASES LAND USE CENSUS 0
11/19/2002 BASES INTERLABORATORY COMPARISON PROGRAM 1
10/04/2007 BASES CRANE TRAVEL-SPENT FUEL STORAGE POOL 1
12/03/2010 BASES HEAVY LOADS REQUIREMENTS TEXT B3.12.1
Title:
LOADS CONTROL PROGRAM TEXT B3.12.2
Title:
LOADS CONTROL PROGRAM Page 15~
of 16ReotDe:0/51 Report Date: 06/05/12
SSES MANUAL Manual Name:
TRM1 Manual
Title:
TECHNICAL REQUIREMENTS MANUAL UNIT 1 TEXT B3.12.3 0
11/19/2002
Title:
LOADS CONTROL PROGRAM BASES LIGHT LOADS REQUIREMENTS Page ~
of 16 Report Date: 06/05/12 Page 16 of 16 Report Date: 06/05/12
SUSQUEHANNA STEAM ELECTRIC STATION PPL Rev. 72 LIST OF EFFECTIVE SECTIONS (TECHNICAL REQUIREMENTS MANUAL)
Section Title Effective Date TOC TABLE OF CONTENTS 1.0 2.0 USE AND APPLICATION Pages TRM / 1.0-1 through TRM / 1.0-3 PLANT PROGRAMS Page 2.0-1 Pages TRM / 2.0-2 and TRM / 2.0-3 Page TRM / 2.0-4 Page TRM / 2.0-5 Page TRM / 2.0-6 Page TRM / 2.0-7 Pages TRM / 2.0-8 and TRM / 2.0-9 Page TRM / 2.0-10 Page TRM / 2.0-11 Page TRM / 2.0-12 Pages TRM / 2.0-13 and TRM / 2.0-14 Page TRM / 2.0-15 3.0 APPLICABILITY Page TRM / 3.0-1 Page TRM / 3.0-2 Page TRM / 3.0-3 Page TRM / 3.0-4 11/30/2011 10/04/2002 08/31/1998 01/28/2005 06/25/2002 04/02/1999 03/27/2008 05/15/2008 01/07/2011 02/02/2010 11/15/2004 03/27/2008 11/15/2004 11/15/2005 04/14/2008 04/12/2007 03/15/2002 11/30/2005 10/31/2007 08/31/1998 03/22/2006 04/07/2009 03/27/2008 02/18/1999 02/18/1999 07/07/1999 04/09/2012 07/16/1999 10/31/2007 03/10/2011 10/31/2007 08/31/1998 06/30/2010 3.1 3.2 REACTIVITY CONTROL SYSTEMS Page TRM / 3.1-1 Pages TRM / 3.1-2 through TRM / 3.1-5 Page TRM / 3.1-6 Page TRM / 3.1-7 Page TRM / 3.1-8 Pages TRM / 3.1-9 and TRM / 3.1-9a Page TRM / 3.1-10 CORE OPERATING LIMITS REPORT Page TRM / 3.2-1 Pages TRM / 3.2-2 through TRM / 3.2-54 INSTRUMENTATION Pages TRM / 3.3-1 through TRM / 3.3-3 Page TRM / 3.3-4 and TRM / 3.3-5 Page TRM / 3.3-6 Page TRM / 3.3-7 Page 3.3-8 Pages TRM / 3.3-9 and TRM / 3.3-9a 3.3 SUSQUEHANNA ý UNIT 1 TRM / LOES-1 EFFECTIVE DATE 05/24/2012
SUSQUEHANNA STEAM ELECTRIC STATION PPL Rev. 72 LIST OF EFFECTIVE SECTIONS (TECHNICAL REQUIREMENTS. MANUAL)
Section Title Effective Date 3.4 Page TRM / 3.3-10 Pages TRM / 3.3-11 and TRM / 3.3-11 a Page TRM / 3.3-12 Page TRM / 3.3-13 Page TRM / 3.3-14 Pages TRM / 3.3-15 and TRM / 3.3-16 Page TRM / 3.3-17 Page TRM / 3.3-18 Pages TRM / 3.3-19 through TRM / 3.3-21 Page TRM / 3.3-22 Page TRM / 3.3-22a Pages TRM / 3.3-22b through TRM / 3.3-22d Page TRM / 3.3-23 Pages TRM / 3.3-24 and TRM / 3.3-25 Page TRM / 3.3-26 Pages TRM / 3.3-27 and TRM / 3.3-28 REACTOR COOLANT SYSTEM Page TRM / 3.4-1 Pages 3.4-2 through 3.4-5 Pages TRM / 3.4-6 through TRM / 3.4-8 Page TRM / 3.4-9 Page TRM / 3.4-10 Page TRM / 3.4-11 Page TRM / 3.4-12 Page TRM / 3.4-13 Pages TRM / 3.4-14 and TRM / 3.4-15 EMERGENCY CORE COOLING AND RCIC Page TRM / 3.5-1 Pages 3.5-2 and 3.5-3 Pages TRM / 3.5-4 and TRM / 3.5-5 Pages 3.5-6 and 3.5-7 CONTAINMENT Page 3.6-1 Pages TRM / 3.6-2 and TRM / 3.6-2a Page 3.6-3 Page TRM / 3.6-4 Page 3.6-5 Pages TRM / 3.6-6 through TRM / 3.6-8 10/31/2007 06/30/2010.
