Request for Extension of Time to Submit an Answer and Request a Hearing for the Davis-Besse Nuclear Power Station, Unit 1
ML020810015
Person / Time
Site: Davis Besse Cleveland Electric icon.png
Issue date: 03/18/2002
From: Bergendahl H
FirstEnergy Nuclear Operating Co
To: Collins S
Office of Nuclear Reactor Regulation
References
2773
Download: ML020810015 (3)


Text

FENOC Davis-Besse Nuclear Power Station 5501 North State Route 2 Oak Harbor, Ohio 43449-9760 FirstEnergy Nuclear Operating Company Howard W. Bergendahl 419-321-8588 Vice President - Nuclear Fax. 419-321-8337 Docket Number 50-346 License Number NPF-3 Serial Number 2773 March 18, 2002 Mr. Samuel J. Collins Director Office of Nuclear Reactor Regulation U.S. Nuclear Regulatory Commission Washington, D.C., 20555-0001

Subject:

Request for Extension of Time to Submit an Answer and Request a Hearing for the Davis-Besse Nuclear Power Station, Unit 1

Dear Mr. Collins:

Section IV of the NRC's February 25, 2002, Order Modifying Licensee ("Order") states that, in accordance with 10 CFR 2.202, a Licensee must submit an answer to the Order and may request an extension of time in which to submit an answer or to request a hearing on the Order within 20 days of the date of the Order. In addition, the Order states

"[w]here good cause is shown, consideration will be given to extending the time to request a hearing."

For the following reasons, FirstEnergy Nuclear Operating Company (FENOC) hereby requests an extension of time until June 6, 2002 to supplement the Davis-Besse Nuclear Power Station (DBNPS) answer to the Order being submitted by March 18, 2002, and an equal extension of time in which to request a hearing.

As required by the Order, the DBNPS is submitting a response under separate cover that identifies specific actions to be taken to comply with the applicable requirements and provides a schedule for implementation. As detailed in our answer to the Order, we are unable to complete the necessary evaluations to determine what actions are appropriate and what an appropriate schedule for implementation would be for Interim Compensatory Measure B.2.a. within the required response time.

tjý

Docket Number 50-346 License Number NPF-3 Serial Number 2773 Page 2 Because of the unique nature of the situation that precipitated issuance of the Order, pursuant to Section IV of the Order, the DBNPS requests an extension of time until June 6, 2002 to file an answer for Interim Compensatory Measure B.2.a. The DBNPS also requests that an equal extension of time be granted to file a request for hearing, if necessary, for this answer.

If there are any questions concerning this matter, please contact Mr. David H. Lockwood, Manager - Regulatory Affairs, at 419-321-8450.

Sincerely Howard W. Bergendahl GMW/s Attachments cc: James E. Dyer, Regional Administrator, NRC Region III Stephen P. Sands, DB-1 NRC/NRR Project Manager C. Scott Thomas, DB-l Senior NRC Resident Inspector Glenn Tracy, Chief, Reactor Safeguards U.S. NRC Document Control Desk

Docket Number 50-346 License Number NPF-3 Serial Number 2773 Commitment List, Page 1 COMMITMENT LIST The following list identifies those actions committed to by the Davis-Besse Nuclear Power Station in this document. Any other actions discussed in the submittal represent intended or planned actions by Davis-Besse. They are described only as information and are not regulatory commitments. Please notify the Manager - Regulatory Affairs (419-321-8450) at Davis-Besse of any questions regarding this document or associated regulatory commitments.

COMMITMENTS DUE DATE File an answer for Interim Compensatory Measure B.2.a.

June 6, 2002