l COMANCHE PEAK STEAM ELECTRIC STATION INITIAL STARTUP TEST MANUAL CONTROLLED COPY No. c6l _ _
THERMAL EXPANSION PROCEDURE NO. ISU-008A
- REVISION NO, 1 T
-r SA!F-RELATED SUBMITTE BY:
ENGINEERING SUP INTENDENT 4 DATE: //!df/((
APPROVE BY: [
MANAGER,'P C
a DATE: // 7 Ef OPERATIONS '
/
B606120298 860527 .
> GARDE 86-129 .PDR
CPSES ISSUE DATE PROCEDURE NO.
(
INITIAL STARTUP TEST MANUAL g ISU-008A THERMAL EIPANSION REVISION NO. 1 PAGE 2 0F 132 TABLE OF CONTENTS Title M
, Table of Contents 2 1.0 Tece Objective 4 2.0 Definitions 4 3.0 Acceptance Criteria 5 4.0 References 10 5.0 Test Equipment 13 6.0 Special Conditions 15 7.0 Precautions and Limitations 15 7.1 Precautions 15
(
7.2 Limitations 15 -
8.0 Prerequisites 15 9.0 Procedures 34 1
i 9.1 Thermal Expansion Measurements at Initial ~E Ambient for Non-Power Ascension Systems 35 ,
9.2 Thermal Expansion Measurements at Initial Ambient for Power Ascencion Systems 37 9.3 TLeraal Expansion Measurements at the 250*F Plateau 33 9.4 Thermal Expansion Measurements at the 350*F Plateau 41 9.5 Ihermal Expansion Measurements at the i 450*F Plateau 43 1
9.6 Thermal Expansion Measurements at Norsal Operating Temperature 46 9.7 Thermal Expansion Measurements for Non-Power Ascension Systems After Return to Ambient Temperature 64 l
l
CFE.9 ISSUE DATE PROCEDURE NO.
INITIAL STARTt? TIr.T .' W /.L MV08]g ISU-008A THERMAL EIPANSION REVISION NO. 1 PAGE 3 0F 132 TABLE OF CONTENTS (Continued)
. Title M 9.8 Thermal Expansion Measurements at 30% Power for Power Ascension Systems 66 9.9 Thermal Expansion Measurements for Power Ascension Systems After Return to Ambient Temperature 69 10.0 Computation 71 11.0 Attachments 11.1 Data Sheets 72 11.2 Computation Sheets 73 11.3 Test Verification Sheets 74 11.4 Tables 84
~
11.5 Figures 114 7
l
-e l
l t
I i
4
l CPSES ISSUE DATE PROCEDURE NO.
INITIAL STARTUP TEST MANUAL ISU-008A THERMAL EXPANSION REVISION NO. 1 PAGE 4 0F 132 1.0 Test Objectives 1.1 The purpose of this procedure is to verify that the ASME Code Class 1,2, and 3 systems and other non-safety class systems which operate at temperatures greater than 200*F are not restrained during heatup to operating temperatura or during cooldown to ambient conditions.
This procedure will include verification that loads and clearance gaps of selected piping sy' stem snubbers, spring hangers and pipe rupture restraints are properly set for free pipe movement.
Components checked shall consist of items requiring retest after i preoperational test 1-CP-PT-55-11 and items which were not covered l by that test. Measurements will be taken at an initial ambient '
temperature, plateaus, of 250'F, 350*F, and 450'F, and at normal operating temperature. Main Feedvater and certain Main Steam ,
j systems outside the reactor building will also be monitored at 30%
power level. A final set of readings will be taken after ecoldown to ambient temperature. '
2.0 Definitions 2.1 Ambient Tempercture - 120*F or less 2.2 C C_C, Composant Cooling Water -
2.3 CSS Chemical and Volume Control 2.4 W Main Feedwater 2.5 E Main Steam 2.6 S
,P_S Primary Sampling 2.7 RC Reactor Coolant 2.8 H Residual Heal Removal 2.9 ,S_B Steam Generator Blowdown l 2.10 SJ Safety Injection 2.11 E Liquid Waste Processing 2.12 VT-4 Visual ex - N tion to confirm functional adequacy, verificat. ion of the settings, or freedom of motion.
- Paragraph IWA-2214, ASME Section XI
(
2.13 Snubber End of Trsvel: Fully extended or fully contracted 2.14 Stable Thermal Conditions: A system is considered stable when the !
temperature is constant and not varying more than 25'F.
l 7
1 l
CPSES ISSUE DATE PROCEDURE NO.
INITIAL STARTUP TEST MAN M ISW 8A
.NOV o s 1S84 THERMAL EXPANSION REVISION NO. 1 PAGE 5 0F 132 2.15'*Q.A. Notification: An asterisk (*) indicates that the Q.A.
Notification has been modified to allow Q.A. signoffs based on sampling techniques.
3.0 Acceptance Criteria NOTE: The temperatures recorded on the data sheets are for engineering information only and are not subject to any acceptance criteria.
NOTE: All data taken during the conduct of this test will be analyzed for acceptance by an engineering review conducted by Pipe Support Engineering per their standard procedures and guidelines. Any data not meeting the acceptance criteria listed in this section should be processed in accordance with STA-405, Control of Nonconforming Materials.
3.1 The following acceptance criteria apply to Section 9.1:
3.1.1 Snubbers positions shall be 0.25 inches or greater from the cold end of travel limit. (CPPA-35,613) 3.1.2 There shall be no binding of the snubber in the attachment -
brackets. (FSAR, Table 14.2-2 Sheet 52A of 60) 3.1.3 For variable eupport spring hangers, the load indicater shall not be at either end of travel. (FSAR, Table 14.2-2, Sheet 52A of 60) -
-4 3.1.4 Constant support spring hanger travel indicators shall not _
move below the cold setting. (CPPA-35,613) 3.1.5 There shall be no contact between the pipe and the rupture restraint. (FSAR, Table 14.2-2. Sheet 52A of 60) 3.1.6 Piping systems and equipment tested are free to nova without interference. (FSAR, Table 14.2-2. Sheet 52A of 60) 3.2 The following acceptance criteria apply to Section 9.2:
3.2.1 Snubber positions shall be 0.25 inches or greater from the cold and of travel limit. (CPPA-35,613) 3.2.2 There shall be no binding of the snubber in the attachment brackets. (FSAR, Table 14.2-2, Sheet 52A of 60) 3.2.3 For variable support spring hangers, the load indicator shall not be at either end of travel. (FSAR, Table 14.2-2, Sheet 52A of 60) f
CPSES ISSUE DATE PROCEDURE NO.
l INITIAL STARTUP TEST MANUAL *- 8^ l NOV 0 81984 l
THERMAL EIPANSION REVISION NO. 1 PAGE 6 0F 132 3.2.4 Constant support spring hanger travel indicators shall not move below the cold setting. (CPPA-35,613) 3.2.5 There shall be no cor. tact between the pipe and the rupture restraint. (FSAR, Table 14.2-2, Sheet 52A of 60) 3.2.6 Piping systems and equipment tested are free to move without interference. (FSAR, Table 14.2-2 Sheet 52A of 60) 3.3 The following acceptance criteria apply to Section 9.3:
3.3.1 Snubber positions shall not be within 0.25 inches of either end of travel. (CPPA-35,613) 3.3.2 There shall be no binding of the snubber in the attachment brackets. (FSAk, Table 14.2-2, Sheet 52A of 60) 3.3.3 For variable support spring hangers, the load indicator shall not be at either end of travel. (FSAR, Table 14.2.2, Sheet 52A of 60) 3.3.4 Constant support spring hanger travel indicators shall not -
move within 0.25 inches of the hot position total travel indicator. (CPPA-35,613) 3.3.5 There shall be no contact between the pipe and the rupture restraint. (FSAR, Table 14.2-2 Sheet 52A of 60) 7 g
3.3.6 Piping systems and equipment tested are free to move without ,
interference. (FSAR, Table 14.2-2, Sheet 52A of 60) 3.4 The following acceptance criteria apply to Section 9.4:
l 3.4.1 Snubber positions shall not be within 0.25 inches of either end of travel. (CPPA-35,613) 3.4.2 There shall be no binding of the snubber in the attachment brackets. (FSAR, Table 14.2-2 Sheet 52A of 60) 3.4.3 For variable support spring hangers, the load indicator shall not be at either end of travel. (FSAR, Table 14.2-2, 1
Sheet 52A of 60) 3.4.4 Constant support spring hanger travel indicators shall not move within 0.25 inches of the hot position total travel indicator. (CPPA-35,613) k 1
l CPSES ISSUE DATE PROCEDURE NO.
INITIAL STARTUP TEST MANUAL ISU-008A THERMAL EXPANSION REVISION NO. 1 PAGE 7 0F 132 l
3.4.5 There shall be no contact between the pipe and the rupture restraint. (FSAR, Table 14.2-2. Sheet 52A of 60) 3.4.6 Pipe movements shall not deviate from the predicted travel by greater than +0.25 inches or -0.25 inches, or 20% of the predicted travel (whichever is greater). This applies only to RRR piping which does not attain temperatures greater than 350*F. (CPPA-35,613) 3.4.7 Piping systems and equipment tested are free to move without l
interference. (FSAR, Table 14.2-2, Sheet 52A of 60) 3.5 The following acceptance criteria apply to Section 9.5:
3.5.1 Snubber positions shall not be within 0.25 inches of either end of travel. (CPPA-35,613) 3.5.2 There shall be no binding of the snubbers in the attachment brackets. (FSAR, Table 14.2-2, Sheet 52A of 60) t 3.5.3 For variable support spring hangers, the load indicator shall not be at either end of travel. (FSAR, Table 14.2-2, Sheet 52A of 60) ~
3.5.4 Constant support spring hanger travel indicators shall not move v1 thin 0.25 inches of the hot position total travel indicator. (CPPA-35.613) -
3.5.5 There shall be no contact between pipes and rupture restraints. (FSAR, Table 14.2-2, Sheet 52A of 60) ~
3.5.6 Piping systems and equipment tested are free to move without interference. (FSAR, Table 14.2-2. Sheet 52A of 60) 3.6 The following acceptance criteria apply to Section 9.6:
3.6.1 Snubber hot set positions shall not exceed the predicted hot position setting by greater than 0.25 inches, or the snubber shall be qualified by assuring that the maximum thermal l condition will not move the snubber to within 0.25 inches of l
either end of travel. (CPPA-35,613) 3.6.2 There shall be no binding of snubbers in the attachment bracket. (FSAR, Table 14.2-2, Sheet 52A of 60)
{ .
1 l
CPSES ISSUE DATE PROCEDURE NO.
INITIAL STARTUP TEST MANM. ISU- 8A k, NOV 0 8 1S84 THERMAL EXPANSION REVISION NO. 1 PAGE 8 0F 132 3.6.3 Variable support spring hangers shall be within +10% and
-10% of the predicted hot load. Those lines listed in Table 11.4.20 shall also be analyzed with consideration of the max thermal and dynamic movement. (CPPA-35,613)
- 3.6.4 Constant support spring hanger travel indicators shall not be within 0.25 inches of the hot position total travel.
Those lines listed in Table 11.4.20 shall also be analyzed with consideration of the max thermal and dynamic movement.
(CPPA-35,613) 3.6.5 The rupture restraint hot gap acceptability shall be determined by an engineering review. (CTT-10182) 3.6.6 Pipe movements shall not deviate from the predicted travel by greater than +0.25 inches or -0.25 inches, or 20% of the predicted travel (whichever is greater). (CPPA-35,613) 3.6.7 Westinghouse RCS equipment support shim gaps shall be within the tolerances specified in Attachment 33.(WPT-7551).
3.6.8 Piping, systems and equipment tested are free to move without interference. (FSAR, Table 14.2-2, Theet 52A of 60) ,
3.7 The following acceptance criteria apply to Section 9.7:
3.7.1 Snubber positions shall be 0.25 inches or greater from the cold end of travel limit. (CPPA-35,613)
-4 3.7.2 There shall be no binding of snubbers in the attachment ~
bracket. (FSAR, Table 14.2-2. Sheet 52A of 60) i 3.7.3 For variable support spring hangers, the load indicator shall not be at either end of travel. (FSAR, Table 14.2-2 Sheet 52A of 60) l 3.7.4 Constant support spring hanger travel irdicators shall not move below the cold setting. (CPPA-35,613) 3.7.5 The final cold gap acceptability between the pipe and the rupture restraint shall be determined individually per an engineering review. (GTI-10182) 3.7.6 Pipe movement shall not deviate from the initial ambient measurements by greater than +0.25 inches or -0.25 inches, or 20% of the initial ambient setting (whichever is i greater). (CPPA-35,613)
- g' i
k
)
CPSES ISSUE DATE PROCEDURE NO.
INITIAL STARTUP TEST MANUAL ISU-008A THERMAL EIPANSION REVISION NO. 1 PAGE 9 0F 132 3.7.7 Piping systems and equipment tested are free to move without interference. (FSAR, Table 14.2-2, Sheet 52A of 60) 3.8 The following acceptance criteria apply to Section 9.8:
3.8.1 Snubber hot set positions shall not exceed the predicted hot position setting by greater than 0.25 inches, or the snubber -
shall be qualified by assuring that the maximum thermal conditions will not move the snubber to within 0.25 inches -
of either end point. (CPPA-35,613) 3.8.2 There shall be no binding of the snubber in the attachment bracket. (FSAR, Table 14.2-2, Sheet 52A of 60) 3.8.3 Variable support spring hangers shall be within +10% and
-10% of the predicted hot load. (CPPA-35,613) 3.8.4 Constant support spring hanger travel indicators shall not be within 0.25 inches of the hot position total travel.
(CPPA-35,613) t 3.8.5 The hot gap acceptability between pipes and rupture _
restraints shall be determined individually per an engineering review. (GTT-10182) l 3.8.6 Pipe movements shall not deviate from the predicted travel by greater than +0.25 inches or -0.25 inches, or 20% of the -
predicted travel (whichever is greater). (CPPA-35,613) i 3.8.7 Piping systems and equipment tested are free to move without '
interference. (FSAR, Table 14.2-2, Sheet 52A of 60) 3.9 The following acceptance criteria apply to Section 9.9:
3.9.1 Snubber positions shall be 0.25 inches or greater from the cold and of travel limit. (CPPA-35,613) 3.9.2 There shall be no binding of the snubber in the attachment bracket. (FSAR, Table 14.2-2. Sheet 52A of 60) 3.9.3 For variable support spring hangers, the load indicator -
shall not be at either end of travel. (FSAR, Table 14.2-2 Sheet 52A or 60) 3.9.4 Constant support spring hanger travel indicators shall not move below the cold setting. (CPPA-35,613)
CPSES ISSUE DATE PROCEDURE NO.
INITIAL STARTUP TEST MAN M ISU-6 8^
NOV08 1984 THERMAL EXPANSION REVISION NO. 1 PACE 10 0F 132 3.9.5 The final cold gap acceptability between the pipe and the rupture restraint shall be determined individually per an engineering review. (GTT-10182) -
3.9.6 Pipe movements shall not deviate from the initial ambient measurements by greater than +0.25 inches or -0.25 inches, ,
or 20% of the initial ambient setting (whichever is greater). (CPPA-35,613) ,
3.9.7 Piping systema and equipment tested are fre.e to move without interference. (FSAR, Table 14.2-2, Sheet 52A of 60) ,
4.0 References 4,1 Drawings 4.1.1 Flow Diagrams 4.1.1.1 2323-M1-0202 Rev CP-5 '
4.1.1.2 2323-M1-0202-01 Rev CP-2 4 .1.1. 3 TNE-M1-0202-02 Rev CP-1 4.1.1.4 2313-M1-0203 Rev CP-3 4.1.1.5 2323-M1-0203-01 :,Rev CP-3 -
4 '
4.1.1.6 2323-M1-0228 Eav CP-$ ,
l 4.1.1.7 2323-MI-0228-01 Rev CP-7 l
4.1.1.8 2323-M1-0229 Rev CP-3 4.1.1.9 2323-M1-0230 Rev CP-7 l 4.1.1.10 2323-M1-0231 Rev CP-6 4.1.1.11 2323-M1-0239 Rev CP-5 l 4.1.1.12 2323-M1-0240 Rav CP-1 4.1.1.13 2323-M1-0250 Rev CP-6 i
l 4 1.1.14 2323-M1-0251 Rev CP-6 l
l 4.1.1.15 2323-M1-0253 Rav CP-5 1
1 .
CPSES ISSUE DATE PROCEDUPI NO.
INITIAL SIA2 TUP TEST MANUAL
(
g ISU-068A THERMAL EIPANSION REVISION NO. 1 PAGE 11 0F 132 ,
4.1.1.16 2323-M1-0254 Rev CP-6 ,
4.1.1.17 2323-M1-0255 Rev CP-5 4.1.1.18 2323-MI-0256 Rev CP-5 4.1.1.19 2323-M1-0257 Rev CP-3 4.1.1.20 2323-M1-0260 Rev CP-6 4.1.1.21 2323-M1-0261 Rev CP-5 4.1.1.22 2323-M1-0262 Rev CP-5 4.1.1.23 2323-M1-0263 Rev CP-8 4.1.2 I&C Diagrams None
( 4.1.3 Elementary Diagrams ,
None -
4.1.4 One Line Diagrams None 7
4.1.5 Vendor Diagrams m I '
l See Equipment Support and Restraint drawings listed on the Data Sheets; current revisions are as noted on each Data Sheet.
l l 4.1.6 Isometric Drawings l
See drawings listed on the Data Sheets; current revisions are as noted on each Data Sheet.
l 4.2 Vendor Manuals .
l 4.2.1 Pacific Scientific Snubber Catalog 4.2.2 ITT Grinnel Pipe Support Catalog l 4.2.3 ITT Grinnel Load Capacity Data Sheets f
l CPSES ISSUE DATE PROCEDURE NO.
INITIAL STARTUP TEST MANUAL gig jgg ISU-008A I THERMAL EXPANSION REVISION NO. 1 PAGE 12 0F 132 !
4.2.4 NPSI Pipe Support Catalog 4.2.5 NPSI Load Capacity Data Sheets ,
4.2.6 Power Piping Support Catalog 4.2,7 Basic Engineers Support Catalog 4.3 Documents 4.3.1 U.S. NRC Regulatory Guide 1.68, Revision 2, Aug., 1978, Appendix A. Section 1, para, a, e, Section 5, para. 0.0.
4.3.2 FSAR Chapter 14.2 Table 14.2-2, Sheet 52 of 60 and Sheet 52A of 60 4.3.3 FSAR Chapter 3, Secticn 3.9B.2.1 4.3.4 ASME Section XI, 80 Edition, Winter 1980 Addenda, Subsection IhT 4.3.5 CPPA-35,611 dtd 12/6/83. Hot Functional Testing Acceptance -
Critatia 4.3.6 WPT-7551 R03 Primary Equipment Support Shia Inspection
- 4.3.7 Preoperatienal Test Procedure ICP-PT-55-11. " Thermal -.
Expansien" d' 4.3.8 TNO-84778, ded. 5/10/84, Post Fuel Losd Deferred Test Package #5 4.3.9 TNO-841713, dtd. 9/18/.845 Post Fu41 Lead Deferred Test Package #12 '
4.3.10 CPPA-41717, dtd.11/6/84, Containment Feedwater System Mov.ements for Thennal Expansion Testing 4.5.11 TSU-84404, dtd. 10/29/84, Deferred Test Package #14 .
4.3.12 Procadutee 4.3.12.1 ISU-001A, Rev. 1. " Initial Fuel Load Sequence" 4.3.12.2 ISU-010A, Rav. 1, " Post Core Load Precritical Test Sequence" l-
-, ._ ~ , . . . . .. ... ..
CPSES ISSUE DATE PROCEDURE NO.
{ INITIAL STARTUP TEST MANUAL NOV o o 19R4 ISU-008A THERMAL EXPANSION REVISION NO. 1 PAGE 13 0F 132 4.3.12.3 ISU-201A, Rev. 1. " Initial Synchronization and Power Ascension to 30% Reactor Power" 4.3.12.4 ISU-300A, Rev. O, " Pre-Fuel Load Initial Startup Test Sequence" 4.3.12.5 SOP-101A, Rev.1. " Reactor Coolant System" 4.3.12.6 SOP-102A, Rev. 2. " Residual Heal Removal System" 4.3.12.7 SOP-103A, Rev.1. " Chemical and Volume Control System" 4.3.12.8 SOP-301A, Rev. 1. " Main Steam System"
, 4.3.12.9 SOP-302A, Rev. O. "Feedwater System" I
i 4.3.12.10 SOP-305A, Rev. O, " Steam Generator Blowdown and Cleanup System" 4.3.12.11 SOP-501A, Rev. 1. " Station Service Water System"
. 4.3.12.12 CHN-513, Rev. O, " Operation of the Process Sampling System" l
' 4.3.12.13 CHK-514. Rev. O, " Operation of the Secondary Sampling System" ,
3_
j 4.3.12.14 STA-405 Rev. 6. " Control of Nonconforming -
! Materials" 4.3.12.15 SIA-602, Rev. O, " Temporary Modifications and Bypassing of Safety Functions" 4.3.11 Specifications 4.3.11.1 MS-94 Pipe Whip Restraints 5.0 Test Equipment 5.1 6" long steel rule, graduated in 1/32" increments Starrett Model l No. 304SRE cr equal 5.2 12" long steel rule, graduated in 1/32" increments Starrett Model No. 304SRE cr equal 5.3 18" Icog steel rule, graduated in 1/32" increments, Starrett Model
- No. C604R or equal l i i
CPSES ISSUE DATE PROCEDURE NO. ,
INITIAL STARTUP TEST MAN M '"- 8^
NOV o 91984 THERMAL EXPANSION REVISION NO 1 PAGE 14 0F 132 5.4 36" long steel rule, graduated in 1/32" increments, Starrett Model No. 404R or equal 5.5 18" long steel straight edge, Starrett Model No. 387 or equal 5.6 36" long steel straight edge, Starrett Model No. 387 or equal 5.7 9" aluminum torpedo level, McMaster-Carr Model No. 2140A2 or equal 5.3 36" aluminum level, McMaster-Carr Model No. 2156A65 or equal 5.9 Line level, McMaster-Carr Model No. 2141A11 or equal 5.10 Heavy duty canvas tote bag 5.11 Feeler gage stock, rolls of .005 inch, .010 inch, .015 inch, and
.020 inch. Cut to length as needed.
5.12 6" long inside caliper, Starrett Model No. 27 or equal 5.13 12" long inside caliper, Starrett Model No. 27 or equal
(
5.14 12" long outside caliper, Starrett Model No. 26 or equal _
5.15 12' long tape rule McMaster-Carr Model No. 2021A4 or equal 5.16 Direct reading 6" inside/outside Vernier caliper, Starrett Model No. 122 or equal _
5.17 Steel plumb bob 5.18 Marking scribe, Starrett Model No. 67 or equal 5.19 Combination square, 18" blade, graduated in 1/32" increments, Starrett Model No. 11H or equal 5.10 Baecery-operated digital thermometer, Model 727F, as manufactured by Omega Engineering, One Omega Drive, Box 4047, Stanford, Conn. ,
20 each 5.21 Thermocouples Type K. 150 each 5.22 Thermocouple, probe-type, Type K 10 each l
i 4
1
CPSES ISSUE DATE PROCEDURE NO.
INITIAL STARTUP TEST MANUAL gj jog ISU-008A THERMAL EXPANSION REVISION NO. 1 PAGE 15 0F 132 6.0 Special Conditions None
- 7.0 Precautions and Limitations 7.1 Precautions 7.1.1 Caution must be exercised by all personnel working in areas of hot piping or equipment. Severe burns could occur. It is recommended that personnel working in these areas wear
" insulating gloves. long-sleeve shirts, knee pads, and other protective clothing such as welders' sleeves. Plastic eye wear should not be worn in hot areas, only glass eye wear.
Hearing protection should be worn in areas of high noise.
7.2 Limitations 7.2.1 None
( 8.0 Prerequisites 8.1 The following prerequisites apply to Section 9.1 of this procedure:
8.1.1 The Clearance Report Index in the Clearance Report Log Book has been reviewed. None of the outstanding items will prevent conduct of this test nor invalidate test results __
upon correction. -4
~
/
Name Date 8.1.2 The Temporary Modifiestion and Bypass of Safety Function Log, as required by Station Administrative Procedure STA-602, has been reviewed and found not to preclude conduct of this test.