03/30/2001 01/07/2011 12/14/1998 01/07/2011 06/14/2002 10/31/2007 10/22/2003 03/27/2008 11/15/2004 03/22/2006 12/03/2004 05/16/2003 10/22/2003 04/07/2009 03/31/2006 10/23/1998 04/01/2009 08/31/1998 10/31/2007 08/31/1998 03/27/2008 03/31/2006 06/10/2010 0l/28/2005 08/31/1998 10/31/2007 08/31/1998 08/31/1998 08/11/2011 08/31/1998 01/07/2002 08/31/1998 12/31/2002 3.5 3.6 SUSQUEHANNA
- UNIT 1 TRM / LOES-2 EFFECTIVE DATE 05/24/2012 SUSQUEHANNA - UNIT 1 TRM / LOES-2 EFFECTIVE DATE 05/24/2012
SUSQUEHANNA STEAM ELECTRIC STATION PPL Rev. 72 LIST OF EFFECTIVE SECTIONS (TECHNICAL REQUIREMENTS MANUAL)
Section Title Effective Date 3.7 PLANT SYSTEMS Pages 3.7-1 through 3.7-3 Page TRM / 3.7-4 Pages TRM / 3.7-5 Pages TRM / 3.7-6 through TRM / 3.7-8 Pages TRM / 3.7-9 and TRM / 3.7-10 Page TRM / 3.7-11 Page TRM / 3.7-12 Page TRM / 3.7.13 Page TRM / 3.7-14 Pages TRM / 3.7-15 and TRM / 3.7-16 Page TRM / 3.7-17 Page TRM /3.7-18 Page TRM / 3.7-19 Pages TRM / 3.7-20 through TRM / 3.7-22 Page TRM / 3.7-23 Page TRM / 3.7-24 Pages TRM / 3.7-25 and TRM 3.7-26 Page TRM 3.7-27 Page TRM / 3.7-28 Page TRM / 3.7-29 Page TRM / 3.7-30 Pages TRM / 3.7-31 and TRM / 3.7-32 Page TRM / 3.7-33 Page TRM / 3.7-34 Page TRM / 3.7-34a Page TRM / 3.7-35 Pages TRM / 3.7-36 and TRM / 3.7-37 Pages 3.7-38 and 3.7-39 Page TRM / 3.7-40 Page TRM / 3.7-41 Pages TRM / 3.7-41a through TRM / 3.7-41c Page TRM / 3.7-42 Page TRM / 3.7-43 Pages TRM / 3.7-44 through TRM / 3.7-46 Page TRM / 3.7-47 Page TRM / 3.7-48 Page TRM / 3.7-49 Page TRM / 3.7-50 Page TRM / 3.7-51 Page TRM / 3.7-52 Page TRM / 3.7-53 Page TRM / 3.7-54 Pages TRM / 3.7-55 through TRM / 3.7-57 08/31/1998 03/31/2006 04/07/2009 08/02/1999 04/07/2009 12/29/1999 08/02/1999 04/07/2009 08/09/2005 08/02/1999 04/07/2009 08/02/1999 04/07/2009 08/02/1999 04/07/2009 03/31/2006 08/02/1999 11/24/2011 11/29/2006 08/09/2005 01/13/2010 11/16/2001 09/16/2010 11/16/2001 10/05/2002 03/31/2006 02/01/1999 08/31/1998 03/31/2006 05/24/2012 05/24/2012 09/04/2008 08/31/1998 10/05/2006 06/07/2007 10/05/2006 06/07/2007 03/09/2001 08/16/2006 12/03/2004 04/15/2003 07/29/1999 04/01/2009 SUSQUEHANNA
- UNIT I TRM / LOES-3 EFFECTIVE DATE 05/24/2012 SUSQUEHANNA - UNIT I TRM / LOES-3 EFFECTIVE DATE 05/24/2012
SUSQUEHANNA STEAM ELECTRIC STATION PPL Rev. 72 LIST OF EFFECTIVE SECTIONS (TECHNICAL REQUIREMENTS MANUAL)
Se6tion Title Effective Date 3.8 3.9 3.10 ELECTRICAL POWER Page TRM / 3.8-1 Page TRM / 3.8-2 Pages TRM / 3.8-3 and TRM /3.8-4 Pages TRM / 3.8-5 and TRM / 3.8-6 Page TRM / 3.8-7 Pages TRM / 3.8-8 through TRM / 3.8-10 Page TRM / 3.8-11 Page TRM / 3.8-12 Page TRM / 3.8-13 Page TRM / 3.8-14 Pages TRM / 3.8-15 through TRM / 3.8-17 Page 3.8-18 Page TRM / 3.8-19 Page 3.8-20 Pages TRM / 3.8-21 through TRM / 3.8-23 Pages TRM / 3.8-24 and TRM / 3.8-25 Page TRM / 3.8-26 Page TRM / 3.8-27 Pages TRM / 3.8-28 and TRM / 3.8-29 REFUELING OPERATIONS Pages 3.9-1 through 3.9-3 MISCELLANEOUS Page TRM / 3.10-1 Pages 3.10-2 and 3.10-3 Pages 3.10-2 and 3.10-3 Page TRM / 3.10-4 Pages TRM / 3.10-5 and TRM / 3.10-6 Page TRM / 3.10-7 RADIOACTIVE EFFLUENTS Page TRM / 3.11-1 Pages 3.11-2 and 3.11-3 Page TRM / 3.11-4 Page 3.11-5 Page TRM / 3.11-6 Pages TRM / 3.11-7 through TRM / 3.11-9 Page TRM / 3.11-10 Pages 3.11-11 and 3.11-12 Page TRM / 3.11-13 04/02/2002 01/28/2005 03/25/2010 04/02/2002 10/31/2007 12/03/2004 09/03/2004 12/03/2004 03/25/2010 08/31/1998 04/02/2002 08/31/1998 04/02/2002 08/31/1998 06/06/1999 11/30/2011 05/28/2009 11/29/2006 05/28/2009 08/31/1998 03/31/2006 08/31/1998 08/31/1998 08/01/2006 03/22/2006 06/10/2010 03/31/2006 08/31/1998 03/31/2006 08/31/1998 03/31/2006 08/31/1998 12/03/2004 08/31/1998 04/12/2007 3.11
'e SUSQUEHANNA - UNIT 1 TRM / LOES-4 EFFECTIVE DATE 05/24/2012
