Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20072E982 + (Rev 1 to Improved Dynamic Vacuum Breaker Valve Response for Brunswick Plant)
- ML20213A177 + (Rev 1 to Incident Investigation Manual)
- ML20236E273 + (Rev 1 to Incorporation of Requirements & Commitments in Design:Traceability of Design Requirements, TVA Employee Concerns Special Program Element Rept)
- ML20207P573 + (Rev 1 to Incorporation of Requirements & Commitments in Design,Traceability of Design Requirements)
- ML20212G859 + (Rev 1 to Incorporation of Requirements & Commitments in Design:Design Criteria)
- ML20140F895 + (Rev 1 to Independent Corrective Action Verification Program (ICAVP) Sys Review Checklist)
- ML20140F740 + (Rev 1 to Independent Corrective Action Verification Program Communications Protocol)
- ML20140D799 + (Rev 1 to Independent Corrective Action Verification Program Millstone Unit 2 - Audit Plan)
- ML20140F805 + (Rev 1 to Independent Corrective Action Verification Program Team Personnel Substitution &/Or Addition)
- ML20072K014 + (Rev 1 to Independent Design Review,Shoreham Nuclear Power Plant)
- ML17342B064 + (Rev 1 to Independent Mgt Appraisal Program Plan for Florida Power & Light Co)
- ML20101C959 + (Rev 1 to Index for Attachments to Event Classification/ Notification/Reporting Guide)
- ML20101C940 + (Rev 1 to Index for Event Classification/Notification/ Reporting Guide)
- ML20211C361 + (Rev 1 to Initial Startup Test Manual Procedure ISU-008A, Thermal Expansion)
- ML20091K486 + (Rev 1 to Inservice Exam Program)
- ML20097J059 + (Rev 1 to Inservice Insp & Testing Program,Quad Cities Nuclear Power Station Units 1 & 2)
- ML20155J867 + (Rev 1 to Inservice Insp & Testing Program Plan 1st Insp Interval)
- ML20245L747 + (Rev 1 to Inservice Insp 10 Yr Plan for Unit 1 Second Interval & Unit 2 First Interval)
- ML20128C632 + (Rev 1 to Inservice Insp Plan,Catawba Nuclear Station Units 1 & 2)
- ML20079E198 + (Rev 1 to Inservice Insp Program Plan for 1983-1993)
- ML18003B077 + (Rev 1 to Inservice Insp Program Procedure ISI-201, ASME Preservice Insp Program Plan (Except Reactor Vessel))
- ML20035A223 + (Rev 1 to Inservice Insp Program Summary Manual for Palo Verde Nuclear Generating Station,Unit 2)
- ML20035A225 + (Rev 1 to Inservice Insp Program Summary Manual for Palo Verde Nuclear Generating Station,Unit 3)
- ML20035A188 + (Rev 1 to Inservice Insp Program Summary Manual for Palo Verde Nuclear Generating Station,Unit 1)
- ML20234F572 + (Rev 1 to Inservice Insp Pump & Valve Program Crystal River Unit 3)
- ML20196C450 + (Rev 1 to Inservice Insp Repair & Replacement Program)
- ML20148S305 + (Rev 1 to Inservice Insp Rept for 1986 Refueling Outage 3)
- ML20128E485 + (Rev 1 to Inservice Insp Rept on 840331-0609)
- ML20246N464 + (Rev 1 to Inservice Insp Rept,Unit 2 Catawba 1987 Refueling Outage 1)
- ML17347A662 + (Rev 1 to Inservice Insp Summary Results for Outage 2 (1987) First Period,Second Interval)
- ML20237G427 + (Rev 1 to Inservice Insp Test IST-101, Preservice & Inservice Data Control Procedure (Nes))
- ML20197C652 + (Rev 1 to Inservice Test Program,Vogtle Electric Generating Plant,Unit 1)
- ML20215H375 + (Rev 1 to Inservice Testing Plan for Pumps & Valves)
- ML13309B352 + (Rev 1 to Inservice Testing Plan,San Onofre,Unit 3)
- ML20080B370 + (Rev 1 to Inservice Testing Plan.Summary of Corrections to First Edition of Inservice Insp Program Encl)
- ML20205R961 + (Rev 1 to Inservice Testing Program)
- ML17265A149 + (Rev 1 to Inservice Testing Program)
- ML18093A199 + (Rev 1 to Inservice Testing Program (Pumps & Valves) for Second 10-Yr Insp Interval)
- ML18093A198 + (Rev 1 to Inservice Testing Program (Pumps & Valves) for Second 10-Yr Insp Interval)
- ML20211N507 + (Rev 1 to Inservice Testing Program MP-3)
- ML20093D705 + (Rev 1 to Inservice Testing Program for Pumps & Valves)
- ML20199E197 + (Rev 1 to Insp Repts 50-498/97-05 & 50-499/97-05 on 970629-0809,correcting Errors in Numbering of Insp Followup Sys Open Items & Some Items Identified in Executive Summary)
- ML20126B708 + (Rev 1 to Installation Procedure A25K-51512-IP6, `A & `B Once-Through Steam Generator Stabilization & Plugging. Supporting Documentation Encl)
- ML20126B751 + (Rev 1 to Installation Procedure A25K-51512-IP1, Stabilizer Tube Endmilling - `A & `B Once-Through Steam Generators)
- ML20073F661 + (Rev 1 to Installation Specification 21A2040, Cleaning & Cleanliness Control for Field Mods of Vessel Components)
- ML20237L650 + (Rev 1 to Instruction 1310.1, Relief from Tech Spec Limiting Conditions for Operations)
- ML20237L579 + (Rev 1 to Instruction 1380.1, Interfaces W/Other Agencies on Enforcement Matters)
- ML20202B199 + (Rev 1 to Instruction 35-1195-CEI-15, Procedure for Installation of Containment Anchor Bolts,Nuts & Plates)
- ML20205Q683 + (Rev 1 to Instruction CP-EI-4.0-22, Design Document Control by Technical Svcs Mechanical Drafting Group)
- ML20136A542 + (Rev 1 to Instruction CP-EI-4.0-49, Evaluation of Thermolag (TSI) Fire Barrier Matl on Class 1E Electrical Raceways. W/15 Oversize Drawings)
- ML20138P268 + (Rev 1 to Instruction CP-EI-4.0-51, Control of Protective Coatings Field Verification Activities. Related Info Encl)