Search by property

Jump to navigation Jump to search

This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.

Search by property

A list of all pages that have property "Title" with value "Rev 0 to BWR-2 Transient Analysis Model Using Retran Code". Since there have been only a few results, also nearby values are displayed.

â§Ľshowingresultsâ§˝

View (previous 50 | next 50) (20 | 50 | 100 | 250 | 500)


    

List of results

  • ML20151R862  + (Rev 0 to Assessment of 50% Tube Wall Repair Limit W/Respect to Reg Guide 1.121)
  • ML20100P958  + (Rev 0 to Assessment of Doses in Unit 2 Control Room Due to Locked Rotor Accident at Unit 2 Assuming 18% Failed Fuel)
  • ML19332F410  + (Rev 0 to Assessment of Spent Fuel Pool Liner Leakage)
  • ML20023D146  + (Rev 0 to Assessment of Stitch Weld Strength in HVAC Ductwork Const,Lasalle County Station Units 1 & 2)
  • ML20141M824  + (Rev 0 to Audit Plan,Comanche Peak Steam Electric Station, Cable Tray & Conduit Support Reanalysis,Project 6410)
  • ML20072L341  + (Rev 0 to Auditable Link Document for Byron Unit 1)
  • ML20091M740  + (Rev 0 to Augmented Inservice Insp Plan,Comanche Peak Steam Electric Station)
  • ML20137F130  + (Rev 0 to Auxiliary Bldg Sump Sludge Prevention (Regulatory Required))
  • ML20129B803  + (Rev 0 to Auxiliary Feed Pumps Overspeed Trips)
  • ML20076D144  + (Rev 0 to Auxiliary Feedwater Sys Design Review Rept. Util QA Statement Re Verification of Adequacy of Design & Const of Byron Unit 1 Encl)
  • ML17346A404  + (Rev 0 to Auxiliary Power Upgrade Summary & Design Evaluation. W/10 Oversize Figures.Aperture Cards Available in PDR)
  • ML20248M047  + (Rev 0 to Avlis Nuclear Criticality Safety Rept Validation of Scale 4.3 Wbs 1.6.1.2)
  • ML20135G589  + (Rev 0 to B&W Owners Group Emergency Operating Procedures Technical Bases Document. W/Three Oversize Drawings)
  • ML20210T800  + (Rev 0 to B&W Owners Group Trip Reduction & Transient Response Improvement Program)
  • ML20206S233  + (Rev 0 to B&W Svcs,Inc Parks Facility Final Survey Rept for 1996 Remediated Area of Outfall 3)
  • ML20217D491  + (Rev 0 to B-SP-93-06 Assessment Plan Outline, Program or Area:BNP-1 Startup & Power Ascension Readiness Assessment)
  • ML20198T296  + (Rev 0 to B2C13, Brunswick Unit 2,Cycle 13 Neutronics Startup Rept)
  • ML20147E560  + (Rev 0 to BEN-50-723, Seismically Qualifying Conduit Supports)
  • ML20147E392  + (Rev 0 to BFEP-PI 86-05, NRC IE Bulletin 79-02/79-14 Program Document for Browns Ferry Nuclear Plant)
  • ML20055F724  + (Rev 0 to BOP-69, Receipt Insp of Poly HIC Engineered Barriers)
  • ML20055F753  + (Rev 0 to BOP-70, Offloading & Storage of Poly HIC Engineered Barriers)
  • ML20055F754  + (Rev 0 to BOP-71, Disposal of Polyethylene Hic)
  • ML20247N750  + (Rev 0 to BSEP Unit 1,Cycle 12 Colr)
  • ML20093D675  + (Rev 0 to BVPS SSFI Technical Assessment Plan for Unit 1 - Safety Injection Sys)
  • ML20012F547  + (Rev 0 to BWR Owners Group Response to Generic Ltr 89-19, Encl 2,Hardware Change Recommendations)
  • ML20235J143  + (Rev 0 to BWR-2 Transient Analysis Model Using Retran Code)
  • ML20210P139  + (Rev 0 to BYR97-332, CR Dose for MSLB Accident)
  • ML20034H574  + (Rev 0 to Basis for Continued Operation W/Crack in Core Spray Header)
  • ML20207S941  + (Rev 0 to Bnwl Administrative Procedure PAP-604, Independent Technical Review)
  • ML20207S950  + (Rev 0 to Bnwl Administrative Procedure PAP-101, Communication & Commitment (Interface) Control)
  • ML17324B003  + (Rev 0 to Books 1-3 of Analysis of Pressurizer Safety/Relief Valves Discharge Piping Sys Per NUREG-0737,II.D.1,Unit 1)
  • ML17324B005  + (Rev 0 to Books 1-3 of Analysis of Pressurizer Safety/Relief Valves Discharge Piping Sys Per NUREG-0737,II.D.1,Unit 2)
  • ML20237F606  + (Rev 0 to Braidwood Plan for Managing Unit 1/Unit 2 Concurrent Activities)
  • ML20128K894  + (Rev 0 to Braidwood Unit 1 Preservice Insp Program)
  • ML20235H282  + (Rev 0 to Braidwood Unit 2 Preservice Insp Program)
  • ML19317E674  + (Rev 0 to Branch Technical Position 9-1, Overhead Handling Sys for Nuclear Power Plants)
  • ML20155C047  + (Rev 0 to Branch Technical Position Cmeb 9.5-1, Fire Event Safe Shutdown Evaluation Summary Rept)
  • ML20198K456  + (Rev 0 to Brown & Root Hanger Location Drafting Guide. Related Documentation Encl)
  • ML20093G847  + (Rev 0 to Brown Ferry Nuclear Plant Unit 3,COLR)
  • ML18038B647  + (Rev 0 to Browns Ferry Nuclear Plant Unit 2,Cycle 9 Colr)
  • ML18038B811  + (Rev 0 to Browns Ferry Nuclear Plant,Surveillance Instruction,Inservice Insp Program,Unit 3)
  • ML20092G389  + (Rev 0 to Brunswick Nuclear Plant Units 1 & 2 USI A-46 Relay Evaluation Rept, Final Rept)
  • ML20092G395  + (Rev 0 to Brunswick Nuclear Plant Units 1 & 2 USI A-46 Seismic Evaluation Rept, Final Rept)
  • ML20035E616  + (Rev 0 to Brunswick Nuclear Plant,Three-Yr Plan)
  • ML20207B908  + (Rev 0 to Brunswick Steam Electric Plant,Unit 1,Reload 6 (Cycle 7) (W/O Recirculation Pump Trip))
  • ML20204D496  + (Rev 0 to Brunswick Steam Electric Plant,Unit 1 Simulator Certification Rept)
  • ML20204D524  + (Rev 0 to Brunswick Steam Electric Plant,Unit 2 Simulator Certification Quadrennial Rept)
  • ML20235T388  + (Rev 0 to Brunswick Unit 1,Cycle 7,Core Operating Limits Rept,Feb 1989)
  • ML20067E361  + (Rev 0 to Brunswick Unit 1,Cycle 8 Core Operating Limits Rept)
  • ML20086E651  + (Rev 0 to Brunswick Unit 2,Cycle 10 Core Operating Limits Rept)
  • ML20069N893  + (Rev 0 to Brunswick Unit 2,Cycle 11 Colr)