SUSQUEHANNA STEAM ELECTRIC STATION PPL Rev. 72 LIST OF EFFECTIVE SECTIONS (TECHNICAL REQUIREMENTS MANUAL)
Section Title Effective Date Page TRM / 3.11-14 Pages 3.11-15 and 3.11-16 Page TRM / 3.11-17 Page 3.11-18 Page TRM /3.11-19 Pages TRM / 3.11-20 and TRM / 3.11-21 Page TRM / 3.11-22 Page TRM / 3.11-23 Page TRM / 3.11-24 Page TRM / 3.11-25 Pages TRM / 3.11-26 and TRM / 3.11-27 Page TRM / 3.11-28 Page TRM / 3.11-29 Pages TRM /3.11.30 through TRM / 3.11.32 Page TRM / 3.11-33 Page 3.11-34 Page TRM / 3.11-35 Pages TRM / 3.11-36 through TRM / 3.11-39 Pages 3.11-40 through 3.11-43 Page TRM / 3.11-44 Page TRM / 3.11-45 Page 3.11-46 Page TRM / 3.11-47 LOADS CONTROL PROGRAM Pages TRM / 3.12-1 through TRM / 3.12-3 Page TRM / 3.12-4 Page TRM / 3.12-5 ADMINISTRATIVE CONTROLS Pages TRM / 4.0-1 through TRM / 4.0-3 Page TRM / 4.0-4 Pages TRM / 4.0-5 through TRM / 4.0-8 12/03/2004 09/01/1998 03/31/2006 08/31/1998 08/15/2005 03/31/2006 04/02/2002 11/14/2006 05/13/2005 04/12/2007 01/21/2004 09/08/2009 12/03/2004 01/21/2004 03/31/2006 08/31/1998 03/31/2006 11/30/2005 08/31/1998 08/01/2006 03/31/2006 08/31/1998 03/31/2006 02/05/1999 03/14/2008 02/05/1999 08/31/1998 12/11/2008 08/31/1998 3.12 4.0 L
SUSQUEHANNA - UNIT 1 TRM / LOES-5 EFFECTIVE DATE 05/24/2012
SUSQUEHANNA STEAM ELECTRIC STATION PPL Rev. 72 LIST OF EFFECTIVE SECTIONS (TECHNICAL REQUIREMENTS MANUAL)
'4 Section Title Effective Date B 3.0 APPLICABILITY BASES Pages TRM / B 3.0-1 through TRM / B 3.0-3 Page TRM / B 3.0-4 Page TRM / B 3.0-5 Page TRM / B 3.0-6 Page TRM / B 3.0-7 Pages TRM / B 3.0-8 through TRM / B 3.0-10 Pages TRM / B 3.0-11 and TRM / B 3.0-12 Pages TRM / B 3.0-13 and TRM / B 3.0-14 Page TRM / B 3.0-15 REACTIVITY CONTROL SYSTEMS BASES Page TRM / B 3.1-1 Pages TRM / B 3.1-2 and TRM / B 3.1-3 Page B 3.1-4 Page TRM / B 3.1-5 Pages TRM / B 3.1-6 and TRM / B 3.1-7 Page TRM / B 3.1-8 B 3.1 B 3.2 B 3.3 CORE OPERATING LIMITS BASES Page B 3.2-1 08/31/1998 01/10/2007 04/14/2008 08/31/1998 04/12/2007 08/31/1998 03/15/2002 11/30/2005 03/15/2002 07/13/1999 10/31/2007 08/31/1998 11/15/2005 03/22/2006 02/18/1999 08/31/1998 04/07/2000 03/10/2011 10/31/2007 12/11/2008 10/31/2007 06/30/2010 05/30/2006 06/30/2010 10/30/2007 06/30/2010 10/31/2007 01/07/2011 06/25/2002 10/31/2007 10/31/2007 10/22/2003 03/22/2006 03/22/2006 03/27/2008 INSTRUMENTATION BASES Page TRM / B 3.3-1 Page TRM / B 3.3-2 Page TRM / B 3.3-2a Page TRM / B 3.3-3 Page TRM / B 3.3-3a Page TRM / B 3.3-4 Page TRM / B 3.3-5 Page TRM / B 3.3-6 Page TRM / B 3.3-7 Page TRM / B. 3.3-8 Page TRM / B 3.3-9 Pages TRM / B 3.3-10 through TRM / B 3.3-13 Page TRM / B 3.3-14 Page TRM / B 3.3-14a Page TRM / B 3.3-14b Pages TRM / B 3.3-15 and TRM / B 3.3-16 Page TRM / B 3.3-17 Pages TRM / B 3.3-17a through TRM / B 3.3-17c Page TRM / B 3.3-17d r
SUSQUEHANNA - UNIT 1 TRM / LOES-6 EFFECTIVE DATE 05/24/2012
SUSQUEHANNA STEAM ELECTRIC STATION PPL Rev. 72 LIST OF EFFECTIVE SECTIONS (TECHNICAL REQUIREMENTS MANUAL)
Section Title Effective Date B 3.4 B 3.5 B 3.6 Pages TRM / B 3.3-17e and TRM / B 3.3-17f Pages TRM / B 3.3-18 and TRM / B 3.3-19 Page TRM / B 3.3-20 Page TRM / B 3.3-21 Pages TRM / B 3.3-22 and TRM / B 3.3-23 REACTOR COOLANT SYSTEM BASES Page B 3.4-1 Pages TRM / B 3.4-2 and TRM / B 3.4-3 Pages TRM / B 3.4-4 and TRM / B 3.4-4a Page TRM / B 3.4-5 Page B 3.4-6 Pages TRM / B 3.4-7 and TRM / B 3.4-8 ECCS AND RCIC BASES Pages B 3.5-1 and B 3.5-2 Pages TRM / B 3.5-3 through TRM / B 3.5-5 CONTAINMENT BASES Page TRM / B 3.6-1 Page TRM / B 3.6-2 Page B 3.6-3 Page TRM / B 3.6-4 Page TRM / B 3.6-5 Page TRM / B 3.6-6 Pages B.3.6-7 through TRM / B 3.6-11 PLANT SYSTEMS BASES Pages B 3.7-1 and B 3.7-2 Page TRM / B 3.7-3 Page TRM / B 3.7-3a Page TRM / B 3.7-4 Page TRM / B 3.7-5 Page TRM / B 3.7-6 Pages TRM / B 3.7-7 and TRM / B 3.7-7a Page TRM / B 3.7-8 