Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20134B381 + (Provides Invitation to Integrated Materials Performance Evaluation Program Commission Briefing,Scheduled 970131)
- ML20207A514 + (Provides Invitation to Participate in 870402 Public Hearing in Washington,Dc Re User Fees.Notice of Participation Requested by 870320)
- ML20055H741 + (Provides Irrevocable Standby Ltr of Credit Opened in Favor of NRC for Licensee.Fund Will Be Made Available Upon Presentation of Listed Documents)
- ML20149J589 + (Provides Issues That Needs to Be Discussed Re PAR Component Shipping on 960126 & Site Visit)
- ML20216G126 + (Provides Itemized Response to 970730 RAI Re 10CFR50,App R, Section III.G.2.c Exemption Request)
- ML20198A870 + (Provides Itemized Response to Each of NRC Questions in 970819 RAI & Proprietary Applied Analysis Corp Calculation C-9000-814-5310-002,rev 0.Affidavit Certifying Basis for Withholding Info Is Also Attached.Proprietary Encl Withheld)
- ML20248C966 + (Provides Itemized Response to NRC Request for Addl Info Re Ipeee.Calculations Encl)
- ML20005E452 + (Provides Itemized Response to Recommendations Outlined in Generic Ltr 89-10)
- ML19310A511 + (Provides Items for Discussion During 790719 Meeting W/B&W Owners Group Subcommittee for TMI-2 Issues)
- ML19296B848 + (Provides Joint Committee on Atomic Energy W/Support for H.R. 9285 & S. 2151,discretionary ACRS Review Legislation)
- AECM-89-179, Provides Joint Info Re Arkansas Power & Light,Louisiana Power & Light & Sys Energy Resources,Inc Commitment to Achieve & Maintain Effective Communications W/Public,Public Officials & State Regulatory Bodies + (Provides Joint Info Re Arkansas Power & Light,Louisiana Power & Light & Sys Energy Resources,Inc Commitment to Achieve & Maintain Effective Communications W/Public,Public Officials & State Regulatory Bodies)
- AECM-89-0179, Provides Joint Info Re Arkansas Power & Light,Louisiana Power & Light & Sys Energy Resources,Inc Commitment to Achieve & Maintain Effective Communications W/Public,Public Officials & State Regulatory Bodies + (Provides Joint Info Re Arkansas Power & Light,Louisiana Power & Light & Sys Energy Resources,Inc Commitment to Achieve & Maintain Effective Communications W/Public,Public Officials & State Regulatory Bodies)
- 0CAN098906, Provides Joint Info Re Utils Commitment to Achieve & Maintain Effective Communications W/Public & State Regulatory Bodies.Encl Summary Outlines 1989 Notification & Consolidated Activities to Date + (Provides Joint Info Re Utils Commitment to Achieve & Maintain Effective Communications W/Public & State Regulatory Bodies.Encl Summary Outlines 1989 Notification & Consolidated Activities to Date)
- ML20216D183 + (Provides Joint Status Rept Re Proposed Schedule for Discovery & Other Matters Identified in Board 980422 Memorandum & Order on Rulings on Standing,Contentions,Rule Waiver Petition & Procedural Matters.W/Certificate of Svc)
- ML19262A871 + (Provides Justification & Descriptions of Differences from NRC short-term Requirements Presented in NUREG-0578)
- PY-CEI-NRR-1174, Provides Justification Re Events Leading to Declaration of Alert on 900403 Due to Loss of Emergency Svc Water When Manway Flange Gasket Leak Developed at Pump a Discharge Strainer,In Response to Ocre 900406 Petition + (Provides Justification Re Events Leading to Declaration of Alert on 900403 Due to Loss of Emergency Svc Water When Manway Flange Gasket Leak Developed at Pump a Discharge Strainer,In Response to Ocre 900406 Petition)
- ML18054B151 + (Provides Justification Re Operability Determination for Continued Operation W/Piping Support Sys Stress Calculation. All Identified Deficiencies Have Been Reanalyzed & Found Acceptable or Reworked to Meet FSAR Allowables)
- 3F0692-13, Provides Justification Re Request for Temporary Waiver of Compliance for TS 3.9.4 to Allow Administrative Controls to Be Utilized for Station Air Valves & Temporary Connection Air Valves + (Provides Justification Re Request for Temporary Waiver of Compliance for TS 3.9.4 to Allow Administrative Controls to Be Utilized for Station Air Valves & Temporary Connection Air Valves)
