. _ . . -. - -- _ - --- .- . _ . ~ . . . - - . . . ~ -

i l

, l PROJECT

O
iss1RocriOs .

INSTRUCTION PI-MP3-01 REv. ,

Client: Northeast Utilities _

Station: Millstone Unit 3

Title:

INDEPENDENT CORRECTIVE ACTION VERIFICATION PROGRAM COMMUNICATIONS PROTOCOL i

1

[ Safety-Related Non Safety-Related

(

i Reviewed By: Approved By:

l System Lead Programmatic O&M Lead Accident QA Engineer Intemal Review Verification Team Lead Mitigation Committee Manager Lead

{, (

Chairman O*'*

,g.97 som m a m m/a

.. in ,.

m.

Description V V w%L

() '

~

} '

Rev.1

}

. Added NEAC to protocol e Revised NU contacts i

e Revised meeting advanced notification time i

, e Revised some external distribution j e Added allowance for administrtive discussions I e DeletedIOT i

1 O

Page 1 of 8 l 9705050335 970428 DR ADOCK0500g3

PROJECT.

INSTRUCTION PI-MP3-01 O INSTRUCTION . aev. ,

'1.0 PURPOSE The purpose of employing an independent reviewer for the independent Corrective Action Program (ICAVP) is to obtain an unbiased assessment of the Millstone Unit 3 configuration management and corrective action programs. Therefore, every reasonable effort will be made to assure that the observations and conclusions made are the result of the Project Team's own independent assessment and not influenced or biased by representations of other parties such as the Northeast Utilities (NU) line organization or their l contractors responsible for subjects under review. To maintain this assuranc' of independence, this formal protocol has been established and will be implemented to control the communications between S&L, NU, and the rdRC.

This protocol has been written so that the Project Team reviewers remain objective and unbiased, yet will permit the legitimate need for the Project Team to communicate with the NU organization to obtain information including any necessary verbal clarification to maintain an efficient process. It is, however, the responsibility of the independent reviewers to assure that these O guidelines are implemented in a manner which assures the objectivity and independence of the review.

Sargent & Lundy Project Team internal communications are unaffected by the requirements of this protocol, including those between or among the Verification Team, the Internal Review Committee and the Quality Assurance Division.

2.0 ORGANIZATIONAL-POINTS OF CONTACT The Nuclear Energy Advisory Council (NEAC) is an organization created by the Connecticut State Legislature to monitor activities related to Millstone.

The NEAC and the NRC have established a memorandum of understanding that permits the NEAC to participate and/or observe the NRC's oversight activities for the ICAVP. As such, the NEAC will be included in the communications protocol and will be provided with documents, notifications, and opportunities to participate in the overs!ght of S&L activities.

Each of the organizations involved in the ICAVP (NRC, NU, and S&L) has provided a primary and backup point of contact. These points of contact are the personnel through which inter-organizational communications will occur or be arranged. This includes both verbal and written communications, including electronic mail.

I l l l

Page 2 of 8 l

d j

4 PROJECT INSTRUCTION PI-MP3-01 INSTRUCTION REV.1 4

l l 2.1 Northeast Utilities Primary

Contact:

Richard Laudenat, ICAVP Program Manager Phone - 860-444-5248 l Fax - 860-440-2091 e-mail-laude 1@gwsmtp.nu.com i

Ovemight mail- Northast Utilities 1 l Millstone Nuclear Pt. .er Station i Rope Ferry Road l Waterford, Connecticut 06385 i

i Backup

Contact:

George Pitman, Unit 3 lCAVP Coordinator j Phone - 860-447-1791 XO454 Fax - 860-440-2140 e-mail- pitmagr@gwsmtp.nu.com

Ovemight mail- Northeast Utilities Millstone Nuclear Power Station Rope Ferry Road j O4 Waterford, Connecticut 06385

! 2.2 Nuclear Regulatory Commission

! Primary

Contact:

Gene Imbro, Deputy Director, ICAVP Oversight l 3 Phone -301-415-1490 Fax - 301-415-2260 e-mail - exi@nrc. gov l l Ovemight mail - Nuclear Regulatory Commission j 11555 Rockville Pike i Rockville, Maryland- 20852-2738 Backup

Contact:

Loren Plisko, Branch Chief ICAVP Oversight l Phone - 301-415-123' Fax - 301-415-2260

e-mail-Irp@nrc. gov 1 l Ovemight mail - Nuclear Regulatory Commission
11555 Rockville Pike l Rockville, Maryland 20852-2738 j 4

i 4

!O I I

. Page 3 of 8 l

i

! PROJECT INSTRUCTION PI-MP3-01 INSTRUCTION ,

REV.1 2.3 Nuclear Energy Advisory Council Primary

Contact:

State Representative, Terry Concannon l Co-Chairman, NEAC j j Phone: 860240-8585 Capitol

880 345-4141 Home 4

Fax- 0 345-2888

! Ovemight ..il:

! Legislative Oflim Building, Room 4035 l

l Capitol Avimun Hartford, Connecticut 06106 i or 34th Assembly District 76 Timms Hill Road Haddam, Connecticut 06438 i

Backup

Contact:

Mr. Evan Woolacott d Co-Chairman, NEAC Phone: (860) 658-9591 (Q./ Fax-Ovemight Mail:

128 Terry's Plain Road Simsbury, Connecticut 06070 2.4 Sargent & Lundy l Primary

Contact:

Don Schopfer, Verification Team Manager Phone - 312-269-6078 Fax - 312-269-2049 e-mail - don.k.schopfer@sichicago.infonet.com  !

Ovemight mail- Sargent & Lundy 55 E. Monroe Street Chicago, Illinois 60603 Backup

Contact:

Bryan Erler, ICAVP Project Director Phone - 312-269-7132 Fax - 312-269-2049 e-mail - bryan.a.erler@sichicago.infonet.com Ovemight mail- Sargent & Lundy  !

55 E. Monroe Street Chicago, Illinois 60603 i i

Page 4 of 8 l

l PROJECT

~ '"'

INSTRUCTION PI-MP3-01 i INSTRUCTION REV.1 i

! 3.0 RULES FOR VARIOUS TYPES OF COMMUNICATIONS h

! There are a variety of types of communications necessary to effectively l- implement the ICAVP. The following identifies the various types of inter-organizational communications required and defines the rules governing those types of communications. These rules address aspects such as who initiates  ;

the communication, whether notification of other parties is given, who may participate in the communication, whether public access is to be given, and the documentation requirements for the communication and to whom it is provided. Other communication between personnel in these project j

organizations or their contractors should be avoided during the performance of the ICAVP.

3.1 Request for information - S&L will need significant amounts of .)

documents and drawings from NU to commence and proceed with the i review. The information request process from S&L to the NU organization will be a frequent occurrence during the ICAVP.

The S&L Verification Team Manager, or one of the Review Leads, will O- submit all requests for information to the NU primary contact in writing. 1 This may be via fax, e-mail or ovemight mail. Each request shall be on a standard form developed for this purpose and shall be provided  !

with a sequential number for tracking (See Attachment 5.1). A copy of l each request for information shall be provided to the NRC's primary contact. NU's response to the requests shall be submitted in duplicate ,

to the S&L primary contact, one copy to Chicago and one copy the I office space provided by NU to S&L near the Millstone station. NU shall provide an index of all documents submitted, including a revision number or identifying date.

In order to ascertain the availability of information or to identify the appropriate documents containing required information, the S&L Verification Team Manager or one of the Review Leads may contact the NU primary contact or a designated Document Control personnell via phone. This type of informal contact shall only be made in the process of preparing and submitting a request for information.

There may occasionally be a need for S&L to discuss administrative issues with NU, such as arrangements for access training and badging of personnel, arrangements for access to NU computer databases, and issues related to the local office facility. This type of I

Page 5 of 8 l

e s

PROJECT INSTRUCTION PI-MP3-01

( INSTRUCTION - REV.1 communication is permitted directly between S&L and NU primary contacts or their designees without NRC or NEAC involvement.

i 3.2 Request for conference - S&L may on occasion request a conference l with NU line organization personnel to obtain clarification or further j understanding of particular issues. Alternately, NU may request a l conference to discuss or clarify findings issued by S&L. This conference l can be by telephone, by videoconference, or in person.

The primary contact for the organization initiating the informal confereG::e shall contact the primary contact of the other organization (via phone, fax, or e-mail) and identify the reason for the conference and the participants needed. The NRC and NEAC primary contacts l will be notified of the conference and given the opportunity to pariicipate. A minimum of a 24 hour2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> advanced notice shall be provided to the participating organization and to the NRC and NEAC.

Notes of the conference shall be written by S&L and distributed to ~l the primary contacts of the participating organizations.  ;

3.3 issuance of findings - The findings identified by S&L will be distributed to NU, the NRC, and the NEAC, including their posting on an internet l Web Site.

The S&L primary contact, or designee, will distribute the findings (discrepancy reports) from the ICAVP to NU, the NRC, and the NEAC primary contacts by fax and ovemight mail. In addition, S&L '

will post the findings on the S&L Internet page 48 hours5.555556e-4 days <br />0.0133 hours <br />7.936508e-5 weeks <br />1.8264e-5 months <br /> after they have been distributed to NU, the NRC, and the NEAC. This will allow public access to this information. More information about accessing the ICAVP information on the Internet is included in Section 4.0 of this protocol. The S&L instructions for the -

processing of the discrepancy reports and their proposed  ;

resolutions is provided in project instruction PI-MP3-11.