Page TRM / B 3.7-9 Page TRM / B 3.7-10 Page TRM / B 3.7-10a Page TRM / B 3.7-11 Page TRM / B 3.7-11a Pages TRM / B 3.7-12 through TRM / B 3.7-14 Page TRM / B 3.7-14a 03/22/2006 08/03/2010 10/22/2003 05/16/2003 04/07/2009 08/31/1998 04/01/2009 10/31/2007 10/15/1999 08/31/1998 06/10/2010 08/31/1998 10/31/2007 07/26/2001 02/01/1999 08/31/1998 03/27/2008 04/04/2007 12/03/2004 12/31/2002 08/31/1998 06/10/2010 12/27/2007 03/31/2006 08/02/1999 03/31/2006 08/02/1999 08/02/1999 03/31/2006 08/02/1999 03/31/2006 08/02/1999 03/31/2006 08/02/1999 08/02/1999 B 3.7 VI...
SUSQUEHANNA
- UNIT 1 TRM / LOES-7 EFFECTIVE DATE 05/24/2012 SUSQUEHANNA - UNIT 1 TRM / LOES-7 EFFECTIVE DATE 05/24/2012
Ke SUSQUEHANNA STEAM ELECTRIC STATION PPL Rev. 72 LIST OF EFFECTIVE SECTIONS (TECHNICAL REQUIREMENTS MANUAL)
Section Title Page TRM / B 3.7-14b Pages TRM / B 3.7-15 and TRM / B 3.7-16 Pages B 3.7-17 through B 3.7-20 Page TRM / B 3.7-21 Pages TRM / B 3.7-21a through TRM / B 3.7-21g Page TRM / B 3.7-22 and TRM / B 3.7-23 Pages TRM / B 3.7-24 through TRM / B 3.7-28 Pages TRM / B 3.7-29 and TRM / B.3.7-30 Pages TRM / B 3.7-30a and TRM / B 3.7-30b Page TRM / B 3.7-31 Page TRM / B 3.7-32 Page TRM / B 3.7-33 Page TRM / B 3.7-34 Page TRM / B 3.7-35 Pages TRM / B 3.7-36 through TRM / B 3.7-39 Page TRM / B 3.7-40 ELECTRICAL POWER BASES Page TRM / B 3.8-1 Pages TRM / B 3.8-2 and TRM / B 3.8-2 Page TRM / B 3.8-2a Page TRM / B 3.8-3 Page TRM / B 3.8-3a Page TRM / B 3.8-4 Page TRM / B 3.8-4a Page TRM / B 3.8-5 Pages TRM / B 3.8-6 through TRM / B 3.8-16 Page TRM / B 3.8-17 Pages TRM / B 3.8-17a and TRM / B 3.8-17b Pages TRM / B 3.8-18 through TRM / B 3.8-20 Pages TRM / B 3.8-21 through TRM / B 3.8-24 REFUELING OPERATIONS BASES Pages B 3.9-1 through B 3.9-7 Effective Date 11/24/2011 02/01/1999 08/31/1998 05/24/2012 05/24/2012
- 01/30/2008 10/05/2006 06/07/2007 10/05/2006 11/30/2011 03/09/2001 04/15/2003 12103/2004 07/05/2000 04/01/2009 04/08/2010 04/02/2002 01/28/2005 03/01/2010 04/02/2002 04/02/2002 08/10/2004 04/02/2002 08/31/1998 04/02/2002 11/30/2011 11/30/2011 11/29/2006 05/28/2009 08/31/1998 B 3.8 B.3.9 B 3.10 MISCELLANEOUS BASES Page B 3.10-1 Pages TRM / B 3.10-2 and TRM / B 3.10-3 Pages TRM / B 3.10-4 and TRM / B 3.10-5 08/31/1998 03/22/2006 08/23/1999 SUSQUEHANNA - UNIT 1 TRM / LOES-8 EFFECTIVE DATE 05/24/2012
SUSQUEHANNA STEAM ELECTRIC STATION PPL Rev. 72 LIST OF EFFECTIVE SECTIONS (TECHNICAL REQUIREMENTS MANUAL)
Section Title Effective Date B 3.11 RADIOACTIVE EFFLUENTS BASES Pages B.3.11-1 through B 3.11-9 Page TRM / B 3.11-10 Pages TRM/B 3.11-11 and TRM/B 3.11-1 Ia Pages TRM/B 3.11-12 and TRM/B 3.11-13 Page TRM / B 3.11-14 Page TRM / B 3.11-15 Pages B 3.11-16 through B 3.11-19 Page TRM / B 3.11-20 Page TRM / B 3.11-20a Page TRM / B 3.i1-21 Pages TRM / B 3.11-22 and TRM / B 3.11.23 Page TRM / B 3.11.23a Pages TRM / B 3.11-24 and TRM / B 3.11-25 Pages B 3.11-26 and B 3.11-27 Pages TRM / B 3.11-28 and TRM / B 3.11-29 Page TRM / B 3.11-30 Pages B 3.11-31 and B 3.11-32 Page TRM / B 3.11-33 Pages TRM / B 3.11-34 and TRM / B 3.11-35 Page TRM / B 3.11-36 B.3.12 LOADS CONTROL PROGRAM BASES Page TRM / B 3.12-1 Page TRM / B 3.12-2 Page TRM / B 3.12-3 08/30/1998 02/01/1999 04/07/2000 02/01/1999 12/03/2004 02/01/1999 08/30/1998 04/02/2)02 04/02/2002 05/13/2005 11/14/2006 05/13/2005 01/21/2004 08/30/1998 11/30/2005 06/30/2010 08/30/1998 06/30/2010 08/30/1998 02/12/1999 09/19/2007 11/29/2010 02/05/1999 TRM1 text LOES 05/25/2012 SUSQUEHANNA
- UNIT I TRM / LOES-9 EFFECTIVE DATE 05/24/2012 SUSQUEHANNA - UNIT 1 TRM / LOES-9 IFFIFECTIVIF DATF 0512412012
ESSW Pumphouse Ventilation 3.7.6 je PPL Rev. 3 3.7 Plant Systems 3.7.6 ESSW Pumphouse Ventilation TRO 3.7.6 Two ESSW Pumphouse Ventilation Subsystems shall be OPERABLE.
APPLICABILITY:
