ML20213C839
| ML20213C839 | |
| Person / Time | |
|---|---|
| Site: | Columbia |
| Issue date: | 12/19/1978 |
| From: | Haass W Office of Nuclear Reactor Regulation |
| To: | Varga S Office of Nuclear Reactor Regulation |
| References | |
| CON-WNP-0248, CON-WNP-248 NUDOCS 7901090019 | |
| Download: ML20213C839 (2) | |
Text
'
-: D o eAc e-t-so-3 '! 7 s
-Y OLSTRIBUTION:
W ocket File JConway, QAB
- QAB Projects JGilray, QAB gy3g QAB Chron. File FAllenspach, QAB NRR Reading File RMcDermott, QAB DJSkovholt, DPM f
Dross, DPM Docket No. 50-397 DLynch, LWR #4 DVassallo, DPM HEMORANDUM FOR:
S. A. Varga. Chief, Light Water Reactors Branch No. 4, Division of Project Management FROM:
Walter P. Haass, Chief, Quality Assurance Brarch.
Division of Project Management
SUBJECT:
REQUEST FOR ADDITIONAL INFORMATION: WPPSS HUCLEAR PROJECT NO. 2 - QUALITY ASSURANCE, CONDUCT OF OPERATIONS Applicant: Washington Public Power Supply System (WPPSS)
Licensing Stage: OL Responsible Branch: LWR #4 Project Manager:
D. Lynch Requested Ccapletion Date: January 19, 1979 Review Status:
Q-l's Complete The Quality Assurance Branch has reviewed the FSAR sections describing the Conduct of Operations (Sections 13.1 and 13.4) and the Quality Assurance Program (Section 17.2) submitted in support of the Operat'ing License application for WNP-2.
The QA program for operatfor.s is de' scribed in the WPPSS QA Topical Report WPPSS-QA-004, Revision 3. " Operational Quality Assurance Program Description" dated March 1978. This report was evaluated and found acceptable by the QAB (Ref. !!elterJes/Renberger letter dated May 3,1978).
Additional infomation is required from WPPSS in Sections 13.1 and 13.4.
Accordingly WPPSS should be requested to amend these sections of the FSAR to satisfy the enclosed request prior to April 9,1979 in order for the QAB to maintain their review schedule.
l We are available for a meeting or conference call with WPPSS to discuss these t
i questions.
l Originaf signed by Walter P.H3 ass N
h
~
Wal ter P. Haass, Chief g\\
7001090019 Quality Assurance Branch Division of Project Management l
A o,rbkt br Additlon$1 INomai. ion @b_.
DPM:QAB g
.DPM:QA,B Dfy l
FAllenspach RMcDemott klPbH nway:g t J011rayV ears
- 2..C / 78. ~. 32//f/78-12//f'/ 78_.-
-.12LI.f/18 12/l LZ.8_.,
NRC K,1M ll8 0 76) FisCW 0240 h us e. mo<sanwaar **'avuee orrics. s eve - eas.4a4
WASHINGTON PUBLIC POWER SUPPLY SYSTEM WNP-2 Request for Additional Information 422.0 Conduct of Operations 422.3 Indicate the number of professional persons (13.1.1. 2) reporting to each of the following: Manager, Test and Startup Programs; Chief, Design Engineering; Project Engineer, WNP-2; and Mcnager, Quality Ascurance.
422.4 Provide the resume of the persons filling (13.1.1.2) the positions of Plant Operations Division Manager and Project Engineer - WNP-2.
422.5 Please provide the specific level of experience (13.1.3.1 )
requirements for your Mechanics, Electricians, and Technicians shown in Figure 13.1-5 of your FSAR. Note subsection 4.5.2 and 4.5.3 of ANSI N18.1-1971.
422Property "ANSI code" (as page type) with input value "ANSI N18.1-1971.</br></br>422" contains invalid characters or is incomplete and therefore can cause unexpected results during a query or annotation process..6 Please provide the resumes of the persons (13.1.3.2) filling the positions of Nuclear Engineer and I&C Engineer shown in Figure 13.1-5.
422.7 Describe the functions and responsibilities (13.4.1 )
quorum requirements, meeting frequency, authority, and recordkeeping provisions of your Plant Operations Committee.
422.8 Describe the membership, responsibilities, (13.4.2) authority, and. method of operation of your Safety Review Board.