Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20234C122 + (Rev 1 to Phase II, Risk Assessment Review of B&W Plant Transient History)
- ML20141N357 + (Rev 1 to Photographic & Video Techniques Used in 1/5-Scale Mark I BWR Pressure Suppression Experiment)
- ML20140F769 + (Rev 1 to Physical Plant Configuration Walkdowns. Returned to DCD Due to Missing Page 10 of 11 within 9705050343 on 5/9/97)
- ML20207T040 + (Rev 1 to Physical Protection of Nuclear Matl. Supporting Documentation Encl)
- ML20011D478 + (Rev 1 to Pipe Rupture Analysis Criteria Outside Reactor Bldg Crystal River Unit 3)
- ML20024E970 + (Rev 1 to Pipe Stress Analysis Rept,Vols 1 & 2)
- ML20198R573 + (Rev 1 to Piping & Structural Design Review Criteria for Millstone Unit 2,Independent Corrective Action Verification Program)
- ML18018B953 + (Rev 1 to Plant Emergency Procedure PEP-362, Interpretation of Liquid & Gas Samples for Core Damage Assessment)
- ML20132F451 + (Rev 1 to Plant Engineering Procedure EP-2-005, Plant Engineering Condition Identification Work Authorization Processing)
- B110069, Rev 1 to Plant Hatch Unit 1 RPV Surveillance Matls Testing & Analysis + (Rev 1 to Plant Hatch Unit 1 RPV Surveillance Matls Testing & Analysis)
- ML20207P641 + (Rev 1 to Plant Leakage Monitoring)
- ML20205Q679 + (Rev 1 to Plant Mfg Instruction 3.1.1, Thread Upset. Related Documentation Encl)
- ML20195F295 + (Rev 1 to Plant Mfg Instruction 3.1.1, Thread Upset. Related Info Encl)
- ML20134A436 + (Rev 1 to Plant Operations Manual PAP-0507, Preparation, Review Approval,Rev & Cancellation of Instrumentations)
- ML18005A346 + (Rev 1 to Plant Program Procedure PLP-108, Environ Qualification Program (10CFR50.49))
- ML18019B045 + (Rev 1 to Plant Program Procedure PLP-610, Equipment Identification & Numbering Sys)
- ML20132F626 + (Rev 1 to Plant Protection Sys Field Mod Procedure for Louisiana Power & Light)
- ML20073E568 + (Rev 1 to Plant Specific Procedure for Seismic Verification of Nuclear Plant Equipment)
- ML20151D498 + (Rev 1 to Plant Specific Technical Guideline 5, Radioactive Release Control)
- ML20151D447 + (Rev 1 to Plant Specific Technical Guideline 3, Primary Containment Control)
- ML20151D597 + (Rev 1 to Plant Specific Technical Guideline 11, Primary Containment Flooding)
- ML20151D425 + (Rev 1 to Plant Specific Technical Guideline 2, Reactor Pressure Vessel Control)
- ML20151D419 + (Rev 1 to Plant Specific Technical Guideline 1, Introduction & Operator Precaution)
- ML20151D582 + (Rev 1 to Plant-Specific Technical Guideline 9, Reactor Pressure Vessel Flooding)
- ML20151D548 + (Rev 1 to Plant-Specific Technical Guideline 6, Alternate Level Control)
- ML20198J084 + (Rev 1 to Plant-Specific Technical Guidelines)
- ML20082M661 + (Rev 1 to Policies & Practices:Engineering Assurance Program Policy)
- ML20199E651 + (Rev 1 to Population Description, Large Bore Pipe Supports - Nonrigid. Related Info Encl)
- ML20199E538 + (Rev 1 to Population Description, Large Bore Pipe Supports - Rigid)
- ML20199E303 + (Rev 1 to Population Description, Large Bore Pipe Welds/ Matl)
- ML20199E529 + (Rev 1 to Population Items List, Large Bore Pipe Supports - Rigid. Related Info Encl)
- ML20080F804 + (Rev 1 to Position Paper on Reg Guide 1.97)
- ML18087A745 + (Rev 1 to Post-Reactor Trip/Safety Injection Review & Startup Approval Requirements)
- ML20155G959 + (Rev 1 to Post-Shutdown Decommissioning Activities Rept)
- ML20245H947 + (Rev 1 to Power Ascension Test Program,Final Startup Rept)
- ML20212N002 + (Rev 1 to Power Train Hybrid Computer Simulation of B&W Nuclear Power Plant)
- ML20212M972 + (Rev 1 to Power-Operated Relief Valves Type 1525VX Electromatic)
- ML20086T563 + (Rev 1 to Prairie Island Nuclear Generating Plant Station Blackout/Electrical Safeguards Upgrade Project)
- ML20237L108 + (Rev 1 to Prairie Island Nuclear Generating Plant,Inservice Insp & Testing Program Manual)
- ML20141A991 + (Rev 1 to Prairie Island Unit 2 45 F Ultrasonic Exam Rept (3rd 10yr))
- ML20078H332 + (Rev 1 to Prairie Nuclear Nuclear Generating Plant,Core Operating Limits Rept,Unit 2-Cycle 16)
- ML20024B595 + (Rev 1 to Preliminary Annotated Sequence of Events on 790328 at TMI-2)
- ML20207S055 + (Rev 1 to Preliminary Safety Analysis for Vitrification Sys, West Valley Demonstration Project SAR Vol Iii,C)
- ML20140F810 + (Rev 1 to Preparation & Approval of Checklists)
- ML20107H298 + (Rev 1 to Preservice Insp Program (002))
- ML20072J452 + (Rev 1 to Preservice Insp Program Plan:Standby Liquid Control Sys)
- ML20203J935 + (Rev 1 to Preservice Insp Summary Rept for Seabrook Unit 1)
- ML20086T342 + (Rev 1 to Preservice Testing (Preservice Insp) Program Plan for Snubbers)
- ML20113D625 + (Rev 1 to Pressure Locking Analysis for 23MOV-19)
- ML20211N177 + (Rev 1 to Pressure/Temp Limits Rept)
- ML20080N084 + (Rev 1 to Pressurizer Safety Valve Operability Rept)