Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML020800245 + (Request for Extension of Time to Submit an Answer or Request a Hearing)
- ML020790049 + (Request for Extension of Time to Submit an Answer or Request a Hearing)
- HL-6217, Request for Extension of Time to Submit an Answer or Request a Hearing + (Request for Extension of Time to Submit an Answer or Request a Hearing)
- ML020810015 + (Request for Extension of Time to Submit an Answer and Request a Hearing for the Davis-Besse Nuclear Power Station, Unit 1)
- CPSES-200200717, Request for Extension of Time to Submit an Answer and Request a Hearing for Interim Safeguards and Security Compensatory Measures + (Request for Extension of Time to Submit an Answer and Request a Hearing for Interim Safeguards and Security Compensatory Measures)
- ML18227B989 + (Request for Extension of Time to Submit Inservice Inspection Report, Which Will Be Submitted Prior to April 1, 1975)
- ULNRC-05239, Request for Extension of Time within Which to Respond to Demand for Information + (Request for Extension of Time within Which to Respond to Demand for Information)
- ML20066E274 + (Request for Extension of Time,Until 821122,to Respond to Aslab 821105 Order,To Present Views on Proposed Alternative for Dealing W/Feed & Bleed Issue.Certificate of Svc Encl)
- ML20034C331 + (Request for Extension of Time.* Requests That Dates for States Filing of Contentions & Filing of Responses by Util & NRC Staff Be Postposed for 1 Wk from Dates Established in Board 900404 Memo & Order.W/Certificate of Svc)
- ML20044D419 + (Request for Extension of Time.* Requests Until 930625 to File Responses to Interrogatory Questions & Document Requests Received on 930503 from Gap.W/Certificate of Svc)
- ML082530196 + (Request for Extension of Unit 1 and 2 Completion Dates for Generic Letter 2004-02, Potential Impact of Debris Blockage on Emergency Recirculation During Design Basis Accidents at Pressurized-Water Reactors)
- NRC 2009-0053, Request for Extension of Unit 1 and 2 Completion Dates for Generic Letter 2004-02, Potential Impact for Debris Blockage in Emergency Recirculation During Design Basis Accidents at Pressurized-Water Reactors (TAC MC4705/4706) + (Request for Extension of Unit 1 and 2 Completion Dates for Generic Letter 2004-02, Potential Impact for Debris Blockage in Emergency Recirculation During Design Basis Accidents at Pressurized-Water Reactors (TAC MC4705/4706))
- ML091660326 + (Request for Extension of Unit 1 and 2 Completion Dates for Generic Letter 2004-02, Potential Impact for Debris Blockage in Emergency Recirculation During Design Basis Accidents at Pressurized-Water Reactors (TAC MC4705/4706))
- L-2008-235, Request for Extension of the Completion Date of the St. Lucie Unit 1 NRC Generic Letter 2004-02 Actions + (Request for Extension of the Completion Date of the St. Lucie Unit 1 NRC Generic Letter 2004-02 Actions)
- TMI-09-134, Request for Extension of the Implementation Period for License Amendment Request No. 326 to Adopt TSTF-490-A, Rev. 0, Deletion of E Bar Definition & Revision to Reactor Coolant System Specific Activity.. + (Request for Extension of the Implementation Period for License Amendment Request No. 326 to Adopt TSTF-490-A, Rev. 0, Deletion of E Bar Definition & Revision to Reactor Coolant System Specific Activity..)
- ML080300133 + (Request for Extension of the Review Time for the Draft Safety Evaluation for Nuclear Energy Institute (NEI) Topical Report (TR) 94-01, Revision 2 and EPRI No. 1009325, Revision 2)
- NL-08-0574, Request for Extension of the Three-Month Response to NRC Generic Letter 2008-01, Managing Gas Accumulation in Emergency Core Cooling, Decay Heat Removal And.. + (Request for Extension of the Three-Month Response to NRC Generic Letter 2008-01, Managing Gas Accumulation in Emergency Core Cooling, Decay Heat Removal And..)
