Proposed Tech Spec Changes Re Operability of Fire Detection Instrumentation
ML20134D523
Person / Time
Site: Rancho Seco
Issue date: 08/01/1985
From:
SACRAMENTO MUNICIPAL UTILITY DISTRICT
To:
Shared Package
ML20134D521 List:
References
TAC-59510, NUDOCS 8508190261
Download: ML20134D523 (19)


Text

. . _ . _ ._- . . . - _ . _ _ _ _ _ . ___ _ . - . _ .._

RANCHO SECO' UNIT 1 i~

TECHNICAL SPECIFICATIONS Limiting Conditions for Operation 3.14 FIRE SUPPRESSION L 3.14.1 INSTRUMENTATION i

SPECIFICATION 13.14.1.1 Fire detection zones shown in Table 3.14-1 shall have all detection instrumentation OPERABLE.

3.14.1.2 With any instrumentation NOT OPERABLE in the zones shown in ,

Table 3.14-1:

a. Within 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> establish a fire watch patrol to inspect zone (s) with the inoperable instrument (s) at least once i per hour, unless the instrument (s) is located inside the containment, then inspect the containment at least once i per 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> or monitor the containment air temperature at least once per. hour at the points below:

I TE-52009 Reactor Building Cooling Units A & B Air In -

'- TE-52010 Reactor Building Cooling Units C & D Air In TE-53406 Top of Reactor Shielding i TE-53405 Top of Reactor Shielding TE-53202 Top of Reactor Building

b. Restore the inoperable instrument (s) to OPERABLE status i

within fourteen (14) days; or

c. In lieu of any other report required by Specification i- 6.9, prepare and submit a special report to the Commis-
' sion pursuant to Specification 6.9.5.E within the next 30 days outlining the action taken, the cause of the inoperability and the plans and schedule for restoring

!- the instrument (s) to OPERABLE status.

~ '

3.14.2 Water System

. Specification 3.14.2.1 The fire suppression water system shall be OPERABLE with: ,

l a. Two high-pressure pumps with a capacity of 2000 gal / min j- with their discharge aligned to the fire suppression

. header.

t

3-53 j-.

3 1

8508190261 850B01

! PDR ADOCK 05000312 Proposed Amendment No. 137 P PDR i

- 2 - . , - -, n , - - , - - , . - w, -,, -,-.v,--- =-...--..___,*<,-,w- , , , ,,--r,--7. v..- ..-.,,.wwy,,..,%,,r y. .p,-. . , . - , , , ,.,.,,,.,<----.w,,,-,,..3w-r

a RANCHO SECO UNIT 1 TECHNICAL SPECIFICATIONS Limiting Conditions for Operation 3.14'.2.1 (Continued)

b. 1Nns separate water supplies containing a minimum of

-2,000,000 gallons each.

-4 c. An OPERABLE flow path capable of taking suction from the circulating water system and the Site Reservoir or the Folsom South Canal and transferring the water through distribution piping with OPERABLE sectionalizing control or isolation valves.to the yard hydrant curb valves, the last valve ahead of the water flow alarm device on each sprinkler or hose standpipe, and the last valve ahead of the deluge valve on each deluge or spray system required to be OPERABLE per Specifications 3.14.3.1 and 3.14.5.

3.14.2.2-- With one pump and/or one water supply inoperable, restore the inoperable equipment to OPERABLE status within 7 days or, in lieu of any other report required by Specification 6.9.5.E, prepare and submit a Special Report to the Commis-sion pursuant to Specification 6.9 within the next 30 days outlining the plans and procedures to be used to restore the -

inoperable equipment to OPERABLE status or to provide an alternate backup pump of supply.

3.14.2.3 With no fire suppression water system OPERABLE:

a. Establish a backup fire suppression water system equiv-alent to Specification 3.14.2.1 within 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />.
b. In lieu of any other report required by Specification 6.9, submit a Special Report in accordance with Specifi-cation 6.9.5.E:
1) By telephone within 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />,
2) Confirmed by telegraph, mailgram of facsimile trans-mission no later that the first working day fol-lowing the event, and
c. In writing within 14 days following the event, outlining the action taken, the cause of the inoperability and the plans and schedule for restoring the system to OPERABLE status. .

