Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20053D099 + (Response Supporting Util 820518 Motion for Addl Time to Respond to Suppls to Intervention Petitions.Extension Should Be Granted to 820607.Prehearing Conference Should Be Held on 820628 or Later.Certificate of Svc Encl)
- ML20024A485 + (Response Supporting Util 830608 Motion for Extension Until 830701 to File Motions for Summary Disposition.Palmetto Filed Discovery Responses Late.Motions to Dismiss for Failure to Make Discovery Pending.W/Certificate of Svc)
- ML20128Q144 + (Response Supporting Util 850708 Motion for Directed Certification of ASLB Procedures Employed in Admission of Bl Rorem 850307 QA Contention.Certificate of Svc Encl)
- ML20136D830 + (Response Supporting Util 851104 Motion for Page Limit Extension on Petition for Review of ALAB-818,in Interest of Averting Denial of Petition.W/Certificate of Svc)
- ML20203B393 + (Response Supporting Util 860306 Motion for Summary Disposition of Joint Intervenor Contention EP-4 Re Identification of Hosps for Contaminated Injured Individuals)
- ML20140G053 + (Response Supporting Util 860318 Motion to Dismiss Proceeding to Determine Adequacy of Special Physical Security Measures for Protection of Alternate Backup Sources of Ac Power as Moot.W/Certificate of Svc)
- ML20203F879 + (Response Supporting Util 860711 Motion for Termination of Appeal Board Jurisdiction Over Proceeding.Certificate of Svc Encl)
- ML20203P056 + (Response Supporting Util 860930 Motion to Reopen Evidentiary Record to Replace Nassau Veterans Memorial Coliseum as Reception Ctr W/Hicksville,Bellmore & Roslyn Operations Ctrs.Certificate of Svc Encl)
- ML20004E167 + (Response Supporting Util Exceptions to ASLB 810227 Memorandum & Order Dismissing Proceeding W/Prejudice. Proceeding Should Be Dismissed W/O Prejudice.Site Should Not Be Eliminated.W/Certificate of Svc & Notice of Appearance)
- ML20039C689 + (Response Supporting Village of Buchanan 811221 Supplemental Petition to Intervene.Deficiencies Cured by Village Authorization of CR Dalvia as Representative.Certificate of Svc Encl)
- ML19350D092 + (Response Supporting W Christy Amended Petition to Intervene. Christy Should Be Admitted as Intervenor W/Participation Limited to Contention on Emergency Planning.Certificate of Svc Encl)
- ML20041F526 + (Response Supporting Wi Environ Decade 820224 Motion for Reconsideration of ASLB 820219 Order.Aslb Requirement That Decade Comply W/Criteria for Late Filed Contentions Is Procedural Change.Certificate of Svc Encl)
- ML19341B009 + (Response Supporting Wright 810116 Petition for Local Govt Representative Participation When Representative Capacity Is Shown.Botwinick 810113 Petition for Leave to Intervene Should Be Denied W/Leave to Amend.Certificate of Svc Encl)
- ML20069N392 + (Response Supporting Zimmer Area Citizens - Zimmer Area Citizens of Ky & City of Mentor,Ky 821119 Petitions for Appointment of Consultant to Monitor Third Party Audit & for Public Participation Procedures.Certificate of Svc Encl)
- ML20155G736 + (Response Supporting,In Part,Applicant 860425 Motion in Limine-Puckett Settlement Agreement.Aslb Should Rule That Evidence Re Agreement Inadmissible to Prove Fault or Liability.Certificate of Svc Encl)
- ML19318B472 + (Response Supporting,In Part,State of Il 800612 Motion for Addl Time.Urges Revision of ASLB 800604 Order Re Discovery Schedule,To Adopt NRC Dates Which Will Relieve Burden & Will Take Into Account Eia & SER Delays.W/Certificate of Svc)
- ML19336A280 + (Response Taking No Position Re Jf Doherty 800930 Motion to Subpoena Sections 2,5,6,7,11,18,21 & 25 of GE Reed Rept. Motion Moot Per Commission 801009 Order Re Availability of Rept Per Black Fox Decision.Certificate of Svc Encl)
- ML19312E645 + (Response Taking No Position on States of Mn,Wi,Il,Mo,Hi,La, Oh,Vt & Sc Motions for Extension of Schedule for First Phase of Proposed Rulemaking Proceeding Re Storage & Disposal of Radwaste.Opposes Individual Extension.W/Certificate of Svc)
- ML20148S249 + (Response Team Action Plan Item VII.a.6, Exit Interviews. Related Info Encl)
- ML20141P077 + (Response Team Activities Insp Repts 50-445/85-14 & 50-446/85-11 on 851001-31.Violations Noted: Drawings Revised W/O Required Review & Approval Actions & Insp Repts Signed by Noncertified Electrical Inspector)
- ML20151N909 + (Response Team Activities Insp Repts 50-445/85-13 & 50-446/85-09 on 850901.Violations & Deviation Noted:Erroneous Conduit Observation,Incomplete &/Or Incorrect Documents & Incorrect Population Development)
- ML20207E034 + (Response Team Activities Insp Repts 50-445/86-15 & 50-446/86-12 on 860601-30.Violations Noted: Absence of Procedural Requirements Re Onsite Fabrication Shop & Operations Travelers Not Completed)