I Name Date 8.1.3 The following test procedures have been completed to the extent necessary to support conduct of this test:
None
_ _ _ _ _---- _ -_ - - - _ - - - - --- -- - - - _ - - - - - _ -a
CPSES ISSUE DATE PROCEDURE NO.
INITIAL STARTUP TEST MANUAL U- 8A NOV 08 984 1
- THERMAL EXPANSION REVISION NO. 1 PAGE 16 0F 132 8.1.4 Insulation has been removed, as required, at the data measuring points.
. /
Nama Date 8.1.5 Access scaffolds or ladders are installed as necessary at i
t areas where thermal movement data is to be taken.
/
Name Date i
l 8.1.6 Reference marks have been established as needed at data points requiring thermal movement measuring.
/
Name Date 8.1.7 Shinuning has been completed as required for components listed in Table 11.4.1, and support surfaces have been inspected to ensure debris has been removed. -
/
Name Date 8.1.8 The following system.a within the test boundaries are filled
]
with fluid as required, are available for conduct of this '
test, and have been reviewed to ensure that all hangers -
which allow or restrict thermal growth have been installed and adjusted:
8.1.8.1 Component Cooling Water (CC)
/
Name Date 8.1.8.2 Chemical & Volume Control (CS)
/
l Name Date 8.1.8.3 Main Feedwater (PV)
/
Name Date I .
I
CPSES ISSUE DATE PROCEDURE NO.
( INITIAL STARTUP TEST MANUAL NOV o a 1984 ISu 008A THERMAL EXPANSION REVISION NO. 1 PAGE 17 0F 132 8.1.8.4 Main Steam (MS)
/
Name Date 8.1.8.5 Process Sampling (PS)
/
Name Date 8.1.8.6 Reactor Coolant (RC)
/
Name Date 8.1.8.7 Residual Heal Removal (Shutdown Cooling Mode)
(RH) 3
/
Name Date 8.1.8.8 Steam Generator Blowdown (SB)
/
Name Date 8.1.8.9 Safety Injection (SI) j
-4 Name Date -
8.1.8.10 Liquid Waste Processing (WP)
/
Name Date S.I.9 Reactor coolant system temperature is at ambient condition.
1 TR-4138 . TR-433B i
/
Name Date
CPSES ISSUE DATE PROCEDURE NO.
INITIAL STARTUP TEST MANUAL NOV 0 8 EM_ ISU.co8A
{
THERMAL EXPANSION REVISION NO 1 PAGE 18 0F 132
- Q.A. NOTIFICATION Before proceding, notify the Q.A. representative to witness the following steps:
/ or /
Q.A. Representative Witness Waived By Test Engineer 8.1.10 Variable and constant spring support travel stops have been removed for those systems to be tested (see Tables 11.4.2 through 11.4.18).
Q.A. */ /
Name Date Name Date END Q.A. SURVEILLANCE The preceding steps have been witnessed by: / ,
Q.A. Representative 8.1.11 Personnel taking measurements on ASME components during this test have been trained and qualified per ASME Section XI as l
VT-4 Inspectors. A minimum of 20 personnel should be available.
/ 4 Name Date 8.2 The following prerequisites apply to Section 9.2 of this procedure:
8.2.1 The Clearance Report Index in the Clearance Report Log Book I has been reviewed. None of the outstanding items will prevent conduct of this test nor invalidate test results upon correction.
/
Name Date 8.2.2 The Temporary Modification and Bypass of Safety Function Log, as required by Station Administrative Procedure STA-602 has been reviewed and found not to preclude conduct of this test.
/
Name Date i .
. - - - , _ - - - - - - - - _, , . - , . , - , . - - - - - , - - - - - - , -~,,--,,,,-,,,,-n,,+
l CPSES ISSUE DATE PROCEDURE NO. l INITIAL STARTUP TEST MANUAL .
ISU-008A c.ov 0 a IS8L.e THERMAL EXPANSION REVISION NO. 1 PAGE 19 0F 132 8.2.3 The following test procedures have been completed to the extent necessary to support conduct of this test:
ISU-010A
/
Name Date 8.2.4 Insulation has been removed, as required, at the data measuring points.
/
Name Date 8.2.5 Access scaffolds and ladders are installed as necessary at areas where thermal movement data is to be taken.
/
Name Date 8.2.6 Reference marks have been established as needed at data points requiring thermal movement measuring.
/
Name Date 8.2.7 The following systems within the test boundaries are filled with fluid as required, operable, and available for conduct of this test:
6.2.7.1 Main Feedwater (FW) / --
Name Date 'N 8.2.7.2 Main Steam (MS) /
Name Date 8.2.8 Piping systems to be tested have been reviewed to ensure that all hangers which allow or restrict thermal growth have been installed and adjusted.
/ .
Name Date 8.2.9 Main Steam and Feedwater systsas temperatures are at ambient condition.
/
Name Date 8.2.10 Variable and constant spring stops have been removed for those systems to be tested (see Table 11.4.19).
/
Name Date i
CPSES ISSUE DATE PROCEDURE NO.
INITIAL STARTUP TEST MANUAL 8^
M 08 IM "-
THERMAL EXPANSION REVISION NO, 1 PAGE 20 0F 132 s
8.3 The following prerequisites apply to Section 9.3 of this procedure:
8.3.1 The Clearance Report Index in the Clearance Report Log Book ,
has been reviewed. None of the outstanding items will ,
prevent conduct of this test nor invalidate test results upon correction.
/
Name Date 8.3.2 The Temporary Modificatica ahd Bypass of Safaty Function Log, as required by 5tation Administrative Procedure STA-602, has been reviewed and found not to preclude conduct of this test.
/
Name Date 8.3.3 The following test procedures have been completed to the extent necessary to' support conduct of this test:
ISU-300A /
Name Date ,
8.3.4
~
Insulation has been removed as required at the data ,
measuring points.
/
Name Date 8.3.5 Access scaffolds and ladders are installed as necessary at -
areas where thermal movement data is to be taken. .
/
Name Date 8.3.6 Reference marks have been established as needed at data points requiring thermal movement measuring. :
/
Name Date 3 8.3.7 The following systems within the test boundaries are filled with fluid as required, operable, and available for conduct of this test:
8.3.7.1 Component Cooling Water (CC)
/
f Name Data
i .
CPSES ISSUE DATE PROCEDURE NO.
INITIAL STARTUP TEST MAWE I"- 8*
NOV 0 81984 THERMAL EXPANSION REVISION NO. 1 PAGE 21 0F 132 8.3.7.2 Chemical & Volume Control (CS)
/
Name Date 8.3.7.3 Main Feedwater (FW) /
Name Date 8.3.7.4 Main Steam (MS) /
Name Date 8.3.7.5 Process Sampling (PS) /
Name Date 8.3.7.6 Reactor Coolant (RC) / '
Name Date 8.3.7.7 Residual Heat Removal (Shutdown Cooling Mode)
(RH)
/
Name Date 8.3.7.8 Steam Generator Blowdown (SB)
/
.Name Date 8.3.7.9 Safety Injection (SI) / -l Name Date .
8.3.7.10 Liquid Waste Processing (WP)
/
Name Date Q.A. NOTIFICATION Before proceeding, notify the Q.A. representative to witness the following steps:
/ or /
Q.A. Representative Witness Waived By Test Engineer l
l CPSES ISSUE DATE PROCEDURE NO.
~
INITIAL STARTUP TEST MAFUAL ISU-008A
( e m 1 M P' M.. nu. u, o . .
TdERMAL EXPANSION REVISION NO. 1 PAGE 22 0F 132 8.3.8 Reactor coolant system temperature has been raised to 250*F (245'F to 255'F) per ISU-300A.
TR-413B . TR-433B Q.A. / /
Name Date Name Date 8.3.9 Applicable piping shall be subject to stable thermal conditions for a minimum of four (4) hours before measurements are recorded.
Q.A. / /
Name Date_ Name Date END Q.A. SURVEILLANCE The preceding steps have been witnessed by: /
Q.A. Representative 8.4 The folicwing prerequisites apply to Section 9.4 of this procedure:
~
8.4.1 The Clearance Report Index in the Clearance Report Log Book has been reviewed. None of the outstanding items will prevent conduct of this test nor, invalidate test results _
upon correction.
-4
/
~
Name Date 8.4.2 The Temporary Modification and Bypass of Safety Function Log, as required by Station Administrative Procedure i STA-602, has been reviewed and found not to preclude conduct of this test.
/
Name Date 8.4.3 The following test procedures have been completed to the extent necessary to support conduct of this test:
ISU-300A /
Name Date 8.4.4 Insulation has been removed, as required at the data measuring points.
/
Name Date Ib 4
CPSES ISSUE DATE PROCEDURE NO.
INITIAL STARTUP TEST MANUAL ISU- 8A NOV 08 gg THERMAL EXPANSION REVISION NO. 1 PAGE 23 0F 132 8.4.5 Access scaffolds and ladders are installed as necessary at areas where thermal movement data is to be taken.
/
Name Date 8.4.6 Reference marks have been established as needed at data points requiring thermal movement measuring.
/
Name Date 8.4.7 The following systems within the test boundaries are filled with fluid c.s required, operable, and available for conduct of this test:
8.4.7.1 Component Cooling Water (CC)
/
Name Date 8.4.7.2 Chemical & Volume Control (CS) .-
/
Name Date 8.4.7.3 Main Feedwater (FW) /
Name Date ,}
8.4.7.4 Main Steam (MS) /
Name Date 8.4.7.5 Process Sampling (PS) /
Name Date 8.4.7.6 Reactor Coolant (RC) /
Name Date 8.4.7.7 Residual Heat Removal (Shutdown Cooling Mode)
(RH) l l Name Date S.4.7.8 Steam Generator Blowdown (SB)
/
l Name Date l
1 I
i e
CPSES ISSUE DATE PROCEDURE NO.
INITIAL STARTUP TEST MANUAL ISU-008A 1
THERMAL EXPANSION REVISION No. 1 PAGE 24 0F 132 ,
8.4.7.9 Safety Injection (SI) /
Name Date <
8.4.7.10 Liquid Waste Processing (WP)
/
Name Date Q.A. NOTIFICATION Before proceeding, notify the Q.A. representative to witnesr. the following steps:
/ or /
Q.A. Representative Witness Waived By Test Engineer 8.4.8 Reactor coolant system temperature has been raised to 345*F (340*F to 349'F) per ISU-300A.
g TR-413B , TR-433B Q.A. / / ,
Name Date Name .Date 8.4.9 Applicable piping shall be subjecc to stable thermal conditions for a minimum of four (4) hours before -.
l measurements are recorded. -4 Q.A. / /
Name Date Name Date END Q.A. SURVEILLANCE The preceding steps have been witnessed by: /
Q.A. Representative 8.5 The following prerequisites apply to Section 9.5 of this procedure:
8.5.1 The Clearance Report Index in the Clearance Report Log Book has been reviewed. None of the outstanding items will prevent conduct of this test nor invalidate test results
~
upon correction.
/ *
. Name Date 9
m ,-
CPSES ISSUE DATE PROCEDURE NO.
I'tITIAL STARTUP TEST MANUAL ISU-008A THERMAL EXPANSION REVISION NO. 1 PAGE 25 0F 132 8.5.2 The Temporary Modification and Bypass of Safety Function Log, as required.by Station Administrative Procedure STA-602, has been reviewed and found not to preclude conduct of this test.
/
Name Date
, 8.5.3 The following test procedures have been completed to the extent necessary to support conduct of this test:
ISU-300A /
Name Date i
8.5.4 Insulation has been removed as required at the data measuring points.
/
Name Date 8.5.5 Access scaffolds and ladders are installed as necessary at areas where thermal movement data is to be taken.
/
Name Date 8.5.6 Reference marks have been established as needed at data points requiring thermal movement measuring.
Name Date . 7-8.5.7 The following systems within the test boundaries are filled -
with fluid as required, operable, and available for conduct of this test:
8.5.7.1 Component Cooling Water (CC)
/
Name Date 8.5.7.2 Chemical & Volume Control (CS)
/
Name Date 8.5.7.3 Main Feedvater (FW) /
Name Date 8.5.7.4 M'in a Steam (MS) /
Name Date 8.5.7.5 Process Sampling (PS) /
Name Date
CPSES ISSUE DATE PROCEDURE NO.
INITIAL STARTUP TEST MANUAL g g ISU-008A THERMAL EXPANSION REVISION NO. 1 PAGE 26 0F 132 8.5.7.6 Reactor Coolant (RC) /
Name Date ;
8.5.7.7 Residual Heat Irm val (Shutdown Cooling Mode) l l
(RH)
/
Name Date 8.5.7.8 Steam Generator Blowdown (SB) '
/
Name Date 8.5.7.9 Safety Injection (SI) /
Name Date 8.5.7.10 Liquid Waste Processing (WP)
/
Name Date Q.A. NOTIFICATION Before proceeding, notify the Q.A. representative to witness the following -
steps:
/ or /
Q.A. Representative Witness Waived By Test Engineer 7
1 l 8.5.8 Reactor coolant system temperature has been raised to 450*F ,
(445'F to 455'F) per ISU-300A.
TR-413B , TR-433B Q.A. / /
Name Date Name Date 8.5.9 Applicable piping shall be subject to stable thermal conditions for a minimum of four (4) hours before measurements are recorded.
Q.A. / /
Name Date Name Date END Q.A. SURVEILLANCE The preceding steps have been witnessed by: /
l Q.A. Representative 1
_ _ ~ _ _ _ _ - - - - - _ . _ _ .__ _ < __.
CPSES ISSUE DATE PROCEDURE NO.
1NITIAL STARTUP TEST MANUAL -
g ISU-008A THERMAL EXPANSION REVISION NO. 1 PAGE 27 0F 132 8.6 The following prerequisites apply to Section 9.6 of this procedure:
8.6.1 The Clearance Report Index in the Clearance Report Log Book has been reviewed. None of the outstanding itens will prevent conduct of this test nor invalidate test results upon correction.
/
Name Date 8.6.2 The Temporary Modification and Bypass of Safety Function Log, as required by Station Administrative Procedure STA-602, has been reviewad and found not to preclude conduct of this test.
/
Name Date 8.6.3 The following test procedures have been completed to the extent necessary to support conduct of this test:
ISU-300A /
Name Date 8.6.4 Insulation has been removed as required at the data -
measuring points.
l l Name Date 8.6.5 Access scaffolds and ladders are installed as necessary at .]
areas where thermal movement data is to be taken. -
/
Name Date 8.6.6 Reference marks have been established as needed at data l points requiring thermal movement measuring.
/
Name Date Q.A. NOTIFICATION Before proceeding, notify the Q.A. representative to witness the following steps:
/ or /
Q.A. Representative Witness Waived By Test Engineer
(
l 1
l l
l
CPSES ISSUE DATE PROCEDURE NO.
INITIAL STARTUP TEST MANUAL ISU-008A NOV a 91984 .
THERMAL EXPANSION REVISION NO. 1 PAGE 28 0F 132 8.6.7 Reactor Coolant System temperature is at normal operating temperature (NOT) (550*F to 560*F).
TR-413B , TR-433B .
Q A. / /
Name Date Name Date 8.6.8 The Reactor Coolant System shall be subject to stable thermal conditions for a minimum of twenty-four (24) hours at NOT before measurements are taken.
Q.A. / /
Name Date Name Date END Q.A. SURVEILLANCE The preceding steps have been witnessed by: /
Q.A. Representative 8.6.9 The Component Cooling Water System is aligned in accordance
~
~
with SOP-501A.
/
Name Date 8.6.10 The Chemical and Volume Control System is aligned in _
accordance with SOP-103A. / .;
Name Date
~
l 8.6.11 The Main Feedwater System pipes are filled.
/
Name Date 8.6.12 The Main Steam System is aligned in accordance with SOP-301A with see.am to the Auxiliary Feedwater Pump Turbine Stop and Control Valve.
/
Name Date 8.7 The following prerequisites apply to Section 9.7 of this procedure:
t-r 4
CPSES ISSUE DATE FROCEDURE NO.
INITIAL STARTUP TEST MANUAL gj ., ISU-008A THERMAL EXPANSION REVISION NO. 1 PAGE 29 0F 132 8.7.1 The Clearance Report Index in the Clearance Report Log Book has been reviewed. None of the outstanding items will prevent conduct of this test nor invalidate test results upon correction.
/
Name Date 8.7.2 The Temporary Modification and Bypass of Safety Function Log, as required by Station Administrative Procedure STA-602, has been reviewed and found not to preclude conduct of this test.
/
Name Date 8.7.3 The following test procedures have been completed to the extent necessary to support conduct of this test:
ISU-300A /
Name Date 8.7.4 Insulation has been removed, as required at the data measuring points.
/
Name Date _
8.7.5 Access scaffolds and ladders are installed as necessary at areas where thermal movement data is to be taken.
/ -.
Name Date -E Reference marks have been established as needed at data
~
8.7.6 points requiring thermal movement measuring.
/
Name Date 8.7.7 The following systems within the test boundaries are filled with fluid as required, operable, and available for conduct of this test:
8.7.7.1 Component Cooling Water (CC)
/
Name Date 8.7.7.2 Chemical & Volume Control (CS)
/
Name Date 8.7.7.3 Main Feedwater (FW) /
Name Date, Ob
_ _ _ _ _ _ _ _ - _ _ _ _ _ _ _ _ _ . _ - _ - _ ._1 - - - - - _ _
1
- l CPSES ISSUE DATE PROCEDURE NO.
INITIAL STARTUP TEST MAN M. IW- 8A NOV o a 1981.,
THERMAL EXPANSION REVISION NO. 1 PAGE 30 0F 132 8.7.7.4 Main Steam (MS) /
Name Date 8.7.7.5 Process Sampling (PS) /
Name Date 8.7.7.6 Reactor Coolant (RC) /
Name Date 8.7.7.7 Residual Heat Removal (Shutdown Cooling Mode)
(RH)
/
Name Date 8.7.7.8 Steam Generator Blowdown (SB)
/
Name Date 8.7.7.9 Safety Injection (SI) /
Name Date 8.7.7.10 Liquid Waste Processing (WP)
/ _
Name Date
~
Q.A. NOTIFICATION Before proceeding, notify the Q.A. representative to witness the following _
( steps: -4 i '
l / or /
Q.A. Representative Witness Waived By Test Engineer 8.7.8 Reactor coolant system average temperature is at ambient.
TR-413B , TR-433B Q.A. / /
Name Date Name Date 8.7.9 Applicable piping shall be subject to stable thermal conditions for a minimum of twenty-four (24) hours at ambient temperature before measurements are recorded.
Q.A. / /
( Name Date Name Date 1
6
I CPSES ISSUE DATE PROCEDURE NO.
INITIAL STARTUP TEST MANUAL g jogy ISU-008A THERMAL EXPANSION REVISION NO. 1 PAGE 31 0F 132 END Q.A. SURVEILLANCE The preceding steps have been witnessed by: /
Q.A. Representative 8.8 The following prerequisites apply to Section 9.8 of this procedure:
8.8.1 The Clearance Report Index in the Clearance Report Log Book has been reviewed. None of the outstanding items will prevent conduct of this test nor invalidate test results
. upon correction.
t /
Name Date 8.8.2 The Temporary Modification and Bypass of Safety Function Log, as required by Station Administrative Procedure STA-602, has been reviewed and found not to preclude conduct of this test.
/
- Name Date 8.8.3 The following test procedures have been completed to the --
I extent necessary to support conduct of this test:
t I ISU-201A /
__ Name Date 8.8.4 Insulation has been removed, as required at the data -5 measuring points. .
/
Name Date 8.8.5 Access scaffolds and ladders are installed as necessary at areas where thermal movement data is to be taken.
/
Nan. t Date 8.8.6 Reference marks have been established as neeled at data points requiring thermal movement measuring.
/
Name Date
(
g e
l 1
CPSES ISSUE DATE PROCEDURE NO.
INITIAL STARTUP TEST MANUAL ISU-0C8A NOV 0 8 E81 -
THERMAL EXPANSION REVISION NO. 1 PAGE 32 0F 132 8.8.7 The Main Feedwater System is aligned in accordance with SOP-302A,
/
Name Date 8.8.8 The Main Steam System is aligned in accordance with SOP-301A, and stesa is being supplied to the feedwater pumps from the Moisture Separator Rehester.
/
Name Date Q.A. NOTIFICATION Before proceeding, notify the Q.A. representative to wicness the following steps:
/ or /
Q.A. Representative Witness Waived By Test Engineer 8.8.9 Main Steam and Feedwater pipes being tested shall be subject to stable thermal conditions for twenty-four (24) hours before measurements are recorded. .
Q.A. / /
Name Date Name Date END Q.A. SURVEILLANCE -4 l The preceding steps have been witnessed by: /
Q.A. Representative l
8.8.10 The plant is at 30% (28% to 30%) power.
/
Name Date 8.9 The following prerequisites apply to Section 9.9 of this procedure:
I 8.9.1 The Clearance Report Index in the Clearance Report Log Book 4 has been reviewed. None of the outstanding items will prevent conduct of this test nor invalidate test results upon correction. ,
/
! Name Date
- . s .
t j - .
- , - - - - - , - , . . , - . . - . - - - - ,,_ --- -- -- - -., -.. - . - , , . - - - . - - , .r,-,.----, --.._?,-----
CPSES ISSUE EATE PROCEDURE NO.
, INITIAL STARTUP TEST MANUAL g g IS,U-008A k -
THERMAL EXPANSION REVISION NO. 1 PAGE 33 OF 132 8.9.2 The Temporary Modification and Bypass of Safety Function Log, as required by Station Administrative Procedure STA-602, has been reviewed and found not to preclude conduct of this test.
/
Name Date 8.9.3 The following test procedures have been completed to the extent necessary to support conduct of this test:
ISU-201A /
Name Date 8.9.4 Insulation has been removed, as required at the data measuring points.
/
Name Date 8.9.5 Access scaffolds and ladders are installed as necessary at areas where thermal movement data is to be taken.
(
/
, Name Date -
8.9.6 Reference marks have been established as needed at data points requiring thermal movement measuring.
/ 7 Name Date
- 8.9.7 The following systems within the test boundaries are filled with fluid as required, operable, and available for conduct of this test:
Name Date 8.9.7.2 Main Steam (MS) /
Name Date 8.9.8 Applicable portions of the Main Steam and Main Feedwater systems are at ambient condition.
/
Name Date k
P'
- CPSES ISSUE DATE PROCEDURE NO.
INITIAL STARTUP TEST MANUAL ISU-008A t
NOV o 9 1984 .
THERMAL EXPANSION REVISION NO. 1 PAGE 34 OF 132 Q.A. NOTIFICAIION Before proceeding, notify the Q.A. representative to witness the following steps: .
/ or /
i Q.A. Representative Witness Waived By Test Engineer l
8.9.9 Applicable piping shall be subject to stable thermal conditions for a minimum of twenty-four (24) hours at ambient temperature before measurements are recorded.
Q.A. / /
'! Name Date Name Date l
END Q.A. SURVEILLANCE The preceding steps have been witnessed by: /
(
Q.A. Representative
,, 9.0 Procedures 1
NOTE: Figures 11.5.1 through 11.5.7 provide instructions in the proper measurement techniques for snubbers, variable spring supports, and constant spring supports. --
-e Data sheets which specify that an observation is to be made ,
shall have a check mark placed in the space provided, and the
] data sheet initialed to verify satisfactory observation of the
- acceptance criteria. If the observation shows an unacceptable condition, that condition shall be noted in the " Remarks" column.
i Data will be recorded on Thermal Expansion Data Sheets 1, 1A, 2, 2A, 3, 3A, 4, 4A, 5, 5A, 6, 7, 8, 9, and 10 (see Figures 11.5.8 through 11.5.19).
Section 9.2 may be performed out of sequence at any time prior to Sections 9.8 or 9.9.
Section 9.7 may be performed after either Sections 9.8 or 9.9.
t a
f-v- --m + ------,y.r,-:9- - - - - - --y yw e- - -v-,-- y-, -
CPSES ISSUE DATE PROCEDURE NO.