3-54 Proposed Amendment No. 137

l RANCHO SECO UNIT 1 TECHNICAL SPECIFICATIONS Limiting Conditions for Operation TABLE 3.14-1 FIRE DETECTION INSTRUMENTS FOR SAFETY SYSTEMS Datsction Number of detectors in zones-Ztne . Instrument Location All Required to be OPERABLE Heat Flame Smoke 4 Control and Computer Room Cabinets 0 0 48 5 South East Uncontaminated Area - 0 0 3 Turbine Deck, Auxiliary Building 7 Contaminated Area - Turbine Deck, 0 0 3 Auxiliary Building 11 West Battery Room - Mezzanine Level, 0 0 8 Auxiliary Building 12 West Battery Charger Room - 0 0 4 Mezzanine Level, Auxiliary Building 13 West 480V Switchgear Room - 0 0 4 Mezzanine Level, Auxiliary Building 14 West Cable Shaft - Auxiliary Building 0 0 6 15 East Cable Shaft - Auxiliary Building 0 0 6 16 East 480V Switchgear Room - 0 0 4 .

Mezzanine Level, Auxiliary Building 17 East Battery Charger Room - 0 0 4 Mezzanine Level, Auxiliary Building 19 Communication Room - Mezzanine 0 0 8 Level, Auxiliary Building 20 Electrical Penetration Room - 0 0 21 Mezzanine Level, Auxiliary Building 21 Reactor Building, 20 feet to 40 feet 0 0 3 Level ,

3-55 Proposed Ntendment No. 137

RANCHO SECO UNIT 1 TECHNICAL SPECIFICATIONS Limiting Conditions for Operation TABLE 3.14-1 ,

FIRE DETECTION INSTRUMENTS FOR SAFETY SYSTEMS (Continued)

Dettction Number of detectors in zones-Erne- Instrument Location All Required to be OPERABLE

, Heat Flame Smoke 31 Auxiliary Lube Oil Area - 6 0 0 Grade Level, Turbine Building

, 32 Main Lube Oil - 8 0 0 Grade Level, Turbine Building 33 . Hydrogen Snaled Oil Unit - 4 0 0 9

Grade Level, Turbine Building i

35 Main Feed Pump Area 16 0 0 i

36 West Nuclear Battery Room - 0 0 8

. Grade Level, Auxiliary Building -

, 37 West 4160V Switchgear Room - 0 0 4 i Grade Level, Auxiliary Building * -

i i .

38 East 4160V Switchgear Room - 0 0 4 Grade Level, Auxiliary Building 39 East Nuclear Battery Room - 0 0 8 Grade Level, Auxiliary Building

} 40 North Diesel Generator Room - 4 0 0

Grade Level, Auxiliary Building 41- South Diesel Generator Room - 4 0 0 Grade Level, Auxiliary Building i.

42 Electrical Penetration Room - 0 0 19 I Grade Level, Auxiliary Building 43 Chemical Mix Area - 0 0 7 j Grade Level, Auxiliary Building 3-55a I Proposed Amendment No. 137 i

i I

. _._.._ _,_,.._,_,_.. _.__.~. .- .-..., _._,. -.._,..___.._.,,.,_.___._,..-m,,__.__,,__. , , , _ . . . - . , _ . . . _ ~ ~ , . -

r-

)

RANCHO SECO UNIT 1 TECHNICAL SPECIFICATIONS Limiting Conditions for Operation TABLE 3.14-1 FIRE DETECTION INSTRUMENTS FOR SAFETY SYSTEMS (Continued) ,

Dettction Number of detectors in zone-Ztne Instrument Location All required to be OPERABLE Heat Flame Smoke 44 Reactor Building, O feet to 20 feet 0 4 0 Level 45 Electrical Penetration Area - 0 0 4 Reactor Building 46 Hut Area - Basement Level, 0 0 25 Auxiliary Building 47 Pipe Penetration Area - Basement 0 0 18 Level, Auxiliary Building 48 Decay Heat Room - Auxiliary Building 0 0 3 53-54 Turbine Area 8 0 0 75 NSEB Switchgear Room B 4 0 4 76 NSEB Switchgear Room A 4 0 4 77 NSEG B Electrical Equipment 2 0 3 78 NSEB A Electrical Equipment 2 0 3 79 NSEB Battery GB 1 0 1 80 NSEB Battery GA 1 0 1 81 NSEB B Cable Shaft 0 0 6 82 NSEB A Cable Shaft 0 0 6 83 NSEB Corridor, 1 foot Level 0 0 2 84 NSEB Corridor, 21 feet Level 0 0 *4 85 NSEB Corridor, 40 feet Level 0 0 6 3-55b Proposed Amendment No. 137

c- .-

RANCHO SECO UNIT 1 TECHNICAL SPECIFICATIONS Limiting Conditions for Operation TABLE 3.14-1 FIRE DETECTION INSTRUMENTS FOR SAFETY SYSTEMS (Continued)

