Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML19294A533 + (Requests Addl Info for Review of Environ Rept.W/Encl Questionnaire.Requests Hydrology,Aquatic,Social Impact, Economic & Archeological Info)
- ML19249E881 + (Requests Addl Info for Review of FSAR)
- ML19329C757 + (Requests Addl Info for Review of FSAR Amends 29,30,31 & 32. Info Previously Requested 750328 & 0721)
- ML19269E943 + (Requests Addl Info for Review of FSAR Re Max Probable Flood Water Level,Protection of Structures Against Lightning & QA Section)
- ML19210A736 + (Requests Addl Info for Review of Fee for 780615 Application Responding to NRC 780427 Order to Incorporate Tech Specs Governing Operator Action to Respond to Small Break Loca. Amend to Be Issued)
- ML19220A441 + (Requests Addl Info for Review of Financial Qualifications)
- ML19309H043 + (Requests Addl Info for Review of Fsar.Licensee Should Advise NRC If Info Will Not Be Available by 800430)
- ML19284A468 + (Requests Addl Info for Review of Fsar.Specific Info Required Includes Reactor Physics,Effluent Treatment,Radiological Assessment & Hydrology)
- ML17173A368 + (Requests Addl Info for Review of Proposed Subj Facil Spent Fuel Pool Mod.Question Items Include Occupational Exposure During SFP Mod,Effect on Exposure Level of Cut Up Low Density Racks,Sfp Cooling Sys,Vol of Contaminated Matl)
- ML20151K253 + (Requests Addl Info for Review of Proposed Change 106 to Tech Specs Re Low Temp Overpressure Protection Sys (Ltops). Info Re Ltops Design & Alignment of HPSI Pump at 375 Psig RCS Pressure Requested within 30 Days of Ltr Receipt)
- ML20148K972 + (Requests Addl Info for Review of Recirculation Pump Trip for Use to Mitigate Anticipated Transient W/O Scram.Info Due W/In 60 Days)
- ML20147J128 + (Requests Addl Info for Review of Reload for Cycle 2 Oper of Subj Facil.Requests Partial Responses to Questions as Info Is Dev,& Full Responses W/In 30 Days)
- ML20126L421 + (Requests Addl Info for Review of Rev 1 to T1-80, Operator Training Program for NRC Hot License Candidates & Rev 1 to T2-80, NRC Licensed Operator Retraining Program. Info Requested within 14 Days)
- ML19259C463 + (Requests Addl Info for Review of Revision 3 to BQ-TOP-1, Submitted 790427)
- ML18044A628 + (Requests Addl Info for Review of SEP Topic VI-4, Containment Isolations Sys, within 30 Days)
- ML20041E104 + (Requests Addl Info for Review of SEP Topic III-1 Classification of Sys & Components. Response Required within 30 Days of Receipt of Ltr)
- ML20009B581 + (Requests Addl Info for Review of SEP Topics II-3.A, Hydrologic Description & II-3.B, Flooding Potential & Protection Requirements. Local Site Plans Re Topography & Finished Grading Plan & Site Vicinity Maps Requested)
- ML20148A200 + (Requests Addl Info for Review of Topical Rept DNS-RSS-001-P, Radwaste Solidification Sys. Review of 780907 Submittal Will Be Completed by mid-Nov 1978)
- ML20002C495 + (Requests Addl Info for Review of Util 740620 Reload G-1 Submittal by 750414.Detailed Request Encl)
- ML20134H794 + (Requests Addl Info for Review of Westinghouse AP600 Advanced Reactor Design & Forwards (RAI 231.34 & 210.227-210.231) Re Standard Safety Analysis Rept Descriptions & Updates to Open Items)
- ML13322A602 + (Requests Addl Info for SEP Topic III-7.D Re Description of Procedures & Results of Containment Structural Integrity Test)
- ML14133A528 + (Requests Addl Info for SEP Topics II-3.A Re Hydrologic Description & II-3.B Re Flooding Potential & Protection Requirements.Info Including Site Plans & Vicinity Maps Requested within 30 Days of Ltr Receipt)
- ML20009B605 + (Requests Addl Info for SEP Topics II-3.A Re Hydrologic Description & II-3.B Re Flooding Potential & Protection Requirements.Local Site Plans & Site Vicinity Maps Should Be Submitted within 30 Days)
- ML17194A009 + (Requests Addl Info for SEP Topics II-3.A Re Hydrologic Description & II-3.B Re Flooding Potential & Protection Requirements.Info Including Site Plans & Vicinity Maps, Requested within 30 Days of Ltr Receipt)
