Proposed Temporary Tech Spec Change to Page 3/4 6-13, Extending Limiting Conditions for Operation for 40 Days
ML20037D724
Person / Time
Site: Farley 
Issue date: 08/25/1981
From:
ALABAMA POWER CO.
To:
Shared Package
ML20037D723 List:
References
NUDOCS 8108310145
Download: ML20037D724 (1)


Text

J

.o CONTAINMENT SYSTEMS

(

\\ ' CONTAINMENT COOLING SYSTEM W

LIMITING CONDITIONS FOR OPERATION 3.6.2.3 Two independent groups of containment cooling fans shall be OPERASLE 1 with two fan systems to each group.

APPLICABILITY:

MODES 1, 2, and 3.

. ;;fn * - -

ACTION:

x-

~

7 2%

~

' With one group of the above required containment cooling fans inoperable

~

a.

g-and both containment spray systems OPERABLE, restore the inoperable group of coling fans to OPERABLE status within 7* days or be in at

',:.~'

least HOT STANDBY within the next 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> and in HOT SHUTDOWN within,

the following 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br />.

32 y

3/

a,9 With two groups of the above required containment cooling fans

~

b.

inoperable, and both containment spray systems OPERABLE, restore at least one group of cooling fans to OPERABLE status within 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> or be in at least HOT STANDBY within the next 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> and ih HOT SHUTDOWN within the following 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br />.

Restore both above required groups of cooling fans to OPERABLE status within 7 days of initial loss or be in at least HOT STANDBY within the next 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> and in rb.

HOT SHUTDOWN within the following 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br />..

xs With one group of the abue required containment cooling fans c.

inoperable and one containment spray system inoperable, restore the inoperable spray system to OPERABLE status within 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> or be in at least HOT STANDBY within the next 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> and in HOT SHUTDOWN within the following 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br />.

Restore the ino etable group of T '

containment cooling fans to GPERABLE status wi hin 7 days of initial 4

b loss or be in at least HOT STANDBY within.the next 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> and in HOT SHUTDOWN within the following 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br />.

f.

j,.

SURVEILLANCE REQbIREMENTS

.s

,7 4.6.2.3 Each group of containment cooling fans shall be deconstrated OPERABLE:

At least once per 31 days on a STAGGERED TEST BASIS by:

75 f

a.

1.

Starting each fan group (unless already operating) fron the control room, and verifying that each fan group operates for at

,'=

least 15 minutes.

.p.

-- a y

M 2.

Verifying a coolinC watt" flow rate of greater than or equal to u

,. 88 1600 gpm to each cooler group.

y 3 *$

b.

At least once per 18 months by verifying that each fan group starts p_, b automatically on a safety injection test signal.

l oo

  • One time m1y exception during re,, air of D Containment Cooling Fan - The i

-o j

84 7 day action statement may be extended to a period of 47 days. The provisions i

Sg of Specification 3.0.4are not applicable for this one-time change.