Det;ction Number of detectors in zone-Zone- Instrument Location All required to be OPERABLE Heat Flame Smoke 87 NSEB Computer Room B 0 0 5 89 NSEB Computer Room A 0 0 5 104 Technical Support Center 0 0 15 109 Chemical Lab Area - 0 0 19 Auxiliary Building 110 Auxiliary Feedwater Pump Area 0 5 0 l

l '

i 3-55c Proposed Amendment No. 137

RANCHO SECO UNIT 1 TECHNICAL SPECIFICATIONS Limiting Conditions for Operation 3.14.3 Spray and Sprinkler Systems Specification 3.14.3.1 The spray and/or sprinkler systems for each suppression zone shown in Table 3.14-2 shall be OPERABLE.

3.14.3.2 With one or more of the required spray and/or sprinkler systems inoperable, within one hour establish a continuous fire watch with backup fire suppression equipment for those areas protected by inoperable sprinkler and/or spray sys-tem (s) in which redundant systems or components required to safely shut down and cool down the plant could be damaged; for other areas, protected by inc.perable sprinkler and/or spray system (s) establish an hourly fire watch patrol. Re-store the system to OPERABLE status within 14 days or, in lieu of any other report required by Specification 6.9, prepare and submit a Special Report to the Commission pur-suant to specification 6.9.5.E. within the next 30 days outlining the action taken, the cause of the inoperability and the plans and schedule for restoring the system to OPERABLE' status.

3.14.4 CO2 System Specification 3.14.4.1 The CO2 systems for each suppression zone shown in Table 3.14-3 shall be OPERABLE with a minimum capacity of 66% and a minimum pressure of 275 psig in the storage tank.

3.14.4.2 With one or more of the required CO2 systems inoperable, within one hour establish a continuous fire watch with backup fire suppression equipment for those areas protected by inoperable CO2 system (s) in which redundant systems or components required to safely shut down and cool the plant could be damaged; for other areas protected by inoperable CO2 system (s) establish an hourly fire watch patrol. Restore the system to OPERABLE status within 14 days or, in lieu of any other report required by Specification 6.9, prepare and submit a Special Report to the Commission pursuant to Speci-fication 6.9.5.E within the next 30 days outlining the action taken, the cause of the inoperability and the pl,ans and schedule for restoring the system to OPERABLE status.

3-56,  ;

Proposed Amendment No. 137

_ . _ . _ . _ _ _ _ _ _ _ ~ _ - . _ . - _ . _ _ __ _ -_ _ _

RANCHO SECO UNIT 1 TECHNICAL SPECIFICATIONS Limiting Conditions for Operation 3.14.5 Fire Hose Stations Specification

- 3.14.5.1 The fire hose stations listed in Table 3.14-4 shall be

. OPERABLE.

3.14.5.2 With one or more of the fire hose stations above inoperable, route an additional equivalent size fire hose to the unpro-tected arsa(s) from an OPERABLE hose station within 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> if the inoperable fire hose is the primary means of fire suppression; otherwise, route the additional hose within 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />. Restore the fire hose station to OPERABLE status within 14 days or, in lieu of any other report required by specification 6.9, prepare and submit a Special Report to the Commission pursuant to specification 6.9.5.E within the next 30 days outlining the action taken, the cause of the inoperability, and plans and schedule for restoring the station to OPERABLE status.

e.

l 3-56a Proposed Amendment No. 137

RANCHO SECO UNIT 1 TECHNICAL SPECIFICATIONS Limiting Condition for Operations Table 3.14-3 WATER SUPPRESSION ZONES i ZONES AREAS I

c. 3 Control Room - Turbine Deck, Auxiliary Building
b. 5 South East Uncontaminated Area - Turbine Deck, Auxiliary Building
c. 6 North West Uncontaminated Area - Turbine Deck, Auxiliary Building
d. 7 Contaminated Area - Turbine Deck, Auxiliary Building

