Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20211K575 + (Rev 1 to Generic Concern Task Force Employee Concern IN-85-289-001,IN-85-894-001,XX-85-093-002,WI-85-060-001 & IN-86-209-013, Operator Training)
- ML20210E306 + (Rev 1 to Generic Issues Rept Evaluation & Resolution of Generic Technical Issues for Cable Tray Hangers)
- ML20138P423 + (Rev 1 to Generic Plant Comparison)
- ML20215B508 + (Rev 1 to Gensap Program Verification Document Program Version 4.0)
- ML20087H653 + (Rev 1 to Giraffe QA Plan (TOGE-110 Test Programs))
- ML17265A558 + (Rev 1 to Gnpp Internal Flooding Probabilistic Safety Assessment Final Rept)
- ML20045F340 + (Rev 1 to Gpun Pdms QA Plan for Tmi,Unit 2)
- ML20058D370 + (Rev 1 to Grand Gulf Nuclear Station Core Operating Limits Rept Safety-Related)
- ML20211Q911 + (Rev 1 to Grand Gulf Nuclear Station-Unit 1 Emergency Procedures Upgrade Program Procedures Generation Package)
- ML20043F057 + (Rev 1 to Grand Gulf Unit 1 Cycle 5 Plant Transient Analysis)
- ML20043F049 + (Rev 1 to Grand Gulf Unit 1 Cycle 5 Reload Analysis)
- ML20115J619 + (Rev 1 to Grand Gulf Unit 1 Cycle 6 Reload Analysis)
- ML20033D832 + (Rev 1 to Guidance & Discussion of Requirements for Application to Terminate Nonpower Reactor Facility Ol)
- ML20197D133 + (Rev 1 to Guidance Policy NMS-4001, Guidance Policy for License Termination & Decommissioning of Sites Contaminated with Radioactive Matls, Effective 980821)
- ML20195G630 + (Rev 1 to Guide for High Integrity Container Topical Rept Applications)
- ML20154M811 + (Rev 1 to Guidelines & Technical Bases for NUMARC Initiatives Addressing Station Blackout at Lwr)
- ML20141B081 + (Rev 1 to Guidelines for Decontamination of Facilities & Equipment Prior to Release for Unrestricted Use or Termination of Licenses for Byproduct,Source,Or Snm)
- ML17264A189 + (Rev 1 to Guidelines for Instrument Loop Performance Evaluation & Setpoint Verification)
- ML20115D224 + (Rev 1 to HI-92880, Criticality SE of Comanche Peak Fuel Storage Facilities W/Fuel of 5% Enrichment)
- ML20215D866 + (Rev 1 to HVAC Design;Fire Damper Latching Test)
- ML20076D953 + (Rev 1 to HVAC Recovery Plan. W/One Oversize Encl.Aperture Card Is Available in PDR)
- B13041, Rev 1 to Haddam Neck Plant Third 10 Yr Interval Inservice Testing Program + (Rev 1 to Haddam Neck Plant Third 10 Yr Interval Inservice Testing Program)
- ML18011B037 + (Rev 1 to Harris Uit Cycle 7 COLR for 950905)
- ML18016A597 + (Rev 1 to Harris Unit 1 Cycle 8 Colr)
- ML20236B835 + (Rev 1 to Hatch 9X9 Lead Fuel Assemblies Sar)
- ML20133E277 + (Rev 1 to Health Physics Procedures)
- ML20214A124 + (Rev 1 to Health Physics:Health Physics Facilities,Clothing & Protective Equipment)
- ML20155A323 + (Rev 1 to Heatup & Cooldown Limit Curves for Jm Farley Unit 2 Reactor Vessel)
- ML18038A113 + (Rev 1 to High Energy Line Break (HELB) Evaluation Rept (Effect on Nonsafety-Related Control Components). Six Oversize Figures Encl)
- ML20155F977 + (Rev 1 to Holtec Rept HI-982056, Reanalysis of Crystal River Pool B Spent Fuel Storage Racks with Boraflex Degradation)
- ML20077C496 + (Rev 1 to Hope Creek Generating Station Bailey 862 Sys Logic Module Failure Data Rept,First Quarter 1991)
- ML20235E154 + (Rev 1 to Hope Creek Generating Station Inservice Testing Program (Pumps & Valves))
- ML13324A471 + (Rev 1 to Hot Safe Shutdown Sys Interaction Review)
- ML18087A743 + (Rev 1 to Hot Standby to Min Load)
- ML17305A706 + (Rev 1 to Human Factors Engineering Dcrdr Final Supplemental Technical Evaluation Rept,Palo Verde Nuclear Generating Station)
- ML20129E805 + (Rev 1 to Human Factors Engineering Operating Experience Review Rept for AP600 Npp)
- ML20035B613 + (Rev 1 to Human Factors Evaluation & Allocation of Sys 80+ Functions)
- ML20138L850 + (Rev 1 to Humboldt Bay Power Plant Unit 3 - Safstor QA Plan)
- ML20071D936 + (Rev 1 to Hydraulic Snubbers)
- ML20246F637 + (Rev 1 to Hydrogen Water Chemistry Installation Rept for Amend to Facility Ol)
- ML20245E797 + (Rev 1 to Hydrogen Water Chemistry Installation Compliance W/Epri Guidelines for Permanent BWR Hydrogen Water Chemistry Installations Sept 1987 Rev)
- ML20217Q098 + (Rev 1 to Hydrogeologic Investigation & Ground-Water/Surface Water Monitoring Work Plan for Combustion Engineering Hematite,Mo,Site)
- ML20210H511 + (Rev 1 to I-85-373-NPS, Documentation of Required On-The-Job Training for NDE Personnel Certification, Employee Concerns Special Program Rept)
- ML20238A409 + (Rev 1 to IE Bulletin 79-01B,Environ Qualification of Electric Equipment,Brunswick Steam Electric Plant,Units 1 & 2 (90 Day Rept))
- ML17055B228 + (Rev 1 to IE Bulletin 79-27 Study Rept of Findings for Nine Mile Point Nuclear Station Unit 2)
- ML20100N270 + (Rev 1 to IE Bulletin 79-27 Study,Rept of Findings for River Bend Station Unit 1)
- ML20196C099 + (Rev 1 to IE Bulletin 88-005 Investigation Rept,South Texas Project Electric Generating Station - Unit 2)
- L-96-018, Rev 1 to INEL-96/0188, TER on Third 10-Yr Interval Inservice Insp Program Plan:Gpc,Ei Hatch Nuclear Plant Units 1 & 2 + (Rev 1 to INEL-96/0188, TER on Third 10-Yr Interval Inservice Insp Program Plan:Gpc,Ei Hatch Nuclear Plant Units 1 & 2)
- ML18065A757 + (Rev 1 to IPEEE Rept, Per GL 88-20)
- ML20155B120 + (Rev 1 to ISAP:I.a.4,Agreement Between Drawings & Field Terminations,Comanche Peak Response Team Results Rept)
- ML20155B122 + (Rev 1 to ISAP:I.b.3,Conduit to Cable Tray Separation, Comanche Peak Response Team Results Rept)