Search by property

Jump to navigation Jump to search

This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.

Search by property

A list of all pages that have property "Title" with value "Proposed Transcript Corrections for Nov & Dec 1982 Hearings". Since there have been only a few results, also nearby values are displayed.

â§Ľshowingresultsâ§˝

View (previous 50 | next 50) (20 | 50 | 100 | 250 | 500)


    

List of results

  • ML20037D724  + (Proposed Temporary Tech Spec Change to Page 3/4 6-13, Extending Limiting Conditions for Operation for 40 Days)
  • ML20070R825  + (Proposed Test Program to Demonstrate Operability in Spray Environ)
  • ML20052F136  + (Proposed Testimony of Lf Gerner on Contention 8 Re QA Program & Insp Procedures Re Installation of Proposed Racks & Removal of Existing Racks)
  • ML19317G548  + (Proposed Text for Tech Specs Re Calculated Activity Limits on Primary & Secondary Coolant for Facility)
  • ML20072S275  + (Proposed That Section 3.7.1 of TS Be Changed as Listed, Concerning Rev of TS to More Clearly Define Allowed Reactor Operation W/O Particulate or Gaseous Stack Effluent Monitor in Svc)
  • ML21277A119  + (Proposed Third Amended Protective Order)
  • PLA-5662, Proposed Third Ten-Year Inservice Inspection, Interval Inservice Inspection Program Plan  + (Proposed Third Ten-Year Inservice Inspection, Interval Inservice Inspection Program Plan)
  • RA06-063, Proposed Third Ten-Year Interval Inservice Testing Program  + (Proposed Third Ten-Year Interval Inservice Testing Program)
  • ML062970430  + (Proposed Third Ten-Year Interval Inservice Testing Relief Request)
  • PLA-5746, Proposed Third Ten-year Inservice Testing Program Plans for Susquehanna Units 1&2  + (Proposed Third Ten-year Inservice Testing Program Plans for Susquehanna Units 1&2)
  • ML19323J218  + (Proposed Time Schedule for Further proceedings:800601-0930 for Consultant Data Re Seismic & Geologic studies,801001 for NRC & Intervenor Statements & 801001 for PG&E Conclusions. W/Certificate of Svc & Historical Summary)
  • ML20215K177  + (Proposed Topical Rept on Operability Assessment of ASME Section III Piping & Supports After Unanticipated Loadings)
  • ML17174A609  + (Proposed Transcript Changes.Certificate of Svc Encl)
  • ML19331B296  + (Proposed Transcript Corrections)
  • ML19331B297  + (Proposed Transcript Corrections)
  • ML20054B818  + (Proposed Transcript Corrections)
  • ML20053D098  + (Proposed Transcript Corrections)
  • ML20062M214  + (Proposed Transcript Corrections)
  • ML20037A507  + (Proposed Transcript Corrections)
  • ML20033C486  + (Proposed Transcript Corrections)
  • ML19326D256  + (Proposed Transcript Corrections)
  • ML20008F770  + (Proposed Transcript Corrections for 810501 Prehearing Conference in Bethesda,Md)
  • ML20041E441  + (Proposed Transcript Corrections for 810624,820112,13,15,16 & 20 Hearings.Certificate of Svc Encl)
  • ML20093F759  + (Proposed Transcript Corrections for 840614,15,18 & 19 Evidentiary Hearings.Aslb Should Issue Order Directing That Evidentiary Record Be Amended to Incorporate Changes. Certificate of Svc Encl)
  • ML20101E824  + (Proposed Transcript Corrections for 840905-14 Evidentiary Hearings in Raleigh,Nc.Certificate of Svc Encl)
  • ML20071A032  + (Proposed Transcript Corrections for Nov & Dec 1982 Hearings)
  • ML20069H516  + (Proposed Transcript Corrections for Qa/Qc & Environ Qualification Portions of Record)
  • ML20003B720  + (Proposed Transcript Corrections from 810128 Prehearing Conference in Midland,Mi.Certificate of Svc Encl)
  • ML20107L639  + (Proposed Transcript Corrections of 841009-12 Hearing Sessions.Requests Issuance of ASLB Order Directing That Evidentiary Record Be Amended to Incorporate Changes. Certificate of Svc Encl)
  • ML19329C652  + (Proposed Transcript Corrections of City of Cleveland,Oh. Certificate of Svc Encl)
  • ML20087M990  + (Proposed Transcript Corrections of Evidentiary Hearings Held to Consider Air & Water Pollution Patrol Contention V-4 Re Carburetor Icing.Certificate of Svc Encl)
  • ML20209B278  + (Proposed Transcript Corrections of Numerous Employees.* Certificate of Svc Encl)
  • ML19340A315  + (Proposed Transcript Corrections to 701208-10,710105-07,25-29 & 0208-12 Hearings in Port Clinton,Oh)
  • ML19329C867  + (Proposed Transcript Corrections to 750918 Prehearing Conference Before Aslb.Certificate of Svc Encl)
  • ML20033D048  + (Proposed Transcript Corrections to 810825-0930 Hearings. Proposed Order & Certificate of Svc Encl)
  • ML20212Q817  + (Proposed Transcript Corrections to 860731 & 0825 Prehearing Conferences.Notice of Appearance,Notice of Withdrawal of Appearance & Certificate of Svc Encl)
  • ML19347D157  + (Proposed Transcript Corrections to Aj Cappuci 810122 Deposition.Certificate of Svc Encl)
  • ML20003D221  + (Proposed Transcript Corrections to D Hood 810219 Deposition in Bethesda,Md.Certificate of Svc Encl)
  • ML19297C670  + (Proposed Transcript Corrections to Ds Hood 801229 Deposition.Certificate of Svc Encl)
  • ML19352A124  + (Proposed Transcript Corrections to Re Shewmaker 810119 Deposition.Certificate of Svc Encl)
  • ML19345H416  + (Proposed Transcript Corrections to Record on Plant Design & Procedure,Separation of TMI Units 1 & 2 & Mgt Capability Issues Presented Through 810331)
  • ML20057G218  + (Proposed Transcript Corrections.* Submits Listed Transcript Corrections for 930921 & 22 Prehearing Conference. W/Certificate of Svc)
  • ML19329D302  + (Proposed Transcript Corrections.Certificate of Svc Encl)
  • ML19329D298  + (Proposed Transcript Corrections.Certificate of Svc Encl)
  • ML19329C716  + (Proposed Transcript Corrections.Certificate of Svc Encl)
  • ML19329D322  + (Proposed Transcript Corrections.Certificate of Svc Encl)
  • ML20039B079  + (Proposed Transcript Corrections.Certificate of Svc Encl)
  • ML20070M658  + (Proposed Transcript Corrections.Certificate of Svc Encl)
  • ML20032A674  + (Proposed Transcript Corrections.Certificate of Svc Encl)
  • ML20199K548  + (Proposed Ts,Adding Automatic Primary Containment Isolation on Ambient & Differential Temp High for Rwcs Pump,Pump Valve,Holdup Pipe & F/D Valve Rooms & Eliminating RHR Sys Steam Condensing Mode Isolation Actuation Instrumentation)
  • ML20092G658  + (Proposed Ts,Amending Appendix a Increasing Upper Limit of Maximum Boron Concentration in Bwst to 3,000 Ppm,Revising TS 3.1.2.9 & 3.5.4 & TS Bases 3/4.1.2 & 3/4.5.4)