- ML081000362 + (Request for Extension of the Three-Month Response to NRC Generic Letter 2008-01, Managing Gas Accumulation in Emergency Core Cooling, Decay Heat Removal and)
- ML18276A066 + (Request for Extension on Deadline for Intervention)
- ML020780489 + (Request for Extension on Time to Submit an Answer and Request a Hearing)
- 0CAN040802, Request for Extension to 3-Month Response to Generic Letter 2008-01 + (Request for Extension to 3-Month Response to Generic Letter 2008-01)
- ML19210E624 + (Request for Extension to 791221 to File Proposed Findings of Fact & Conclusions of Law.Opposing Attys Have No Objection)
- ML19340D212 + (Request for Extension to 810107 to Respond to Applicant Interrogatories.Certificate of Svc Encl)
- ML19340D343 + (Request for Extension to 810131 to File Brief in Support of Exceptions to ASLB 801027 Initial Decision Re Spent Fuel Pool Proceeding.Certification of Svc Encl)
- NLS2004148, Request for Extension to Answer the 11/05/04 Order Imposing Requirements for Protecting Certain Safeguards Information (EA-04-190) + (Request for Extension to Answer the 11/05/04 Order Imposing Requirements for Protecting Certain Safeguards Information (EA-04-190))
- BVY-04-125, Request for Extension to Answer the November 5, 2004, Order Imposing Requirements for the Protection of Certain Safeguards Information (EA-04-190) + (Request for Extension to Answer the November 5, 2004, Order Imposing Requirements for the Protection of Certain Safeguards Information (EA-04-190))
- LR-N08-0139, Request for Extension to Complete Generic Letter 2004-02 Testing + (Request for Extension to Complete Generic Letter 2004-02 Testing)
- ML081910152 + (Request for Extension to Complete Generic Letter 2004-02 Testing)
- ML081700281 + (Request for Extension to Complete the Final Confirmatory Analysis and Validation of Containment Sump Strainers Associated with NRC GL-04-002)
- ML073531095 + (Request for Extension to Complete the Final Confirmatory Testing, Analysis and Validation of Containment Sump Strainers Associated with NRC Generic Letter 2004-02)
- DCL-06-124, Request for Extension to Completion Date for Unit 2 for Corrective Actions Required by Generic Letter 2004-02, Potential Impact of Debris Blockage on Emergency Recirculation During Design Basis Accidents at Pwrs + (Request for Extension to Completion Date for Unit 2 for Corrective Actions Required by Generic Letter 2004-02, Potential Impact of Debris Blockage on Emergency Recirculation During Design Basis Accidents at Pwrs)
- JAFP-16-0147, Request for Extension to Comply with 03/12/2012 Commission Orders Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events and Reliable Spent Fuel Pool Instrumentation + (Request for Extension to Comply with 03/12/2012 Commission Orders Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events and Reliable Spent Fuel Pool Instrumentation)
- RS-17-006, Request for Extension to Comply with NRC Order EA-13-109, Order Modifying Licenses with Regard to Reliable Hardened Containment Vents Capable of Operation Under Severe Accident Conditions and NRC Order EA-12-049, Order Modifying Licenses W + (Request for Extension to Comply with NRC Order EA-13-109, Order Modifying Licenses with Regard to Reliable Hardened Containment Vents Capable of Operation Under Severe Accident Conditions and NRC Order EA-12-049, Order Modifying Licenses Wi)
- RS-16-210, Request for Extension to Comply with NRC Order EA-13-109, Order Modifying Licenses with Regard to Reliable Hardened Containment Vents Capable of Operation Under Severe Accident Conditions and NRC Order EA-12-049, Order Modifying Licenses W + (Request for Extension to Comply with NRC Order EA-13-109, Order Modifying Licenses with Regard to Reliable Hardened Containment Vents Capable of Operation Under Severe Accident Conditions and NRC Order EA-12-049, Order Modifying Licenses Wi)
- ML16187A325 + (Request for Extension to Comply with NRC Order EA-13-109, Order Modifying Licenses with Regard to Reliable Hardened Containment Vents Capable of Operation Under Severe Accident Conditions)
- JAFP-16-0148, Request for Extension to Comply with NRC Order EA-13-109, Order Modifying Licenses with Regard to Reliable Hardened Containment Vents Capable of Operation Under Severe Accident Conditions + (Request for Extension to Comply with NRC Order EA-13-109, Order Modifying Licenses with Regard to Reliable Hardened Containment Vents Capable of Operation Under Severe Accident Conditions)
- RA-14-021, Request for Extension to Comply with NRC Order EA-13-109, Order Modifying Licenses with Regard to Reliable Hardened Containment Vents Capable of Operation Under Severe Accident Conditions + (Request for Extension to Comply with NRC Order EA-13-109, Order Modifying Licenses with Regard to Reliable Hardened Containment Vents Capable of Operation Under Severe Accident Conditions)
- ML062970080 + (Request for Extension to Delay Implementation of Containment Sump Strainer Changes Associated with NRC Generic Letter 2004-02, Potential Impact of Debris Blockage on Emergency Recirculation.)