INITIAL STARTUP TEST MANUAL IS.U-008A THERMAL EIPANSION REVISION NO. 1 PAGE 35 0F 132 9.1 Thermal Expansion Measurements at Initial Ambient for Non-Power Ascension Systemt NOTE: The applicable prerequisites of section 8.1 shall b4 satisfied for each system prior to performing steps 9.1.1 through 9.1.8 for that system. These steps may be performed for that system prior to satisfying the nrerequisites for other systems. The signatures for step,. 9.1.1 through 9.1.8 ,
signify that the steps have been performed for all the systems listed in 8.1.8.
9.1.1 Verify the prerequisites of Section 8.1 are complete.
/
Name Date NOTE: Steps 9.1.2 through 9.1.8 may be performed in any order.
9.1.2 For Reactor Coolant System supports listed in Table 11.4.1, record the measurements specified on Thermal Expansion Data I Sheet 1.
/ _
Name Date 9.1.3 For snubbers listed in Tables 11.4.2 through 11.4.18, record inicial ambient measurements on Thermal Expansion Data Sheet
- 2. -
/ mi j Name Date ,
l 9.1.4 For variable load supports listed in Tables 11.4.2 through l 11.4.18, record initial ambient measurements on Thermal Expansion Data Sheet 3.
/
Name Date 9.1.5 For constant load supports listed in Tables 11.4.2 through 11.4.18, record initial ambient measurements on Thermal Expansion Data Sheet 4.
/
Name Date 9.1.6 For pipe movement monitoring points listed in Tables 11.4.2 through 11.4.18, record initial ambient measurements on Thermal Expansion Data Sheets 5 and SA.
/
( . Name Date e
Y
, _ _ . . _ . _ .__.5._.. . _ _
= _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _
CPSES ISSUE DATE FF.0CEEURE NO.
INITIAL STARTUP TEST MANUAL ISU-008A NOV 0 R i%, .
s.
THERNAL EXPANSION REVISION NO. 1 PAGE 36 0F 132 9.1.7 For pipe movement restraints listed in Tables 11.4.2 through 11.4.18, record initial ambient measurements on the appropriate Thermal Expansion Data Sheet (6, 7, 8, or 9).
/
Name Date 9.1.8 For temperature locations listed in Table 11.4.21, record the initial ambient temperatures on Data Sheet 10.
/
Name Date 9.1.9 The required thermal monitoring has been completed.
/
Name Date Q.A. NOTIFICATION
, Before proceeding, notify the Q.A. representative to witness the following eteps:
~
/ or /
Q.A. Representative Witness Waived By Test Engineer 9.1.10 The acceptance criteria of Section 3.1 have been reviewed _.
- against the test data. 4-l
/ /
~
Q.A. _
Name Date Name Date END Q.A. SURVEILLANCE The preceding steps have been witnessed by: /
Q.A. Representative 9.1.11 No equipment problems exist which will prevent heatup.
/
e Name Date 9.1.12 Return to ISU-300A for further testing.
/
Name Date e -
CPSES ISSUE DATE PROCEDURE NO.
(
INITIAL STARTUP TEST MANUAL g gg ISU-008A THERMAL EXPANSION REVISION NO. 1 PAGE 37 OF 132 i
j 9.2 Thermal Expansion Measurements at Initial Ambient for Power Ascension Systems ,
NOTE: This section may be done out of sequence but must be completed prior to beginning the power ascension to 30%
power level.
9.2.1 Verify that the prerequisites of Section 8.2 are complete:
I
/
Name Date NOTE: Steps 9.2.2 through 9.2.6 may be performed in any order.
9.2.2 For snubbers listed in Table 11.4.19, record initial ambient ,
measurements on Thermal Expansion Data Sheet 2. '
J -
Name Date 9.2.3 For variable supports listed in Table 11.4.19 record initial ambient measurements on Thermal Expansion Data Sheet 3.
/
' Name .Date 9.2.4 For constant load supports listed in Table 11.4.19, record initial ambient measurements on Thermal Expansion Data Sheet _
- 4. 4 Name Date *'
9.2.5 For pipe movement monitoring points listed in Table 11.4.19,
! record initial ambient measurements on Thermal Expansion .
Data Sheet 5.
/
Name Date '
i 9.2.6 For pipe movement restraints listed in Table 11.4.19, record initial ambient measurements on the appropriate Thermal Expansion Data Sheet (6, 7, 8, or 9).
/
Name Date 9.2.7 luun required thermal monitoring has been completed.
/
Name Date e
__ .M- .
CPSES 155VE DATE -.FilOCEDURE NO. '
ISU,-008A INITIA1. STARTUP TF.$T MANUAL g gcg _
THERMAL EXPANSION REVISION'NO. 1 PAGE 38 0F 132 ,
J-Q.A. NOTIFICATION ,
Before proceeding, notify the Q.A. representative to witnssa the following ,
steps!
~
Q.A. Representative Wit Ess Wa1ved By' l est Engineer 9.2.8 The acceptance criteria of Section 3.2 have been reviewed against the test data.
Q.A. / / i Naime Date Name Date END Q.4. SURVEILLANCE The preceding steps have been witnessed by: ,
/
Q.A. Representative i 9.2.9 No equipment problema exist which will prevent heetup.
/
Name Date
~~
9.2.10 Return to ISU-010A for further testing. '
/
Name Date t 9.3 Thernal Expansion Measurements at the 250*F Plateau
( ,. CAUTION: Caution must be exercised by all personnel working in areas of hot piping or equipment. Severe burns could occur. It is reconsnanded that personnel working in these l areas weer insulating gloves, long-sleeve. shirts, knee
- l. pads and other protective clothing such as welder's sleeves. Plastic eye wear should not be worn in hot l areas, only glass eye wear. Hearing protection should be worn in areas of high noise.
9.3.1 Verify that the prerequisites of Section 8.3 are complete.
I p / .
Npme Date "
- a4 ,
. - , - , - -- ,w - - - - -. .
--,-,e. - - , . - - - - , * - , , - -
. .. . ., . . z . _ _
a CPSES ISSUE DATE PROCEDURE NO. '
INITIAL STARTUP TEST MANUAL g }Qg ISU-008A THERMAL EXPANSION REVISION NO. 1 PAGE 39 0F 132 NOIE: Steps 9.3.2 through 9.3.8 may be performed in any order.
9.3.2 For Reactor Coolant System Equipment Supports and Restraints listed in Table 11.4.1, record the measurements specified en Thermal Expansion Data Sheet 1.
/
Name Date 9.3.3 Check snubbers listed in Tables 11.4.2, 11.4.3, 11.4.4, 11.4.5, 11.4.7, 11.4.8. 11.4.11, 11.4.12, 11.4.13, 11.4.14, and 11.4.15 for binding and travel and record measurements
, ou Thermal Expansion Data Sheet 2A.
/
! Name Date 9.3.4 Check variable supports listed in Tables 11.4.2, 11.4.3, 11.4.4, 11.4.5, 11.4.7, 11.4.8. 11.4.11, 11.4.12, 11.4.13, 11.4.14, and 11.4.15 fer travel and record the results in Thermal Expansion Data Sheet 3A.
/
Name Date i 9.3.5 Check constant load supports listed in Tables 11.4.2, 11.4.3, 11.4.4, 11.4.5, 11.4.7, 11.4.8. 11.4.11, 11.4.12, 11.4.13,11.4.14, and 11.4.15 for travel and record the results on Thermal Expansion Data Sheet 4A. _.
l /
Name Date -
9.3.6 For pipe movement monitoring points listed in Tables 11.4.2, 11.4.3, 11.4.4, 11.4.5, 11.4.7, 11.4.8. 11.4.11, 11.4.12, 11.4.13, 11.4.14, and 11.4.15, record measurements on Thermal Expansion Data Sheets 5 and 5A.
/
Name Date 9.3.7 For pipe movement restraints listed in Tables 11.4.2, 11.4.3, 11.4.4, 11.4.5, 11.4.7, 11.4.8, 11.4.11, 11.4.12, 11.4.13, 11.4.14, and 11.4.15, record measurements on the appropriate Thermal Expansion Data Sheet (6, 7, 8, or 9).
. /
Name Date e
6 g _-- . , _
,y- , - . - , , , ,-- . . _ . , --- -. , . , - ,- , - - - - - - , . -- -
CPSES ISSCE DATE PFOC2 DURE NO.
INITIAL STARTUP TEST MANUAL IS"-008A '
( NOVA 91CM -
THERMAL EXPANSION REVISION NO. 1 PAGE GS OF 132 9.3.6 For temperature locations listed in Table 11.4.21 record '
the 250* plateau temperatures on Data Sheet 10. ,
1 Name Date 9.3.9 The required thermal monitoring has been completed. ,
/
Name Date Q.A. NOTIFICATION
. Before proceeding, notify the Q.A. representative to witness the following t steps:
/ or / .
Q.A. Representative Witness Waived By Test Engineer i 9.3.10 The acceptance criteria of Section 3.3 have been reviewed against the test data.
Q.A. / /
Name Date Name Date END Q.A. SURVEILLANCE --
r The preceding steps have been witnessed by: / ,,
Q.A. Representative 9.3.11 No equipment problems exist which would prevent continued plant heatup.
/
Name Date 9.3.12 Return to ISU-300A to continue heatup to the 350*F plateau.
/
Name Date I
l (
l O
CPSBS ISSUE DATE PROCEDURE NO.
INITIAL STARTUP TEST MANUAL ISU-008A THERMAL EXPANSION REVISION NO. 1 PAGE 41 0F 132 9.4 Thermal Expansica Measurements at the 350*F Plateau CAUTION: Caution must be exercised by all personnel working in areas of hot piping or equipment. Severe burns could occur. It is recommended that personnel working in these areas wear insulating gloves, long-sleeve shirts, knee pads, and other protective clothing such as welders' sleeves. Plastic eye wear should not be worn in hot areas, only glass eye wear. Hearing protection should be worn in areas of high noise.
9.4.1 Verify that the prerequisites of Section 9.4 are complete.
/
Name Date i NOTE: Steps 9.4.2 through 9.4.10 may be performed in any order.
9.4.2 For Reactor Cociant System Equipment Supports and Restraints listed in Table 11.4.1, record the measurements specified on
( Thermal Expansion Data Sheet 1.
, / -
. Name Date l 9.4.3 Verify that Residual Heat Removal System Trains A and B are in cooldown mode per SOP-102A, Section 5.1.
/ .3
- Name Date 9.4.4 For snubbers. -coastant load supporte, variabla load supports, pipe menitoring points, and pipe movement restraints listed in Table 11.4.2, record the hot set data on the appropriate Thermal Erpansion Data Sheet (2, 3, 4, 5 5A, 6, 7, 8, or 9).
! /
Name Date 9.4.5 Check snubbers listed in Tables 11.4.3. 11.4.4, 11.4.5, 11.4.7, 11.4.8. 11.4.11, 11.4.12, 11.4.13, 11.4.14, and 11.4.15 for binding and travel and record sessurements on Thermal Expansion Data Sheet 2A.
/
! Name Date
(
O e
CPSES ISSUE DATE PROCEDURE NO.
INITIAL STARTUP TEST MANUAL NOV 0 g lag.) IS,U-oo8A THERMAL EXPANSION REVISION NO. 1 PAGE 42 0F 132 9.4.6 Check variable supports listed in Tables 11.4.3, 11.4.4, 11.4.5, 11.4.7, 11.4.8, 11.4.11, 11.4.12, 11.4.13, 11.4.14, and 11.4.15 for travel and record the results on Thermal Expansion Data Sheet 3A.
/
Name Date 9.4.7 Check Constant lead supports listed in Tables 11.4.3, 11.4.4, 11.4.5, 11.4.7. 11.4.8, 11.4.11, 11.4.12, 11.4.13, 11.4.14, and 11.4.15 for travel and record the results on Thermal Expansion Data Sheet 4A.
/
Name Date 9.4.8 For pipe movement monitoring points listea in Tables 11.4.3, 11.4.4, 11.4.5, 11.4.7, 11.4.8. 11.4.11, 11.4.12, 11.4.13, 11.4.14, and 11.4.15, record measurements on Thermal Expansion Data Sheets 5 and SA.
/
Name Date 9.4.9 For pipe movement restraints listed in Tables 11.4.3, 11.4.4, 11.4.5, 11.4.7, 11.4.8, 11.4.11, 11.4.12, 11.4.13, 11.4.14, and 11.4.15, record measurements on the appropriate Thermal Expansion Data Sheet (6, 7, 8, or 9).
/ 4 Name Date 9.4.10 For temperature locations listed in Table 11.4.21, record the 350' plateau temperatures on Data Sheet 10.
/
Name Date 9.4.11 The required thermal monitoring has been completed.
/
Name Date t
4 m
- e-f
\
I CPSES ISSUE EATE PROCEDDI NO. l INITIAL STARTUP TEST MANUAL "- ^ '
M 0819PA .
( 1 THERMAL EXPANSION REVISION NO. 1 PAGE 43 OF 132 Q.A. NOTIFICATION Before proceeding. notify the Q.A. representative to witness the following
- steps
1 I
/ or /
i Q.A. Representative Witness Waived By Test Engineer
- 9.4.12 The acceptance criteria of Section 3.4 have been reviewed
, against the test data.
Q.A. / /
Name Date Name Date l
END Q.A. SURVEILLANCE The preceding steps have been witnessed by: /
i Q.A. Representative
(
9.4.13 No equipment problems exist which would prevent continued -
plant heacup.
i /
Name Date 9.4.14 Return to ISU-300A to continue heatup to the 450*F plateau. 7
-n
/ .
Name Date 9.5 Thermal Expansion Hessurements at the 450*F Plateau CAUTION: Caution must be exercised by all personnel working in areas of hot piping or equipment. Severe burns could occur. It is recommended that personnel working in these areas wear insulating gloves, long-sleeve shirts, knee pads, and other protective clothing such as welder's sleeves. Plastic eye wear should not be worn in hot areas only glass eye wear. Hearing protection should be worn in areas of high noise.
9.5.1 Verify that the prerequisites of Section 8.5 are complete.
/
Name Date .
(
e
-n__ .- .. _ . , _ . , . , . . _ _ . -- .,,,,.__ _ ,___. , _ . . . , , . _ _ _ , _ _ , _ _ , . _ _ , . . . _ , _ _ _ _ _ _ _ _ _ _ _ . . , , . . . _ _ . . _ , _ - _,, ______
l CPSES ISSUE DATE PROCEDURE NO.
INITIAL STARTUP TEST MANUAL g g ISU-008A THERNAL EIPANSION REVISION NO. 1 PAGE 44 0F 132 NOTE: Steps 9.5.2 through 9.5.8 may be performed in any order.
9.5.2 For Reactor Coolant System Equipment Supports and Restraints listed in Table 11.4.1, record the measurements specified on Thermal Expansion Data Sheet 1.
/
Name Date 9.5.3 Check snubbers listed in Tables 11.4.3, 11.4.4, 11.4.5, 11.4.7, 11.4.8. 11.4.11, 11.4.12, 11.4.13, 11.4.14, and 11.4.15 for binding and travel and record measurements on :
Thermal Expansion Data Sheet 2A. ,
/
Name Date ,
9.5.4 Check variable supports listed in Tables 11.4.3, 11.4.4, ,
11.4.5, 11.4.7, 11.4.8, 11.4.11, 11.4.12, 11.4.13, 11.4.14, ,
and 11.4.15 for travel and record the results on Thermal :
Expansion Data Sheet 3A.
/
Name Date 9.5.5 Check constant load supports listed on Tables 11.4.3, _,
11.4.4, 11.4.5, 11.4.7, 11.4.8. 11.4.11, 11.4.12, 11.4.13, '
11.4.14, and 11.4.15 for travel and record the results on Thermal Expansion Data Sheet 4A.
/ -
Name Date 4' 9.5.6 For pipe movement monitoring points listed in Tables 11.4.3, -
11.4.4, 11.4.5, 11.4.7, 11.4.8, 11.4.11, 11.4.12, 11.4.13, 11.4.14, and 11.4.15, record measurements on Thermal Expansion Data Sheets 5 and 5A.
/
Name Date 1
9.5.7 For pipe movement restraints listed in Tables 11.4.3, '
- 11.4.4, 11.4.5, 11.4.7, 11.4.8, 11.4.11, 11.4.12, 11.4.13, i
11.4.14, and 11.4.15, record measurements on the approprince '
Thermal Expansion Data Sheet (6, 7, 8 or 9).
i /
Name Date m
e e 9
e - - . , -
n . -.- - --- - , - - , - - - - . - - - - . - . - - - - - - ,- . , - - - - , . - - - , - - - - - - - - - - - - - - - -w-, -+-------e- --w -w- e , - - - - - , - - - - - - - - - - ,
CPSES ISSUE DATE PROCEDURE NO.
INITIAL STARTUP TEST MANUAL ISU-008A I
NOV o 91984 ,
THERMAL EXPANSION REVISION NO. 1 PAGE 45 OF 132 9.5.8 for the applicable temperature locations listed in Table 11.4.21, record the 450* plateau temperatures on Data Sheet 10.
/
Name Date 9.5.9 The required thermal monitoring has been completed.
/
Name Date Q.A. NOTIFICATION ,
t Before proceeding, notify the Q. A. representative to witness the following steps:
t
/ or _ __
_ /.
Q.A. Representative Witness Waive? By Test Engineer 9.5.10 The acceptance criterts of Section 3.5 have been reviewed t against the test data. ,
q.A. / / ,
Name Date Name Date END Q. A. SURVEILLJL*l0E }
The precedin8 acapa have been witnessed by: / -
Q. A. kepresentative '
9.5.11 No equipment problems exist which would prevent continuei plant heacup.
I
- Name Date .
i
- 9.5.12 Return to ISU-300A to continue heatup to normal operating ;
temperature.
/
l Name Date I
9 k
t O
i n, - , _ , . _ . - , . - , - . , , , , - - - - , _ . . ,.,-.-.-. . , ,
6
~
CPSES ISSUE DATE PROCEDURE NO.
INITIAL STARTUP TEST MANUAL ISU-008A NOV n o 19?a . ,
THERMAL EXPANSION REVISION NO. 1 PAGE 46 0F 132 9.6 Thermal Expansion Measurement at Normal Operating Temperature CAUTION: Caution must be exercised by all personnel working in areas of hot piping or equipment. Severe burns could occur. It is recommended that personnel working in these areas wear insulating gloves long-sleeve shirts, knee pads, and other protective clothing such as welders' sleeves. Plastic eye wear should not be worn in hot areas, only glass eye wear. Hearing protection should be i worn in areas of high noise.
e 9.6.1 Verify that the prerequisites of Section 8.6 are complete.
/
Name Date NOTE: Steps 9.6.2 through 9.6.13 may be complaced in any order.
9.6.2 Record on Thermal Expansion Data Sheet 1 the final hot -
condition shimmed clearances for the Reactor Coolant System Equipment Supports and Restraints listed in Table 11.4.1. ,
/ _
Name Date NOTE: Steps 9.6.3.1 through 9.6.3.6 may be completed in any order, 9.6.3 For data points listed in Tables 11.4.3 through 11.4.5 and -.
Tables 11.4.14 through 11.4.18: 4 ,
~
9.6.3.1 Record snubber hot set measurement on Thermal Expansion Data Sheet 2. ,
/ -
Name Date i 9.6.3.2 Record variable support hot set measurement on
- Thermal Expansion Data Sheet 3. r
__ / !
Name Date 9.6.3.3 Record constant support hot set measurement on i Thermal Expansion Data Sheet 4.
i /
i Name Date
(
6
- - - - - - . , . - _ . _ . - , , -.,,_~_,.,~-----.,,,,-r..y-,-,,-----._,,-..,,,..,_,.-__._,_---..-._,.--,,,,-.-___.,.-_-,--.__-__-._-,___._,_m..-
CPSES ISSUE DATE <
PROCEDURE NO.
INITIAI. STARTUP TEST MANUAL IStJ-008A THERMAL EXPANSION REVISION NO. 1 PAGE 47 0F J22 i
9.6.3.4 Record pipe movement hot set measurements on Thermal Expansion Data Sheets 5 and .54.
/
Name Date 9.6.3.5 Record pipe movement restraint hot set ,
measurements on Thermal Expansion Data Sheet 6, 7, 8 or 9.
/
Name Date 9.6.3.6 For the applicable locations listed in Table ,
11.4.21, record the 550* plateau temperatures on Data Sheet 10.
/ -
Nama Date 9.6.3.7 Review the data recorded in steps 9.6.3.1 through ,
( 9.6.3.5 against the acceptance criteria cf Section 3.6.
/ -
(* Name Date NCTE: For Stepe 9.6.3.8 thru 9.6.3.10, enter N/A in the ,
l signature block of each step for which no adjustments are required. ].
I 9.6.3.8 For those snubbers chich do not meet the -
, acceptance criteria of steps 3.6.1 and 3.6.2, and are to be adjusted, adjust the saubter ar.d record the adjusted hot set measurements on Thermal Espansion Data Sheet 2.
/ ~
Name Date
, 9.6.3.9 For those variable su; ports which do not meet the acceptance c.riteria of step 3.6.3, and are to be :
adjusted, adjust the support end record the ,
adjusted hot see measurements on Therral Expansion Data Sheet 3.
/
I
[
Name~ Date !
l
\
l l
J .
v.- - - - --..-- .,- _ ~ . _ - - - - , , - _ , - . - , ,-, - ---- . ,, y --e -_w. -
, - , - - y-
CPSES ISSUE DATE . PROCEDURE NO.
INITIAL STARTUP TEST MANUAL ISU-008A l
NOVnoloR6 -
THERMAL EXPANSION REVISION NO. 1 PACE 48 0F 132 9.6.3.10 For those constant supports which do not meet the acceptance criteria of step 3.6.4 and are to be adjusted, adjust the support and record the ,
adjusted hot set measurements on Thermal Expansion Data Sheet 4.
/
Name Date 9.6.4 Verify that Steam Cenerator Blowdown is in service ca all
, four steam generators per SOP-305A as required for this j section.
/
Name Date NOTE: The following data points are listed in Tables 11.4.7 and 11.4.8.
NOTE: Steps 9.6.4.1 through 9.6.4.6 may be completed in any order.
9.6.4.1 Record snubber hot set measurements on Thermal Expansion Data Sheet 2. -
/
Name Date 9.6.4.2 Record variable support hot set measurements on Thermal Expansion Data Sheet 3. ~
- T
/ .
Name Date i
9.6.4.3 Record constant support hot set measurements on Thermal Expansion Data Sheet 4.
/
Name Date l
9.6.4.4 Record pipe movement hot set measurements on Thermal Expansion Data Sheets 5 and 5A.
/
Name Date 9.6.4.5 Record pipe movement restraint hot set measurements on Therr.a1 Expansion Data Sheets 6, 7, 8, or 9.
/
Name Date e
c - ~ , , , a n- -, ,e - - - -- n.--.v -- -,,-.e.----- .,--- -, , - , . - , , , . - - - -
r CPSES ISSUE DATE PROCEDURE NO.
INITIAL STARTUP TEST MANUAL ISr-008A i
111ERMAL EXPANSION REVISION NO. 1 PAGE 49 0F 132 9.6.4.6 Fer the applicable locations listed in Table 11.4.21, record the 550' plateau temperatures on Data Sheet 10.
/
Name Date 9.6.4.7 Review the data recorded in steps 9.6.4.1 through 9.6.4.5 agair.se the acceptance criteria of Section 3.6.
/
Name Date NOTE: For Stepr. 9.6.'4.8 tbru 9.6.4.10, enter N/A in the signature block of each step for which no adjystments are required. .
9.6.4.8 'For those snubbers which do not raet the acceptance criterir of steps 3.6.1 and 3.6.2, and are to be adjusted, adjust the snubber and record the adjusted hot set measurements on Thermal
! Expansion Data Sheet 2.'
/ -
Name Date 9.6.4.9 for those variable supports which do not meet the acceptance criteria of step 3.6.3, and are to be edjusted, adjust the support and record the 7 adjusted hot set measurements on Thermal
- Expansion Data Sheet 3. .
/
Name Date 9.6.4.10 For those constant supports which do not meet the acceptance criteria of step 3.6.4, and are to be adjusted, adjust the support and record the adjusted bot' set measurements on Thermal Expansion Data Sheet 4.
/
Name Date )
9.6.5 Verify that the Steam Generator Sample System is aligned per CEM-514 as required for thia section.
t /
Name Date e
e 1
CPSES ISSUE DATE PROCEDURE NO. )
INITIAL STARTUP TEST MANUAI.
