Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML19320C896 + (Provides Resolution Passed by Association of American Geographers at Apr 1980 Annual Business Meeting in Louisville,Ky.Includes Transition from Dependence Upon Nuclear Power to Energy Economy Based on Conservation)
- ML20099B295 + (Provides Resolution R-12-92 of Board of Commissioners of Facility Re Inadequate Operation Performance of Brunswick)
- ML17299B207 + (Provides Resolution Schedule for Masonry Wall Evaluation. Acceptable Analysis & Performance of Addl Testing or Implementation of Design Mods on Masonry Wall Will Be Provided by 861222)
- ML20127M684 + (Provides Resolution Unanimously Passed During Fourth District Executive Committee Meeting on 680229)
- ML20080G958 + (Provides Resolution for Loose Bolts on Structural Steel Found During NRC Const Assessment Team (Cat) Insp.Item Considered Closed.Related Info Encl)
- BECO-87-151, Provides Resolution of ATWS Recirculation Motor Generator (MG) Set Field Breaker Reliability Issue.Resolution Includes Improving Field Breaker Reliability & Design Change to Add Trip of MG Drive Motor Breaker + (Provides Resolution of ATWS Recirculation Motor Generator (MG) Set Field Breaker Reliability Issue.Resolution Includes Improving Field Breaker Reliability & Design Change to Add Trip of MG Drive Motor Breaker)
- ML20095G719 + (Provides Resolution of Concerns Re Fusible Links on Fire Doors Identified During 840409-12 Site Audit of Fire Protection Sys & Documentation.Fusible Links Provided on Hold Open Mechanisms for Hollow Metal Doors)
- ML20076E179 + (Provides Resolution of Equipment Qualification Open Items Cited in Safety Evaluation & Franklin Research Ctr Technical Evaluation Rept.Remaining Deficiencies Will Be Resolved by 851130.Response Encl)
- LD-81-079, Provides Resolution of Potential Open Items Re Cladding Collapse & Supplemental ECCS Calculations for Ser.Applicant Will Verify That Cladding Collapse Will Not Result During Design Lifetime of C-E Fuel + (Provides Resolution of Potential Open Items Re Cladding Collapse & Supplemental ECCS Calculations for Ser.Applicant Will Verify That Cladding Collapse Will Not Result During Design Lifetime of C-E Fuel)
- ML20153G262 + (Provides Resolution of SER Confirmatory Issue C-30 (SER Section 9.5.4.1) Re Potential Degradation from Operational Vibration of Components Mounted in Relay Panel on Emergency Diesel Generators)
- LD-81-075, Provides Resolution of Six Open Items Identified by NRC During Review of Ser.Items Resolved Include Boron Dilution Alarm,Cold Shutdown Boration & Containment Isolation Valve Power + (Provides Resolution of Six Open Items Identified by NRC During Review of Ser.Items Resolved Include Boron Dilution Alarm,Cold Shutdown Boration & Containment Isolation Valve Power)
- LIC-90-0096, Provides Resolution to Conflict Re Rept of Personnel W/Unescorted Access to Plant.Personnel W/Unescorted Access to Facility Determined to Be Hazardous to Themselves or Others Will Be Reported + (Provides Resolution to Conflict Re Rept of Personnel W/Unescorted Access to Plant.Personnel W/Unescorted Access to Facility Determined to Be Hazardous to Themselves or Others Will Be Reported)
- U-601151, Provides Resolutions to Two Concerns Noted in NRC Re Operations QA Manual.Chapter 3 of Manual States That Design Verification Will Be Completed Prior to Relying Upon Component,Sys or Structure to Perform Intended Function + (Provides Resolutions to Two Concerns Noted in NRC Re Operations QA Manual.Chapter 3 of Manual States That Design Verification Will Be Completed Prior to Relying Upon Component,Sys or Structure to Perform Intended Function)