- ML13322A575 + (Requests Addl Info for SEP on Structural Topics Re Wind & Tornado Loads,Effects of High Water Level,Design Codes & Load Combination)
- ML19289G318 + (Requests Addl Info for Second Round Questions for FSAR Review)
- ML19319C141 + (Requests Addl Info for Spent Fuel Mods Re Review of Util 771205 Proposed Expansion of Spent Fuel Pool.Questions Re Facility Spent Fuel Pool Mod Encl)
- ML19319B903 + (Requests Addl Info for Structural Engineering Branch Review of FSAR Re Structural Aspects)
- ML19268B955 + (Requests Addl Info for Structural Review of Containment W/ High Temps)
- ML20009E034 + (Requests Addl Info for TMI Action Plan Item II.E.1.2 Re Auxiliary Feedwater Automatic Initiation & Flow Indication Sys.Response Should Be Submitted by 810801)
- ML19308C342 + (Requests Addl Info for Upcoming Draft of Rept Outline)
- ML20056E981 + (Requests Addl Info for Waste Form Qualification Program for Cement Solidification of Sludge Wash Liquid Re Solification W/Type I Portland Cement)
- ML20058N916 + (Requests Addl Info for Waste Form Qualification Program for Cement Solidification of Sludge Wash Liquid Re Solidification W/Type V Portland Cement)
- ML19256F565 + (Requests Addl Info for as-built Piping Analysis.Site Visit Planned for Discussion of Review W/Engineers.Ornl Will Perform LaSalle Review)
- ML17272A237 + (Requests Addl Info from Applicant for Review of Conduct of Operations,Sections 13.2 & 13.5,re Fire Protection Training Examination & Diagram of Control Room)
- ML20213E578 + (Requests Addl Info from Licensee Re Rigid Conduit Connections to Electrical Equipment Encls,By 830930)
- ML20062F180 + (Requests Addl Info from SEP Licensees Re Elec Penetrations of Reactor Containments in Order to Complete Eval)
- ML20062F163 + (Requests Addl Info from SEP Licensees Re Elec Penetrations of Reactor Containments in Order to Complete Eval)
- ML17173A411 + (Requests Addl Info from SEP Licensees Re Elec Penetrations of Reactor Containments in Order to Complete Eval)
- ML17244A225 + (Requests Addl Info from SEP Licensees Re Elec Penetrations of Reactor Containments in Order to Complete Eval)
- ML20035A526 + (Requests Addl Info from Staff Re Amends to 10CFR31 & 31 Re Air Gaps in Generally Licensed devices,SECY-92-147)
- ML20128M140 + (Requests Addl Info from Staff,Nuclear Util Mgt & Human Resources Committee & INPO Re Alternate Educ Requirements in SECY-85-150, Final Policy Statement on Engineering Expertise on Shift)
- ML20064K899 + (Requests Addl Info from Util Re 810914 Safety Injection & Natural Circulation Event During Performance of Loss of Control Room Test.Info Needed Includes Data Just Prior to Trip & Up to 1-h Following Event)
- ML20235Z262 + (Requests Addl Info from Util Re Bldg 10 Seismic Design, Including Descriptive Matl for PILAY2 Computer Code & Sketches or Drawings Showing Caisson/Slab/Wall Configurations)
- ML18100B147 + (Requests Addl Info from Util to Complete Review Re Second 10-year Interval Inservice Insp Program Plan,Rev 0 & Associated Requests for Relief)
- ML20213C839 + (Requests Addl Info from Washington Public Power Supply Sys on Sections 13.1 & 13.4 of FSAR by 790409 So That Qab Can Maintain Review schedule.WPPSS-QA-004,Rev 3 Acceptable)
- ML20133C038 + (Requests Addl Info in Area of Hydrogen Control Equipment Survivability,Per Review of Application for OL)
- ML18059A432 + (Requests Addl Info in Effort to Support BNL Independent Evaluation of Plant Pressurizer power-operated Relief Valve Nozzle Safe End Crack)
- ML20126J264 + (Requests Addl Info in Favor of Application for Renewal of License SNM-142 Submitted on 920528)
- ML17228A662 + (Requests Addl Info in Form of Detailed Justification as to Why Changes in Question Do Not Decrease Effectiveness of Emergency Plan.W/Encl)
- ML17352A743 + (Requests Addl Info in Form of Detailed Justification as to Why Changes in Question Do Not Decrease Effectiveness of Emergency Plan.W/Encl)