NOV o 91984 ISp08A t
THERMAL EXPANSION REVISION NO. 1 PAGE 50 0F 132 NOTE: The following data points are listed in Table 11.4.6.
NOTE: Steps 9.6.5.1 through 9.6.5.4 may be completed in any order.
9.6.5.1 Record snubber hot set measurements on Thermal Expansion Data Sheet 2.
/
Name Date 9.6.5.2 Record variable support hot set measurements on Thermal Expansion Data Sheet 3.
/
Name Date 9.6.5.3 Record constant support hot set measurements on Thermal Expansion Data Sheet 4.
/
Name Date
(
9.6.5.4 For the applicable locations listed in Table 11.4.21, record the 550' plateau temperatures on
~
Data Sheet 10.
/
Name Date 9.6.5.5 Reviewthedatarecordedinsteps9.6.5.1through .]
9.6.5.3 against the acceptance criteria of Section 3.6 -
/
Name Date NOTE: For Steps 9.6.5.6 thru 9.6.5.8, enter N/A in the signature block of each step for which no adjustments are required.
9.6.5.6 For those snubbers which do not meet the acceptance criteria of steps 3.6.1 and 3.6.2, and I are to be adjusted, adjust the snubber and record the adjusted hot set measurements on Thermal Expansion Data Sheet 2.
/
Name Date i
e
CPSES ISSUE DATE PROCEDURE NO.
INITIAL STARTUP TEST MAN M ISp-cosA NOV 08 BM THERMAL EXPANSION REVISION NO. 1 PAGE 51 0F 132 9.6.5.7 For those variable supports which do not meet the acceptance criteria of step 3.6.3, and are to be adjusted, adjust the support and record the adjusted hot set measurements on Thermal Expansion Data Sheet 3.
/
Name Date 9.6.5.8 For those constant supports which do not meet the acceptance criteria of step 3.6.4, and are to be adjusted, adjust the support and record the adjusted hot set measurements on Thermal Expansion Data Sheet 4.
/
Name Date i
9.6.6 Verify that the Process Sample System is aligned per i CKH-513 as required for this section.
(
/ _
Name Date NOTE: The following data points are listed in Table 11.4.9.
NOTE: Steps 9.6.6.1 through 9.6.6.3 may be completed in Sj any order.
l 9.6.6.1 Record snubber hot set measurements on Thermal
! Data Sheet 2.
/
Name Date 9.6.6.2 Record variable support hot set measurements on Thermal Expansion Data Sheet 3.
l /
Name Date 9.6.6.3 Record constant support hot set measurements on Thermal Expansion Data Sheet 4.
/
Name Date i
e
CPSES ISSUE DATE PROCEDURE NO.
INITIAL STARTUP TEST MANUAL ggg g ISU-008A
'NERMAL EXPANSION REVISION NO. 1 PAGE 52 0F 132 ,
9.5.6.4 Review the data recorded in steps 9.6.6.1 through 9.6.6.3 against the acceptance criteria of Section 3.6.
/
Name Date NOTE: For Steps 9.6.6.5 thru 9.6.6.7, enter N/A in the signature block of each step for which no adjustments are required.
9.6.6.5 For those snubbers which do not meet the acceptance criteria of steps 3.6.1 and 3.6.2, and are to be adjusted, adjust the snubber and record the adjusted hot set measurements on Thermal Expansion Data Sheet 2.
/
Name Date 9.6.6.6 For those variable supports which do not meet the acceptance criteria of step 3.6.3, and are to be adjusted, adjust the support and record the adjusted hot set measurements on Thermal -
Expansion Data Sheet 3.
/
Name Date 9.6.6.7 For those constant supports which do not meet the j acceptance criteria of step 3.6.4, and are to be -
adjusted, adjust the support and record the adjusted hot set measurements on Thermal Expansion Data Sheet 4.
/
Name Date 9.6.7 Verify that the Reactor Coolant System to the Waste Processing System is aligned per SOP-101A as required for this section.
/
Name Date e
e
CPSES ISSUE DATE PROCEDURE NO.
INITIAL STARTUP TEST MAI, IS w o8A NOV o a 1984 THERMAL EXPANSION REVISION NO. 1 PAGE 53 0F 132 l
l NOTE: The following data points are listed in Table 11.4.10. I NOTE: Steps 9.6.7.1 through 9.6.7.4 may be completed in any order.
9.6.7.1 Record snubber hot set measurements on Thermal Data Sheet 2.
/
Name Date 9.6.7.2 Record variable support hot set measurements on Thermal Expansion Data Sheet 3.
/
Name Date 9.6.7.3 Record constant support hot set measurements on Thermal Expansion Data Sheet 4.
t /
Name Date _
9.6.7.4 Record pipe movement hot set measurements on Thermal Expansion Data Sheets 5 and SA.
l l / _
Name Date .-
9.6.7.5 Review the data recorded in steps 9.6.7.1 through -
9.6.7.4 against the acceptance criteria of Section 3.6.
/
Name Date NOTE: For steps 9.6.7.6 thru 9.6.7.8. enter N/A in the signature block of each step for which no adjustments are required.
9.6.7.6 For those snubbers which do not meet the acceptance criteria of steps 3.6.1 and 3.6.2, and are to be adjusted, adjust the snubber and record the adjusted hot set measurements on Thermal Expansion Data Sheet 2.
, /
l Name Date
(
1 e
CPSES ISSUE DATE PROCEDURE NO.
INITIAL STARTUP TEST M N R L NOV 08 g I W 8A j
( ___
THERNAL EIPANSION REVISION NO. 1 PAGE $4 0F 132 9.6.7.7 For those variable supports which do not meet the acceptance criteria of step 3.6.3, and are to be adjusted, adjust the support and record the adjusted hot set measurements on Thermal Expansion Data Sheet 3.
/
Name Date 9.6.7.8 For those constant supports which do not meet the acceptance criteria of step 3.6.4, and are to be
, adjusted, adjust the support and record the adjusted hot set measurements on Thermal Expansion Data Sheet 4.
/
Name Date 9.6.8 Verify that the Chemical and Volume Control System is in service for Excess Letdova per SOP-103A.
(
/ _
s Name Date l
NOTE: The following data points are listed in Table 11.4.11.
NOTE: Steps 9.6.8.1 through 9.6.8.4 may be completed in -h any order. ,
9.6.8.1 Record snubber hot set measurements on Thermal Data Sheet 2.
/
Name Date 9.6.8.2 Record variable support hot set measurements on Thermal Expansion Data Sheet 3.
/
Name Date j 9.6.8.3 Record constant support hot set measurements on i Thermal Expansion Data Sheet 4.
/
Name Date
(
CPSES ISSUE DATE PROCEDURI NO.
INITIAL STARTUP TEST MANUAL M 08 g ISU- 8A THERMAL EIPANSION REVISION NO. 1 PAGE 55 0F 132 9.6.8.4 Record pipe movement hot set measurements on Thermal Expansion Data Sheets 5 and SA.
/
Name Date 9.6.8.5 Review the data recorded in steps 9.6.8.1 through 9.6.8.4 against the acceptance criteria of Section 3.6.
. I Name Date NOTE: For steps 9.6.8.6 thru 9.6.8.8, enter N/A in the signature block of each step for which no adjustments are required.
9.6.8.6 For those snubbers which do not meet the acceptance criteria of steps 3.6.1 and 3.6.2, and are to be adjusted, adjust the snubber and record the adjusted hot set measurements on Thermal
( Expansion Data Sheet 2.
/ -
Name Date 9.6.8.7 For those variable supports which do not meet the acceptance criteria of step 3.6.3, and are to be adjusted, adjust the support and record the ;
adjusted hot set measurements on Thermal 'T Expansion Data Sheet 3. _
/
Name Date 1 9.6.8.8 For those constant supports which do not meet the acceptance criteria of step 3.6.4, and are to be adjusted, adjust the support and record the adjusted hot set measurements on Thermal Expansion Data Sheet 4.
~
/
Name Date l
l 9.6.9 Verify that Excess Letdown is secured.
t
/
Name Date
(
4
'% 'fM '
i l
CPSES ISSUE DATE PROCEDURE NO.
INITIAL STARTUP TEST MANUAL ISU-008A Nov n 91984
(
THERMAL EXPANSION REVISION NO. 1 PAGE 56 0F 132 NOTE: The following data points are listed in Table 11.4.11.
NOTE: Steps 9.6.9.1 through 9.6.9.5 may be completed in any order.
9.6.9.1 Record snubber hot set measurements on Thermal Data Sheet 2.
/
Name Date 9.6.9.2 Record variable support hot set measurements on Thermal Expansion Data Sheet 3.
/
Name Date 9.6.9.3 Record constant support hot set measurements on Thermal Expansion Data Sheet 4.
\
/
Name Date 9.6.9.4 Record pipe movement hot set measurements on Thermal Expansion Data Sheets 5 and SA.
/
Name Date [j
, 9.6.9.5 Review the data recorded in steps 9.6.9.1 through -
l 9.6.9.4 against the acceptance criteria of i
Section 3.6.
/
Name Date NOTE: For steps 9.6.9.6 thru 9.6.9.8, enter N/A in the j signature block of each step for which no adjustments are required.
9.6.9.6 For those snubbers which do not meet the acceptance criteria of steps 3.6.1 and 3.6.2, and are to be adjusted, adjust the snubber and record the adjusted hot set measurements on Thermal Expansion Data Sheet 2.
/
Name Date
{
~ _ _ _ _ _ .
CPSES ISSUE DATE PROCEDURE NO.
INITIAL STARTUP TEST MANUAL g ISU-008A
, g THERMAL EIPANSION REVISION NO. I 1 AGE 57 0F 132 9.6.9.7 For those variable supports which do not meet the ;
acceptance criteria of step 3.6.3, and are to be adjusted, adjust the support and record the adjusted hot set measurements on Thermal Espansion Data Sheet 3.
/
Name Date 9.6.9.8 For those ccustant supports which do not meet the acceptance criteria of step 3.6.4, and are to be adjusted, adjust the support and record the adjusted hot set measurements on Thermal Expansion Data Sheet 4.
/
Name Date 9.6.10 Verify that the Chemical and Volume Control System is lined up for Alternate Charging through valve 1-8147.
(
Name Date _
NOTE: The following data points are listed in Table 11.4.12.
NOTE: Steps 9.6.10.1 through 9.6.10.4 may be completed _
in any order. -f 9.6.10.1 Record snubber hot set measurements on Thermal ~
Data Sheet 2.
/
Name Date 9.6.10.2 Record variable support hot set measurements on Thermal Expansion Data Sheet 3.
/
Name Date 9.6.10.3 Record constant support hot set measurements on Thermal Expansion Data Sheet 4.
/
Name Date
CPSES ISSUE DATE PROCEDURE NO.
INITIAI, STARTUP TEST MANUAL ISU-008A I -
THERMAL EXPANSION REVISION NO. 1 PAGE 58 0F 132 1
j 9.6.10.4 Record pipe movement hot set measurements on Thermal Expansion Data Sheets 5 and SA.
/
Name Date 9.6.10.5 Review the data recorded in steps 9.6.10.1 through 9.6.10.4 against the acceptance criteria of Section 3.6.
/
Name Date NOTE: For steps 9.6.10.6 thru 9.6.10.8, enter N/A in the signature block of each step for which no adjustments are required.
9.6.10.6 For those snubbers which do not meet the acceptance criteria of steps 3.6.1 and 3.6.2, and l are to be adjusted, adjust the snubber and record the adjusted hot set measurements on Thermal Expansion Data Sheet 2.
/
Name Date
! 9.6.10.7 For those variable supports which do not meet the l acceptance criteria of step 3.6.3, and are to be l adjusted, adjust the support and record the .3 adjusted hot set measurements on Thermal '
Expansion Data Sheet 3. -
/
Name Date 9.6.10.8 For those constant supports which do not meet the l acceptance criteria of step 3.6.4, and are to be adjusted, adjust the support and record the adjusted hot set measurements on Thermal Expansion Data Sheet 4.
/
Name Date 9.6.11 Verify that Alternate Charging is secured.
I Name Date
CPSES . ISSUE DATE PROCEDURE NO.
INITIAL STARTUP TEST MANUAL ISU-008A
( NOV 0 9198,4 THERMAL EIPANSION REVISION NO. 1 PAGE 59 0F 132 i
NOTE: The following data points are listed in Table 11.4.12. {
NOTE: Steps 9.6.11.1 through 9.6.11.4 may be completed in any order.
9.6.11.1 Record snubber hot set measurements on Thermal Data Sheet 2.
/
Name Date 9.6.11.2 Record variable support hot set measurements on Thermal Expansion Data Sheet 3.
/
Name Date 9.6.11.3 Record constant support hot set measurements on Thermal Expansion Data Sheet 4.
\ /
Name Date -
l 9.6.11.4 Record pipe movement hot set measurements on
{ Thermal Expansion Data Sheets 5 and SA.
/ z Name Date d 9.6.11.5 Review the data recorded in steps 9.6.11.1
! through 9.6.11.4 against the acceptance criteria l of Section 3.6.
l /
Name Date NOTE: For steps 9.6.11.6 thru 9.6.11.8, enter N/A in the signature block of each step for which no adjustments are required.
9.6.11.6 For those snubbers which do not meet the acceptance criteria of aceps 3.6.1 and 3.6.2, and are to be adjusted, adjust the snubber and record the adjusted hot set measurements on Thermal Expansion Data Sheet 2.
/
Name Date
(
~
l
I CPSES ISSUE DATE PROCEDURE NO.
INITIAL STARTUP TEST MANUAL ISU-008A
(
NOV n 91984 ,
THERMAL EXPANSION REVISION NO. 1 PAGE 60 0F 132
- 9.6.11.7 For those variable supports which de not meet the
- acceptance criteria of sf.ep 3.6.3, s.nd are to be adjusted, adjust the support and record the adjusted. hot set measurements on Thermal Expansion Data Sheet 3.
/
Name Dste 9.6.11.8 For those constant supports which do not meet the acceptance criteria of step 3.6.4, and are to be adjusted, adjust the support and record the adjusted hot set measurements on Thermal Expansion Data Sheet 4.
/
Name Date 9.6.12 Verify that the Chemical and Volume Control System is lined up for RCS Auxiliary Spray through valve 1-8145.
( /
Name Date ,
NOTE: The following data points are listed in Table 11.4.13.
NOTT.: Steps 9,.6.12.1 through 9.6.12.4 may be completed _
in any order. -
9.6.12.1 Record snubber hot set measurements on Thermal ~
l Data Sheet 2.
L
/
Name Date i
l 9.6.12.2 Record variable support hot set measurements on Thermal Expansion Data Sheet 3.
/ ,
Name Date
[
9.6.12.3 Record constant support hot set measurements on Thermal Expansion Data Sheet 4. *
/
Name Date
( -
1 i
CPSES ISSUE DATE PROCEDURE NO.
INITIAL STARTUP TEST MAN M IS.M 8A t!0V 0 81984 l THERMAL EXPANSION REVISION NO. 1 PAGE 61 0F 132 1
9.6.12.4 Reccrd pipe movement hot set measurements on Ihernal Expansion Data Sheets 5 and SA. i
/
Name Date 9.6.12.5 Review the data recorded in steps 9.6.12.1 through 9.6.12.4 against the acceptance criteria of Section 3.6.
/
Name Date NOTE: For steps 9.6.12.6 thru 9.6.12.8, enter N/A in the signature block of each step for which no adjustments are required.
9.6.12.6 For those snubbers which do not meet the acceptance criteria of steps 3.6.1 and 3.6.2, and are to be adjusted, adjust the snubber and record the adjusted hot set measurements on Thermal I Expansion Data Sheet 2.
Name Date 9.6.12.7 For those variable supports which do not meet the acceptance criteria of step 3.6.3, and are to be --
adjusted, adjust the support and record the ~i
' adjusted hot set measurements on Thermal Expansion Data Sheet 3. ,
/
Name Date 9.6.12.8 For those constant supports which do not meet the acceptance criteria of step 3.6.4, and are to be adjusted, adjust the support and record the adjusted hot set measurements on Thermal Expansion Data Sheet 4.
/
Name Date 9.6.13 Verify that RCS Auxiliary Spray is secured.
/
( Name Date
CPSES ISSUE DATE PROCEDURE NO.
INITIAL STARTUP TEST MANUAL IS,U-008A
( 390V o n 1984
'HIERMAL EXPANSION REVISION NO. 1 PAGE 62 0F 132 NOTE: The following data points are listed in Table 11.4.13.
NOTE: Steps 9.6.13.1 through 9.6.13.4 may be completed in any order.
9.6.13.1 Record snubber hot set measurements on Thermal Data Sheet 2.
/
Name Date 9.6.13.2 Record variable support hot set measurements on Thermal Expansion Data Sheet 3.
/
Name Date 9.6.13.3 Record constant support hot set measurements on Thermal Expansion Data Sheet 4.
( /
Name Date ._
9.6.13.4 Racord pipe movement hot set measurements on Thermal Expansion Data Sheets 5 and 5A.
, / -
Name Date -
9.6.13.5 Review the data recorded in steps 9.6.13.1
~
through 9.6.13.4 against the acceptanco criteria of Section 3.6.
/
Name Date NOTE: For steps 9.6.13.6 thru 9.6.13.8, enter N/A in
- the signature block of each step for which no ,
adjustments are required. ,
9.6.13.6 For those snubbers which do not meet the acceptance criteria of steps 3.6.1 and 3.6.2, and are to be adjusted, adjust the snubber and record the adjusted hot set measurements on Thermal Expansion Data Sheet 2.
/
Name Date l
CPSES ISSUE DATE PROCEDURE NO.
INITIAL STARTUP TEST MANUAL ' **
i NOV 0 8 1984 -
THERMAL EXPANSION REVISION NO. 1 PAGE 63 0F 132 9.6.13.7 For those variable supports which do not meet the acceptance criteria of step 3.6.3, and are to be adjusted, adjust the support and record the adjusted. hot set measurements on Thermal Expansion Data Sheet 3.
/
Name Date 9.6.13.8 For those constant supports which do not meet the acceptance criteria of step 3.6.4, and are to be adjusted, adjust the support and record the adjusted hot set measurements on Thermal Expansion Data Sheet 4.
/
Name Date Q.A. NOTIFICATION Before proceeding, notify the Q.A. representative to witness the following ~
steps:
/ or /
Q.A. Representative Witness Waived By Test Engineer i
7 9.6.14 Verify that the shismed clearances for the Reactor Coolant '
System Equipment Supports and Restraints listed in Table '
11.4.1 meet the acceptance criteria of Section 3.6.6.
Q.A. / /
Name Date Name Date END Q.A. SURVEILLANCE The preceding steps have been witnessed by: /
Q.A. Representative 9.6.15 The required thermal monitoring has been completed.
/
Name Date l
CPSES ISSUE DATE PROCEDURE NO.
INITIAL STARTUP TEST MANUAL 28U-o08A 30V 08 1984 .
- I THERMAL EXPANSION REVISION NO. 1 PAGE 64 0F 132 9.6.16 No equipment problems exist which would prevent further plant operation.
I Name Date 9.6.17 Return to procedure ISU-300A for further testing.
/
Name Date 9.7 Thermal Expansion Measurements for Non-Power Ascension Systems After Return to Ambient Temperature 9.7.1 Verify that the prerequisites of Section 8.7 are complete.
/
Name Date NOTE: Steps 9.7.2 through 9.7.8 may be performed in any order.
9 I
9.7.2 For Reactor Coolant System supports listed in Table 11.4.1, record the measurements specified on Thermal Expansion Data Sheet 1. ~
l Name Date l
l 9.7.3 For snubbers listed in Tables 11.4.2 through 11.4.18, record final ambient measurements on Thermal Expansion Data Sheet 3
- 2. '
/
Name Date l 9.7.4 For variable load supports listed in Tables 11.4.2 through 11.4.18, record final ambient measurements on Thermal Expansion Data Sheet 3.
/
i Name Date 9.7.5 ,For constant load supports listed in Tables 11.4.2 through 11.4.18, record final sabient measurements on Thermal Expansion Data Sheet 4.
/
Name Date t
CPSES ISSUE DATE PROCEDURE NO.
INITIAL STARTUP TEST MANUAL EV08 3g ISU-008A THERMAL EXPANSION REVISION NO. 1 PAGE 65 0F 132 9.7.6 For pipe movement monitoring points listed in Tables 11.4.2 through 11.4.18, record final ambient measurements on Thermal Expansion Data Sheets 5 and SA.
/
Name Date 9.7.7 For pipe movement restraints listed in Tables 11.4.2 through 11.4.18, record initial ambient measurements on the appropriate Thermal Expansion Data Sheet (6, 7, 8, or 9).
/
. Name Date 9.7.8 For the applicable locations listed in Table 11.4.21, record the final ambient temperatures on Data Sheet 10.
l
/
Name Date 9.7.9 The required thermal monitoring has been completed.
Name Date Q.A. NOTIFICATION, _
-4 Before proceeding, notify the Q.A. representative to witness the following '
steps:
/ or /
Q.A. Representative Witness Waived By Test Engineer NOTE: Steps 9.7.10 through 9.7.14 may be completed in any order.
9.7.10 Review the cold condition variable and constant spring support settings on Thermal Expansion Data Sheets 3 and 4 against the acceptance criteria of Section 3.7.
Q.A. / /
Name Date Name Date 9.7.11 Review the cold condition clearances specified on Thermal Expansion Data Sheets 1, 6, 7, 8, and 9 against the acceptance criteria of Section 3.7.
(
Q.A. / /
Name Date Name Date
l CPSES ISSUE DATE PROCEDURE NO.
INITIAL STARTUP TEST MANUAL ISU-008A
(
MGU nn1094 -
-uv THERMAL EXPANSICN REVISION NO. 1 PAGE 66 0F 132 9.7.12 Review the cold condition snubber positions listed on Thermal Expansion Data Sheet 2 against the acceptance criteria of Section 3.7.
Q.A. / /
Name Date Name Date, 9.7.13 Review the cold condition pipe deflections listed on Thermal Expansion Data Sheets 5 and SA against the acceptance criteria of Section 3.7.
Q.A. / /
i Name Date Name Date END Q.A. SURVEII. LANCE The preceding steps have been witnessed by;: /
Q.A. Representative I
9.7.14 Notify maintenance to remove the temporary scaffolding and measuring devices and to replace previously removed -
insulation and gratings.
/
Name Date 9.7.15 No equipment problems exist which would prevent further ]
plant operations. '
/ -
Name Date 9.7.16 Return to ISU-300A for further testing.
/
Name Date 9.8 Thermal Expansion Measurements at 30% Power for Power Ascension Systems CAUTION: Caution must be exercised by all personnel working in areas of hot piping or equipment. Severe burns could occur. It is recommended that personnel working in these areas wear insulating gloves, long-sleeve shirts, knee pads, and other protective clothing such as welders' sleeves. Plastic eye wear should not be worn in hot areas, only glass eye wear.- Hearing protection should be
, worn in areas of high noise.
, (
~
- . . ~ .
^
CPSES ISSUE DATE PROCEDURE NO.
INITIAL STARTUP TEST MANUAL NOV 08 1984 .- D8^
\
THERMAL EXPANSION REVISION NO. 1 PAGE 67 0F 132 9.8.1 Verify that the prerequisites of Section 8.8 are complete.
/
Name Date NOTE: Steps 9.8.2 through 9.8.6 may be performed in any order.
9.8.2 For snubbers listed in Table 11.4.19, record the hot set measurements on Thermal Expansion Data Sheet 2.
/
Mame Date 9.8.3 For variable supp0rts listed in Table 11.4.19, record the hot set measurements on Thermal Expansion Data Sheet 3.
/
Name Date 9.8.4 For constant supports listed in Table 11.4.19, record the
, hot set measurements on Thermal Expansion Data Sheet 4.
~
I i
Name Date 9.8.5 For pipe movement monitoring points listed in Table 11.4.19, record the hot set measurements on Thermal Expansion Data Sheets 5 and 5A. .3 ~
l /
Name Date -
9.8.6 For pipe movement restraints listed in Table 11.4.19, record the hot set measurements on Thermal Expansion Data Sheets 6, 7, 8, or 9.