- A09738, Provides Response & Explanation Re Radiation Monitor Calibration Sticker & Surveillance Procedures + (Provides Response & Explanation Re Radiation Monitor Calibration Sticker & Surveillance Procedures)
- ML20133H176 + (Provides Response & Schedule for Satisfying 10CFR50.62(d) Requirements Re Atws.Justification for Implementing Generic Design After Second Refueling Outage Given)
- W3P88-1677, Provides Response & Schedule for Submitting Remaining Info Re Application for Amend to License NPF-38,re Transfer of Mgt & Operating Responsibilities + (Provides Response & Schedule for Submitting Remaining Info Re Application for Amend to License NPF-38,re Transfer of Mgt & Operating Responsibilities)
- RA98-836, Provides Response 2 to GL 98-03, NMSS Licensees & Certificate Holders Y2K Readiness + (Provides Response 2 to GL 98-03, NMSS Licensees & Certificate Holders Y2K Readiness)
- ML20216D996 + (Provides Response Addressing Questions Re Implementation of App B to 10CFR50)
- NRC-95-4448, Provides Response Based on NRC & RAIs on Wcobra/ Trac Code & best-estimate LOCA Analysis Methodology & Code Applicability Document for AP600 + (Provides Response Based on NRC & RAIs on Wcobra/ Trac Code & best-estimate LOCA Analysis Methodology & Code Applicability Document for AP600)
- A07491, Provides Response Plan for Technical Concerns & Deficiencies Re Emergency Operating Procedures Noted in Insp Rept 50-336/88-10,per 880922 Commitment + (Provides Response Plan for Technical Concerns & Deficiencies Re Emergency Operating Procedures Noted in Insp Rept 50-336/88-10,per 880922 Commitment)
- ML17312A986 + (Provides Response Re Installation of Thermocouples in Plant Units 1,2 & 3 Per 940218 Request)
- B13911, Provides Response Re Issue 2 of RI-91-A-0103 + (Provides Response Re Issue 2 of RI-91-A-0103)
- ML20151K111 + (Provides Response Re Resolution of NRC Bulletin 96-003, Potential Plugging of ECCS Strainers by Debris in Bwrs)
- ML20151K438 + (Provides Response Re Respective Plans to Address New SG Regulatory Requirements.Copy of Ltr Provided by EPRI to All SG Mgt Project Members,Encl)
- TXX-3362, Provides Response Schedule for Submittal on 35 Open Items, in Response to NRC + (Provides Response Schedule for Submittal on 35 Open Items, in Response to NRC)
- ML20093K967 + (Provides Response for IST Program Anomalies)
- ML20198M248 + (Provides Response for Issues Two & Eight Re Application for Amends to Licenses DPR-39 & DPR-48.Also Includes Proposed Changes to Improved Ts,Associated Bases & Supporting Info Necessary to Correct TS Errors from GL-96-01 Review)
- ML20087H587 + (Provides Response for Util to GL 92-01,rev 1,suppl 1, Part (1))
- ML20076D361 + (Provides Response from South Carolina Electric & Gas Co to NRC Bulletin 89-001,Suppl 2, Failure of Westinghouse Steam Generator Tube Mechanical Plugs)
- ML20056C991 + (Provides Response on Behalf of Occidental Chemical Corp (OCC) to Questions Raised in NRC Re OCC Activities in Electric Bulk Power Market)
- ML20198M341 + (Provides Response to Grace Comments Re Mexican Hat Raip. Informs That 1 Oven Dry to 1 Speed Dry Ratio Was Changed to 1:10 Ratio.Forwards 880725 & s for Refs)
- ML20086P268 + (Provides Response to 10CFR50.61(b)(1) Re Projected Values for RT-PTS of Any Matl in Reactor Vessel Beltline Projected to Exceed PTS Screening Criteria & Forwards WCAP-13106, Evaluation of PTS for Beaver Valley Unit 1)