,O. 10 Mezzanine Level - Turbine Building -

f. 18 Air Condition Equipment Room - Mezzanine Level, Auxiliary Building
g. 19 Communication Room - Mezzanine Level, Auxiliary Building
h. 20 Electrical Penetration Room - Mezzanine Level, Auxiliary Building
1. 31 Auxiliary Lube Oil Area - Grade Level, Turbine Building
j. 32 Main Lube Oil - Grade Level, Turbine Building
k. 33 Hydrogen Seal Oil Unit
1. 34 Heater Water Pump Area - Grade Level, Turbine Building
m. 35 Main Feed Pump Area ,
n. 40 North Diesel Generator Room - Grade Level, Auxiliary Building 3-56b Proposed Amendment No. 137

f ,

RANCHO SECO UNIT 1 TECHNICAL SPECIFICATIONS Limiting Conditions for Operation Table 3.14-2 WATER SUPPRESSION ZONES (Continued)

ZONES AREAS

o. 41 South Diesel Generator Room - Grade Level, Auxiliary Building
p. 42 Electrical Penetration Room, Grade Level, Auxiliary Building
q. 43 Chemical Mix Area - Grade Level, Auxiliary Building

.r. 46 Hut Area - Basement Level, Auxiliary Building

  • O. 47 Pipe Penetration Area - Basement Level,

. Auxiliary Building

t. 81 NSEB B Cable Shaft
u. 82 NSEB A Cable Shaft
v. 83 NSEB Corridor, 1 foot Level
w. 84 NSEB Corridor, 21 feet Level
x. 85 NSEB Corridor, 40 feet Level
y. 87 NSEB Computer Room B
z. 89 NSEB Computer Room A i

3-56c l .

l

! Proposed Amendment No. 137 l

I 1

l RANCHO SECO' UNIT 1 TECHNICAL SPECIFICATIONS Limiting Conditions for Operation Table 3.14-3 CARBON DIOXIDE SUPPRESSION ZONES ZONES AREAS

c. 11 West Battery Room - Mezzanine Level, Auxiliary Building
b. 12 West Battery Charger Room - Mezzanine Level, Auxiliary Building
c. 13 West 480V Switchgear Room - Mezzanine Level, Auxiliary Building
d. 14 West cable Shaft - Auxiliary Building -
o. 15 East Cable Shaft - Auxiliary Building
f. 16 East 480V Switchgear Room - Mezzanine Level, Auxiliary Building
g. 17 East Battery Charger Room - Mezzanine Level, Auxiliary Building
h. 19 Communication Room - Mezzanine Level, Auxiliary Building
i. 36 West Nuclear Battery Room - Grade Level, Auxiliary Building
j. 37 West 4160V Switchgear Room - Grade Level, Auxiliary Building
k. 38 East 4160V Switchgear Room - Grade Level, Auxiliary Building
1. 39 East Nuclear Battery Room - Grade Level, Auxiliary Building
m. 40 North Diesel Generator Room - Grade Level, Auxiliary Building 3-56d Proposed Amendment No. 137

RANCHO SECO UNIT 1 TECHNICAL SPECIFICATIONS Limiting Conditions for Operation Table 3.14-3 CARBON DIOXIDE SUPPRESSION ZONES, Continued

~

ZONES' AREAS

n. 41 South Diesel Generator Room - Grade Level, Auxiliary Building
o. 53-54 Turbine Area p.- 75 NSEB Switchgear Room B
q. 76 11SEB Switchgear Room A
r. 77 NSEB B Electrical Equipment

,. c. 78 NSEB A Electrical Equipment *

-t. 79 NSEB Battery GB

u. 80 NSEB Battery GA i

i i

i 3-56e

? ' Proposed Amendment No. 137

RANCHO SECO UNIT 1 TECHNICAL SPECIFICATIONS Li:aiting Conditions for Operation Table 3.14-4 FIRE HOSE STATIONS ID No. . Location I Auxiliary Building Hose Stations FPHS-A-001 +40 ft. Level Corridor by Counting Room FPHS-A-002 +40 ft. Level Corridor Across from Control Room FPHS-A-003 +40 ft. Level Corridor by Chemistry Lab FPHS-A-004 +40 ft. Level Corridor by Cleaning Room FPHS-A-005 +20 ft. Level in Ventilation Equipment Room

, FPHS-A-006 +20 ft. Level Corridor by communications Room .