Whenever associated RHRSW and ESW Pumps are required to be OPERABLE.
ACTIONS NOTES ----------------------------------------------------
$7.
- 1.
If two or more fans and one or more dampers render ESSW Pumphouse Ventilation Subsystem fan train(s) inoperable, enter both the appropriate Condition for inoperable fan(s) and Condition D, E, F or G.
- 2.
Dampers gagged in the appropriate position may be un-gagged intermittently under administrative controls to allow for work and/or operability testing.
CONDITION REQUIRED ACTION COMPLETION TIME A.
Two ESSW Pumphouse A.1 Restore inoperable equipment 30 days Ventilation Subsystem fan so at least three fans in each trains in one or both subsystem are in OPERABLE subsystems inoperable due status.
to inoperable fans.
B.
Three ESSW Pumphouse B.1 Restore inoperable equipment 36 hours4.166667e-4 days <br />0.01 hours <br />5.952381e-5 weeks <br />1.3698e-5 months <br /> Ventilation Subsystem fan so at least two fans in each trains in one or both subsystem are in OPERABLE subsystems inoperable due status.
to inoperable fans.
SUSQUEHANNA - UNIT 1 TRM / 3.7-41 EFFECTIVE DATE 05/24/2012
ESSW Pumphouse Ventilation 3.7.6 PPL Rev. 3 ACTIONS (continued)
CONDITION REQUIRED ACTION COMPLETION TIME C.
Four fan trains in one or C.1 Establish acceptable 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br /> both subsystems ventilation flow path.
inoperable due to inoperable fans.
AND 36 hours4.166667e-4 days <br />0.01 hours <br />5.952381e-5 weeks <br />1.3698e-5 months <br /> C.2 Restore inoperable equipment so at least two fans in each subsystem are in OPERABLE status.
D.
NOTE----------
D. 1 Track failed dampers.
Immediately Separate Condition entry is allowed for each damper.
AND D.2 Gag damper or secure and 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> One ESSW Pumphouse deactivate damper actuator on Ventilation Subsystem fan the affected fans' dampers in train in one or both the appropriate position.
subsystems inoperable due to one or more dampers inoperable (includes previously failed dampers that are not repaired).
E.
NOTE ------------
E.1 Gag damper or secure and 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> Separate Condition entry is deactivate damper actuator on allowed for each damper.
the affected fans' dampers in the appropriate position.
Two ESSW Pumphouse AND Ventilation Subsystem fan trains in one or both E.2 Restore all dampers in at least 30 days subsystems inoperable due three fan trains in both to one or more dampers subsystems to original inoperable (includes design/functional status.
previously failed dampers that are not repaired).
SUSQUEHANNA - UNIT 1 TRM / 3.7-41 a EFFECTIVE DATE 05/24/2012
ESSW Pumphouse Ventilation PPL Rev. 3 3.7.6 ACTIONS (continued)
CONDITION REQUIRED ACTION COMPLETION TIME F. -------- NOTE ------------
Separate Condition entry is allowed for each damper.
Three ESSW Pumphouse Ventilation Subsystem fan trains in one or both subsystems inoperable due to one or more dampers inoperable (includes previously failed dampers that are not repaired).
F.1 Gag damper or secure and deactivate damper actuator on the affected fans' dampers in the appropriate position.
AND F.2 Restore all dampers in at least three fan trains in both subsystems to original design/functional status.
36 hours4.166667e-4 days <br />0.01 hours <br />5.952381e-5 weeks <br />1.3698e-5 months <br /> 30 days G.1 Establish acceptable G.
NOTE------
Separate Condition entry is allowed for each damper.
Four ESSW Pumphouse Ventilation Subsystem fan trains in one or both subsystems inoperable due to one or more dampers inoperable (includes previously failed dampers that are not repaired).
G.1 Establish acceptable ventilation flow path.