- ML20038C737 + (Provides Response to 811118 Request Re Schedule for Response to FSAR Questions on Qa.Responses to Questions 421.19 & 421.22 Will Be Available 811207)
- ML20054H948 + (Provides Response to 820120 Request for Addl Info Re IE Bulletin 80-04, Analysis of PWR Main Steam Line Break W/Continued Feedwater Addition. Questions Re Dynamics of Introducing Boron to Prevent Recriticality Undecided)
- ML20054J690 + (Provides Response to 820427 Request for Addl Info Re Environ Qualification of safety-related Electrical Equipment)
- ML20028B793 + (Provides Response to 821013 Request for Clarification Re Indemnity Agreement B-9 & Corporate Name)
- BECO-85-156, Provides Response to 850423 Request for Addl Info Re Generic Ltr 83-28,Item 4.5.3 Concerning on-line Testing of Backup Scram valves.On-line Functional Testing of Reactor Protection Sys Performed,Per Tech Spec Section 3/4.3.B + (Provides Response to 850423 Request for Addl Info Re Generic Ltr 83-28,Item 4.5.3 Concerning on-line Testing of Backup Scram valves.On-line Functional Testing of Reactor Protection Sys Performed,Per Tech Spec Section 3/4.3.B)
- ML20205K217 + (Provides Response to 870312 Request for Addl Info Re Util 870206 Cycle 8 Amend Application)
- ML20205N608 + (Provides Response to 880614 Staff Requirements Memo from Ofc of Secretary Requesting Info on West Valley Demonstration Project)
- ML19332B548 + (Provides Response to 880916 Request for Info on Lixi,Inc & Health Physics Assoc,Inc Re Proposed Rule 10CFR170)
- ML20083C242 + (Provides Response to 910910 Request for Addl Info Re Review of SAR Update Request.Result Compared W/Data from NUREG-0851 for Ar-41 Total Body Dose)
- ML20116A060 + (Provides Response to 920925 Request for Addl Info Re Unit 2 Initial Test Program,Per Reg Guide 1.108 & GL 84-15, Proposed Staff Actions to Improve & Maintain DG Reliability)
- ML20059B213 + (Provides Response to 930807 Petition Filed by Aj Ross Requesting NRC Action Per 10CFR2.206 & Published in Fr on 930910)
- B14632, Provides Response to 930807 Petition Filed by Aj Ross Requesting NRC Action Per 10CFR2.206 & Published in Fr on 930910.W/proprietary Response.Proprietary Response Withheld + (Provides Response to 930807 Petition Filed by Aj Ross Requesting NRC Action Per 10CFR2.206 & Published in Fr on 930910.W/proprietary Response.Proprietary Response Withheld)
- ML17331B166 + (Provides Response to 931216 RAI Re Reactor Protection Sys Upgrade Project)
- ML17331B167 + (Provides Response to 931216 RAI Re Reactor Protection Sys Upgrade Project)
- LIC-96-0104, Provides Response to 950428 GL 95-03 RAI Re Circumferential Cracking of SG Tubes + (Provides Response to 950428 GL 95-03 RAI Re Circumferential Cracking of SG Tubes)
- ML20097G502 + (Provides Response to 950817 GL 95-07 Ltr, Re Pressure Locking & Thermal Binding of Safety-Related Power-Operated Gates Valves)
- ML18102A336 + (Provides Response to 960614 RAI Re USI A-46,seismic Qualification of Electrical Equipment)
- ML20116D428 + (Provides Response to 960624 RAI Re GL 95-07, Pressure Locking & Thermal Binding of Safety-Related Power-Operated Gate Valves)
- NRC-96-0133, Provides Response to 961105 Request for Addl Info Re 951122 License Amend & Listed Ref Info,To Extend EDG Allowed Outage Times + (Provides Response to 961105 Request for Addl Info Re 951122 License Amend & Listed Ref Info,To Extend EDG Allowed Outage Times)