I Name Date l Q.A. NOTIFICATION l
l Before proceeding, notify the Q.A. representative to witness the following steps:
/ or /
Q.A. Representative Witness Waive'd By Test Engineer k
.we w .ww e.
. - s -,, ,e - - - .
- l l CPSES ISSUE DATE PROCEDURE NO.
INITIAL STARTUP TEST MANUAL ISU-008A
.NOVna1opa .
THERMAL EXPANSION REVISION NO. 1 PAGE 68 0F 132 9.8.7 Review the data recorded in steps 9.8.2 through 9.8.6 against the acceptance criteria of Section 3.8.
Q.A. / /
Name Date Name Date END Q. A. SURVEILLANCE The preceding steps have been witnessed by: /
Q.A. Representative NOTE: For steps' 9.8.8 thru 9.8.10, enter N/A in the signature block of each step for which no adjustments are required.
9.8.8 For those snubbers which do not meet the acceptance criteria, and are to be adjusted, adjust the snubbers and record the adjusted hot set measurements on Data Sheet 2.
/
Name Date 9.8.9 For those variable supports which do not meet the acceptance criteria, and are to be adjusted, adjust the supports and record the adjusted hot set measurements on Thermal Expansion Data Sheet 3.
~.
j --e Name Date -
9.8.10 For those constant supports which do not meet the acceptance criteria, and are to be adjusted, adjust the supports and record the final hot set measurements on Thermal Expansion Data Sheet 4.
/
Name Date 9.8.11 The required thermal monitoring has been completed.
l
/
Name Date 9.8.12 No equipment problems exist which would prevent further plant opera. tion.
/
Name Date
+p, w
CPSES ISSUE DATE PROCEDURE NO.
INITIAL STARTUP TEST MANUAL -
ISU-OCEA
.gOVoa1984
(
THERMAL EXPANSION REVISION NO. 1 PAGE 69 OF 132 9.8.13 Return to ISU-201A for further testing.
/
Name Date l 1
9.9 Thermal Expansion Measurements for Power Ascension Systems After Return to Ambient Temperature 9.9.1 Verify that the prerequisites of Section 8.9 are complete.
/
Name Date e
Q.A. NOTIFICATION Before proceeding, notify the Q.A. representative to witness the following steps:
/ or /
Q.A. Representative Witness Waived By Test Engineer
(
NOTE: Steps 9.9.2 through 9.9.6 may be performed in any order. ._
l- 9.9.2 For snubbers listed in Table 11.4.19, record final ambient l measurements on Thermal Expansion Data Sheet 2.
Q.A. / / _.
Name Date Name Date .f 9.9.3 For variable supports listed in Table 11.4.19, record final sabient measurements on Thermal Expansion Data Sheet 3.
Q.A. / /
Name Date Name Date 9.9.4 For constant supports listed in Table 11.4.19, record final ambient measurements on Thermal Expansion Data Sheet 4.
Q.A. / /
Name Date Name Date 9.9.5 For pipe movement monitoring points listed in Table 11.4.19, record fina3 ambient measurements on Thermal Expansion Data Sheet 5.
Q.A. / /
( Name Date Name Date e
1 CPSES ISSUE DATE PROCEDURE NO.
INITIAL STARTUP TEST MAR AL ISU-008A NOV 0 R 1934 -
THERMAL EXPANSION REVISION NO. 1 PAGE 70 0F 132
, 9.9.6 Fce pipe movement restraints listed in Table 11.4.19, record i
the final ambient measurements on Thermal Expansion Data Sheet 6, 7, 8. or 9.
Q.A. / /
Name Date Name Date 9.9.7 Review the cold ccadition snubber position recorded on
- Thermal Expansion Data Sheet 2 against the acceptance
, criteria of steps 3.9.1 and 3.9.2.
Q.A. / /
Name Date Name Date 9.9.8 Review the cold condition variable support setting recorded i
on data sheet 3 against the acceptance criteria of step 3.9.4.
Q.A. / /
Name Date Name Date 9.9.9 Review the cold condition constant support settings recorded on Thermal Expansion Data Sheet 4 against the acceptance -
criteria of step 3.9.3.
l Q.A. / /
l Name Date Name Date 9.9.10 Review the cold condition pipe movement restraint measurements recorded on Thermal Expansion Data Sheets 6, 7 ,
8, and 9 against the acceptance criteria of Section 3.9.
Q.A. / /
l Name Date Name Date l
END Q.A. SURVEILLANCE The preceding steps have been witnessed by: /
i Q.A. Representative j
l l 9.9.11 The required thermal monitoring has been completed.
l =
l /
Name Date l
t 1
,w. , - - - - - - nr , -.-- - - - - ~ - - - , - - - - - - - - - - - - - - - - - - - - -
CPSES ISSUE DATE PROCEDURE NO.
INITIAL STARTUP TEST MANUAL ISU-008A MOV()a 198d THERMAL EXPANSION REVISION NO. 1 PAGE 71 0F 132 9.9.12 Remove temporary scaffolding, ladders, and measuring devices and replace previously removed insulation.
/
Name Date 9.9.13 Return to ISU-201A for further testing.
/
Name Date 10.0 Computations None .
~
b 7
-1 I
I l
l I
i I
l l
CPSES ISSUE DATE PROCEDURE NO.
INITIAL STARTUP TEST MANUAL ISU-008A g
THERMAL EIPANSION REVISION NO. I PAGE 72 0F 132 ATTACHMENT 1 PAGE 1 0F 1 P
Data Sheets: See Thermal Expansion Data Sheets 1, IA, 2 2A, 3, 3A, 4, 4A, 5, 6, 7, 8, 9, and 10. Typical Data Sheets are shown on Attachments 39 through 50.
-1 6
4 G
a - *
-, ,----- - - - - * --'N'u v-- ----* * - *-* -- ----- - - - - - ^ - " - - - - - " - - - - ^ ^ ~
CPSES ISSUE DATE PROCEDURE NO.
INITIAL STARTUP TEST MANUAL ISU-008A NOV o a 1984 .
THERFAL EXPANSION REVISION NO. 1 PAGE 73 0F 132 ATTACHMENT 2
~
PAGE 1 OF 1 Computations: None
-s 9
+ .- --
CFSES ISSUE DATE PROCEDURE NO.
INITIAL STARTUP TEST MANUAL ISU-008A NOV n 91984 .
THERMAL EXPANSICd REVISION NO. 1 PAGE 74 0F 132 ,
ATTACHMENT 3 PAGE 1 OF 1 Test Verification Sheet 11.3.1
'l Test Section 9.1, for data points listed in Tables 11.4.2 through 11.4.18 Results ISU Coordinator /Date 3.1.1 Snubber position shall be 0.25 inches or greater from the cold and of travel limit. 9.1 / ,
3.1.2 There shall be no binding of the snubbers in the attachment brackets. 9.1 /
3.1.3 For variable support spring hangers, the load indicator shall not be at either end of travel. 9.1 /
3.1.4 Constant support spring hanger - t travel indicators shall not move below the cold setting. 9.1 /
3.1.5 There shall be no contact 2
between the pipe and the rupture .3 restraint. 9.1 /
3.1.6 Piping systems and equipment
[
tested are free to move without ;
interference. 9.1 , / ;
I l
i 5 +
T
_.__.,_y.-, _ , , , . , . - - , . , . .-.,.,,r. _ . , _ . , , . , . , , _ . . _ , . . . . _ . _ . - _ _ . _ _ . _ . ,
CPSES l ' ISSUE DATE I
] PROCEDURE NO.
INITIAL STARTUP TEST MANUAL gyyy()g)$' IS,U-008A
( - - -
THERMAL EXPANSION RIV!SION NO. 1 PAGE 75 CF 132 ATTACHMENT 4 PAGE 1 0F 1 Test Verificatica Sheet 11.3.2 Test Section 9.2, for data points listed in Table 11.4.19 '
Rasults ISU Coordinator /Date i
3.2.1 Snubber position shall be 0.25 inches or greater from the cold and of travel limit. 9.2 __ / .,
3.2.2 There shall ba no binding'of the snubbers in the attachment brackets. 9.2 / i 4
3.2.3 For variable support spring bangers, the load indicator shall not be at either end
( of travel. 9.2 /
3.2.4 Constant support spring hanger -
travel indicators shall not move below the cold setting. 9.2 /
3.2.5 There shall be no contact .
between the pipe and the rupture 1:
restraint. 9.2 *
/
3.2.6 Piping systems and equipment tested are free to move without interference. 9.2 /
i l
=
4 CPSES ISSUE DATE PROCEDURE NO.
LNITIAL STARTUT TEST MANUAL ISU-008A
( __3 - _
NOV 08 1934 THERMAL EIPANSION REVISION NO. 1 PACE 76 0F 132 ATTACHMENT 5 PAGE 10F 1 Test Verification Sheet 11.3.3 Teat Section 9.3, for data points listed in Tables 11.4.2 through 11.4.15 Results ISU Coordinator /Date
- 3.3.1 Snubber positien shall not be within 0.22 inches of either and of trnvel-. 9.3 / ,
3.1.2 There shall be no binding of the snubbers in the attachment
- brackets. 9.3 /
3.3.3 Fo. variable support spring hangers, the load indicator
, sinal.1 n6L he at eithet end
, of travel. 9.3 /
3.2.4 Constatt supp9tt spring hanger
~
travel icdicatOta shall MCC mov$ within 0.23 inche s of the Eat position total travsl indicatot. S.3 /
-4 3.3.5 There shall bc no contact betvetn the pipe and the rupture '
ventrai.nc. 9.3 /
3.3.6 Piping systems aca equipmant testad are free to nova without interferen =. 9.3 /
i
l 1
?
%m CPSES ISSUE DATE PRCOEDURE NO.
INITIAL STARTUP TEST MANUAL IS.U-008A NOVp g 1984 THERMAL EXPANSIch' REVISICN NO. 1. PAGE 77 0F 132~
ATTACHMENT 6 PAGE 1 0F 1 Test Verification Sheet 11.3.4 Test Section 9.4, for data poistes listed in I Tables 11 4.2 through 11,4.15
~
l Results ,
ISU Coordinator /Date 3.4.1 Snubber position shall not be within 0.25 inches of either end of travel. 9.4 /
3.4.2 There shall be no binding of the snubbers in the attachment brackets. 9.4 /
3.4.3 For variable support spring hangers, the load indicator i shall not be at either end
( of travel. 9.4 /
3.4.4 Constant support spring hanger travel indicacora shall not move within 0.25 inches of the hot position total travel indicator. 9.4 / -
-4 3.4.5 There shall be no contact '
between the pipe and the rupture restraint. 9.4 /
3.4.6 Pipe movements shall not deviate from the predicted travel by greater than +0.25 inches or -0.25 l
inches, or 20% of the predicted travel (whichever is greater).
l This applies only to RER piping l which does not attain temperatures l greater than 350*F. 9.4 /
3.4.7 Piping systems and equipment tested are free to move without interference. 9.4 /
(
l l .
t l
l l -
CPSES ISSUE DATE FROCEDURE NO.
t INITIAL STARTUP TEST MANUAL g ISU-008A THERMAL EXPANSION REVISION NO. 1 PAGE 78 0F 132 ATTACHMENT 7 PAGE 1 0F 1 Test Verification Sheet 11.3.5 Test Section 9.5, for data points listed in Tables 11.4.3 through 11.4.15 l Results ISU Coordinator /Date 3.5.1 Snubber position shall not be within 0.25 inches of either and of travel. 9.5 /
3.5.2 There shall be no binding of the snubbers in the attachment brackets. 9.5 /
3.5.3 For variable support spring hangers, the load indicator shall not be at either end
( of travel. 9.5 /
3.5.4 Constant support spring hanger travel indicators shall not move within 0.25 inches of the hot position tot 2l travel indicator. 9.5 / -
4 3.5.5 There shall be no contact between the pipe and the rupture
~
restraint. 9.5 /
3.5.6 Piping systems and equipment tested are free to move without interference. 9.5 /
e
CPSES ISSUE DATE PROCEDURE NO.
INITIAL STARTUP TEST MANUAL ISU-008A NOV n 91984 ,
(
THERMAL EXPANSION REVISION NO. 1 PAGE 79 0F 132 ATTACHMENT 8 PAGE 1 0F 2 Test Verification Sheet 11.3.6 Test Section 9.6, for data points listed in Tables 11.4.1, 11.4.3 through 11.4.18 Results ISU Coordinator /Date 3.6.1 Snubber hot set positions shall not exceed the predicted hot position setting by greater than 0.25 inches; or the snubber shall be qualified by assuring that the maximum thermal condition will not move the snubber to within 0.25 inches of either end of l travel. 9.6 /
j 3.6.2 There is no binding of snubbers in the attachment bracket. 9.6 /
3.6.3 Variable support spring hangers are within +10% and -10% of the predicted hot load. 9.6 /
3.6.4 Constant support spring hanger travel indicators shall not be
.].
within 0.25 inches of the hot position total travel. 9.6 /
3.6.5 The rupture restraint hot gap acceptability shall be determined by an engineering review. 9.6 /
3.6.6 Pipe movements shall not deviate from the predicted travel by greater than +0.25 inches or
-0.25 inches, or 20% of the predicted travel (whichever is greater). 9.6 /
I
CPSES ISSUE DATE PROCEDURE NO.
INITIAL STARTUP TEST MANUAL r
M 08 g4 IS,U-008A THERMAL EXPANSION REVISION NO. 1 PAGE 80 0F 132 ATTACHMENT 8 PAGE 2 OF 2 Test Verification Sheet 11.3.6 Test Section 9.6, for data points listed in Tables 11.4.1, 11.4.3 through 11.4.18 (Continued)
Results ISU Coordinator /Date 3.6.7 Westinghouse RCS equipment support shim gaps shall be within the tolermaces specified in Attachment 33. 9.6 ,
/
3.6.8 Piping systems and equipment tested are free to move without interference. 9.6 /
(
O G
CPSES ISSUE DATE PROCEDURE NO.
INITIAL STARTUP TEST MANUAL IS,U-008A
( NOV t) e 10M
~
THERMAL EIPANSION REVISION NO. 1 PAGE 81 0F 132 ATTACHMENT 9 PAGE 1 OF 1 Test Verification Sheet 11.3.7 Test Section 9.7, for data points listed in Tables 11.4.1 through 11.4.18 Results ISU Coordinator /Date 3.7.1 Snubber positions shall be 0.25 inches or greater from the cold and of travel limit. 9.7 /
3.7.2 There shall be no binding of the snubbers in the attachment brackets. 9.7 /
3.7.3 For variable support spring hangers, the load indicator shall not be at either end
( of travel. 9.7 /
3.7.4 Constant support spring hanger ~
travel indicators shall not move below the cold setting. 9.7 /
3.7.5 The final cold gap acceptability between the pipe and the rupture .3 '
restraint shall be determined individually per an engineering -
review. 9.7 /
3.7.6 Pipe movements sha31 not deviate from the initial ambient measurements by greater than +0.25 inches or -0.25 inches, or 20% of the initial ambient setting (whichever is greater). 9.7 /
3.7.7 Piping systems and equipment tested are free to move without interference. 9.7 /
i
~l CPSES ISSUE DATE PROCEDURE NO.
~
INITIAL STARTUP TEST MANUAL '8"- 8^ '
NOV 0 8 1984 t
THERMAL EXPANSION REVISION NO. 1 PAGE 82 0F 132 !
ATTACHMENT 10 PAGE 1 0F 1
~
Test Verification Sheet 11.3.8 Test Section 9.8, for data points listed in Table 11.4.19 Results ISU Coordinator /Date 3.8.1 Snubber hot set positions shall not exceed the predicted hot position setting by greater than 0.25 inches; or the snubber shall be qualified by assuring that the maximum thermal condition will not move the snubber to within 0.25 inches of either end of travel. 9.8 /
3.8.2 There shall be no binding of the snubber in the attachment 9.8 /
brackets. _
3.8.3 Variable support spring hangers shall be within +10% and -10%
of the predicted hot load. 9.8 /
3.8.4 Constant supprot spring hanger travel indicators shall not be within 0.25 inches of the hot '
position total travel. 9.8 /
3.8.5 The hot gap acceptability between pipes and rupture restraints shall be determined individually per an engineering review. 9.8 /
3.8.6 Pipe movements shall not deviate from the predicted travel by greater than +0.25 inches or
-0.25 inches, or 20% of the predicted travel (whichever is greater). 9.8 /
l 3.8.7 Piping systems and equipment tested are free to move without interference. 9.8 /
1 l
l 1
CPSES ISSUE DATE PROCEDURE NO.
INITIAL STARTUP TEST MANUAL 'g g ISU-008A
\
THERMAL EXPANSION REVISION NO. 1 PAGE 83 0F 132 1 AITACHMENT 11 PAGE 1 0F 1 Test Verification Sheet 11.3.9 Test Section 9.9, for data points listed in l
Table 11.4.19 Results ISU Coordinator /Date 3.9.1 Snubber positions shall be 0.25 inches or greater from the cold end of travel limit. 9.9 /
3.9.2 There shall be no binding of the snubbers in the attachment brackets. 9.9 /
3.9.3 For variable support spring hangers, the load indicator shall not be at either end of travel. 9.9 /
3.9.4 Constant support spring hanger '-
travel indicators shall not move below the cold setting. 9.9 /
3.9.5 The final cold gap acceptability between the pipe and the rupture 3 restraint shall be determined -
individually per an engineering -
review. 9.9 /
3.9.6 Pipe movements shall not deviate from the initial
- ambient measurement by greater than +0.25 inches or -0.25 inches, or 20% of the initial ambient setting (whichever is
! greater). 9.9 /
3.9.7 Piping systems and equipment tested are free to move without interference. 9.9 /
i
' ^
=
CPSES ISSUE DATE PROCEDURE NO.
INITIAL STARTUP TEST MAN W.
NOV 0 91984 '.Su-008A 1
THERMAL EXPANSION REVISION NO. I PAGE 84 0F 132 ATTACEMENT 12 PAGE 1 0F 1 TABLE 11.4.1 RCS Components Monitoring Point Drawing Monitoring Point Drawing l
1 MP-402 W-1457F33 MP-423 W-1462F75 MP-403 W-1457F37 MP-424 W-1457F30 MP-404 W-1457F37 MP-425 W-1457F33 MP-405 W-1457F37 MP-426 W-1457F33 MP-407 W-1462F75 MP-427 il-1457F33 MP-408 W-1457F30 MP-428 W-1457F37 MP-409 W-1457F33 MP-429 W-1457F37 HP-410 W-1457F33 MP-431 W-1462F75 MP-411 W-1457F37 MP-432 W-1457F30 MP-412 W-1457F37 MP-433 W-1457F33 MP-413 W-1457F37 MP-415 W-1462F75 g MP-416 W-1457F30 MP-417 W-1457F33 MP-418 W-1457F33 -
MP-419 W-1457F37 MP-420 W-1457F37 MP-421 W-1457F37
-1 l
l e
CPSES ISSUE DATE PROCEDURE .%
INITIAL STARTUP TEST MANUAL ISU-008A g
THERMAL EXPANSION REVISION NO. 1 PAGE 85 0F 132 ATTACHMENT 13 I PAGE 1 0F T !
Table 11.4.2 Components Affected by Residual Heat Removal .
Monitored at: Initial Ambient, 250, 350, Final Ambient RM-1405-01H43 SI-1490-408-C41K MP-059 RM-1-005-419-C4N $1-1491-009-C41K MP-059A RH-1-006-001-C43 SI-1491-411-C41K y-M0 RN-1-006-M4-C42K SI-1491-413-C41K MP-MCA .
RX-t-007404-523 SI-1-092407-C41K y-M3 RH-t-007-005-S23-A SI-1492-006-C41K p-M3A Rot-007-005-S23-8 SI-1-092-009-C41K MP-M4 RH-1-008-005-S22K SI-1-093-001-S42K MP-45 RH-1-008-006-523 SI-1-103-008-C43 MP-065A RH-1-009-005-S22K SI-1-103-014-C42K MP-250 RH-1-013408-533 SI-t-104403-C42K-A MP-251 RN-1-014-006-S33 SI-1-104-M3-C42K-B MP-255 RH-1-014-000-533 SI-1-104-007-C53 $1-1-180-904-C47W RM-1-014-009-S33 SI-1-105-M4-C53 SI-1-181-903-C47W -
RH-1-024409-523-A SI-1-148-402-C41K SI-1-182-904-C47W RH-1-024-009-S22K-I SI-1-148403-C41K-A RX-t-024-012-S23-A SI-1-148403-C41K-8 RM-1-024-012-S22K-1 SI-1-179-004-C4tK RM-1-427-002-53X SI-1-179-005-C41K
~~
RH-1463406-S22K SI-1-179-M7-C41K RX-1-W M4-623 SI-1-180-004-C41K -
RH-1 $8-012-002-2-A SI-1-180-005-C41K RH-t-58-012-002-24 SI-1-180-M6-C41K SI-1-476-M4-S23 SI-1-181-MM41K-A
$1-1-078-009-532S SI-1-181-003-C41K-8
$1-1-079-009-S43 SI-1-181-M4-C41K SI-1-066-7%-C41K SI-1-182-003-C41K l $1-1-087-012-C42K-A SI-t-182-004-C41K I
SI-1-067-412-C43-8 $1-1-182-006-C41K SI-1-087-413-C42K RM-1-SS-011-009-2 SI-1487-41M43 RN-1-M3-004-5325
$1-1-097-015-C43 RH-1-014-M3-S32S SI-1-087-01 H 42K-A RN-1-014407-S32S SI-1487-0!M43-8 SI-1-471-401-S32S S!-1-087-01 M 4 3-A 51-1-071-003-53 3 SI-1487-417-C43-B SI-1-492-003-C415
$1-1488-009-C43-A SI-1-088-009-C4X-3
$1-1488-01H43-A St-1-088-010-C43-9
.I CPSES ISSUE DATE PROCEi'RI NO.
INITIAL STARTUP TEST MANUAL g ISU-006A
( l THERMAL EXPANSION REVISION NO. 1 PAGE 86 OF 132 ATTACHMENT 14 PAGE 1 0F 2 Table 11.4.3 Components Associated With The Reactor Coolant System Monitored at: Initial Ambient, 250, 350, 450, 550, Final Ambient RC-1-007-002-C41K RC-1-072-706-C41K RC-1-103-704-C75K
! RC-1-015-705-C41K RC-1-075425-C61K RC-1-103-705-C75K RC-1-015-709-C411 RC-1-075-431-C51K RC-t-115408-C76K RC-1-015-710-C41K RC-1416-701-C41K RC-1-133-700-C82K RC-1-016-700-C41K RC-1-097-001-C86K-A RC-1-133-701-C82K RC-1-018431-C61K RC-1-097-001-C86K-8 RC-1-133-703-C82K RC-1-018-033-C61K RC-1-499-403-C86K-4 RC-t-133-705-CB2K RC-1-018-034-C61K RC-1-099-003-C86K-B RC-1-134-701-C82K RC-1-018-036-C61K RC-1-110-003-C86K-4 RC-1-134-703-C82K RC-1-018-038-C1K RC-1-110-003-C86K-B RC-1-134-704-C82K RC-1-018-044-C51K RC-1-il2-002-C86K-A RC-1-134-705-C82K i RC-1-018449-C61K RC-1-112-002-C86K-B RC-1-135-004-C51K l'
RC-1-018-050-C51K RC-1-115-011-C76K-A RC-1-135-005-C41K-A ._
RC-1-018-051-C51K-A RC-1-115-011-C76K-B RC-1-135-008-C41K-A RC-1-018-051-C51K-B RC-1-115-418-C66K RC-1-135-008-C41K-B RC-1-052-009-C41K RC-1-115422446K RC-1-135-010-C41K l
RC-1-035-701-C41K RC-1-135-005-C41K-8 RC-1-143-701-C82K l RC-1-052404-C41K RC-1-901-704-C82K RC-1-144-700-C82K --
RC-14052-005-C41K RC-1-075-034-C511 RC-1-146-004-C81K -5 RC-1-052-008-C41K RC-1-075-041-C51K RC-1-147-007-C81K ,
RC-1-052-010-C',1K RC-1-075-043-C51K RC-1-147-010-C81K RC-1-052-012-C41K RC-1-075444-C51K RC-1-161-001-C81K RC-1452-013-C41K RC-1-075445-C51K RC-1-161-003-C81K RC-1-052-014-C41K RC-1-075448-C51K RC-t-161404-C81K RC-1-052-015-C41K RC-1-075-451-C51K RC-1-161-005-C81K-A RC-1-052-016-C41K RC-1-007-003-C81K RC-1-161-005-C81K-8 RC-1-052-020-C41K RC-1-087-004-C81K RC-1-162-001-C81K RC-1-052-021-C41K RC-1487-005-C81K RC-1-162-002-C81K RC-1-052-022-C411 RC-1-007-407-C81K-A RC-t-162-004-C81K RC-1452-023-C41K RC-1-087-007-C81K-9 RC-I-163402-C81K RC-1-052-024-C41K RC-1-007-700-C81K RC- 163-003-C81K-A RC-1-052-025-C41K-A RC-1-080-005-C81K K. 4 63-003-C81K-8 RC-1-052-025-C41K-B RC-1-088-006-C81K RC-1-163-008-C81K RC-t-052-026-C41K RC-t-080-000-C81K RC-1-164-001-C81K RC-1-069-001-C41K RC-1-008-009-C81K RC-1-l&4403-C81K RC-1-072-700-C41K RC-1-oe9-700-C81K RC-1-164-700-C81K RC-1-072-702-C41K RC-1-091-401-C81K RC-1-901-701-C82K-A
( RC-1-032-703-C41K RC-1-097-002-C86K RC-t-901-701-C82K-8 RC-1-072-705-C41K-A RC-1-499-001-C86K RC-1-R8-005-001-2 RC-1-072-705-C41K-B RC-1-103-700-C75K RC-1-RB406-001-2 RC-1-015-704-C415
. 1 CISES ISSUE DATE PROCEDURE NO.