FPHS-A-007 Grade Level by CRD Cooling Water Heat Exchanger FPHS-A-008 +20 ft. Level Corridor by Ventilation Equipment Room FPHS-A-009 +20 ft. Level Corridor by A/C Equipment Room FPHS-A-010 Grade L3 vel Corridor by Diesel Generator Room FPHS-A-011 Grade Level Corridor Across from East 4160 Switchgear Rm FPHS-A-012 Grade Level Corridor Across from East Battery Room FPHS-A-013 Grade Level Corridor by East End Stairwell FPHS-A-014 Grade Level by Waste solidification Area FPHS-A-015 -20 ft. Level HPI Pump A Room FPHS-A-016 -20 ft. Level Containment Penetration Valve Area FPHS-A-017 -20 ft. Level Corridor by Waste Gas Decay Tank Room ,

3-57 Proposed Amendment No. 137

~

RANCHO SECO UNIT 1 TECHNICAL SPECIFICATIONS Limiting Conditions for Operation Table 3.14-4 FIRE HOSE STATICNS (Continued)

ID No.. Location FPHS-A-018 -20 ft. Level Corridor North of BA Evaporator Room FPHS-A-019 -47 ft. Level Stairway by East and West DHR Pump Rooms FPHS-A-020 -20 ft. Level Corridor East of HPI Pump B Room II NSEB Hose Stations FPHS-N-001 NSEB First Floor Corridor North FPHS-N-002 NSEB First Floor Corridor South

,FPHS-N-003 NSEB Second Floor Corridor North -

FPHS-N-004 NSEB Second Floor Corridor South FPHS-N-005 NSEB Third Floor Corridor North FPHS-N-006 NSEB Third Floor Corridor South III Turbine Building Hose Stations FPHS-T-001 1 Station North Wall Elevation O' FPHS-T-002 1 Station South Wall Elevation O' FPHS-T-003) 2 Stations East Wall Elevation O' FPHS-T-004)

FPHS-T-005) 2 Stations West Wall Elevation O' FPHS-T-006)

FFHS-T-007 1 Station North Wall Elevation 20' FPHS-T-008 1 Station South Wall Elevation 20'- ,

3-57a Proposed knendment No. 137

RANCHO SECO UNIT 1 TECHNICAL SPECIFICATIONS Limiting Conditions for Operation Table 3.14-4 FIRE HOSE STATIONS ID No. Location FPHS-T-009) 2 Stations Ea.st Wall Elevation 20' FPHS-T-010}

FPHS-T-011} 2 Stations West Wall Elevation 20' FPHS-T-012}

FPHS-T-013 1 Station North Wall Elevation 40' FPHS-T-014 1 Station South Wall Elevation 40' FPHS-T-015} 2 Stations East Wall Elevation 40' FPHS-T-016}

FPHS-T-017} 2 Stations West Wall Elevation 40' -

FPHS-T-018}

IV Hydrants FHV-002 Hydrant No. 2 FHV-003 Hydrant No. 3 FHV-024 Hydrant No. 24 -

FHV-026 Hydrant No. 26 1

3-57b Proposed Amendment'No. 137

~

f

, ],s . .- -

RANCHO SECO UNIT 1 i

' TECHNICAL SPECIFICATIONS Limiting Conditions for Operation 3.14.6 Fire Rated Assemblies Specification ,

3.14.6.1 All fire rated assemblies (walls, floor / ceilings, cable l tray enclosures and other fire barriers) separating safety-related fire areas or separating portions of redundant sys-tems important to safe shutdown within a fire area and all sealing devices in fire rated assembly (fire doors, fire windows, fire dampers, cable, piping, and ventilation, duct penetration seals) shall be OPERABLE.

3.14.6.2 With one or more of the above required fire rated assemblies and/or sealing devices inoperable, within one hour'either establish a continuous fire watch on at least one side of the affected assembly, or verify the OPERABILITY of fire detectors on at least one side of the inoperable assembly and establish an hourly fire watch patrol. Restore the inoperable fire rated assembly and sealing device to OPERABLE within 7 days or, in lieu of any other reports re-quired by Specification 6.9, prepare and submit a Special Report to the Commission pursuant to Specification 6.9.5.E .

within the next 30 days outlining the action taken, the cause of the inoperable fire rated assembly and/or sealing device and plans and schedule for restoring the fire assembly and sealing device to OPERABLE status.