- ML20212P837 + (Response Team Activities Insp Repts 50-445/86-01 & 50-446/86-01 on 851101-860131.Violations Noted:Nonconforming Conditions Not Identified Per QA Program Requirements & Failure to Field Test Cable Reels)
- ML20199L020 + (Response Team Activities Insp Repts 50-445/85-16 & 50-446/85-13 on 851101-30.Violation Noted: Failure to Verify Performance to Procedure Requirements for Hilti Bolt Installation)
- ML20215G003 + (Response Team Answers to ASLB 14 Questions Raised in 860414 Proposed Memorandum & Order on Action Plan I.d.2 Re Guidelines for Administration of QC Inspector Tests.Related Documentation & Certificate of Svc Encl)
- ML20147B248 + (Response Team Collective Significance Rept)
- ML20206S263 + (Response Team Discovery 3 Rept Re Program Principles & Objectives.Certificate of Svc Encl.Related Correspondence)
- ML20215J864 + (Response Team Insp Repts 50-445/86-03 & 50-446/86-02 on 860201-0331.Five Violations & Five Deviations Noted.Violations Included,Inadequate Site Operation Trend Analysis)
- ML20235V860 + (Response Team Results Rept Rev 1 for Issue Specific Action Plan VII.a.4 Audit Program & Auditor Qualifications)
- ML20235U752 + (Response Team Results Rept Rev 1 for Issue Specific Action Plan Isap I.d.2 Guidelines for Administration of QC Inspector Tests, Technical Evaluation Rept)
- ML20237L203 + (Response Team Results Repts)
- ML20237L159 + (Response Team Results Repts)
- ML050210309 + (Response Thank You Ltr to Mr Sourber)
- ML20009B250 + (Response That Documents Will Be Made Available Per Joint Intervenor First Request for Production of Documents Except Document Requests 13,42,43,48,49,51-55,6,7,28,30-32 & 38. Certificate of Svc Encl.Related Correspondence)
- ML20009C454 + (Response That NRC Has No Objection to Withdrawal W/O Prejudice of Intervenor Requests to Aslab for Certified Rulings & for Appellant Review of Rights to Raise Some Issues at Later Time.Certificate of Svc Encl)
- ML19339B691 + (Response Time Qualification of Resistance Thermometers in Nuclear Power Plant Safety Sys)
- ML19249B974 + (Response Time Qualification of Resistance Thermometers in Nuclear Power Plant Safety Sys)
- ULNRC-04638, Response Time Testing Elimination + (Response Time Testing Elimination)
- 05000316/LER-2076-022, Response Time Testing of Valves CCR-460 and CCR-462 Found Isolation Times for These Valves Exceeding the Limits Established in Technical Specifications Table 3.6-1 + (Response Time Testing of Valves CCR-460 and CCR-462 Found Isolation Times for These Valves Exceeding the Limits Established in Technical Specifications Table 3.6-1)
- ML063480124 + (Response Time for TSTF-426 & TSTF-486, Requesting Additional Information)
- ML17209A325 + (Response Time of Platinum Resistance Thermometers Using Loop Current Step Response Techniques)
- Information Notice 1987-17, Response Time of Scram Instrument Volume Level Detectors + (Response Time of Scram Instrument Volume Level Detectors)
- ML20008G118 + (Response Transmitting Replies to ASLB 810428 Order Which Inquired Into Impact Conclusions in 810402 Nucleonics Week Rept Might Have on Future Plans.Replies Were Previously Submitted for Similar Requests.W/Certificate of Svc)
- ML20079R942 + (Response Tree Evaluation - Implications for the Use of Artificial Intelligence in Process Control Rooms)
- ML20137W817 + (Response Tree Evaluation:Experimental Assessment of an Expert System for Nuclear Reactor Operators)
- ML20083K774 + (Response Trees and Expert Systems for Nuclear Reactor Operators)
- ULNRC-05295, Response Update to Generic Letter 2004-02: Potential Impact of Debris Blockage on Emergency Recirculation During Design Basis Accidents at Pressurized-Water Reactors + (Response Update to Generic Letter 2004-02: Potential Impact of Debris Blockage on Emergency Recirculation During Design Basis Accidents at Pressurized-Water Reactors)
- ML061570193 + (Response Update to Generic Letter 2004-02: Potential Impact of Debris Blockage on Emergency Recirculation During Design Basis Accidents at Pressurized-Water Reactors)
- DCL-14-041, Response Update to Request for Information Pursuant to 10 CFR 50.54(f) Regarding Recommendation 2.3 Seismic + (Response Update to Request for Information Pursuant to 10 CFR 50.54(f) Regarding Recommendation 2.3 Seismic)
- ML19337A196 + (Response Urging Deferral of Ruling on Carolina Environ Study Group 800815 Motion to Reopen Record Re Hydrogen Generation Issue Arising from TMI Accident.Suggests 15 Days for Parties to File Simultaneous Reply.W/Certificate of Svc)
- ML19331D523 + (Response Urging Denial of Coulee Region Energy Coalition & Fm Olsen Requests for Hearing Re Site Dewatering Sys,Unless Interest Is Adequately & Sufficiently Shown.Notices of Appearances & Certificate of Svc Encl)