INITIAL STARTUP TEST MANUAL gg g ,ISU-008A THERMAL EXPANSION REVISION NO. 1 PAGE 87 0F 132 ATTACHMENT 14 PAGE 2 0F 2 ,
Table 11.4.3 Components Associated With The Reactor Coolant System Monitored at: Initial Ambient, 250, 350, 450, 550, Final Ambient RC-1-018-008-C&lS MP-067 RC-1-018-047-C5tS-A y-006 RC-1-018447-C515-8 y.og9 RC-t-018-053-C415 y.o93 RC-1-035-702-C4tS y.og4 l RC-1-052-001-C415 np.o95 RC-1-052403-C41S RP-096 RC-t-052-018-C41S W-097 RC-t-053-700-C415 W-098 RC-t-072-701-C415 y.o99 ..
RC-1-075-005-C&15 W-100 RC-1-075-0%-CalS-A W-104 RC-t-075-0%-C&lS-B W-105 RC-1475-042-C&55 W-1M RC-1-087-001-C815 ~~
RC-t-135-901-C47W RC-t-088-010-C815 RC-t-135-902-C47M RC-t-115-012-C565 RC-t-135-903-C47W -
RC-1-115424-C&6S RC-t-135-904-C47W RC-t-115-035-C765-A RC-1-135-905-C47W RC-1-ll5-035-C76S-8 RC-1-135-904-C47W RC-1-133-702-C82S RC-1-135-907-C47W RC-1-134-700-C825 RC-1-135-908-C47W RC-t-135-001-C415 RC-t-135-909-C47W RC-1-135-007-C4tS RC-t-135-910-C47W RC-1-147-003-C815-A RC-t-147-003-C8154 RC-1-147409-C815-4 RC-t-147-009-C815-8 RC-t-161-002-C815 RC-t-162-003-C815 RC-t-163-009-CalS RC-t-901-702-C82S
CPSES ISSUE DATE PROCEDURE NO.
INITIAL STARTUP TEST MANUAL M 08 N ISU- 8A THERMAL EXPANSION REVISION NO. 1 PAGE 88 0F 132 ATTACHMENT 15 PAGE 1 0F 2 .
Table 11.4.4 Componenta Associated fiith Main Steam System i Monitored at: Initial Ambient, 250, 350, 450, 550, Final Ambient RS-1-55-010-005-2 MS-1-007-505-T54K RS-1-007406-T545 RS-1-SB-011-001-5 MS-1-007-506-T54K MS-t-007-006-T54S MS-1-SB-011405-2 MS-1-012-014-T44K-A MS-1-012410-T44S MS-1-SB-011-007-2 MS-1-012414-T44K-8 RS-t-012-011-T445 MS-1-SB-012-002-2 MS-1-012-502-S54K RS-1-012-012-T44S MS-t-SB-012-004-2 RS-t-017-301-S64K MS-1-017401-S645 MS-1-001-005 6 MS-t-017-502-554K MS-1-017-003-T545 MS-1-001404-C72K
- MS-1-017-503-T54K MS-1-017-004-T545 MS-1-002-006-C73-A RS-t-017-504-T54K MS-1-017-005-T545 MS-1-402-006 M -B MS-1-017-505-T54K MS-1-017-006-T54S MS-1402-M7-C73 MS-1-022-502-S54K RS-1417-008-i34S MS-t-002-008-C72K-A RS-1422-503-T54K MS-1-017409-T54S-A RS-1-002-000-C72K-B MS-t-022-505-T54K RS-1-017-009-T545-B -
RS-t-002-013 M -A MS-1-022-506-T54K MS-1-017-010-T54S-A MS-1-002-013 6 -8 RS-1-070-002-T44K MS-1-017-010-T545-B RS-1403-005-C72K RS-1-471-002-T44K MS-1-017-011-T44S MS-1-003406-C73 RS-1-071-M3-T44K-A MS-t-017-012-T44S RS-1-003-007-C72K-A MS-1471-003-T44K-B MS-1-022-M1-564S T
- MS-1-003-M7-C73-8 MS-1-240-001-S72K-A RS-1-022-003-T545 MS-t-M 3-000 6 -A MS-1-240-001-573-8 MS-t-022-011-T445-A -
MS-1403-006-C73-B RS-1-240-002-S72K RS-1-022-011-T44S-B MS-1403-009-C72K-A MS-t-240-003-575K MS-1-033401-T445-A MS-1-003-009 C72K-B RS-1-223-M2-573 RS-1-033-001-T44S-B MS-1-403-011 M -A NS-1-223-004-S75K MS-I-033-002-T44S RS-1403-Cll-C72K-B MS-t-274-004-575K RS-t-033-003-T44S MS-1403-012-C72K MS-1-002-M3-C72S-A MS-1-033-005-T44S-A MS-t-003-013-C72K-A MS-1-002-003-C725-8 MS-1-033-005-T445-B MS-t-003-013-C72K-B RS-1-002-012-C72S-A MS-1-033-406-T445-A RS-1-M3-014-C72K-A MS-1-002-012-C725-8 MS-1-033406-T44S-B MS-t-M3-014-C72K-8 RS-1-003-002-C725-A MS-1-033-007-T44S MS-1404403-C72S MS-t-M3-002-C72S-B MS-1-033-010-T445 MS-t-004-004-C72K RS-1-003403-C72S-A RS-1-033-011-T44S-A MS-t-404-005-C72K-A MS-1-M3-003-C725-8 MS-1-033-011-T445-B RS-t-004-005-C72K-B MS-1-M3-M4-C72S MS-t-034-003-T34S RS-1-004409-C62K MS-1-004401-C72S MS-1-034-007-T345 RS-1-007-501-564K MS-1-007-MI-5645 MS-t-035-402-T445 MS-t-007-500-564K RS-1-M7-403-7543 RS-1-035-007-T44S MS-t-007-502-T54K RS-1-M7-004-T545 RS-t-035408-T445 RS-1407-504-T54K RS-1407-005-T54$ RS-1436-700-T44S
CPSES ISSUE DATE PROCEDURE NO.
INITIAL STARTUP TEST MANUAL ISU M 8A NOV n a 19u .
THERMAL EXPANSION REVISION NO. 1 PAGE 89 0F 132 ATTACHMENT 15 PAGE 2 0F 2 .
Table 11.4.4 Components Associated With Main Steam System Monitored at: Initial Ambient, 250, 350, 450, 550, Final Ambient MS-1-053-M1-T445 MS-1-007-903-T53 MS-t-M1-001-T445 MS-1-007-904-T57M MS-1-M3-001-T445 MS-t-007-905-T57W FSI-210841-04-lG2402-2 MS-t-007-9N-T57M FSI-2108-0144-192-M3-2 MS-1-007-907-T57W MP-002 MS-1-007-908-T57W MP-003 MS-I-007-910-T57W MP-005 MS-1-012-901-T57W MP-006 MS-t-012-902-T57W MP-009 MS-!-012-903-T57W MP-010 MS-1-012-904-T57W I
MP-011 MS-t-012-905-T57W MP-014 MS-1-017-901-T57W -
MP-015 MS-1-017-902-T57W MP-200 MP-209 PF-211 MP-212 _.
MP-213 -i MP-218 MP-219 MP-201 MP-292 MP-203 MP-206 i MP-207 MS-t-017-903-T57W i
MS-1-017-904-T57W MS-1-017-905-T57M MS-1-022-901-T57W MS-I-022-902-T57W I MS-t-022-903-T57W l MS t-022-904-T57U MS-t-022-905-T57W MS-t-022-906-T57W MS-1422-907-T57W MS-t-004-906-C&7M ,
MS-t-007-901-T57W MS-1407-902-T57W
- _ _ _ . _ __ _, . _ ~ _ . . . _. _
CPSES ISSUE DATE PROCEDURE NO.
INITIAL STARTUP TEST MANUAL ISU;008A NOV g g 1984
(
THERMAL EXPANSION REVISION NO. 1 PAGE 90 0F 132 ATTACHMENT 16 PAGE 1 0F 1.
Table 11.4.5 Components Associated With Main Steam to Aux. Feed. Turbine Monitored at: Initial Ambient, 250, 350, 450, 550, Final Ambient MS-1-027-023-53X-A MS-1427-023-533K-8 MS-1427-030-53X-A MS-1427411-S$35 MS-t-027430-533K-8 MS-t-027-438-53X MS-1-027441-533 MS-1-027442-S3R MS-1-027447-573K MS-t-027-048-S73K MS-1-027-056-5335 MS-t-027-0:5-S33-A
( MS-1-027-055-S33K-8 MS-1-028-017-533K MS-I-028-018-533K-A MS-1-028-018-53X4 MS-t-028-028-533 MS-t-028-029-533K-A MS-1-028-029-53X-5 __
MS-t-028-030-S33K-A 4 MS-1-028-030-533K-9
~
RS-1-028-034-S33K MS-t-028-041-533-A MS-1428-041-S33K-8 MS-1-028442-533 MS-t-028443-S33K MS-t-028-047-S43K MS-1-028-048-S4R MS-1-028-035-533K MS-t-027-016-S535 MS-t-027-057-S335-A MS-1-027-057-5335-8 MS-t-028-005-S43S-A MS-t-028-005-S435-8 MS-1-028-031-533S MS-1428-036-933S MS-1428-040-5333 MP-220 MP-221 MP-222 MP-223 MS-t-416-700-S3X MS-t-41,6-003-533K
CPSES ISSUE DATE PROCEDURE NO. -
INITIAL STARTUP TEST MANUAL ISU-008A
(
, THERMAL EIPANSION REVISION NO. 1 PAGE 91 0F 132 ATTACHMENT 17
' AGE P 1 0F 1 Table 11.4.6 Componenta Associated With Steam Generator Sampling Monitored at: Initial Ambient, 550, Final Ambient MS-t-RS-005-002-2 MS-1-RS-005-006-5 MS-148405-007-5 MS-1-R9405-010-2 MS-1-RO-005-Oll-2 MS-1-RI-005416-5 MS-1-RI-026-007-2 MS-1-RB406-004-2 MS-1-RI-006-017-5 MS-1-RS-027-011-2 g
MS-1-R8-028-012-2 MS-1-R9-034-001-2 MS-148436-002-2 MS-1-R8434-004-2 MS-1-St-052-005-5 MS-1-R9405-001-2 MS-148-004-001-2 --
MS-1-RO-006-009-5
- MS-1-RI-046-010-5 MS-149-006-013-2 MS-1-RS-007-001-2 MS-t-RS-007-007-2 MS-141-007-005-2 MS-148407-411-2 MS-1-RI-007-012-2 MS-t-RO-007-013-2 MS-140-447-014-2 MS-148-007-416-2 MS-148407-0!I-2 MS-1-RS-007419-2 MS-145-000401-2 MS-1-RS-006408-2 MS-1-RS-046-010-2 MS-148-006-018-5 MS-1-R9-000-019-2 MS-1-RS-006-024-2 MS-t-RI424-001-2 MS-1-h3-034-010-2
~
CPSES ISSUE DATE PROCEDURE NO.
I INITIAL STARTUP TEST MANUAL SU-008A pgy q p jgg4 t
THERMAL EXPANSION REVISION NO. 1 PAGE 92 0F 132 l
l ATTACHMENT 18 PAGE 1 0F 2 Table 11.4.7 Components Associated With Steam Generator Blowdown Monitored at: Initial Ambient, 250, 350, 450, 550, Final Ambient MS-1-473406-C32K MS-1-150437-C5X MS-1-342-001-C5X MS-1473-007-C5X MS-1-150-045-C33 MS-1-342-003-C5X RS-1-073-009-C5X RS-1-15 H 44 6 MS-1-344-004-C5X RS-1-073-011-C5X MS-1-150448-C5X RS-1-344-005-C5X-A MS-1-073-013 M -A RS-1-150-050-C52K-A MS-1-344-005-C32K-B MS-1-073-013-C53-8 MS-1-15 H 50-C32K-l MS-1-344-007-C52K-A PS-t-473-414 6 RS-t-150-051-C52K-A MS-1-344-007-C32K-B RS-1-073-702-C5X RS-t-15 H 51-C52K-I MS-1-345403-CMK-A RS-1-074-003-C32K RS-1-150-053-C5X MS-1-345403-C52K-B RS-1-074-004-C52K MS-1-150-054-C3X-A MS-1-!45-004-C52K-A MS-1-074-004-C52K NS-t-150-054-C5X-B MS-t-345-004-C52K-B MS-1-074-009 6 MS-t-150-055-C32K MS-1-345405-C5X MS-1474-412G RS-1-150-050 6 -A MS-1-345-006-C32K ~
RS-1-474-413-C5X MS-1-150-458-C32K-I MS-1-344-008 6 MS-1-474-015-C5X RS-1-150-060-C5X MS-1-344-009-C53 MS-1-074-016-C32K MS-1-150-M2-C52K-A MS-1-073-003-C525 MS-t-074-419-C53 RS-1-150-%2-C5X-I MS-1-074-002-C325-A NS-1-074-020 G ns-t-150-%3-C52K MS-1474402-C325-8 __
MS-t-074-023 6 nS.1-1504446 MS-1-074405-C525 -4 MS-t-150-424 M ns-1-150465-C32K RS-t-074-008-C32S MS-1-15 H 25-C32K-A ns-t-1504476 MS-t-074-011-C325 MS-1-150-025-C5X-9 RS-t-151-421 6 MS-1-074-017-C52S MS-1-15 H 26 G g-t-151-422 G MS-1-150-004-C325-A NS-1-15 H 27 6 g 151-423 G MS-t-150-004-C525-B MS-t-15 H 28 6 nS-t-151-026-C5X RS-t-15 H il-C52S RS-t-150-029 6 -A MS-1-151-427-C5X nS-1-151-700-C32S MS-1-15 H 29-C32K-8 RS-1-151432G-A nS-t-340-001-C525 RS-1-073-0106 MS-1-151-432 6 -9 RS-t-340-702-C52S MS-t-074-003-S53 RS-1-1514406-A MS-t-342-002-C525 MS-1-074-009-S55K MS-1-151-040-C32K-B RS-t-345-001-C525 MS-1-074-422 6 -4 MS-I-151-042 6 MS-t-345402-C325 MS-I-4744226-B MS-t-151443-C5X-A nS-1-073-020-C525 MS-1-15 H 32 6 -A RS-I-151443G-8 MS-1-073-422-C52$
RS-I-15 H 32 6 -8 MS-1-151-444-C53 MS-t-074-418-C32S MS-t-15 H 33 6 -4 MS-1-151446-C32K-A RS-t-074-024-C525 RS-1-15 H 33 6 -1 MS-1-151-444-C52K-8 y-017A MS-1-15 H 35 6 -A RS-t-340-004 G y-4tg4 MS-1-15 H 35 M -9 RS-t-340-005-C5X y423A
- RS-t-15H34-C5X ns-1-340-006-C5X y-024A
i CPSES ISECE DATE PROCEDURE NO.
INITIAL STARTUP TEST MANUAL ISU-008A N0'/ 0 8 1984 -
THERMAL EXPANSION ,
REVISION NO. 1 PAGE 93 0F 132 ATTACHMENT 18
, PAGE 2 0F 2 Table 11.4.7 Components Associated With Steam Generator Blowdown Monitored at: Initial Ambient. 250, 350, 450, 550, Final Ambient W-029A RS-t-RB-019-003-2 W-030A MS-1-RO-419-005-2 W431A ns.1-R842H01-2 M4324 MS-1-RI-020-002-2 MP-035A ns.148420-003-2 i #434A MS-148-020-004-2 MP-028A ns g.gg.020406-2 MP-019A ns.1-RB-020-011-2 MP-020A
' ns.1-RB-021-001-2 MP-021A ns.g.gg.ogg.002-2
( MP433A ns.g.RB-021-003-2 W-027A g .g.gg.42g 4g4 2 -
l MP422A ns.g.pg.o21009-2 l #434A RS-1-RS-021411-2 l nS-t-073-902-C57W nS-t-Rs-022-004-2 l MS-1-073-905-C57W ns.g.gg.022405-2
! RS-1-Al-006-015-2 ns-1-R8422-010-2 7 MS-t-RS-0104402-2 ns.g.RB-022411-2 ~5 MS-t-RS-010A-003-2 ns. gag.012405-2 -
MS-149-0104-004-2 ns.g.ggag9.qqq.2 MS-1-R8-0104405-2 ns.t.gg.022-006-2 MS-t-RI-0104-007-2 ns.t.pg.021-006-2-A RS-1-RI-010A400-2 n.g.R9421-006-2-B RS-1-RS-0104-011-2 ns.t.Rg421407-2 R3-t-RI-010A-012-2 ns t.R8-010A-001-2 Mi-t-RI-0104-014-2 ns-t-Rg-c104 009 2 l MS-t-Al-010 H 15-2 ns.g-Ag-010A-010 2 MS-1-RI-010 H 16-2 ns.1-AB-0104-013-2-A RS-1-RI 410 H 17-2 RS-148-010H13-2-8 MS-149-010H18-2 ns.t.gg 4tg.oq4 2 MS-148-010H20-2 ns.t.ggag9-006-2 R!-149411401-2 g.1-R8420-005-2 MS-14 Hit-002-2 ns.g.RB420-009-2-A MS-t-RI-0!!403-2 ns.1-R8-020-009-2-8 RS-1-R8411-005-2 ns.t.pg42g.005-2-A MS-t-R8412402-2 ns.1-RI-021-005-2-1 i
RS-1-AB-012-004-2 ns. gag.022-009-2-A MS-t-RI419401-2 ns.t-Ag-022-009-2-8 RS-1-344-001-C525 ns-1-344402-C525
Ch ES ISSUE DATE PROCEDURE NO.
INI!1AL STARI;? TEST MANUAL N0'/08 1984 I.SU-008A
( .
THERMAL EXPANSION REVISION NO. 1 PAGE 94 0F 132 ATTACHMENT 19
, PAGE 1 0F 1 Table 11.4.8 Components Associated With Steam Generator Blowdown Outside Containment Monitored at: Initial Ambient, 250, 350, 450, 550, Final Ambient
. SI-1-001-00f-S55K SI-t-010405-6555 SI-t-025-703-E35K SI-t-060-020-S55K-A SI-t-060-020-555K-I SI-1-060-060-T35K-A SI-1460-060-T35K-f SB-1-060462-T35K n i SI-t-060-062-T35K-9 _
SI-t-060-077-T35K-A -
SI-t-060-077-T35K-9 53-1-460-075-T35S
$8-1460-019-T555 IF-227 7
-e
. - _ . _ . . _ . _ . . . .- . - - , _ . _ . _ _ _ _ _ . . ~ . , - _ _ . _ . _ , , _ . _ _ - - - . . . - - - -
t CPSES ISSUE DATE PROCEDURE NO.
INITIAL STARTUP TEST MANUAL ISU-008A g jag,4 I
i, THERMAL EXPANSION REVISION NO. 1 PAGE 95 OF 132 ATTACHMENT 20
, PAGE 1 OF 1 Table 11.4.9 Components Associated With the Process Sampling System Monitored at: Initial Ambient, 550, Final Ambient PS-1-RS-412-018-2 PS-t-43-012-014-2 PS-1-RS-002-000-2 PS-1-AI-002-007-2 PS-t-RS-003-022-2 PS-I-RS-002-011-2 PS-1-R8-003-007-2 PS-1-RS-003-006-2 m
-1 I
i
CPSES ISSUE DATE PROCEDLTE NO.
INITIAL STARTUP TEST MANUAL g jgg I,SU-008A THERMAL EXPANSION REVISION NO. 1 PAGE 96 0F 132 ATTACFMENT 21 PAGE 1 0F 1 Table 11.4.10 Components Associated With the Waste Processing System Monitored at: Initial Ambient, 550, Final Ambient W-t-030406-C4&K W-t-430-024-C4&K W-t-430-025-C4&K W-t-430-026-C4&K-A W-1-030-026-C46K-B W-1-030-027-C46K W-t-031-700-C45K W-1-032-701-C45K W-t-030-017-C46S
( W-t-031-701-C455 W-1-030-700-C46S -
W-108 1
l i
I e
CPSES ISSUE DATE PROCEDURE NO.
INITIAL STARTUP TEST MANUAL ISw008A NOV n 91984 .
(
THERMAL EIPANSION REVISION NO. 1 PAGE 97 0F 132 ATTACHMENT 22 PAGE 10F 1 Table 11.4.11 Components Associated With CVCS Excess Letdown Monitored at: Initial Ambient, 250, 350, 450, 550, Final Ambient CS-1-161-702-C41K-A CS-1-161-702-C41K-I CS-1-162-701-C42K CS-1-l&2-705-C425 IIP-107
(
-1 O
CPSES ISSUE DATE PROCEDURE NO.
INITIAL STARTUP TEST MANUAL ISU-008A
(
THERMAL EXPANSION REVISION NO. 1 PAGE 98 0F 132 i
l ATTACHMENT 23 PAGE 1 OF 1 Table 11.4.12 Components Associated With'CVCS Alternate Charging Monitored at: Initial Ambient, 250, 350, 450, 550, Final Ambient CS-14M414-C43 CS-1478417-C43 CS-14M419-C43 CS-1478420-C43-A l CS-1-078-420-C43-1 CS-1-078-021-C43-A CS-1-478-021-C42K-I CS-1478412-C42S CS-1-078-014-C425
~
i W472 W472A ,
e
~
i f
l l
e I
(.
t
.---n---- - ,.. ._ . . . . _ , - - . ,._nn---- - . - - . , - , , , _ _ . . , , . _ , . . , . , , _
. . i CPSES ISSUE DATE PROCEDURE NO.
INITIAL STARTUP TEST MANUAL ISU-008A NOV 08 W THERMAL EXPANSION REVISION NO. 1 PAGE 99 0F 132 ATTACHMENT 24 PAGE 1 0F 1 Table 11.4.13 Components Associated With Pressurizer Auxiliary Spray Monitored att Initial Ambient. 250. 350, 450, 550 Final Ambient CS-1-111-702-C42K CS-1-111-703-C425 .