3.4 Submittal of proposed resolutions - NU will evaluate the findings submitted by the S&L Project Team and develop proposed resolutions and submit these proposed resolutions to S&L for review.

The NU primary contact will submit the proposed resolutions to th7 ICAVP findings to both the S&L and the NRC primary contacts.

Following acceptance of the resolution in accordance with PI-MP3-11 S&L will post the NU resolution on the ICAVP Web Site.

I Page 6 of 8 l

a PROJECT INSTRUCTION PI-MP3-01 O INSTRUCTION Rev. ,

3.6 Formal Meetings or Briefings - It is expected that there will be formal meetings with the various participants and the public to discuss the 3 results of the program.

l l Formal meetings to discuss the results of the ICAVP and periodic

! briefings for the public will normally be scheduled in advance or

initiated by the NRC. The NRC will notify the NU and S&L primary
contacts at least one week in advance of the meetings. For meetings .

open to the public, the NRC normally provides a two week notification.

i , S&L will also post meeting notification on the Web Site for meetings raan to the public after the NRC has issued notification. S&L r:sticipation at this type of meeting will normally be the Project Director, the Verification Team Manager, and others as may be determined by S&L. Participation other than S&L will be determined by the NRC. If the NRC has the meeting transcribed, no other notes of meeting are required.. Otherwise, S&L will publish notes from the meeting and distribute them to the participants. Copies of all O presentation material will be available at the public meetings and will be posted to the Web Site.

3.6 Press and/or Media Communications - Based on the current level of public interest in the ICAVP and Millstone in general, there is expected to be press and media interest in the work of the ICAVP Contractor.

Communications with the press and media and notification of the NRC and NU of such interest are included in this protocol.

Requests for interviews with the press or media shall be referred to the Project Director or the Verification Team Manager. One of them shall notify the NU and the NRC primary contact of the request. The '

Director or Manager shall respond appropriately to the press or media requests.

3.7 Communications related to NRC oversight of S&L - S&L's activities l in the ICAVP are considered an extension of the NRC As such, communication between S&L and the NRC will be required, both related to the execution of the review and to the NRC's oversight of S&L's l performance.

O i i

Page 7 of 8 l

. _ . . . _ _ _ _ _ _ _ . _ . _ _ . . _ _ _ _ . _ . . ~ . _ _ _ _ . . . _ _ _ _ _ . _ . _ . _ . _ . _ . _

4 PROJECT INSTRUCTION PI-MP3-01 INSTRUCTION REV.1

  • l From time to time S&L may have specific questions or need direction l from the NRC. When necessary the S&L primary contact may call or i

meet with the NRC primary contact, or his designee, to discuss these i issues. No other participants are required for a conference of this type between S&L and the NRC, unless the NRC wishes to include

[ NEAC.

) 3.8 Financial / Contractual issues between G&L and NU - As with any l i contractual relationship between two organizations, periodic discussions

and / or written communications will be required between S&L and NU.

j This type of communication will be primarily between the S&L Verification Team Manager and the NU Director - Contracts &  ;

! Purchasing and/or the NU ICAVP Program Manager, and will be limited

to purchasing and contract related issues. However, NRC and NEAC

! will be invited to attend any meetings that are required between NU and l S&L regarding contractualissues.

4.0 PUBLIC ACCESS TO ICVAP INFORMATION ON THE INTERNET  !

As discussed in earlier sections of this protocol, discrepancy reports identified

during the course of the ICAVP and their accepted resolution will be posted on j the S&L Internet Web Site to allow public access. In addition, certain other l j

documents will be posted on the Web Site, including portions of the Project i Manual, periodic status report information, and the final report. The S&L l l home page may be accessed on the internet World Wide Web at j http:/heww.sichicago.com.

i j 5.0 ATTACHMENTS 5.1 lCAVP Request for Information (1 page)

L I

i 1

i l

i

!,O I

j Page 8 of 8 l 4

PI MP3-01 JLttachment 5,1

(-

U Northeast Utilities RFI No.

Millstone Unit 3 REQUEST FOR INFORMATION INDEPENDENT CORRECTIVE ACTION VERIFICATION PROGRAM j To
Mr. Oeorge Pitman, Unit 3 ICAVP Coordinator l

From: . _

i Date ofRequest: /Date Needed by:

, Document Title or Description Document Title or Description i

iO A

(

3 i

)

cc: D. K. Schopfer/ File l