AND G.2 Gag damper or secure and deactivate damper actuator on the affected fans' dampers in the appropriate position.
AND G.3 Restore all dampers in at least three fan trains in both subsystems to original design/functional status.
2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br /> 36 hours 30 days r..
H. Required Action and H.1 Declare the associated Immediately associated Completion ESW/RH RSW pumps Time of Conditions A, B, C, inoperable.
E, F or G not met.
SUSQUEHANNA - UNIT 1 TRM / 3.7-41 b EFFECTIVE DATE 05/24/2012
ESSW Pumphouse Ventilation 3.7.6 PPL Rev. 3 TECHNICAL REQUIREMENT SURVEILLANCE SURVEILLANCE FREQUENCY TRS 3.7.6.1 Verify that the ESSW Pumphouse Ventilation 92 days Subsystems fans start and associated dampers automatically position when their associated pump starts.
SUSQUEHANNA - UNIT 1 TRM / 3.7-41c EFFECTIVE DATE 05/24/2012
PPL Rev. 3 ESSW Pumphouse Ventilation B 3.7.6 B 3.7.6 ESSW Pumphouse Ventilation BASES TRO The ESSW Pumphouse Ventilation System provides heat removal capability to ensure equipment temperature limits are maintained for the ESW pumps and the Unit 1 and Unit 2 RHRSW pumps. These pumps are required to operate to mitigate a design basis event. The ESSW Pumphouse ventilation system consists of two subsystems that provide the primary means to remove heat from the pumphouse. Each subsystem consists of four trains.
A train consists of a fan and associated dampers. The associated dampers for a fan train are an outside supply damper, two recirculation dampers and an exhaust damper. The fail safe position of the outside supply and exhaust dampers is closed and the recirculation damper fail safe position is open.
Note that when the outside supply damper is placed in the fail safe position (closed), one of the recirculation dampers should be gagged in the open position to prevent potential fan damage. Placing the outside supply damper in the fail safe position assures that a single failure of an outside supply damper will not cause freezing temperatures in the subsystem during winter.
Analysis has shown that two fan trains in a subsystem (fan, duct, dampers and associated controls) will maintain temperatures within operability limits.
Analysis has also shown that one fan train assures adequate cooling (36 hours4.166667e-4 days <br />0.01 hours <br />5.952381e-5 weeks <br />1.3698e-5 months <br />) during summer months.
If only one damper or multiple dampers in one fan train are failed, the appropriate damper positions are closed for the supply and exhaust dampers and open for the recirculation dampers regardless of the time of year (see Table B3.7.6-1). If the supply damper is failed or gagged closed, one of the recirculation, dampers must be opened to prevent potential fan damage. The above actions allow the dampers to remain in the above configuration through any season since the remaining fan systems can maintain temperatures in the pumphouse. With the exception of the supply damper failure requiring one recirculation damper to be gagged open, only the damper or dampers that are failed need to be placed in the position dictated by Table B3.7.6-1 or as directed by Engineering. The affected fan train is considered not operable.
If one damper or multiple dampers in two or three fan trains are failed during June, July or August, the appropriate damper positions is open'for the supply and exhaust dampers and closed for the recirculation dampers (see Table B3.7.6-2). Note that the time frames are for when the damper failure initially occurred and changes to damper positions are not required even if the TRO (continued)
SUSQUEHANNA - UNIT 1 TRM ! B 3.7-21 EFFECTIVE DATE 05/24/2012 i*_.
PPL Rev. 3 ESSW Pumphouse Ventilation B 3.7.6 B 3.7.6 ESSW Pumphouse Ventilation BASES TRO (continued) carries into an adjacent month. If one damper or multiple dampers in two or three fan trains are failed during any month except June, July or August, the appropriate damper positions is closed for the supply and exhaust dampers and open for the recirculation dampers (see Table B3.7.6-3). All dampers in the affected train must be placed in the position specified in Table B3.7.6-2 or Table B3.7.6-3 or as directed by Engineering. If the supply damper is failed closed, one of the recirculation dampers must be opened to prevent potential fan damage. The damper configuration in Table 3.7.6-2 maintains the fan train operable if the fan is operable.
- If all 4 Division I fan trains (0V521A, 0V521C, 1V506A and 2V506A) are failed and three Division II fan trains (0V521 B, 0V521D, 1V506B and 2V506B) are operable an acceptable ventilation alignment is blocking open Door 1702-0, Door 1703-0, Door 1701-0 and Door 1706-0 and confirming Door 1704-0 and 1705-0 are closed. If all 4 Division II fan trains (0V521B, 0V521 D, 1V506B and 2V506B) are failed and three Division I fan trains (0V521A, 0V521C, 1V506A and 2V506A) are operable an acceptable ventilation alignment is blocking open Door 1702-0, Door 1703-0, confirming Door 1704-0 and 1705-0 are closed and gagging open two exhaust dampers in Division I1. Note that during winter months this will require additional heater installation. Other appropriate ventilation alignment will be determined by engineering.
Each ventilation subsystem provides cooling for separate divisions of equipment. Each division consists of two ESW pumps, one Unit 1 RHRSW pump and one Unit 2 RHRSW pump. The two ESSW Pumphouse Ventilation Subsystems provide the normal and emergency ventilation for the ESSW pumphouse. (Reference 1)
ACTIONS The ACTIONS are modified by two Notes. Note 1 directs the entry into both a Condition for an inoperable fan(s) and Condition D, E, F or G for inoperable dampers when both one or more fans and one or more dampers are inoperable. Should the fan(s) and one or more dampers in an ESSW Pumphouse Ventilation Subsystem fan train(s) be inoperable, entry into two Conditions is required.