CS-1-112-700-C71K CS-1-112-729-Celt CS-1-!!2-730-C&lK CS-t-112-727-C&15 CS-1-il2-731-C415 CS-1-112-7'A-C715 MP-101 t
MP 102 e
-1 l
O I
l .
e
CPSES ISSUE DATE PROCEDURE NO, INITIAL STARTUP TEST MANU.U. g g 'ISU~008A
(
THERMAL EIPANSION REVISION NO 1 PAGE 100 0F 132 ,
ATTACRMENT 25
_ PAGE 1 0F 1 Table 11.4.14 Components Associated With Chemical and Volume Control System Ecoitored at: Initial Ambient. 250, 350, 450, 550 Final Ambient CS-143404414-24 CS 4 4 M-7t M 43 CS-1-079-042-C425-4 CS-148404-014-2-1 CS-t-tM-721443 CS-1-07?-042-C425-I '
CS-145404417-2-A CS-t-lM422-C43-A CS-1-071444-C425-A CS 1-Al %4-017-24 CS4-l#-722-C434 CS-147744M425-5 CS-149406409-2 CS4-lH-720-C43 CS-1-079-045-C425-A CS-1484M-011-2 CS I-195400-C41K CS4-0M445 C425 0 CS-1-Al@t-013-2 CS4-lM425-C43-4 CS-1 104419-C423 CS-t-Al-000415-2 CS-t-106-725-C434 CS-t-EB-419-005-2 P'r-112 CS4-190405-C42K C!-14f 419-C07-2 CS-148-02145-2 CS-1-AS424402-24. CS449 019-)C8-2 CS_-t-PO-%4418-2 CS449424402-24 W-073 CS4 RI-42>0ll-2 CS-148424-402 2-C W-g75
( ,
CS-1-4424-007-J-A CS-1-100-700-C43 W-076 W-077 -- ,
CS-t-Al-024-0C7-5-4 CS-1-190404-C43 '
CS-I-88-424407-M CS-1-19640K43 r47s CS-t-001-017-C434 CS4405-700 C43 W-6M CS-1-001417-C42%-I C*rd-lM-710-C43 W460 CS4-001-024-C43 CS1-149-708C41K fr Cgt CS-1-001-02H43 CS4414-7M-Clit-A y-0q4 7 1
CS-1-ll4405-C41C4 y-og5 CS-1431-M9-C43 CS-1-079-034-C43 CS1-11C-701-C4tt r-!!0 CS-t-4M-422-Cl21-A C34-llHC4-Cftr-A t-122 CS-t-CM 42*-C434 Ci-t-il H 04-C41( l W-123 CS-147943M43-4 CS-1-244-101 C41( e-135 CS-14M43Ma%4 CS4-248-701-C4it-A PP-133 CS-t-0M-04H42K CS-t-244401-C41K4 W-134 CS-14M-700-C43 CS-1-!44-703-(.417. F-145 C3 1-0M-Mt-C42K CS-142940M35r p-144 ,
CS4482403-C42K CS t-93lN0( C51%
CS-t 102-7G4-Cl3 CS4-C M00-C35K CS4-102-709-C43 C34-942-70H::K C1-1 104406-C43 CS-14444sMilt CS-t-1C4-71 H l2K-A CS-1249401-Cett
- CS-t-1944tt-C434 CS-148-M4-M9-2 4 CS-1 104-Ta-C43 CS-148-004 Oct-2-9 CS-t 1954 0 M 4tt CS-1-Al-M44(M CS-1-lM40H43 CS448-004-011-2 I
CS-t-tM-MS-C43 C"4-N-004-0124 CS 1-l %-712 C4 3 C3-1-All 0G4420-2 CS-1-l M al M 43 CS4-49460-0C44 CS-1-lh41H43 CS 14849A21-2 6
- -- - - _ , - -m.m ,---. + , _ , , - , , . -
~
CPSES IESUE DATE PROCEDURE NO.
INITIAL STARTUP TEST MANUAL
(
AV08 E ' 8' THERMAL EXPANSION REVISION NO. 1 PAGE 101 0F 132 ATTACHMENT 26 PAGE7 0F 1 Table 11.4.15 Comportents Associated With Component Cooling Water System Monitored at: Initial Ambient, 250, 350, 450, 550, Final Ambient CC-1-5401403-3-A CC-I-217-414 "3 X CC-14H01-003-34 CC-1-212405-C33-4 CC-:-40-M2401 3 CC-t-218-M5-C53-I CC-1-48402-001-3 CC-t-210407-C32-4 CC-t-al-M3-M2-3 CC-1 218-007-C5X-t CC-1 -RS-003-M4-3 CC-1-2iB-006-C32 CC-1-it940545-3 CC 1-218-015-C$ 3 CC-1-95-M -0%-3-A CC 1-R9-00 H 13-3 CC-1-AB4054%-3-B CC-148-M4 016-3 CC-145-005-010-2 CC-148-001-M1-3 CC-1-AS4%-M2-3 CC-t-Al-003-011 A CC-148-Mf-M1-34 CC-190 M3411-3-9 .
CC-1-AH01401-34 CC-t-44405-401-3 CC-t-RS-009-003-3 CC-145-006-001-3 CC-148-001-M5-3 CC-1-RS-0H-M4-3 i CC-149-001-00H CC-t-AI-401407-3
! CC-1-RI-001-000-3 CC-149-M1411-3 -
CC-I-AB409-Mf-3 CC-t-RS-033-007-3 4 CC-t-R340H10-3 CC-1404:4H-3 ,
CC-t-R9409412-3 CC-t-217-0Cl C3354 CC-1-Al-M9413-3 CC-1-217 M1-C535-l' CC-t-RI401-014-3 CC-t-217 70C-C."5 CC-1-R8410407-3 r-115 CC-t4841H12-3 W-140 l CC-1-Al-010413-3-4 W-151 l
CC-1-RH10-013-3-0 W-152 l CC-t-RI411-M2-3 l CC-t-as-016-005-3 -
CC-140-031-021-5 CC t-48431-022-3 CC-t-RS431-025-5 CC-t M4444-Mt-3 CC-t-RS43403-3 CC t-et-001A-002 3 CC-t-RI-0828407-3 CC t-217404-C33-4 CC-t-217406-C324 I
.y _ _ . . .-. __ _ . . _ _. _ . _ _ - _ . .__- . % - _ ,. ._ , _ _ _ . _
l
^l CPSES ISSUE DATE PROCEDURE NO.
INITIAL STARTUP TEST MANUAL g ISU-008A i
TEERMAL EIPANSION KEVISION NO. 1 PAGE 102 0F 132 ATTACHMENT 27 PAGE 1 0F 2 Table 11.4.16 Componenta Associated With Main Feedwater System Honitored at: Initial Ambient, 250, 350, 450, 550, Final Ambient R-1-4174176-A FF1418-7C0-C43-A FF1-018-006-C725-A FF1417-017-C&2K4 R-1-018-704-C42K-5 FF1-018400-C725-8 FF1-4174186 FV-t-0184C1-C33 FFt418-001-C725-4 FF1-017423-C734 FF1-4184046 R-t-018409-C7254 FF1-417-023M4 FF1-018-705-C73-A FUt497-035-C&25 FF1417426-C73-A FV-1-018-705 M -1 FF1-097437-C425 F1-1-017-426-C72K4 FF1-018-704-C73-A FF1-098404-C625-A FF1417427-C73-A FV-t-018404-C72K-B Fu-1498-006-C6 5-8 FF1-017-027-C72K-B FF141M04-C73 R-1498-0!!-C625 FM-t-0! N 00-C43 -A FW-t-017-701-C73-A FW-t-017401-C42S R-1-017-700-C42K4 FW-t-0lM09-C734 FV-t-017-003-C725 FN-t-01 N 01-C4 2 -A FW-1-020-700-C42K-A FF1-017-004-C725 R 0! N 01 C43-0 FV-t-020400-C43-8 FF1-017-005-C725 -
FV-1-01 N 02-C3 3 -4 rpt.420404-C43 FW-t-01 M M-C72S j FV4-0lN02M-9 ry.g.020-701-C43-A FW4-Cll-007-C72S FF141M03M-A ry.g.020-701-C4it-t FV-t-017-717 6 -A i
FV 1-417-7C364 FV-t-096-004-C&2-A FV-1-017-717-C325-8 FF1-0!NOS-C73 FV-1-496-404-C62K-I Fu-t-0184Cl-C425 --
l FF1417-704-C73 ry.g.q,6-000-C&2 FM-t-018404-C725-A 1 FF1-0I N 07-C72K-A ry.g.49H12-C63 FF1418404-C725-9 ,
FM-t-41N07-C72K4 ry.g.o,6-702 6 -4 F1-1-018-707-C72K-A FW-141N00-C73 ppg 496-702-C42K4 FF1-OtB407-C73-B FF1417-710-C73 ry.g.og9 702-C43 FF1-018409-C72K-A FF 1-0I N I1-C7 3 ry.g.q,6-700-C42K-A FM-1-018409-C73-8 FV-t-01M126-A rpg.o,6-700-C63-9 FUt-018410-C72K-A FV-1417-712-C734 ry.1497-038-C&2K-4 FF1-018410-C73-B FF1-41 Hit-C&2K-A rpg.o9M33.C63-8 FF1-018411-C72K F F 1-0! H it-C&3-B ry.g.0974396 FF1-018-712-C72K-A FF L-el H 14 6 rpt-0974416 FF1-018-712-C72K-B F F 1-4t H 15-C62K-A ry.1-097-705 6 -A FW-t-018-714-C53 R-141H15-Ca2M ry.g.09M05-C&2K4 FW-t-0184176-A FV-14tH16-C33-4 ryq.g,Ht3M4 rpt-018417-C72K-8 Fv-t 41 H t&-C32L-l ry.g.ti H t3 6 -8 FW4-019403-C42FA FW-14tHlf-C73 n.g.41H05-C725-4 FF1-019-703-C42K-B FF t-4( H 21 6 ry.g.qtg.405-C725-8 FM-t-019404-C32K-A FF 1-0! H 22-C73 -A ry.g.qtg.406-C725-A FW-1419-7046-B l [ FF 1-4t H 22 M -I rpg4tg4g.C725.g Fu-t-019-706-C32K-A FF141H29-C&2FA rpg.018407-C725-A FF1-019-706-C334 FW4-elH296-1 ry.g.01H07-C725-8 l
CPSE3 ISSUE DATE PROCEDURE NO.
INITIAL STARTUP TEST MAN M. ISWOO8A NOV0s E83-THERMAL EIPANSION REVISION NO. 1 PACE 103 0F 132 ATTACHMENT 27 PAGE 2 0F 2 Table 11.4.16 Componenta Associated With Main Feedwater System Monitored at: Initimi Ambient. 250, 350, 450, 550, Final Ambient W439 FV-1-017-911-C474 W440 FV-1417-912-C&N W442 FV-1-017-913-C&7W W443 FV-1-018-901-C57M W444 FV-1-418-902-C57W W-044 FW-t-018-903-C57W W447 FV-t-018-904-C57W M448 FF1-018-905-C&N W-049 FV-1-018-904-C&7W
( W-052 FN-t-018-907-C&7W W-053 FV-1-018-908-C&7W -
W-055 Fu-1-018-909-C&M FV-1-017-M1-C57W FW-1-018-910-C&74 FF1-017-902-C5N FF1-018-911-C&N FV-t-017-M34-C5N F1-1418-912-C&75 FV-1-017-M3FC57W FF1418-913-C&N 7 FV-t-017-M44-C5N FV-t-020-907-C47V FW-1-017-9048-C5N FN-1420-909-C4N -
FV-1417-905-C&M FV-t-020-913-C47W FV-1-017-906-C&M FUl420-917-C4N FV-t-017-M7-C&74 FW-t-097-901-C&7W FV-t-017-908-C&75 FW-1-017-M9-C&M F1-1417 910-C&N m.,. , , , , , , , ,, .. - a
CPSES ISSUE DATE PR(X:h"RZ NO.
INITIAL STAICVP TEST MANUAL , , Isg 008A THERMA 1. EXPANSION REVISICW NO. 1
. PACE 104 OF 132 ATTACIDfENT 28 PAGE 10F 1 Table 11.4.17 Components Associated With Safety Injection Inside Containment Monitored at: Initial Ambient. 250. 350. 450, 550, Final Ambient Si-1-199-712C41K St-i-206-7se<4tt SI-t-201-7tt<41K-A St-i-201-7tt-C4tt-I St-i-202-711-C4tK-A l SI-t-202-711-C41K-l SI-t-101-009-C41K-A SI t-101-009-C41K-1 SI-t-059-703-C4tS ,.
! WM .
i .
s l _
l
I
'l CPSES ISSUE DATE PROCEDURE NO. l INITIAL STARTUP TEST MANUAL ISU- 8A NOV 0819M THERMAL EXPANSION REVISION NO. 1 PAGE 105 0F 132 ATTACHMENT 29 PAGE 1 0F 1 Table 11.4.18 Components Associated With Residual Heat Removal Inside Containment Monitored at: Initial Ambient, 250, 350, 450, 550, Final Ambient I
M-1401407-C41K M-t-001-013-C4tt Itit-1-002-009-C41K-A M-t-002-009-C41K4 M-t-404-0%-542K M-1-001-004-C415 RH-1-001-012-C415 RH-t-002-004-C415
(
-6
-e k
i l
CPSES ISSUE DATE PROCEDURE NO.
INITIAL STARTUP TEST MANUAL ISU- 8A i
NOV n 9199J -
THERMAL EIPANSION REVISION NO. 1 PAGE 106 0F 132 ATTACHMENT 30 PAGE 1 0F 2 Table 11.4.19 -
Components Associated With Main Feedwater and Main Steam Monitored at: Initial Ambient, 30% Power, Final Ambient EF1-001401-T345!Ak!) Fb-1-011-904-SpW FF1419901-557W FF1-001-0^4-T34! FF1411-907-557W FF1-0lb903A-S$7W FW-1401-000-T44S( AU S Fu-1411-906-SUN Fh-1-016-9033-SUh FW-1-002401-T345 FF1412-001-T545 FW-1-Olb904-SUN FW-1402-005-T44SI AH) FW-1412-002-T545 FFl4tb905-557W Fb-14644GI-T345 F 012-901-SU . FG-1-Olb!06-SUE FF1404-002-T345(A&I) FF1412-902-SUW FF1-016-M7-557M FW-l-004-003-T34S(AH) FF1-012-903-S$7W FW-1-021-001-T345(AU)
FF1-004404-T34SI AO) FV-1412-904-557W FW1-021-002-T345 FF1-004-005-T34SIAU) FW-1413-001-1545( A&B) FF1-021-003-T145 FW-1405-001-T34S(ALS) FM-t-013-002-S545 FW-1-021-M4-1145 FW-1405-002-T34S I AU) FF1413-M3-S545 FF1-021-005-T145 FF1-0M-001-T345 FF1-013-901-557W FV-1-021404-T!4SI AkB) ._
F4-1-007-001-T345 FV-1413-903A-557W FF1-021-007-114SIA6El FFl407402-T34S(Ant) FF1-013-9033457U FW-1-021-000-T14S Fb-1-0^7403-T34S( AU) Fh-1-013-904437W Fb-1421409-T145 Fb-1-ME-M1-T345 t ALI) FF1-013-905-557U Fh-1421410-T14!( At!-
eb-1-M9-M2-T!45 FW-1-013-%i-SUW FW-1-021-011-T145 _.
Fb-!409401-T34S t At!! FF1-013-M7-S!7W Fh-1-C22401-T345 4 Fu-1405-002-U4SIAu) FF1-014401-T545( AU) FW-1-022402-T34S( Ali- '~
Fh-1-009403-T34SI A!S: FW-1-014402-5545 FW-1-022-CS3-T145 FF1409-M4-T345 FV-1414-%3-5645 FF1422404-T145 FFly^*-MS *38Si Alb Fe-1-014-? G 4 SE Fh-1-0~~405-T185 9i5 '
FW-1409406-T34SIAE!) FW-1414-90!!-557W FW-t-022407-T14S tAH)
FW-1410-001-T345 Fu-1414-M4-!!7W FW-1-022-006-T145 Fbl410-002-T345 FW-1-014-905-257W FW-1-022-010-T345 FW-t-010-003-T34SIAO) FW-1414-9M-S2W FW-1-022411-T34SjAlf)
FF1-0!!401-T545 FW-1414-907-557W FW-1-025401-T145 FW-1-011402-T545 FW-t-015-001-T54S(Akt! FW-1-025-002-T14S Fel-Oll-003-7545 FF1-015402-$455 FW-1-026-001-T14S FF1-011-M4-T545 FF1415-0034645 FF1442401-5645 FF1411-005-!545 FW-t-015-901-S57W FW-1443-001-5645 FF 1-011- h -T54SiAU ) FW-t-015-903A-557W FW-1444401-!:45 rW-1-011 007-T445 FF1-015-M3f-557W FW-1445-001-Si45 FW-t-0!!-ME-T445 F'. 1415-M4-557W FW-) "4401-5645 l FE-t-Oll-010-T445 FV-1-015-905-557V FW-1-01:401-5645 !
FW-i-Cll-9014UW FW-1415-90b!!7W FW-1-054-001-5645 FF1-Cll-902-557n FF1415-M7-557W FW-1457401-5645 i FW-1-0!!-9034 Un FW-1-016-M1-T545( Ak!! FW-1442401-T345 FW-t-011-904457W FW-1-01FM2-Se45 Fb-1-062402-T345 l FF1411-905457U FF1-016-M3-5645 FF1462403-T345 l
. l
CPSES ISSUE DATE PROCEDURE NO.
INITIAL STARTUP TEST MANUAL , . ISU-008A hvV 0 919A J .
~
THERMAL EIPANSION REVISION NO. 1 PAGE 107 0F 132 ATTACHMENT 30 PAGE 2 0F 2 Table 11.4.19 .
Components Associated With Main Feedwa,ter and Main Steam Monitored at': Initial Ambient, 30% Power, Final Ambient FW-14*1401-S&2r ni!- Fh-1-106-014- 62E y-234 FF1491402-542K Fh-1-1;14014625 pp-2:3 FF1-M1403-542K FW-t-111-002-562K y-2 6 FF1491-004-S&2K FW-t-il2401-S&25 y-2p 8W-1 491-70 H f268 tift FW-t-!!2-002-StM y-2;g FF1492-001-S&2Kinki) FN-1-il3-001-S&25 y-239 FV-1492402-542r FV-t-il3402462K tA68) y-240 FF1492-003-54R FN-1-l!4401-S&25 y-243 Fel-092-004-S&2r FF1-ll4-002-S62r np-242 Fbl-082-700-562r FF1-ll4403462r(AtB) y-243 FW-1-09 H 0!-563 41!i FW-1-55-003-002-2 sp-244
( FW-1-093-002-542K Fb-1-53421404-2 RS-1-037-001-T445 Fv-t-093-003-542r Fbl-SI421405-2 MS-t-037-003-T445(At!!
~-
Fel-093404-S&25 FF1-58-022404-2 nc.g-037-004-T44; FW-1-0?3405-S&25 F#-!-SE-C22-005-2 MS-1437-007-T44!
Fu-1-094401-S&3 ' At!'- FF1-SI-023-005-2 MS-1-037-005-T44Sistoi FW-1494402-!!26 Fbl-SH23-Mi-2 ns-14P40c-T445 FW-j4:4-00; 5 2, re-t-!M24-M7-2 gg-3-Op4g g-T445 .3 ~
Fb-1-094-004-Se25 FF14~--024-005-2 pc-t-037-0:2-T445 FF1-0944054625 FW-1-!!-02 H 03-2 ns-g-035-00;-T445 "
FW-1-095-704-!&2r FF1-!H25404-2 MS-1435-003-T445 461:
rW-:-.:.st 70? et2i ste. Fr !4 H 2t-M3-2 p5-t-03o-Or.4-t 45 Fel-097-003-$s2r FW-1-S H 26 404-2 nc-1-03E-012-T44:-
FW-t-091403-542) FW-1-!!-027-003-2 MS-1-03ea:3-T445 F F 1-10 H 07-542r FW-t-S H 27-004-2 ns-1-032-014-T445(At!i Fb-i-103-009-5625 FW-1-S!-02E402-2 MS-143E-0!t-T443 FW-1-10 H 10-563 !ak!? FW-1-!!-035-001-2 MS-t-03!417-T445 # At?)
FW-1-103413-542' FW-1-S H 35-004-2 ns-1493401-T445 FW-1-10 H 14-562F FW-1-S H 37-001-2(AE!n ne-t-09o-0^3-Tats FF1-104-00H63 Fb-1-S H P -004-2(At!5 Fb-1-104-005-St*! Fb-1-$HI7-065-2(A!!:
FW-1-!04-Mt-!!3 tis FU !-!! 4 P-006-2 FW-t-104-013-565n Fb!-S!-0!7-00*-2(A6!'
Fbl-1044144t!! FW-1-!HP412 2 Fbl-105-003-!!!*. MP-22E Fb-1-105-010-S!!r MP-229 FW-t-10 H il-562) F-230 FW-1-106403-Si2) RF-231 F b l-10 H 12-S62nA,th21 no-232 FW-t-106-0!!-Si3 P-233 I
l l
CPSES ISSUE DATE PROCEDURE NO.
INITIAL STARTUP TEST MANUAL ISU-008A s
NOV 0 81984 THERMAL EXPANSION REVISION NO. I PAGE 108 0F 132 ATTACHMENT 31 PAGE 1 0F 2 TABLE 11.4.20 Pipe Lines Whose Dynamic Movement Must be Considered in the Engineering Evaluation Problem Line Problem Line 1 MS-1-001 5 W-1-019 2 MS-1-002 6 W-1-018 3 MS-1-003 7 W-1-017 4 MS-1-004 8 W-1-020 100 MS-1-001 152 W-1-095 100 MS-1-007 152 FW-1-099 100 MS-1-071 153 W-1-096 _
100 MS-1-002 153 W-1-100 100 MS-1-012 154 W-1-97 100 MS-1-069 154 FW-1-101 5 100 MS-1-003 155 FW-1-98 100 MS-1-017 155 FW-1-102 100 MS-1-070 10B W-1-094 l 100 MS-1-004 10B AF-1-020 100 MS-1-022 10B AF-1-055 100 MS-1-072 10B AF-1-024 80 A, B, C, D MS-1-025 IOC FW-1-091 80 A, B, C, D MS-1-026 10C AF-1-017 80 A, B, C, D MS-1-027
' 10C AF-1-052
(
80 A, B, C, D MS-1-028 10C AF-1-021
CPSES ISSUE DATE PROCEDURE NO.
INITIAL STARTUP TEST MANUAL
THERMAL EXPANSION REVISION NO. 1 PAGE 109 0F 132 i
ATTACHMENT 31 PAGE 2 0F 2 TABLE 11.4.20 Pipe Lines Whose Dynamic Movement Must.be Considered in the Engineering Evaluation (Continued)
Problem Line Problem Line 80 A, B, C, D MS-1-029 12D FW-1-092 12D AF-1-018 12D AF-1-053 12D AF-1-022 12E FW-1-093
(
12E AF-1-019 ..
12E AF-1-054 12E AF-1-023
~
- 1-53 RC-097 -5 1-53 RC-099 1-53 RC-101 1-53 RC-103 1-53 RC-110 t
l 1-53 RC-111 l
1-53 RC-112
'1-53 RC-115 1-53 RC-146 I
1 i
CPSES ISSUE DATE PROCEDURE NO.
INITIAL STARTUP TEST MANUAL IS,U-008A EV 08 1 8, THERMAL EXPANSION REVISION NO. 1 PAGE 110 0F 132 ATTACHMENT 32 PAGE 1 0F 2 '
Table 11.4.21 Temperature Measuring Locations Tearperature Point Isometric Location TP-01 RC-1-RB-020 RC-1-075-044-C51K TP-02 RC-1-RB-014 RC-1-115-012-C56S TP-03 RC-1-RB-019 RC-1-103-704-C75K TP-04 RC-1-RB-015 RC-1-146-004-C81K TP-05 MS-1-TB-008 MS-1-033-001-T44S TP-06 MS-1-TB-022 MS-1-036-700-T44S TP-07 MS-1-TB-020 MS-1-034-007-T34S TP-08 MS-1-TB-009 MS-1-033-011-T44S TP-09 N I-RB-004 W-1-018-714-C62K TP-10 N 1-RB-009 W-1-096-004-C62K --
TP-11 N 1-RB-003 N 1-017-008-C72S _
TP-12 W-1-RB-010 W-1-097-041-C62K TP-13 N 1-RB-010 W-1-097-705-C62K TP-14 N 1-RB-008A W-1-098-012-C62K
! TP-15 N 1-RB-002 W-1-019-706-CS2K TP-16 MS-1-RB-018 MS-1-150-058-C52K TP-17 MS-1-RB-017 MS-1-151-046-C52K TP-18 SB-1-SB-001 SB-1-060-032-S55K TP-19 SB-1-EC-006 SB-1-060-719-E35S TP-20 CS-1-RB-004 CS-1-RB-004-011-2 TP-21 CS-1-RB-031B CS-1-105-700-C41K o
CPSES ISSUE DATE PROCEDURE NO.