- L-84-301, Provides Justification That Loss of One LPSI Pump Worst Active Failure,In Response to Amend 63 to SER for Cycle 6 Restart + (Provides Justification That Loss of One LPSI Pump Worst Active Failure,In Response to Amend 63 to SER for Cycle 6 Restart)
- ML20072G146 + (Provides Justification That Present Automatic Depressurization Sys (ADS) Logic Provides Best Response Capabilities Considering Relative Probability of Need for Blowdown in Transient W/O LOCA)
- 2CAN038505, Provides Justification That Senior Reactor Operators Adequately Trained to Cope W/Emergency Situations.Scope of Training for Future Senior Reactor Operator Candidates Will Place More Emphasis on Emergency Plan Training + (Provides Justification That Senior Reactor Operators Adequately Trained to Cope W/Emergency Situations.Scope of Training for Future Senior Reactor Operator Candidates Will Place More Emphasis on Emergency Plan Training)
- ML13310B309 + (Provides Justification Why Limiting Use of 6-inch Containment Vent Sys Considered Unnecessary.Based on Info Provided,Vent Sys Demonstrated Capable of Performing Intended Isolation Function Under Transient Conditions)
- ML20094B140 + (Provides Justification for 830302 Request to Utilize ASME Code Case N-340 Re Alternate Rules for Exam of Weld Edge Preparation & Ultrasonic Exam of Completed Weld,Per NRC 830503 Request)
- ML20237G561 + (Provides Justification for 870802 & 03 Requests for Temporary Relief from Tech Spec Limiting Condition for Operation to Permit Facility to Continue to Operate)
- ML17347A673 + (Provides Justification for 880129 Request for 24 H Discretionary Enforcement from Requirements of Tech Spec 3.0.1.Procedures Acceptance Criteria & as-found Values Fall within Allowable Value)
- NSD-NRC-96-4669, Provides Justification for AP600 Separation Criteria to Reg Guide 1.75 + (Provides Justification for AP600 Separation Criteria to Reg Guide 1.75)
- B10572, Provides Justification for Addl Time Needed to Complete Valve Mod Resulting from Plant Shielding Review,Per NUREG-0737,Item II.B.2.Const for Mod Scheduled to Begin in Early Jan 1983.Completion Expected by Apr,Prior to Startup + (Provides Justification for Addl Time Needed to Complete Valve Mod Resulting from Plant Shielding Review,Per NUREG-0737,Item II.B.2.Const for Mod Scheduled to Begin in Early Jan 1983.Completion Expected by Apr,Prior to Startup)
- GO2-82-446, Provides Justification for Adequacy of Present Design Re Tornado Missile Protection for Diesel Generator Exhausts. New SRP Requirement Should Not Be Imposed.Removal of Item from SER Outstanding Issue List Requested.Rept Encl + (Provides Justification for Adequacy of Present Design Re Tornado Missile Protection for Diesel Generator Exhausts. New SRP Requirement Should Not Be Imposed.Removal of Item from SER Outstanding Issue List Requested.Rept Encl)
- ML20059E986 + (Provides Justification for Applicability of Reload Methodology Topical Repts to Facility & Requests NRC Approval for Application of Reload Analysis Methodologies)
- ML20132C364 + (Provides Justification for Assumption That Containment Sprays Available to Mitigate Postulated Hydrogen Generation Events.Two Redundant Containment Spray Sys Provided for Mark III Plants)
- ML20126E720 + (Provides Justification for Cancellation of B/A 402808, Conversion of Sigma Computer to Gss Ofc, Per 920616 Request.Project to Relocate Gss Ofc Removed from Integrated Schedule)
- ML20133G857 + (Provides Justification for Comeds Decision to Increase Commitment for Max Number of Days of Operation of Unit 1 Cycle 8.Increase Will Improve Detection Threshold for Top of Tube Sheet Circumferential Indications)
- ML20012E300 + (Provides Justification for Commission Refusal to Answer Questions of House Interior Subcommittee on General Oversight & Investigations Re Min Evacuation Time for Nuclear Power Plants)
- ML19256A791 + (Provides Justification for Containment Purging W/Flow Diagram of Primary Containment Atmospheric Control Sys)
- ML17320A417 + (Provides Justification for Continued Operation,In Response to 821230 SER on Environ Qualification of safety-related Electrical Equipment)