(continued)
SUSQUEHANNA - UNIT 1 TRM / B 3.7-21a EFFECTIVE DATE 05/24/2012
PPL Rev. 3 ESSW Pumphouse Ventilation B 3.7.6 B 3.7.6 ESSW Pumphouse Ventilation BASES ACTIONS (continued)
Note 2 allows a gagged damper to be un-gagged intermittently under administrative controls to allow for work and/or operability testing. These controls consist of stationing a dedicated person capable of installing a gag, who is in communication with the control room, at the damper. In this way, the damper can be re-gagged if the associated ESW/RHRSW pump starts.
An exception to the administrative control requirement to have a dedicated person stationed at the damper is when a damper has been repaired and successfully tested for operability but all of the required documentation has not been completed (i.e., functional but not administratively operable). If an inoperable damper remains un-gagged under administrative controls for a period of time greater than allowed by the action statements (i.e., 72 hrs.),
the associated ESW\\RHRSW pump must be declared inoperable.
The Actions are defined to ensure proper corrective measures are taken in response to inoperable components. The completion times are similar to completion times for the ESW system and are also based on engineering judgement that accounts for the fact that She system is a support system whose function is to maintain the ESSW Pumphouse temperature within limits.
Each subsystem.of ESSW pumphouse equipment can maintain acceptable temperatures to meet design basis limits when all ventilation subsystem fan trains are OPERABLE. If a fan's associated damper(s) are inoperable, the associated fan subsystem can perform its intended safety function provided the inoperable fan(s) damper(s) are gagged in the appropriate position as determined by Table B3.7.6-1, B3.7.6-2 and B3.7.6-3 or by Engineering. The gagged damper position ensures that the ambient temperatures will remain within limits thus assuring operability of ESSW pumphouse equipment. An inoperable fan reduces the cooling capability of the subsystem thus compromising the subsystems ability to maintain temperatures within design limits.
Conditions D, E, F and G relate to inoperable dampers in a subsystem.
Condition D is specific to the failure of one or more dampers on one fan train in a subsystem. Condition D requires the dampers to be gagged in the fail safe position. Adequate cooling to the division will be provided by the remaining fans.
(continued)
SUSQUEHANNA - UNIT 1 TRM / B 3.7-21b EFFECTIVE DATE 05/24/2012
PPL Rev. 3 ESSW Pumphouse Ventilation B 3.7.6 B 3.7.6 ESSW Pumphouse Ventilation BASES ACTIONS (continued)
An example of a hypothetical Condition D entry would be the failure of the 'D' ESW Fan supply damper (TD-08206D1). This condition would require gagging the damper or. securing and deactivating the damper actuator in the fail safe position (closed for this damper) within 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> due to Condition D entry assuming all other dampers in the division are operable. If the 'D' ESW fan exhaust damper (TD-08206D4) were to fail at a later date (but before the
'D' ESW supply damper was repaired), entry into Condition D would be required for the 'D' ESW exhaust damper since it is associated with the same fan train as the 'D' ESW supply damper.
A second example is provided for the hypothetical entry into Condition E. If the 'D' ESW supply damper (TD08206D1) failed, entry into Condition D would be required and the damper would be gagged in the fail safe position (closed for this damper) assuming all other dampers in the division are operable. If the 'B' ESW supply damper (TD08206B1) failed at a later date (but before the 'D' ESW supply damper was repaired), separate entry into Condition E would be required since it is associated with a different fan train.
Additional damper failures would require entry into either Condition F or G.
Conditions D, E, F and G are modified by a separate note to allow separate Condition~entry for each damper. The purpose of this note is to allow adequate time to gag or secure and deactivate the damper actuator of the damper that has failed. This is acceptable since the Required Action for this condition provides appropriate compensatory actions.
Condition G contains an action to establish an appropriate flow path within 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br />. If all 4 Division I fan trains (0V521A, 0V521C, 1V506A and 2V506A) are failed and three Division II fan trains (0V521 B, 0V521 D, 1V506B and 2V506B) are operable an acceptable ventilation alignment is blocking open Door 1.702-0, Door 1703-0, Door 1701-0 and Door 1706-0 and confirming Door 1704-0 and 1705-0 are closed. If all 4 Division II fan trains (0V521B, 0V521D, 1V506B and 2V506B) are failed and three Division I fan trains (0V521A, 0V521C, 1V506A and 2V506A) are operable an acceptable ventilation alignment is blocking open Door 1702-0, Door 1703-0, confirming Door 1704-0 and 1705-0 are closed and gagging open two exhaust dampers in Division I1. Note that during winter months this will require additional heater installation. Other appropriate ventilation alignment will be determined by engineering.
(continued)
SUSQUEHANNA - UNIT 1 TRM / B 3.7-21c EFFECTIVE DATE 05/24/2012
PPL Rev. 3 ESSW Pumphouse Ventilation B 3.7.6 B 3.7.6 ESSW Pumphouse Ventilation BASES TRS The TRSs are defined to be performed at the specified Frequency to ensure that the ESSW Pumphouse Ventilation Systems are maintained OPERABLE.
Verifying the fans are OPERABLE includes ensuring fans and associated dampers have properly functioned when operated to support normal pump operation. This ensures adequate pump heat removal capability.
REFERENCES
- 1.
FSAR Section 9.4.8
- 2.
Safety Evaluation NL-99-057
- 3.
50.59 SD 00756 SUSQUEHANNA - UNIT 1 TRM / B 3.7-21d EFFECTIVE DATE 05/24/2012
PPL Rev. 3 ESSW Pumphouse Ventilation B 3.7.6 Table B3.7.6-1: Damper Position for One (1) Fan Train Inoperable Due to Inoperable Damper(s)
Affected Fan Failed Damper Gagged or Secured Position Train 0V521A Closed: TD-08206A1 "Supply" and TD-08206A4 "Exhaust".