INITIAL STARTUP TEST MANUAL ISU-008A NOV08 1984 -
l THERMAL EXPANSION REVISION NO. 1 PAGE 111 0F 132 1 l
ATTACHMENT 32 PAGE 2 0F 2 Table 11.4.21 Temperature Measuring Locations Temperature Point Isometric Location TP-22 CC-1-RB-003 CC-1-RB-003-014-3 TP-23 CS-1-RB-001 CS-1-106-722-C42K TP-24 RC-1-RB-006 RC-1-069-001-C41K TP-25 RH-1-SB-014 RH-1-014-007-S32S TP-26 RH-1-SB-003 . RH-1-064-004-S22K TP-27 RH-1-SB-012 RH-1-SB-012-002-2
( TP-28 RH-1-RB-001 RH-1-001-004-C41S TP-29 RH-1-SB-002 RH-1 003-004-S32S TP-30 SI-1-RB-059 SI-1-180-005-C41K TP-31 RH-1-RB-003 RH-1-005-016-C42K TP-32 RH-1-SB-011 RH-1-SB-011-017-2 ,
TP-33 SI-1-RB-016 SI-1-101-009-C41K TP-34 WP-1-RB-005A RC-1-035-702-C41S TP-35 MS-1-SB-0023 MS-1-023-035-S33K TP-36 MS-1-SB-007 MS-1-028-005-S63S TP-37 MS-1-SB-048 MS-1-416-003-S33K
( -
CPSES ISSUE DATE PROCEDURE NO.
INITIAL STARTUP TEST MAN M ISU-008A NOV 08 1994 THERMAL EXP.ANSION REVISION NO. 1 PAGE 112 0F 132 ATTACHMENT 33 PAGE 1 0F 2 FINAL SUPPORT SHIM INSTALLATION VERIFICATION CRITERIA Support Shim Temperature Gap Tolerances Location (*F) (inches) (inches) Comments
- a. SG Inlet Restraint 557 0.122 +.047, .031
- b. SC Lower Support Slight contact Bumpers #1&3 (sides) 557 0.032 +.031 .016 permitted Bumper #2 (back) 557 0.218 !.063
- c. SG Upper Support 557 Acceptance is Bumpers #163 based on gap at
( Bumper #2 (visual inspection only) -
Bumper #2 557 0.215 !.063 Includes shell/
ring gap
. d. X-0 Leg Vertical 557 0.445 !.063 A 0.125 inch gap -
) Drop Restraint is acceptable ,
operating on a per loop basis
- e. X-0 Leg Horizontal 557 0.000 +.045, .000 Slight rubbing Restraints RCP Site permitted (vertical)
(horizontal) 557 0.000 +.045, .000 Slight rubbing permitted SG Side 557 0.000 +.045, .000 Slight rubbing (vertical) permitted 1
I (horizontal) 557 0.000 +.045, .000 Slight rubbing permitted I
1
CPSES ISSUE DATE PROCEDURE NO.
INITIAL STARTUP TEST MANUAL ISU-008A
\ NOV n s 1984 - ,
\
THERMAL EXPANSION REVISION NO. 1 PAGE 113 0F 132 {
ATTACHMENT 33 PAGE 2 0F 2 FINAL SUPPORT SHIM INSTALLATION VERIFICATION CRITERIA Support Shim Temperature Gap Tolerances Location (*F) (inches) (inches) Comments
- f. RC Pemp Tie Rods TR-l&2 557 0.000 +.030, .000 (top & bottom gaps)
TR-3 N/A N/A N/A Visual inspection is only required to note pin translation, I
f
-1 l
(
CPSES ISSUE DATE PROCEDURE NO.
INITIAL STARTUP TEST MANUAL ISU-008A
. gV 0 9198d ,
\
THERMAL EXPANSION REVISION NO. 1 PAGE 114 0F 132 ATTACHMENT 34 PAGE 1 0F 1 Figure 11.5.1 -
Snubber Data Measurement Techniques Ac M Au uc a x ,
t ]
O !!
' e
.a g t , enc memnc SIZES: PSA-t/4 & PSA-t/2 ._
, Ac (COLD) ,
Aw LMOT) i e b .3 ih k,
. ji j;
N
) i l - momnc SIZESS PSA-1, PSA-3 & PSAHO A. (CCLO) i Ag wCT) l I l
l l Y Y I
q PAC:nc SC:ENT1FIC SIZES 4 PSA-35 & PSA-t00 h
CPSES ISSUE DATE PROCEDURE NO.
INITIAL STARTUP TEST MANUAL ISU-008A NOV 0 8 1234 .
(
THERMAL EXPANSION REVISION NO. 1 PAGE 115 0F 132 ATTACHMENT 35 PAGE 1 0F 1 FIGUKE 11.5.2 -
Snubber. Swing Angle (SWG ANG) Observation I
CXAM4NE M SNUGSDI ATTACNMENT P0eN TS. VERIFY THAT THE SWING ANGLE OF M SNusact DOCS NOT INHigfT FRE MOTION OF THC SMSSER.
ASSURE THAT THC SWTVEL SALL ENDS ARC NOT SIN 0 LNG AND M pacott Exos or Twt SNumerR Anc Not N CcNTACT Witw THE sTMuCTuRAL ATTACNMENT CR PIPC ATTACHW.N T.
- em YPICAL STRUCTURAL pg OR PtPC ATTACHMENT
/ -
! Cex roa r-- - -
anNaNG L- .3 ~
SWlVEL BALL END l
e i
l l l
i 1
CPSES ISSUE DATE PROCEDURE NO.
INITIAL STARIUP TEST MANUAL ISU-008A NOV 0 8 jgg,2
(
THEPMAL EIPANSION REVISION NO. 1 PAGE 116 0F 132 ATTACHMENT 36 PAGE 1 0F 1 FIGURE 11.5.3 ,
, Variable Support Data Measurement Techniques PLACE STRAIGHT EDGE on SPRfNG SIDE OF LOAD INDICATOR SAR AND READ LDAO(LSS.) FRoad LDAD SCALE ON CCRRESPONDmG S!QE OF STRAIGHT EDGE AS INDICATED ON SKETCH SELOW.
, READ LOAD SCALE ALONG EDGE Lt3AD NDICATCR BAR
!,TRAIGHT EDGE g l M ., l
==
mc $
mas a.
1 8 '~'
LcAo SCALE
\ ;4i;
' SAD WTAT.JUruftf" N l
uno no u;,m W s-== et. c.
N une/ocrtsman s:xx M - AI. WAYS M O F#CM tTm.E tew utAsuntutut me s otrLtctio= m o= ht TWavtL SCALE.
(
l l
l 1
l l
~l CPSES ISSUE DATE PROCEDURE NO.
INITIAL STARTUP TEST MANUAL ISU-008A j
THERMAL EIPANSION REVISION NO. 1 PAGE 117 0F 13'2 !
l ATTACHMENT 37 PAGE 1 0F 1
. FIGURE 11.5.4 Constant Supports Data Heasurement Techniques NPSI (NPS INDUSTRES. INC.)
POSITION OF THE SUPPORTS tel INCHES IS DETERMINED SY IRLTIPLYlN44 l fsIMO4CATED POSIT 1001 : TOTAL TRAVEL (!N) e PCSTION SETTING EXAasPLE: 3-l/2" TOTAL TIUWEL
- l. 4 INDICATED PCSITION I/ 4 a 1.4 s 3-1/2" s 0.82 IN PCS! TION SETTING s
/ "'% -=
N -4 e Y
\ ~
/~ u
-I -
LDAD itX.x CR C:.EVl3 k
2 3 4
' 5 S i l /
SIX (4)
INCREMENTS OE All. l
l CPSES ISSUE DATE PROCEDURE NO.
INITIAL STARTUP TEST MANUAL NO\/ 08l ogj ISU-008A THERMAL EXPANSION REVISION NO. 1 PAGE 118 0F 132 ATTACHMENT 38 PAGE 1 0F 1 FIGURE 11.5.5 Constant Support Data Measurement Techniques N AVC0 (BASIC ENGINEERS)
POSITION OF TIC SUPPORT IM INCHES IS DETERM!NED BY MU.' TIP(YING:
I POSITION 3 TOTAL TRAVEL (IN) a POSITION SETTING k a INDICATED EXAMPLE: 3-l/2 TOTAL TRAVEL 0.25 INDICATED POSm0N t/10 s 0.25 a 3-t/2"
- 0.09 IN POSITION SETTING I
asCTT-maas6tW Deowse AT -
T. or v.
(
. _a -
-4. -
m ,
e .,
- . T taavt. weicaton LocaTc II a Too , sea , acru. . -
l DCwee TRAWL nassern E 5 TDeomany I -
too*.e 9
+ .,
F s $. ,
Mi'4-N weesTE C2.0
- stos \ ,
g ,,
TDs40) iseCROstYrs M
M TDeatasty L.oO*i8e Tum seCATUt 8 f* e..
-e- .
- LOCAT O estas ac? Tees a
_ sen 3 - _
y e F004 Ocwes -
CvtR tam ,
T"'*T=
i\ f. twaW6
- TA3-sco e.,
- '"C" s
- OC*Aa L e
l CPSES ISSUE DATE PROCEDURE NO.
INITIAL STARTUP TEST MANUAL ISU-008A NOV o a 1984 THERMAL EXPANSION REVISION NO. 1 PAGE 119 0F 132 ATTACHMENT 39 PAGE 1 0F 1 FIGURE 11.5.6 Constant Support Data Measurement Techniques PCwDt PtPfNG CO.
. PCETION & TNE SWPORT IN pfCNES IS DETDDANED ST IMA.T1 PLYING:
' s INDICATE POSmON s TOTAL TRmEL (lN)= PCSm0N SETTING W NCL OF INGIDIDfT3 EXAasPLE 3-1/2" 1011L TRWEL 2 INDICATE PCSmoe 64 NO. OF IICRDdENTS t/14 s 2 a 3*t/2"e C.S IN POSITION SETTUC Tctas, rame, i.ocAten stassac
\ / act m.Afts or uset
- o ocr a cima asamuses/Ton ._
O e The. 8'AE / A 7
) aTTaoserr stactunt T
f #
v museet or senestwts woes t
A
~
Q b _
nave. -
2 h Y O _
%nri
. c mes ==e. er .weca
, l s u sato so. Tous antA j 55; C m ,, - '** " ~
'w'*'s't"sta'nspe s ee 'se**** *'Tw
- 's ansa a am COETirtCatcos Pt. ATE
- NCTE: THE POWDt MPtNG TRAVEL SCALE 13 DMOED INTO AN ARSfTMARY NUMODt
& INCRDdENTS. TO DETDhmE TIE NUMSDt OF INCRDADfTS COUNT TNE NLadapt QF iMCROdENTS SETWEEN THE COLD PCSm0N MARtGR AND T)E TO11L TRAVEL INDICATION STAndP.
I
CPSES ISSUE DATE PROCEDURE NO.
INITIAL STARTUP TEST MANUAL NOV 0 8 19g4 IS M 08A THERMAL EIPANSION REVISION NO. 1 PAGE 120 0F 132 ATTACHMENT 40 PAGE 1 0F 1 FIGURE 11.5.7 Constant Supports Data Measurement Techniques ITT WWNNELL PCsmCN OF THE SUPPORT IN INCM3 18 DCTERtRNED SY MULTIPLYINGs 1/:0 s INDICATED POSITION a TOTAL TIIAVEL (IN.) e POSTTION SETTING EXAasPLE 4-1/2" TOTAL TsuwEL
.; 3.25 IN13CATED POSITION t/10 a 3.25 s 4.5" e 1.46* PC5 MON SETMNG
- 1. 1.
/ .
I e ~
e Y
~
/S ll S' i
/ __ , d e i l orna. i -
l
,e e , .
1 . e
} q - ,
u ,
s y .
..( e, o QEML1 4_
l DETAIL I ,
(
ee --en-f e
CPSES ISSUE DATE PROCEDURE NO.
INITIAL STARTUP TEST MANUAL ISU-008A NOV o a 198 THERMAL EIPANSION REVISION NO. 1 PAGE 121 OF 132 ATTACHMENT 41 PAGE 1 0F 1 Figure 11.5.8
- oca ns na DATA SHEET NO. I "
RCS EQUIPMENT SUPMTS & RESTRAWTS met 09 REFERENCE CRAWING:
LOCATION:
LOOP NO.
ELEMTION VERIFIED BY. DATE SHIMS REQulREDs YES NO 1
MEASURE / RECCRO (LN) l
" " ' " ~ '**
250 35o 450 e
- a. RCMARKS l
mais cuam se==
11 I
i i I 7 i -e i 1 i i i l l 1 -
1 I i i i i I ,
I I i .I li i l l l 1 I I I 11 I i 1: I l i I i l li 1 I l l I I i l i l i i I I l i l i I I I i 1 I -
1 i i i I L i i i l l 11 I i 1 4 -i i
\
True. I I I I TIME I i f l DATE l l
mmat l l ',
1 I sh
i e -
CPSES ISSUE DATE PROCEDURE'NO.
~
INITIAL STARTUP TEST MANUAL '88- 8A NOV 081984
(
~
THERMAL EIPANSION REVISION NO. 1 PAGE 122 0F 132 l
ATTACHMENT 42 PAGE 1 0F 1 FIGURE 11.5.9 enocanuu ac.
DATA SHEET NO. IA "*
RCS EDUPMENT SUPPORTS & RESTRMNTS paa artmes onawmos or LOCJDONt LOOP MC.
ELEVATION
-1 G
4 i
(
9*
, . , , ,,-._,_r_. - -
l CPSES ISSUE DATE PROCEDURE NO.
INITIAL STARTUP TEST MANUAL g jgg ISU-008A
(
THERMAL EXPANSION REVISION NO. 1 l PAGE 123 0F 132 ATTACHMENT 43 t
PAGE 1 0F 1 i
FIGURE 11.5.10 succgDWIE 880-avo EnN
- 09 2
E 5 se a $ II Ee [:e II !ii Wa -
n e SW s
. i g -
y_$ !#i- l __ l l l l il l s s
( o I l
$ SE
~
N W - !isr I I E !"- .
a,_
,_m 1 ww <
W 1,i, I.
i ! I i _
W 'I l I -
I s -
g _
W H
! W i
_a -
i h l E
ili! l I
g r
3 li I l=.-
si!l s I 5 l1W -
lit I mil i
s ls-E=- a I
hlhE II g
' "d ite i l c I ing !g .
l i- l l l l l .si.. .=.ta:
( *=
sg g.g" -
w m I - O E w. -
3.e=
e CPSES ISSUE DATE PROCEDURE NO.
m TIAL STD TUP TEST MANUAL I88- 8A fiOV08 N .
THERMAL EXPANSION REVISION NO. 1 PAGE 124 OF 132 ATTACHMENT 44 PAGE 1 0F 1 FIGURE 11.5.11 i
pea:sount ma NOL in Beet W
2 w
i= E a
O W .
IU y a <=
, II -
2
$ E *
- e I"$8 3 h 5 .
a a S - s' s ! ,
N 4 [s f5 31 a _
CI w h 3 zg = , .f. . 4.
g l
/ y ;
W J, s s 4
w- , .
=5 m *; n -
va .
q 5 e-
- <5 g ~* h-s a .
h5 N . wa e ,. e gw g
' Ig C '
$ #. 3. E 3 ~. g si !
l g ii
. I I]dE i
- !Ss!
- '
s= g:I I .
lsx4 e 113
..- 6.= .
I E 5 2n o i I. $ < $ C g' 5 5
- ) d.15 E
] I ;f f i
% . !' E .* = !
G
l CPSES ISSUE DATE PROCEDURE NO.
INITIAL STARTUP TEST MANUAL , ISU-008A hud 0 Q SfM .
THERMAL EIPANSION REVISION NO. 1 PAGE 125 0F 132 ATTACHMENT 45 PAGE 1 0F 1 FIGURE 11.5.12 paoccus me.
OmK as 3 3C 2
E i
o Q = {w I
Ia 5m s :* 5 -
l,w:3 :
l l .
e s
I a . .
- W W WE -
e2 ia hb I l l l l IEe e a 's -is l l 5
s .l H~ g ;= y -e WD yz .
' r.i r a
- c -
~5 m =
gm ,.,
l .
l l E ~
- ss != !!!/ i i j i l I
- l
<g' o ,.e l. l l l t. _t 3,
IU '
E.l E la ;gs l-5 ?
e l l 'Ef h - c. .
I5 x
!![ ! ! ! ! , $e$E!! I
. i.
. l l 121="
... l S E 4 .
ia . , , .n ni I e I
3 I I I!: Eis l li 5
g.:==
a =. ,I E. l
- , .. i l
l1 Elli_~ 8' l .I ?g!Est;!
a .w-,*
- l 1
CPSES ISSUE DATE '
PROCEDURE NO.
INITIAL STARTUP TEST MANUAL ISU-008A
.NOV o s 1984
(
THERMAL EXPANSION REVISION NO. 1 PAGE 126 0F 132 ATTACHMENT 46 PAGE 1 0F 1 ,
FIGURE 11.5.13 mecteunt no.
aty.
I w
E 5
2 End I
- E= != =
g: .
m
~
o o E- 3 :
- T E (g
m d i z.e -
in .
2 t,g 5 e w n y
E z
l M$ $ E1 3
~
cn -
w iE I H< 5d ia l C I
~
ts -
5 V 2 -
1 I e
a Mt l a a 5 a
g! .
s -
sa la. !
j -*
=
is
-i a l l l 1 -a: ..
gss -
s e=
I**
11 nl,.
a i .
l +
CPSES ISSUE DATE PROCEDURE NO.
INITIAL STARTUP TEST MANUAL gg ggg ISU-008A THERMAL EIPANSION REVISION NO. 1 PAGE 127 OF 132 ATTACHMENT 47 PAGE 1 0F 1 FIGURE 11.5.14 M
n pas 09 3
=
5_, !5 o i e t 5s e- W3 E
y1 a
- 3
- I' E
- !* 3 8
(
8, E EI 8 g .- -
L S E 15 eE $
- 5%
O 32 g 8 Z * *
.. - -i H
5 E 1 i
$e8 ., -
E " j - :
=. 3 5 *
. e Mci
- l !
i 3 .
@:E 5 *32 * .D 1 g E Ob i ,;11
!!x ?
!! I le
=
g Yo la s*
~ ! m *e t
BE !
il- I5 a
l 15.2
- 35 .i 3 E$8*=$ g, g- g*
a . < 1 <
$
- 1 2.5
- s2
- g se {1
- y _a g*ng _ =
.I
= m, z 1I -
$ 5
- a it' iigs is = allit!
. .e v=_ .
i n no sz, k f "I . .-
k
.s-n.== ,8 a(, b s1 ss k!!I!! $
o li$}k:I!E I"
-- ---- . e - .- - - - . . . . . - - - . . - , - . . - , - -
.... . . . -- ~~
CPSES ISSUE DATE PROCEDUKE NO.
INITIAL STARTUP TEST IfANUAL liDV 0 8 IW
'8"- **
THERMAL EIPANSION REVISION NO, 1 i FACE 128 CF 132 ATTACHMEN"' 48 PAGE 1 0F 1 FICURE 11 5.15
.__ _ _ . _7mp
=
l 4
h 2 w
EE l
e '
O dW I W =
3{ f .
%5 so I
' I o.
s .
}-
_ N U
T ja i d W o
- z =. s f_
-s 1c 8 g- y \
W4 i -4 3
- w (n *~ G&
g H M 4
- lq $
<t g - .I i,
ai g=3 .
8 3 j j !-
II s I'.I l
l E~ !a! !
l
- I -
g"Ef !
- ."i<
.I Ed.
5 s:
I E kW =w 3JE 5
- g54 g at g
.$!. E *a ~ g _
al - - -
a f
, CPSES ISSUE DATE PROCEDURE NO.
INITIAL STARTUP TEST MANUAI. NOV c, s 10M 1su-008A
@ ERMAL EXPANSION REVISION NO. 1 PAGE 129 0F 132 ATTACHMENT 49 PAGE 1 0F 1 FIGURE 11.5.16 ,
~~" '
DATA SHEET NO. 5 l P18E MCNEMENT y wm a un t
P9E Mll 8tCDC DT. 1 % 8111 eeG3E PT IIEF t>st est1 STNCE 884 NEF OM fath STMER 4 l
l l
e 3
I -
I I wfAtvRE 6 rec::RC (tN) l m.
C 2:c sao ano sao atuanw.s M Y l l
ei- ': ~ i i 1 1 4 l l uar mia .I I I I I I
( ~x' 1 l e
t_ ___
r w ar "Y" l l
%: 'z' i o i
, .;mr rese l l l l l l j rsnu. !
I l I i l ( ._
W l l l l j i
_n == m .m=.n .,m . .um m e se aerse.e mes.ess sme
.u . a u s.
wee %
Tr8(R916O SIR!Ab @
Esgaattcss . Out 04ft l
l
_ m i
CPSES 'SSUE DATE PROCEDURE NO.
INITIAL STARTUP TEST MANUAL :30V 0 o 1994 ISU-008A
(
THERMAL EIPANSION REVISIONNb.1 PAGE 130 0F 132 ATTACHMENT 50 PAGE 1 0F 1 FIGURE 11.5.17 ,
=
DATA ,*.,HEET NO. 5A .
P1PE MOVEMENT 85"'
or VDtlMED D DATE RE DWEL NQ N00E PolNT STMESS NC.
I 1
l t
I
-t autsc1D INITIAL 250 150 450 SSO N"# I" REMAPMS noceer AusiENT AMsIENT !
x- ,
v- ~
l
'Z' , l L LINE TEMP i l l l l i INmAb l l l l l l f OATE l l l l l l
n m. ..n..
. _- am smtw ,
1 causar=N out oArt t.mc Nc.
l i i i
b CPSES ISSUE DATE PROCEDUPI NO.
INITIAL STARTUP TEST MANUAL ISU-M8A AUV 0R 1994
( .
THERMAL EXPANSION REVISION NO. 1 PAGE 131 0F 132 l
ATTACHMENT 51
- PAGE 1 0F 1 ,
FTCUPI 11.5.18 .
Data Sheet No. 6, 7, 8, and 9 .
DATA 5HEET NO. "' c"*E "" ;
e :
ftESTRA.NT NC ftEE DwE N0(:l3 i 1
I RsLDING a
MICRid No. UNE ,
VEfttF1ED BY: 0, ATE:
(
."EIIL t satesy omsc en ex*=o oc.as set: M.S.Lw.iJt ON
- 2. au. etAaMMorTs Amt races wt samt ucTat wM ,
==t to M asce toot w ' -
M ecs7maat.
- s. au. =asaammerrs amt a iseC>tI.
- 4. LtNC TDsSATU#ts stPE '
osmvc tecu mostomino power remagnarunts.
VIEW LOO 4GNG l T3","'l cessivt wa= =t/secomo
.. r.
- INT CES ACT 250 350 450 QC3 , ACT M ftEMAKxs t l l 2 i l I 3 ,
I e i 1:
I i i I i i l l-( l I i i I U NE TEMP l l l l TiuE l l
QATE .
INITI AL l .
1 ym,, --,,w- -
- - * * ' -t = h
r CPSES ISSUE DATE PROCEDURE NO.
INITIAL STARTUP TEST MANUAL ISU-008A
.NOV 08 1984 .
( ._
THEMfAL EIPANSION REVISION NO. 1 PAGE 132 0F 132 ATTACHMENT 52 PAGE 1 0F 1 F16 ure 11.5.19 N .*:0,
- y eSu=C28A k' IWf, a
- h a
It:
'gz S
- \
1,s .
m ' '
W '
D R H -
4 gg. --
W !!
- c. m 1*
2 a .
N 5:$ k -
I cl Q y -;
c s
.b a :- .,.
I*
H W i w
i I
. lE. '
m i l i [
n t e
a :
C :r
~ l 7 ,
M i lX 5 , ,
E ;
g -
5 C
I ,
w I t
N ,E i : , t=
! EU A =
d '
(
E E 3
~
1 , e 5 5 l 1 l 3 E
- 1 l .
I
--- -