ML20213E578
| ML20213E578 | |
| Person / Time | |
|---|---|
| Site: | Columbia |
| Issue date: | 08/24/1983 |
| From: | Noonan V Office of Nuclear Reactor Regulation |
| To: | Schwencer A Office of Nuclear Reactor Regulation |
| References | |
| CON-WNP-0643, CON-WNP-643 NUDOCS 8308300827 | |
| Download: ML20213E578 (1) | |
Text
..:.
pISTRIBUTION:
/_Dockat me EQB R/F AUG 2 41983 VNoonan
-[l 3
g3 ME!!0RANDUit FOR:
A. Schwencer, Chief Licensing Branch No. 2, DL FROM:
V. Noonan, Chief Equipment Qualification Branch, DE
SUBJECT:
REQUEST FOR INFORMATION REGARDING RIGID CONDUIT CONNECTIONS TO ELECTRICAL EQUIPMENT ENCLOSURES AT WASHINGTON NUCLEAR PLANT NO. 2
REFERENCES:
A.
Memorandum, Robert F. Heishman to Goutam Bagchi, dated August 2,1983.
B.
Memorandum, A. D. Toth to Goutam Bagchi, dated August 11, 1983.
Please request the applicant, WNP-2, to provide the infomation identified in References A and B to A. D. Toth, Senior Resident Inspector, UNP-2 Project, and to NRR by September 30, 1983.
If there are any questions regarding the information to be provided, please contact D. Toth.
1 l
d 1
b Vincent S. Noonan, Chief Equipment Qualification Branch Division of Engineering cc:
J. Knight G. Dagchi R. Wright R. Auluck k
i 8308300827 830824 1P-i WP~ ADOCK 05000397 W
l
Contact:
G. Bagchi X-28251 n
....9.Ey{Q),7f E:EQg,g',
,DE:EgB, l
l o,,,co
,,,,,,,hfn 1
,,y S,po,,n a,n_
\\ suno...RJ'f;,j,gh t 8..!.23.183
...81M.Lu.. 8/..AM./B3... ' '................. -
om>
pc ronu ats oa-m sc..i caa OFF1CIAL RECORD COPY u: age. is i-225-4362
AUG 2 1 1983 OISTRIBUTION:
See attached page MEMORAtl0UM FOR:
A. Schwencer, Chief Licensing Branch flo. 2, OL FROM:
R. Auluck, Project Manager Licensing Branch No. 2 DL
SUBJECT:
FORTHCOMIllG MEETING WITH WASHI?lGTON PUBLIC POWER SUPPLY SYSTEM (WPPSS)
DATE & TIME:
Tuesday, August 30, 1983 9:00 am LOCATI0fl:
P-422 Phillips Building Bethesda, Maryland PURPOSE:
Discussion of Fire Protection Issues PARTICIPAtlTS:*
NRC WPPSS
~
V. Benaroya P. Powell &
R. Ferguson support staff D. Kub icki R. Auluck 0:t 1nat e.t -
,,3 s...
9 R. Auluck, Project !!anager Licensing Branch flo. 2 Division of Licensing cc: See next page O!oOhhj7
/ '
PDR o,,,c,,OL:L M DL}{#2/BCi I
l
. uc k.;pt.
. ASdhwencer sunn uar orre y ' 84%B3..
..B l@.Y8.3...
.f.
e c r:w :n 2.s.
. m. 2: n O FFICI.AL R ICO R O C O Pv t
WNP-2 Mr. D. Mazur
~
Managing Director
~
Washington Public Power Supply System P. O. Box 968 3000 George Washington Way Richland, Washington 99352 cc:
Nicholas Reynolds, Esquire Debevoise & Liberman 1200 Seventeenth Street, N. W.
Washington, D. C.
20036 Mr. G. E. Doupe, Esquire Washington Public Power Supply System P.O. Box 968 3000 George Washington Way Richland, Washington 99352 Nicholas Lewis, Chairman Energy Facility Site Evaluation Council Mail Stop PY-il Olympia, Washington 98504 Roger Nelson, Licensing Manager Washington Public Power Supply System P.O. Box 968 Richland, Washington 99352 Mr. W. G. Conn, Sr. N/M Group Supervisor Burns and Roe, Incorporated 601 Williams Boulevard Richland, Washington 99352 Mr. Richard Feil l
U.S. NRC Resident Inspector WPPSS-2 NPS P.O. Box 69 Richland, Washington 99352 Dr. G. D. Bouchey, Manager Nuclear Safety & Regulatory Programs Washington Public Power Supply System P.O. Box 968, MD 650 Richland, Washington 99352 l
i
AUS 2 4 1983 MEETING NOTICE DISTRIBUTION:
Date:
E. Hylton Project Manager R. Auluck V.'Benaroya H. Denton/E. Case R. Ferguson D. Eisenhut/R. Purple D. Kubicki R. Auluck T. M. Novak*
B. Youngblood A. Schwencer G. Knighton E. Adensam G. Lainas F. Miraglia J. P. Knight W. Johnston D. Muller T. Spets R. Houston L. Rubenstein F. Schroeder M. Ernst O. Ziemann NRR Division Directors
- OELD Attorney Paton E. L. Jordan, DEQA:IE J. M. Taylor, DRP:IE Phillips Building Receptionist **
ACRS (16)V Region Resident Inspector cc:
Service List F. Ingram, PA
- 0nly if participant in meeting
- 0nly if meeting held in Bethesda i
l l
[