Search by property

Jump to navigation Jump to search

This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.

Search by property

A list of all pages that have property "Title" with value "Proposed Tech Spec Changes Re Organizational Corporate Structure". Since there have been only a few results, also nearby values are displayed.

â§Ľshowingresultsâ§˝

View (previous 50 | next 50) (20 | 50 | 100 | 250 | 500)


    

List of results

  • ML20093E260  + (Proposed Tech Spec Changes Re Instrumentation That Initiates Recirculation Pump Trip)
  • ML18047A300  + (Proposed Tech Spec Changes Re Instrumentation & Control Sys)
  • ML20079M241  + (Proposed Tech Spec Changes Re Isolation of Containment Atmosphere Monitoring Sys During Operation of post-accident Sampling Sys)
  • ML20024D531  + (Proposed Tech Spec Changes Re LOCA Analysis)
  • ML20094E554  + (Proposed Tech Spec Changes Re Limiting Conditions for Operation & Surveillance Requirements,To Provide Consistency W/Sts)
  • ML20099E184  + (Proposed Tech Spec Changes Re Limiting Conditions for Operation,Surveillance Requirements & Bases for Diesel Generator Operability,In Response to Generic Ltr 84-15)
  • ML20079G208  + (Proposed Tech Spec Changes Re Limiting Condition for Operation,Surveillance Requirements & Bases for Deinerting Containment During Reactor Operation,Performing Minor Maint/ Insp & Inerting Containment)
  • ML20138R919  + (Proposed Tech Spec Changes Re Limiting Conditions for Operation of Turbine Cycle Equipment Necessary to Assure Required Steam Relief Capacity During Normal Operation & Capability to Remove Decay Heat from Reactor Core)
  • ML19332A556  + (Proposed Tech Spec Changes Re Limiting Outage Duration for Inverters a or B Not to Exceed 48-h)
  • ML18051A623  + (Proposed Tech Spec Changes Re Limiting Safety Sys Settings for Reactor Protection Sys)
  • ML20071K114  + (Proposed Tech Spec Changes Re Local Leakage Tests for Valves IC-VI6,VI8 & NS-VII in Type C Testing Program & Newly Installed Hydrogen Recombiner Valves)
  • ML20207Q035  + (Proposed Tech Spec Changes Re Main Steam Line Radiation Monitors & Steam Tunnel Ventilation Radiation Monitors)
  • ML20197B884  + (Proposed Tech Spec Changes Re Max Extended Operating Domain)
  • ML20211K669  + (Proposed Tech Spec Changes Re Measurement Uncertainty for RCS Flow Rate & Allowable Power Levels for RCS Flow Rate Less than 100% of Thermal Design Flow)
  • ML20053C083  + (Proposed Tech Spec Changes Re Min Conditions for Criticality,Instrument Operating Conditions & Accident Monitoring Instrumentation)
  • ML20082D485  + (Proposed Tech Spec Changes Re Min RCS Flow Rate for Unit 2)
  • ML20099L021  + (Proposed Tech Spec Changes Re Mode 3 Reactor Coolant Loop Operating Conditions)
  • ML20155G888  + (Proposed Tech Spec Changes Re Moderator Temp Coefficient Required to Support Cycle 6 Operation & Surveillance Requirement to Allow Greater Operational Flexibility)
  • ML19323G330  + (Proposed Tech Spec Changes Re Mods to Several Action Statements to Allow Entry Into Modes 3 & 4 Before Completion of Actions Listed in Oreilly)
  • ML20078J340  + (Proposed Tech Spec Changes Re Movable Rod Control Sys Requirements)
  • ML20093N396  + (Proposed Tech Spec Changes Re NUREG-0737,Item II.K.3.18 Covering Implementation of Automatic Depressurization Sys Logic Mods)
  • ML18047A652  + (Proposed Tech Spec Changes Re NUREG-0737,Item II.F.1, Addl Accident Monitoring Instrumentation)
  • ML20134D523  + (Proposed Tech Spec Changes Re Operability of Fire Detection Instrumentation)
  • ML20207S693  + (Proposed Tech Spec Changes Re Operating pressure-temp Limits,Limiting Conditions & Surveillance Requirements)
  • ML20128B929  + (Proposed Tech Spec Changes Re Operation of Plant Between Refueling Shutdown W/O Potential of Requiring Surveillance to Be Performed That May Affect Plant Availability)
  • ML20197A683  + (Proposed Tech Spec Changes Re Organizational Corporate Structure)
  • ML20064J960  + (Proposed Tech Spec Changes Re Overtime Requirements)
  • ML17214A412  + (Proposed Tech Spec Changes Re Peaking Factors)
  • ML20054K849  + (Proposed Tech Spec Changes Re Periodic Testing of Auxiliary Feedwater Sys Automatic Actuation Logic)
  • ML20028F185  + (Proposed Tech Spec Changes Re Personnel Titles)
  • ML20212D946  + (Proposed Tech Spec Changes Re Plant Review Board Review of Procedures,Consisting of Rev 2 to License Change Application 130)
  • ML20039C031  + (Proposed Tech Spec Changes Re Power Distribution Limits)
  • ML20028D905  + (Proposed Tech Spec Changes Re Preservice Insp of Steam Generator Tubes)
  • ML19344F003  + (Proposed Tech Spec Changes Re Primary Containment Atmospheric Hydrogen Monitoring Instrumentation to Be Installed During Upcoming Refueling Outage.Sys Description & Justification Encl)
  • ML20023D241  + (Proposed Tech Spec Changes Re Process Piping Penetrating Primary Containment)
  • ML20028F067  + (Proposed Tech Spec Changes Re Pulse Mode Operation & Reactor Fuel Elements)
  • ML20214L463  + (Proposed Tech Spec Changes Re Quorum Required to Conduct Meeting of Unit 3 Nuclear Review Board to Make Quorum Consistent W/Units 1 & 2)
  • ML20087K414  + (Proposed Tech Spec Changes Re RCS Vent post-accident sampling,long-term Auxiliary Feedwater Sys Evaluation,Noble Gas Monitors,Iodine Particulate Sampling & Containment Water Level Monitor)
  • ML20052H284  + (Proposed Tech Spec Changes Re RTD Response Time)
  • ML17325A234  + (Proposed Tech Spec Changes Re Radiation Monitoring Instrumentation)
  • ML20206F327  + (Proposed Tech Spec Changes Re Radioactive Effluents)
  • ML20087M288  + (Proposed Tech Spec Changes Re Radioactive Gaseous Effluent Monitoring Instrumentation Surveillance Requirements)
  • ML18092A494  + (Proposed Tech Spec Changes Re Radioactivity Inventory Limit)
  • ML20072D334  + (Proposed Tech Spec Changes Re Reactor Bldg Purge Valves)
  • ML17261A788  + (Proposed Tech Spec Changes Re Reactor Trip Breakers)
  • ML20082N943  + (Proposed Tech Spec Changes Re Recirculation Flow Rate)
  • ML19284A876  + (Proposed Tech Spec Changes Re Reload 3 Licensing & Cycle 4 Operation.Safety Evaluation Encl)
  • ML20113H186  + (Proposed Tech Spec Changes Re Reload 6/Cycle 7)
  • ML20246N655  + (Proposed Tech Spec Changes Re Removal of cycle-specific Core Limits)
  • ML20042E632  + (Proposed Tech Spec Changes Re Removal of cycle-specific Parameter Limits)
  • ML20006A408  + (Proposed Tech Spec Changes Re Removal of cycle-specific Parameter Limits from Tech Specs & Relocating Limits to Core Operating Limits Rept)