- ML20076G888 + (Request for Extension to File Answer to Joint Intervenors Motion to Reopen Contention 22,to 10 Days After Util Receipt of Consultant Analysis Rept.Granted by Aslab on 830829)
- ML19340D072 + (Request for Extension to File Response to Dl Allred Contentions Until 30 Days After ASLB Rules on Allred 801110 Motion to Withdraw from Proceeding.Certificate of Svc Encl)
- NLS2008074, Request for Extension to Generic Letter 2008-01, Managing Gas Accumulation in Emergency Core Cooling, Decay Heat Removal, and Containment Spray Systems, Dated January 11, 2008 + (Request for Extension to Generic Letter 2008-01, Managing Gas Accumulation in Emergency Core Cooling, Decay Heat Removal, and Containment Spray Systems, Dated January 11, 2008)
- ML082610224 + (Request for Extension to Generic Letter 2008-01, Managing Gas Accumulation in Emergency Core Cooling, Decay Heat Removal, and Containment Spray Systems, Dated January 11, 2008)
- ML062140346 + (Request for Extension to Reply to a Notice of Violation)
- ML17361A290 + (Request for Extension to Respond - Nuclear Regulatory Commission Vendor Inspection of Sor, Inc. Report No. 99900824/2017-201)
- ML17339A382 + (Request for Extension to Respond to Util Objections to Interrogatories.Opposes Util Attempt to Dismiss Intervenor Interrogatories.Requests Hearing to Ensure That ASLB 790813 Order Is Fairly Executed)
- NOC-AE-04001821, Request for Extension to Respond to the NRC Order Imposing Requirements for Protecting Certain Safeguards Information (EA-04-190) + (Request for Extension to Respond to the NRC Order Imposing Requirements for Protecting Certain Safeguards Information (EA-04-190))
- ML043350392 + (Request for Extension to Respond to the NRC Order Imposing Requirements for Protecting Certain Safeguards Information (EA-04-190))
- CPSES-200402681, Request for Extension to Respond to the November 5,2004 Order Imposing Requirements for Protection of Certain Safeguards Information (EA-04-190) + (Request for Extension to Respond to the November 5,2004 Order Imposing Requirements for Protection of Certain Safeguards Information (EA-04-190))
- LIC-04-0126, Request for Extension to Respond to the November 5, 2004, Order Imposing Requirements for the Protection of Certain Safeguards Information (EA-04-190) + (Request for Extension to Respond to the November 5, 2004, Order Imposing Requirements for the Protection of Certain Safeguards Information (EA-04-190))
- ML043350328 + (Request for Extension to Respond to the 11/05/04 Order Imposing Requirements for the Protection of Certain Safeguards Information (EA-04-190))
- DCL-04-161, Request for Extension to Respond to the November 5. 2004, Order Imposing Requirements for the Protection of Certain Safeguards Information (EA-04-190) + (Request for Extension to Respond to the November 5. 2004, Order Imposing Requirements for the Protection of Certain Safeguards Information (EA-04-190))
- GO2-15-171, Request for Extension to Respond to the November 12, 2015 NRC Integrated Inspection Report (EA-15-202) + (Request for Extension to Respond to the November 12, 2015 NRC Integrated Inspection Report (EA-15-202))