Open: TD-08206A2 and TD-08206A3 "Recirculation Dampers" 0V521C Closed: TD-08206C1 "Supply" and TD-08206C4 "Exhaust" Open: TD-08206C2 and TD-08206C3 "Recirculation Dampers" 1V506A Closed: TD-18201A1 "Supply" and TD-18201A4 "Exhaust" Open: TD-18201A2 and TD-18201A3 "Recirculation Dampers" 2V506A Closed: TD-28201A1 "Supply" and TD-28201A4 "Exhaust" Open: TD-28201A2 and TD-28201A3 "Recirculation Dampers" 0V521B Closed: TD-08206B1 "Supply" and TD-08206B4 "Exhaust" Open: TD-08206B2 and TD-08206B3 "Recirculation Dampers" 0V521D Closed: TD-08206D1 "Supply" and TD-08206D4 "Exhaust" Open: TD-08206D2 and TD-08206D3 "Recirculation Dampers" 1V506B Closed: TD-182011B1 "Supply" and TD-18201B4 "Exhaust" Open: TD-182011B2 and TD-182011B3 "Recirculation Dampers" 2V506B Closed: TD-28201B1 "Supply" and TD-28201B4 "Exhaust" Open: TD-28201 B2 and TD-28201 B3 "Recirculation Dampers" Note: With the exception of the supply damper failure requiring one recirculation damper to be gagged open, only the damper or dampers that are failed need to be placed in the position dictated by this table or as directed by Engineering.
SUSQUEHANNA - UNIT 1 TRM / B 3.7-21e EFFECTIVE DATE 05/24/2012
PPL Rev. 3 ESSW Pumphouse Ventilation B 3.7.6 Table B3.7.6-2: Damper Position for Two (2) or Three (3) Fan Trains Inoperable Due to Inoperable Damper(s) During June, July or August Affected Fan Failed Damper Gagged or Secured Position Train 0V521A Closed: TD-08206A2 and TD-08206A3 "Recirculation Dampers" Open: TD-08206A1 "Supply" and TD-08206A4 "Exhaust" 0V521C Closed: TD-08206C2 and TD-08206C3 "Recirculation Dampers" Open: TD-08206C1 "Supply" and TD-08206C4 "Exhaust" 1V506A Closed: TD-18201A2 and TD-18201A3 "Recirculation Dampers" Open: TD-18201A1 "Supply" and TD-18201A4 "Exhaust" 2V506A Closed: TD-28201A2 and TD-28201A3 "Recirculation Dampers" Open: TD-28201A1 "Supply" and TD-28201A4 "Exhaust" 0V521B Closed: TD-08206B2 and TD-08206B3 "Recirculation Dampers" Open: TD-08206B1 "Supply" and TD-08206B4 "Exhaust" 0V521 D Closed: TD-08206D2 and TD-08206D3 "Recirculation Dampers" Open: TD-08206D1 "Supply" and TD-08206D4 "Exhaust" 1V506B Closed: TD-18201B2 and TD-18201 B3 "Recirculation Dampers" Open: TD-18201 B1 "Supply" and TD-1 8201 B4 "Exhaust" 2V506B Closed: TD-28201 B2 and TD-28201 B3 "Recirculation Dampers" Open: TD-28201 B1 "Supply". and TD-28201 B4 "Exhaust" Note: All dampers in the affected train must be placed in the position specified in this table or as directed by Engineering. The damper configuration in this table maintains the fan train operable if the fan is operable.
SUSQUEHANNA - UNIT 1 TRM / B 3.7-21f EFFECTIVE DATE 05/24/2012
PPL Rev. 3 ESSW Pumphouse Ventilation B 3.7.6 Table B3.7.6-3: Damper Position for Two (2) or Three (3) Fan Trains Inoperable Due to Inoperable Damper(s) During September through May Affected Fan Failed Damper Gagged or Secured Position Train 0V521A Closed: TD-08206A1 "Supply" and TD-08206A4 "Exhaust" Open: TD-08206A2 and TD-08206A3 "Recirculation Dampers" 0V521C Closed: TD-08206C1 "Supply" and TD-08206C4 "Exhaust" Open: TD-08206C2 and TD-08206C3 "Recirculation Dampers" 1V506A Closed: TD-18201A1 "Supply" and TD-18201A4 "Exhaust" Open: TD-18201A2 and TD-18201A3 "Recirculation Dampers" 2V506A Closed: TD-28201A1 "Supply" and TD-28201A4 "Exhaust" Open: TD-28201A2 and TD-28201A3 "Recirculation Dampers" 0V521 B Closed: TD-08206B1 "Supply" and TD-08206B4 "Exhaust" Open: TD-082061B2 and TD-08206B3 "Recirculation Dampers" 0V521 D Closed: TD-08206D1 "Supply" and TD-08206D4 "Exhaust" Open: TD-08206D2 and TD-08206D3 "Recirculation Dampers" 1V506B Closed: TD-18201B1 "Supply" and TD-18201 B4 "Exhaust" Open: TD-18201 B2 and TD-18201B3 "Recirculation Dampers" 2V506B Closed: TD-28201B1 "Supply" and TD-28201B4 "Exhaust" Open: TD-28201 B2 and TD-28201B3 "Recirculation Dampers" Note: All dampers in the affected train must be placed in the position specified in this table or as directed by Engineering. If the supply damper is failed closed, one of the recirculation dampers must be opened to prevent potential fan damage.
SUSQUEHANNA - UNIT 1 TRIVI / B 3.7-21g EFFECTIVE DATE 05/24/2012