Bases OPERABILITY of all fire detection instrumentation ensures that adequate

' warning capability is available for the prompt detection of fires. This espability is required in order to detect and locate fires in their early cttgns. Prompt detection of fires will reduce the potential'for damage

to cafety-related equipment or redundant systems important to safe shut-down and is an integral element in the overall facility fire protection program. ,

7 In the event that a portion of the fire detection instrumentation is i inoparable, the establishment of frequent fire patrols in the affected crGes is required to provide detection capability until the inoperable l inOtrumentation is returned to service.

l

! 3-58 i

l

' Proposed Amendment No. 137

. ,' ~

RANCHO SECO UNIT 1 TECHNICAL SPECIFICATIONS Limited Conditions for Operation B' son (Continued)

Tho OPERABILITY of the fire suppression systems ensures that adequate firo suppression capability is available to confine and extinguish fires occurring in any portion of the facility where safety-related equipment cr redundant systems important to safe shutdown is located. The fire cuppression system consists of the water system, spray and/or sprinklers, CO2, and fire hose stations. The collective capability of the fire cuppression systems is adequate to minimize potential damage to safety rointed equipment or redundant systems important to safe shutdown and is a major element in the facility fire protection program.

In the event that portions of the fire suppression systems are inoper-eblo, alternate backup fire fighting equipment is required to be made cynilable in the affected areas until the affected equipment can be rOctored to service.

In the event that the fire suppression water system becomes inoperable, imm diate corrective measures must be taken since this system provides tha major fire suppression capability of the plant. The requirement for n tw;nty-four (24) hour report to the Commission provides for prompt .

cvaluation of the acceptability of the corrective measures to provide ad:quate fire suppression capability for the continued protection of the nucicar plant.

ThJ operable integrity of the fire rated assemblies ensures that fires will be confined or adequately retarded from spreading to adjacent portions of the facility. This design feature minimizes the possibility of a single fire rapidly involving several areas of the facility prior to dst:ction and extinguishment. The fire rated assemblies are a passive alcm:nt in the facility fire protection program and are subject to pariodic inspections. During periods of time when the fire rated ecs mblies are inoperable, an hourly or continuous fire watch, as cppropriate, is required to be maintained in the vicinity of the affected ccccmbly until the assembly is restored to operable status.

3-59 Proposed Amendment'No. 137

s j

'r RANCHO SECO UNIT 1 TECHNICAL SPECIFICATIONS Administrative Controls Special Reports 6.9.5 Special reports shall be submitted to the Director of the Regulatory Operations Regional. Office within the time period specified for each report. These reports shall be submitted covering the activities identified below pursuant to the requirements of the applicable reference specification:

A. A one-time only, " Narrative Summary of Operating Ex-perience" will be submitted to cover the transition period (calendar year 1977).

B. A Reactor Building structural integrity report shall be submitted within ninety (90) days of completion of each of the following tests covered by Technical Specifica-tion 4.4.2 (the integrated leak rate test is covered in Technical Specification 4.4.1.1).

1. Annual Inspection
2. Tendon Stress Surveillance
3. End Anchorage Concrete Surveillance
4. Liner Plate Surveillance C. In-Service Inspection Program D. Reserved for Proposed Amendment No. 43 E. Status of Inoperable Fire Protection Equipment 30 days.(3.14.1.2, 3.14.2.2, 3.14.3.2, 3.14.2.3 3.14.5.2, 3.14.4.2, 3.14.6.2)

F. Reserved for Proposed Amendment 125 G. Radioactive Liquid Effluent Dose 30 days (3.17.2) l H. Noble Gas Limits 30 days (3.18.2)

I. Radio-Iodine and Particulates 30 days (3.18.3),

6-12f Proposed Amendment No. 137

RANCHO SECO UNIT 1 TECHNICAL SPECIFICATIONS Administrative Controls Special Reports (Continued)

J. Gaseous Radwaste Treatment 30 days (3.19)

K. Radiological Monitoring Program 30 days (3.22)

L. Monitoring Point Substitution 30 days (3.22)

M. Land Use Census 30 days (3.23)

N. Fuel Cycle Dose 60 days (4.25)

O. Liquid Holdup Tanks 30 days (3.17.3) l 6-12g ,

Proposed Amendment No. 137