- B12866, Provides Justification for Continued Operation W/Reduction in ECCS Flowrate.Requests That Until Reanalysis Complete,Nrc Review Justification for Continued Operation Allowing Up to 80% Power.Power Presently Limited to 40% + (Provides Justification for Continued Operation W/Reduction in ECCS Flowrate.Requests That Until Reanalysis Complete,Nrc Review Justification for Continued Operation Allowing Up to 80% Power.Power Presently Limited to 40%)
- ML18064A739 + (Provides Justification for Continued Operation for Repaired Pressurizer Instrument Nozzles)
- ML20081D909 + (Provides Justification for Continued Operation of Plant During MSIV Surveillance Testing)
- ML17341B620 + (Provides Justification for Continued Operation & Qualification Info for Safety Evaluation Category II a Items 35,59 & 101,in Response to NRC Re Environ Qualification of safety-related Equipment.Withheld)
- ML20082V235 + (Provides Justification for Continued Operation W/Seven Thermal Sleeves Removed from Selected Locations in Rcs. License Condition 2.C.(4) Satisfied)
- ML17303A504 + (Provides Justification for Continued Power Operation of Unit 2 in Light of Recent LPSI Pump Seal Leakage & Subsequent Motor Failure Experienced in Unit 1)
- ML20003E932 + (Provides Justification for Continued Safe Operation of Facility in Response to W/List of Potential Deficiences Re Environ Qualification of safety-related Electrical Equipment)
- GO2-89-118, Provides Justification for Continued Use of Five Installed Items Identified in Insp Rept 50-397/89-21,in Response to Bh Faulkenberry .Final Results & Assessment of Addl Commercial Grade Items Will Be Provided by 890815 + (Provides Justification for Continued Use of Five Installed Items Identified in Insp Rept 50-397/89-21,in Response to Bh Faulkenberry .Final Results & Assessment of Addl Commercial Grade Items Will Be Provided by 890815)
- ML20069K606 + (Provides Justification for Decision to Replace Control Power Transformers in 480-volt Emergency Motor Control Ctrs Rather than Fusing Secondary Side of Transformers.Change Conforms w/10CFR50,App R.Change Scheduled for June 1983)
- ML20198E665 + (Provides Justification for Deferral of Drywell Temp Mod Until Second Refueling Outage.Mod Intended to Restore Drywell Cooling Redundancy.Analysis Encl)
- NRC-87-0253, Provides Justification for Deferral of Testing for Eight motor-operated Valves Until Spring 1988 Local Leak Rate Test Outage,Per 871003 Commitment Re IE Bulletin 85-003, Motor-Operated Valves Common Mode Failure During Plant.. + (Provides Justification for Deferral of Testing for Eight motor-operated Valves Until Spring 1988 Local Leak Rate Test Outage,Per 871003 Commitment Re IE Bulletin 85-003, Motor-Operated Valves Common Mode Failure During Plant..)
- ML20081J224 + (Provides Justification for Delay in Submittal of Review of Integrated Reliability Evaluation Program (Irep). Configuration Analyzed in Irep Contains Less Redundancy & Is Less Reliable than Actual Configuration)
- U-600662, Provides Justification for Deleting Berm Height Requirement to Divert Flood Water Runoff from Entering Excavation,Per FSAR Section 2.5.4.14.4 & Sser 2 (NUREG-0853).As-built Berm Satisfactory & Will Be Included in Next FSAR Rev + (Provides Justification for Deleting Berm Height Requirement to Divert Flood Water Runoff from Entering Excavation,Per FSAR Section 2.5.4.14.4 & Sser 2 (NUREG-0853).As-built Berm Satisfactory & Will Be Included in Next FSAR Rev)
- SNRC-1014, Provides Justification for Deletion of Station Blackout Test & Completion of Program for Training During Low Power Testing,Per TMI Item I.G.1,in Response to Generic Ltr 83-24 + (Provides Justification for Deletion of Station Blackout Test & Completion of Program for Training During Low Power Testing,Per TMI Item I.G.1,in Response to Generic Ltr 83-24)
- ML18153B982 + (Provides Justification for Discretionary Enforcement of Tech Spec 3.1.A.3.a Re Pressurizer Safety Valve Operability. Request Made Due to Recent Pressurizer Safety Valve Lift During RCS Overpressure Test While Returning to Svc)
- ML18054B565 + (Provides Justification for Excluding Piping Associated W/Porv/Block Valve Mods & Plans for Walkdowns of Piping. Piping Sys or Portions of Piping Sys Covered by Phase I of safety-related Piping Reverification Program Listed)