Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20249C479 + (Rev 6 to COLR for PBAPS Unit 2 Reload 11,Cycle 12)
- ML20151S094 + (Rev 6 to COLR for PVNGS Unit 3)
- ML20059H741 + (Rev 6 to COLR, Reflecting Cycle 15 Operating Conditions)
- ML20202A967 + (Rev 6 to CP-QAP-12.1, Insp Criteria & Documentation Requirements Prior to Sys N-5 Classification)
- ML20202A997 + (Rev 6 to CP-QAP-17.1, Corrective Action. Related Info Encl)
- ML20211J678 + (Rev 6 to CP-QAP-7.1, Control of QA Procedures & Instructions)
- ML20137G358 + (Rev 6 to CPC Pnp Process Control Program)
- ML20212H077 + (Rev 6 to CPSES Glen Rose,Tx ASME Section XI ISI Program Plan for 1st Interval on 990820. Page 119 in Unit 1 ASME Section XI of Incoming Submittal Not Included)
- ML20203K489 + (Rev 6 to Calculation M97-0098, Boron Dilution by Hot Leg Injection)
- ML20217M907 + (Rev 6 to Callaway Cycle 9 Colr)
- ML20140G233 + (Rev 6 to Callaway Plant Offsite Dose Calculation Manual)
- ML20246L822 + (Rev 6 to Callaway Plant,Odcm)
- ML20148M683 + (Rev 6 to Canister Handling & Preparation for Shipment)
- ML20151H482 + (Rev 6 to Cask Handling Procedure for HN-100,Series 2 & Series 3 Shielded Transport Casks. W/Three Oversize Drawings.Aperture Cards Are Available in PDR)
- ML20078Q467 + (Rev 6 to Catawba Unit 1 Cycle 9 Colr)
- ML20126H558 + (Rev 6 to Chapter 1.0, Operations QA Plan Organization)
- ML20094D309 + (Rev 6 to Chapter 3.0 of Operations QA Plan,Conduct of Plant Operations)
- ML20097H783 + (Rev 6 to Chapter 6.0, Operations QA Plan Design & Modification Control)
- ML20097D364 + (Rev 6 to Chapter 7.0, Operations QA Plan,Procurement)
- ML20134K540 + (Rev 6 to Chemistry Manual 5.1, Emergency Response Guidelines)
- ML20237E947 + (Rev 6 to Colr)
- ML20237E836 + (Rev 6 to Colr)
- ML20207S473 + (Rev 6 to Configuration Control)
- ML20202A801 + (Rev 6 to Const Procedure 35-1195-DCP-3, Reproduction)
- ML20127C327 + (Rev 6 to Const Work Procedure W-WP-7, Concrete Placing, Curing,Finishing & Repairs)
- ML20128E603 + (Rev 6 to Cpses,Unit 1 IST Program Plan)
- ML20072T695 + (Rev 6 to Crisis Mgt Plan Implementing Procedure EDA-2, Offsite Dose Projections for Catawba Nuclear Station)
- ML20042H067 + (Rev 6 to Crisis Mgt Plan Implementing Procedure EDA-8, Environ Monitoring for Emergency Conditions for Catawba Nuclear Station)
- ML20058P673 + (Rev 6 to Criticality Safety Engineering Rept Push-Pull Instructions)
- ML20072S861 + (Rev 6 to Davis-Besse Offsite Dose Calculation Manual)
- ML20106C206 + (Rev 6 to Decontamination & Treatment of Radioactively Contaminated Patient at Salem County Memorial Hosp)
- ML20126K031 + (Rev 6 to Defueling Water Cleanup Sys)
- ML20151A417 + (Rev 6 to Dept QA Procedure E&C 24-10-15, Preparation,Review & Approval of Proposed Facility Changes (Pfc) & Pfc Packages (Pfcp) for San Onofre Nuclear Generating Station 1,2 & 3. Proposed Change Notices 1,2 & 3 Encl)
- ML20236P008 + (Rev 6 to Design Adequacy Procedure DAP-2, Documentation & Tracking of Issues & Discrepancies)
- ML20082J860 + (Rev 6 to Design Assessment Rept)
- ML20134A555 + (Rev 6 to Design Configuration Change Control for AP600 Program)
- ML20196L443 + (Rev 6 to Design Procedure B-5, Control of Matl & Equipment for GSE Engineered Mods at Fort Calhoun Station)
- ML20195J949 + (Rev 6 to Div Sys Description for Auxiliary Bldg Emergency Liquid Cleanup Sys (Epicor II))
- ML20196K523 + (Rev 6 to Div Sys Description for Dewatering Sys for Defueling Canisters)
- ML20210E738 + (Rev 6 to Div Technical Evaluation Rept for Waste Handling & Packaging Facility)
- ML17250B106 + (Rev 6 to ECA-0.2, Loss of All AC Power Recovery W/Si Required)
- ML17250B109 + (Rev 6 to ECA-3.1, SGTR W/Loss of Reactor Coolant - Subcooled Recovery Desired)
- ML20195B526 + (Rev 6 to EDP-ZZ-03000, Containment Building Coatings)
- ML20202G566 + (Rev 6 to EMIP-103, Emergency Operations Mgt. with Emip Index)
- ML17262A896 + (Rev 6 to EOP AP-CVCS.1, CVCS Leak)
- ML17263A261 + (Rev 6 to EOP AP-RCS.3, High Reactor Coolant Activity)
- ML17263A193 + (Rev 6 to EOP AP-TURB.3, Turbine Vibration)
- ML17262A883 + (Rev 6 to EOP ECA-0.1, Loss of All Ac Power Recovery W/O SI Required)
- ML17263A263 + (Rev 6 to EOP ES-0.2, Natural Circulation Cooldown)
- ML17262A893 + (Rev 6 to EOP ES-3.2, Post-SGTR Cooldown Using Blowdown)
- ML17262A895 + (Rev 6 to EOP ES-3.3, Post-SGTR Cooldown Using Steam Dump)